HomeMy WebLinkAboutResolution 2002-054 RESOLUTION NO. 2002-054
A RESOLUTION OF THE ATASCADERO CITY COUNCIL APPROVING
VESTING TENTATIVE TRACT MAP 2002-0014 THEREBY
ALLOWING A SIXTEEN LOT CLUSTER RESIDENTIAL
SUBDIVISION OF APN 049-023-0309 049-291-0169 049-291-005
CONSISTENT WITH THE PD-16 MASTER PLAN OF
DEVELOPMENT CUP 2002-0067
(2000 Ferrocarril / Gearhart)
WHEREAS, an application has been received from Kelly Gearhart, 6205 Alcantara
Avenue, Atascadero, CA 93422, (Applicant & Owner), to consider a project consisting of a
Planned Development overlay zone change to PD-16 with the adoption of a Master Plan of
Development, and an sixteen-lot cluster residential tract map, on a 31+/- acre lot located at 2000
Ferrocarril Road(APN 049-023-030, 049-291-016, 049-291-005); and,
WHEREAS, the site's vested General Plan Designation is PUB (Public) and SSF (Single
Family Suburban); and,
WHEREAS, the site's vested zoning district is P (Public) and RS (Residential
Suburban); and,
WHEREAS, the Planning Commission has recommended that a site be rezoned to a PD-
16 overlay district which requires the adoption of a Master Plan of Development; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Enviromnental Quality Act(CEQA)have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Tract Map application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a Public Hearing
held on November 5, 2002, studied and considered Tentative Tract Map 2002-0014, after first
studying and considering the Draft Mitigated Negative Declaration prepared for the project; and,
WHEREAS, the Atascadero City Council, at a Public Hearing held on December 10,
2002, studied and considered Tentative Tract Map 2002-0014, after first studying and
considering the Draft Mitigated Negative Declaration prepared for the project; and,
NOW,THEREFORE, the City Council takes the following actions:
Section 1. Findings of Approval for Vesting Tentative Tract May, the Atascadero
City Council finds as follows:
City of Atascadero
Resolution No.2002-054
Page 2
1. The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
2. The design and improvement of the proposed subdivision is consistent with the
General Plan and applicable zoning requirements.
3. The proposed subdivision, as conditioned, is consistent with the Planned
Development Overlay District 16-2 Master Plan of Development(CUP 2002-0067).
4. The site is physically suitable for the type of development proposed.
5. The site is physically suitable for the density of development proposed.
6. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or
their habitat.
7. The design of the subdivision will not conflict with easements acquired by the public
at large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
Section 2. Approval. The Atascadero City Council resolves to approve Vesting
Tentative Tract Map 2002-0014 subject to the following:
1. Exhibit A: Vesting Tentative Tract Map 2002-0014
2. Exhibit B: Improvement Plans
3. Exhibit C: Arborist Report
4. Exhibit D: Conditions of Approval
City of Ataseadero
Resolution No.2002-054
Page 3
On motion by Council Member Scalise and seconded by Council Member O'Malley, the
foregoing Resolution is hereby adopted following roll call vote:
AYES: Council Members O'Malley, Scalise and Mayor Clay
NOES: Council Members Luna and Pacas
ABSTAIN: None
ABSENT: None
ADOPTED: December 10, 2002
B L
J y Cl , Sr., Ma
�/
Attest:
Marcia McClure Torgerson, City Cler
Approved as to form:
J
Roy 7
anley, City Attey
r , • r
• .. .��,,��,�; , >Ir. :. . IIS -9�0��6��0��E�0���0�
•1• � */r `��.�i'N�/i�/ AIM ,I � _ ���������������G'���
N WAN
air 3�+,.fin �_ �, ,•
N fi r• ( r, �GGGOGGGGGOQfl��GGGG
;.����r,.
•Ir� ��Il�- - kin " �'M�'"��+� .
`���;:�' -�°t��♦�,+'��`:`+ii���� ill
tr ;
h �
SO- �((
City of Atascadero
Resolution No.2002-054
Page 5
Exhibit A:Tentative Tract Map Sheet 2
TTM 2001-0014
fix-
Ali!�
I �
I, I g
j
' I
i i a
1 i
1 I
I I
R ,
� N �
� I
x � I
F
m
ID
I
j �
1
R
I IL
,
Ii
MqI mum I
i
1
I I
i B I
I 1 3 3 H 3 3 s
City of Ataseadero
Resolution No.2002-054
Page 6
Exhibit B: Improvement Plans:Offsite Access Easement
TTM 2001-0014
Pedestrian
Trail and >
access
\\ m easement D M
CO
\ \ rnn
f
CO
\ 1 i \
1 \
f
gcss
t e RolliE!
; g
City of Atascadero
Resolution No.2002-054
Page 7
Exhibit B: Improvement Plans:Street Improvement Plans
TTM 2001-0014
i i„i•i 111 i_ i 1 1 1 ! 1„i 1 1 : i 1 11-1` --
$ ---- -
$
Y Y 1 Y i i Y i i ! 1 I 1 ! ! 1 1 1 � ^�. `' + �jo�•
$ ,
t t +if t 1
,
� Y
L J
r _
,a
ID N $ 1p
A a $L f 1-�,-}- Lj$ 0000000
$IIi1Yl
� ill
TT
- ..- . L
City of Atascadero
Resolution No.2002-054
Page 8
Exhibit B: Improvement Plans:Street Improvement Plans
TTM 2001-0014
t t t t t t l t t l t l l l i t t t t .
It {� ` {
fr �4 ..;� j
+ f 1 r �'
i F T ..ill
IT
_
a a( rt
lz
t _ ✓
'� 1 C
r l +
p ( r 11111
i F F -I { `_f_� !},1 1"""III",$. ; ♦ o !"
T ,
t Hr
r "4 C
Jt
/ p
t }.
City of Atascadero
Resolution No.2002-054
Page 9
Exhibit B: Improvement Plans:Street Improvement Plans
TTM 2001-0014
YAMH! 1
oil
frill
i I _J
i
Vi
/ I
m m ,
i o
i
y
� t
City of Atascadero
Resolution No.2002-054
Page 10
Exhibit B: Improvement Plans:Street Improvement Plans
TTM 2001-0014
�a_ i IjM I ,IIlI\
- - T i 'G 1 ! !I' �IIIII
1, Iln
t r_{
I I Ilii) II i L I
I �I, 'Ili
li I '
�� I� I!lIl lllj I
i it 141 I I v
i# II I fs� II I !Illjj l ! r
[IT
L c ----
i �i IIt
I
- ciI �
P��t
;I IIII' tl
l.i 1 I I ll� t III.
---
I
r-Fi�r
T
N
I IIp }III\\ \ _,-
�I�lil�� t t
1!1
VIII!II 1I 1!1;I1 i1111111I1!IIIII
� 1
� � 1
City of Atascadero
Resolution No.2002-054
Page 11
Exhibit B: Improvement Pians:Street Improvement Plans
TTM 2001-0014
/ I I
kill
I
" I I 111\\\\\\
kA
s ;
i I
1
� I .
I �
r
a
I
1
i
s+tl{II 1
it��i��1•I��� �" � s
��Elfli
M.
i N s la
R
a
City of Atascadero
Resolution No.2002-054
Page 12
EXHIBIT Q Arborist Report Page 1
TTM 2002-0014
JUN 5" 2002
802 PASO ROBLES STREET PASO ROBLES,CALIFORNIA 93446 805 E VT 42
"A
ARBOR
TUB SYRGIRY
Date: 5/13/02 FILE COPY
To: Kelly Gearhart
From Steven Alvarez,Arbor Tree Surgery
Re: Riverbed Development,Atascadero
This report is in regards to the Oak Trees bordering the existing road through the
Riverbed Development. After reviewing the site,fifteen Oak.Trees will have impacts
varying from slight to recommending removal. The trees are labeled on the
accompanying map in an East to West direction. A large proportion of the trees require
"road clearance"which unless otherwise specified will require a maximum of 5-10%
canopy removal for vehicular traffic. The height above road level should be 16 feet. All
pruning activities should be supervised by a trained arborist. "Dbh"referred to below is
the diameter at breast height. Two trees will require retaining walls that should be
constructed according to the following mitigation measures:
1) Trenching operations should be either hand dug or performed by an
experienced backhoe operator.
2) All roots encountered larger than one inch in diameter should be cut with
sharp tools.
3) The footing should be re-buried as soon as practically possible.
Trees
1) 24"Live Oak-Road Clearance
2) 36"Live Oak-Road Clearance
3) 24"Live Oak-Road Clearance
4) 48"Live Oak-Road Clearance
5) 28"Live Oak-Road Clearance
6) 14"Live Oak-Removal is recommended for this tree due to its proximity
to the roadway.
7) 60"Live Oak-Road Clearance
8) 72"Live Oak-Road Clearance
9) 40"Live Oak-Road Clearance
10) 11"Live Oak-This tree requires a retaining wall at approximately 8 feet
out from the main stem so the soil level can be returned to its original
grade.
11) 8"Live Oak-A retaining wall should be constructed to return soil level to
its original grade.
12) 28"Live Oak-Road Clearance
City of Atascadero
Resolution No.2002-054
Page 13
EXHIBIT Q Arborist Report page 2
TTM 2002-0014
13) 50"White Oak-This particular tree has an extremely poor crotch between
its two dominant stems. Failure is highly probable. Removal is
recommended.
14) 48"White Oak-Road Clearance
15) 42"White Oak-Road Clearance
All trees,except the removals,should be protected with construction fencing at
the edge of the roadway. Excess fill should not be placed under the drip line of any tree.
Drip line areas should not be used as a storage site nor should heavy machinery be
operated there. All contractors working in this vicinity should sign off on this arborist
report along with the plans identifying the trees.
Sincerely, ^,
Q---77�X�`�
Steven G.Alvarez
Certified Arborist#0511
Arbor Tree Surgery
2002-0014
Al
Y
fit
ILA
0
.vo&
i
i� 4
City of Atascadero
Resolution No.2002-054
Page 15
EXHIBIT D:Conditions of Approval
TTM 2002-0014
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 FM:Final Map GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
F0:Final Occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
CA:City Attorney
AMWC:Atascadero
Mutual Water Company
Planning Services
1. The approval of this application shall become final, subject FM PS
to the completion of the conditions of approval, fourteen
(14) days following the Planning Commission approval
unless prior to the time, an appeal to the decision is filed as
set forth in Section 9-1.111(b)of the Zoning Ordinance.
2. Approval of this Tentative Tract Map shall be valid for two FM PS
years after its effective date. At the end of the period, the
approval shall expire and become null and void unless an
extension of time is granted pursuant to a written request
received prior to the expiration date.
3. The Community Development Department shall have the FM PS
authority to approve minor changes to the project that (1)
result in a superior site design or appearance, and/or (2)
address a construction design issue that is not substantive
to the Tentative Parcel Map.
4. The Tract Map shall be subject to additional fees for park or FM PS
recreation purposes (QUIMBY Act) as required by City
Ordinance.
5. The applicant shall record CC&R's for the subdivision FM PS/CE
subject to the review and approval of the City Engineer,City
Attorney and Planning Department. The CC&R's shall
identify the maintenance responsibilities of all private
driveways, roads, bridges, sewer facilities, drainage
facilities, common parking areas, site lighting, landscape
areas, fencing, and other common facilities. The CC&R's
shall also state that each unit shall have no more than three
bedrooms and that all exterior colors, exterior materials,
and yard fencing shall be consistent with the overall master
plan of development.
6. The subdivider shall defend, indemnify, and hold harmless Ongoing CA
the City of Atascadero or its agents, officers, and
employees against any claim or action brought to challenge
an approval by the city, or any of its entities,concerning the
subdivision
7. An irrevocable open space and public access easement FM PS
shall be recorded on Lot 16 and clearly noted on the final
City of Atascadero
Resolution No.2002-054
Page 16
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 FM:Final Map PS:Planning Services
GP:Grading Permit
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
FO:Final Occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
CA City Attomey
AMWC:Atascadero
Mutual Water Company
map.
8. Twenty foot (20-foot) public access easements shall be FM PS
recorded across all trail corridors located outside of street
right-of-ways.
9. A paved Class I Bikeway shall be provided on the east side IP/FM PS
the street from the existing cul-de-sac on Ferrocarril Road
to Graves Creek.
10. The access road shall be constructed with an emergency IP PS/CE
only connection to Ferrocarril Road as shown on Alternative
2 of Sheet C2.2 of the road improvement plans.
11. A tract map drawn in substantial conformance with the FM PS
approved tentative map, and in compliance with all
conditions set forth herein, shall be submitted for review
and approval in accordance with the Subdivision Map Act
and the City's Subdivision Ordinance.
Mitigation Measures
12. The project shall be conditioned to comply with all IP PS 3.b.1.
applicable District regulations pertaining to the control of
fugitive dust (PM-10) as contained in section 6.4 of the Air
Quality Handbook. All site grading and demolition plans
notes shall list the following regulations:
A. All material excavated or graded shall be
sufficiently watered to prevent excessive amounts
of dust. Watering shall occur at least twice daily
with complete coverage,preferably in the late
morning and after work is finished for the day.
Increased watering frequency would be required
whenever wind speeds exceed 15 mph.
Reclaimed water should be used whenever
possible.
B. All clearing,grading,earth moving,or excavation
activities shall cease during periods of high winds
(i.e.greater than 20 mph averaged over one hour)
so as to prevent excessive amounts of dust.
C. All material transported off-site shall be either
sufficiently watered or securely covered to prevent
excessive amounts of dust.
D. The area disturbed by clearing,grading,earth
moving,or excavation operations shall be
minimized so as to prevent excessive amounts of
dust.
E. Permanent dust control measured identified in the
approved project reve etation and landscape
City of Atascadero
Resolution No.2002-054
Page 17
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 FM:Find Map GP:Grading Pemdt PS:Planning Services
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
F0:Final occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
CA:city Attorney
AMWC:Atascadero
Mutual Water Company
plans shall be implemented as soon as possible
following completion of any soil disturbing
activities.
F. Exposed ground areas that are planned to be
reworked at dates greater than one month after
initial grading shall be sown with fast-germinating
native grass seed and watered until vegetation
becomes established.
G. All disturbed areas not subject to revegetation
shall be stabilized using approved chemical soil
binders,jute netting,or other methods approved
in advance by the APCD.
H. All roadways,driveways,sidewalks,etc.to be
paved shall be completed as soon as possible. In
addition,structural foundations shall be completed
as soon as possible following building pad
construction.
I. On-site vehicle speed shall be limited to 15 mph
for any unpaved surface.
J. All unpaved areas with vehicle traffic shall be
watered at least twice per day,using non-potable
water.
K. Streets adjacent to the project site shall be swept
daily to remove silt which may have accumulated
from construction activities so as to prevent
excessive amounts of dust from leaving the site.
L. Wheel washers may be required when significant
offsite import or export of fill is involved.
M. All dirt stock-pile areas should be sprayed daily as
needed.
13. A multi-use Class I bicycle, pedestrian and equestrian trail IP PS 3.c.1.
will be provided from Chico Road to the Salinas River and
along the shoulder of the new proposed street.
14. Large canopy shade trees shall be provided along street IP PS 3.c.2.
frontages to minimize urban heat build-up.
15. All construction within the drip lines of native trees shall be IP PS 4.e.1.
consistent with the mitigation requirements of the 5/13/02
arborist report.
16. A tree fencing protection plan shall be submitted with IP PS 4.e.2.
construction plans and installed prior to permit issuance
17. All tree removals shall be mitigated consistent with the IP PS 4.e.3.
requirements of the Atascadero Native Tree Ordinance
City of Atascadero
Resolution No.2002-054
Page 18
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 FM:Final Map PS:Planning Services
GP:Grading Permit
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
F0:Final Occupancy PD:Polioe Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
CA City Attorney
AMWC:Atascadero
Mutual Water Company
requirements of the Atascadero Native Tree Ordinance
18. An arborist shall be retained monitor construction, IP PS 4.e.4.
mitigations,and overall tree health.
19. A Storm Water Pollution Prevention Plan (SWPPP)will be IP PS 8.c.1.
required to be approved by the RWQCB prior to
construction.
20. Deed disclosures shall be recorded against all lots notifying FM PS 11.a.1.
potential buyers that noise levels on their property will most
likely exceed the recommended limits established by the
City of Atascadero when trains are present on the tracks.
Advise buyers that noise levels and vibration during train
passbys will be very loud, potentially annoying, and
perhaps startling.
21. Locate outdoor living spaces out of direct line-of-sight with IP PS 11.a.2.
the railway to the extent possible.
22. Installed landscaped berms around outdoor living areas IP PS 11.a.3.
that have direct line-of-sight with the railway.
23. Construct all housing will stucco siding and concrete or tile On Going PS 11.a.4.
roofing materials to reduce interior noise.
24. Minimize windows that have direct line of sight with railway. On Going PS 11.a.5.
25. Prior to recording the final map, the applicant shall make FM PS/CE AMWC-1
every effort to annex the property into the AMWC service
area. The annexation is required to provide the subdivision
with an adequate, safe and reliable source of water for
domestic and fire suppression uses. If annexation into the
AMWC service area fails for reasons beyond the control of
the applicant,the applicant shall perform well tests on each
lot to the satisfaction of the City Engineer. The final map
shall not record until the well tests reveal there is an
adequate, safe, reliable and long-term water supply
available for each lot.
26. The applicant shall provide a 145-foot wide exclusionary FM PS AMWC-2
easement contiguous to the northerly tract boundary that
expressly prohibits construction of septic systems or wells,
or as otherwise approved by the Atascadero Mutual Water
Company. The applicant shall provide the easement by
separate instrument, shall show the easement on the final
map, and shall address the restrictions in the CC&R's for
the project.
27. The applicant shall record instruments separate from and FM PS AMWC-3
concurrent with the final map that discloses the following to
City of Ataseadero
Resolution No.2002-054
Page 19
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 FM:Final Map PS:Planning Services
GP:Grading Permit
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
F0:Final Occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
CA City Atomey
AMWC:Ataseadero
Mutual Water Company
all property owners within the subdivision. AMWC shall
review and approve the form and content of the instruments
relative to these conditions of approval before they record.
a. Private wells are subject to failure.
b. AMWC operates community water wells on the
parcel adjacent to the subdivision (the "River
Parcel") and that operation said community wells
will have influence over and interfere with the
private wells constructed on the lots within the
subdivision.
c. Development and operation of community wells
and other water-related facilities on the River
Parcel will be of an industrial nature. Impacts to
the subdivision will result from operations on the
River Parcel that produce intermittent and
continuous noise and dust. Other activities will
include the drilling of wells, excavation of recovery
ponds, construction of pipelines, hauling, handling
and storage of hazardous materials, and
construction of well and treatment buildings.
Cl. The existence of an easement that prohibits
construction of septic systems or wells within 145-
feet of the northerly tract boundary.
e. The possible future uses of the River Parcel that
could include residential subdivisions,public parks
or other uses.
f. Prohibitions on the export of water from the private
wells within the subdivision or transfer of water
between properties within the subdivision.
28. All proposed trail access points on to AMWC property, the FM PS AMWC-4
Salinas River or the De Anza trail shall include appropriate
signage and vehicular barriers to prevent property damage,
damage to the riparian environment, vandalism, uses
inconsistent with AMWC policies, or other inappropriate or
illegal uses. All access points shall be adequately
maintained by the City or an entity established to maintain
the trail system. Access to AMWC property where the
proposed roadway is contiguous to the northerly tract
boundary shall be controlled in a manner consistent with
other access points to AMWC property.
City Engineer Standard Conditions
City of Ataseadero
Resolution No.2002-054
Page 20
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 FM:Final Map PS:Planning Services
GP:Grading Perna
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
F0:Fined Occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
CA City Attorney
AMWC:Atascadero
Mutual Water Company
29. An Encroachment Permit shall be obtained from the Public
Works Department.
30. The applicant shall enter into a Plan Check & Inspection
agreement with the City. All cost for the checking of the
plans, administration of the encroachment permit and
inspection of the improvements shall be borne by the
applicant. A deposit for the plan check and inspection shall
be placed with the City,as determined by the City Engineer.
31. All road improvements and drainage systems shall be
designed and constructed in accordance with the City
Engineering Department and Standard Specifications and
Drawings or as directed by the City Engineer by a
Registered Civil Engineer.
32. The applicant shall be responsible for the protection,
relocation and/or alteration of existing utilities.
33. The applicant shall install all new utilities (water, gas,
electric,cable TV and telephone)underground.
34. The applicant shall monument all property corners for
construction control and shall promptly replace them if
disturbed.
35. Prior to issuance of building permits, the applicant shall
submit a grading and drainage plan with a separate
sheet(s) devoted to sedimentation and erosion control,
prepared by a registered civil engineer for review and
approval by the City Engineer.
36. Prior to the final inspection, all outstanding plan check and
inspection fees shall be paid.
City Engineer Project Conditions
Circulation
37. The proposed road from the end of Ferrocaril to the end of IP CE
EI Camino Real shall be Rural Local Standard 401 Type"B"
(13-foot wide lanes).
38. An 8-foot wide paved multi-purpose trail shall be IP CE
constructed next to the road. The trail shall be separated
from the road.
City of Atascadero
Resolution No.2002-054
Page 21
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 FM:Final Map PS:Planning Services
GP:Grading Permit
BP:Building Penn t BS:Building Services
TO:Temporary Occupancy FD:Fire Departnent
F0:Final Occupancy PD:Police Department
IP:Improvement Plans CE:Cily Engineer
WW:Wastewater
CA City Attorney
AMWC:Atascadero
Mutual Water Company
39. The construction documents for the proposed RR bridge IP CE
shall be approved by the UPPR and the City of Atascadero.
40. Access easement across the project subdivision and the IP CE
Rochelle property shall be granted to the AMWC and the
City of Atascadero and any other future property owners of
the River parcel or the subdivision there of. No restrictions
shall be placed on the access easement.
41. The UPPR is requesting a signal at the intersection of
Chico Road and Traffic Way. The applicant shall pay the
prorata share of the cost of the signal for each lot at time of
residential building permit.
42. The bridge construction from the end of Ferrocaril to the IP CE
end of EI Camino Real shall be competed and approved by
the City of Atascadero prior to the issuance of any Phase 2
residential building permits.
Easements
43. Signed and recorded easements or proof of ownership of FM CE
all property that is used for access will required to be
submitted prior to Planning Commission Meeting.
44. A 50-foot easement for access, water facilities and utilities FM CE
will be recorded on the Final map.
Road Maintenance
45. The applicant shall provide for annual reports on the bridge FM CE
condition by a qualified Civil Engineer, Structural engineer
or other qualified Professional approved by the City
Engineer. The report shall detail the structural integrity of
the bridge and the required maintenance for the bridge.The
repair and maintenance work on the bridge shall be
inspected and approved.The report and repair work will the
responsibility of the property owner of this subdivision.
46. The applicant shall record a road maintenance agreement FM CE
or assessment district for the bridge, roads and multi-
purpose trail. The property owner of the lots will be fully
disclosed of the maintenance agreement and the
anticipated annual cost to each property.
Grading and Drainage
47. Grading and Drainage Plans shall be submitted with the IP CE
Tract Improvement Plans. These plans will conform to all
State and Local standard.
City of Ataseadero
Resolution No.2002-054
Page 22
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Ma 2002-0014 FM:Final Map PS:Planning Services
Map GP:Grading Permit
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire DepaMieent
F0:Fined Occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
CA:City Attorney
AMWC:Atascadero
Mutual Water Company
48. All drainage released off the project site and into the IP CE
Salinas River shall comply with the Regional Water Quality
Board Standard and the National Pollution Elimination
System, Phase II requirement. The Regional Water Quality
Board shall approve a Storm Water Pollution Prevention
Plan.
Wastewater
49. Septic Systems will be design in accordance with Section 8- IP CE
2.103 of the Atascadero Municipal Code.
50. Percolation Test for each lot and the distance between the IP CE
ground water and the bottom of the septic system will be
submitted to the City of Atascadero. The information must
be reviewed and approved by the City of Atascadero prior
to recording the Final map. All systems shall comply with
the requirements of the Regional Water Quality Control
Board.
Water
51. Prior to recordation of any final maps, the applicant shall FM CE
enter into an agreement with the Atascadero Mutual Water
Company to annex the project area into the Water
Company service area. The applicant shall post a cash
deposit in an amount determined by the City Engineer to
cover the cost of engineering and fiscal studies required for
annexation.
52. Any wells installed prior the annexation to the Atascadero FM/1P CE
Mutual Water Company shall require water quality and
quantity test reports subject to approval by the City
Engineer. The reports will be reviewed and approved by
County Health department and the City of Atascadero..
53. The minimum sustained yield of water from a source or FM/IP CE
sources and minimum water storage capacity shall not be
less than 0.50 Gal/Min and 1,000 Gal/3 day for pumped
sources.. For uses other than that specified above the
minimum yield and storage requirements shall be based on
estimated consumption as approved by the"Health Officer."
All sources shall be perennial.
54. All wells shall be subject to the following Test Method for FM/IP CE
Pumped Source:
Step 1.Commence the test no sooner than 7-days
after development of the well.Record the time and the
initial level of the water in the well prior to start of
City of Atascadero
Resolution No.2002-054
Page 23
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Ma 2002-0014 FM:Final Map
Map GP:Grading PermitPS:Planning Services
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
FO:Final Occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewaler
CA:City Attorney
AMWC:Atascadero
Mutual Water Company
pumping.
Step 2.Start pumping at a rate of 10 GPM,or more,
until a 3-day minimum yield is pumped from the well,or
until the well is"pumped dry".*
*"Pumped Dry"is the point at which the pump starts
pumping air,thus reducing the pumping rate.
If a 3-day yield is obtained without"pumping dry"skip
to Step 5.
If the well is"pumped dry"continue to Step 3.
Step 3. Record the time at which the well is"pumped
dry"and the new pumping rate at which the pump
continues to operate.
Step 4.Continue pumping and record the pumping rate
at one hour intervals commencing at the time in Step 3,
until the same reduced pumping rate is obtained on 3
consecutive hours.
If the 3 consecutive hourly readings are less than the
minimum yield required,the yield is inadequate.
If the 3 consecutive hourly readings are equal to or
greater than the minimum allowable yield and a 3-day
yield was pumped from the well,continue to Step 5.
If the consecutive hourly readings are equal to or
greater than the minimum allowable yield, but a 3-day
yield was not pumped from the well,continue pumping
until this total 3-day yield is obtained,then continue to
Step 5.
Step 5. End pumping and record the time and the
elevation of the water level at the completion of
pumping.
Step 6.72 hours after the time recorded in Step 5,
measure and record the water level in the well.
a. If the is a 100%recovery of the initial water level at
72-hour measurement,the well yield is adequate.
b. If the above recovery is not obtained for the well,this
yield is inadequate.
c.Test Results-The results of the yield tests shall be
recorded on the forms provided by the"Health Officer."
City of Atascadero
Resolution No.2002-054
Page 24
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 FM:Final Map PS:Planning Services
GP:Grading Permit
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
F0:Final Occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
CA City Attorney
AMWC:Atascadero
Mutual Water Company
All applicable blanks on the forms shall be filled out.
The yield of a gravity fed source shall be the lowest of
the(3)three tests.The yield of a pumped source shall
be the pumping rate established by the"3-day yield
pumping tests."
55. The yield testing shall be performed during the dry season
(July 15 to October 1, unless the"Health Officer"expands
this time limit due to lack of precipitation).Testing outside of
the dry season may be allowed if sufficient data as
approved by the"Health Officer"is submitted which
correlates the actual test results with dry season results to
establish actual sustained yield at the driest season.
56. Yield tests shall be made only by State Licensed Well
Drilling Contractors,General(Class A License)Contractors,
Civil Engineers,or Geologists,except where a gravity fed
source will supply(1)one single family dwelling,the test
may be made by the property owner.Verification by a
representative of the"Health Officer"may be required.
Source Setbacks shall be 5 feet from property line, 100 feet
from Subsurface Disposal Field,Septic Tank or other
Subsurface Storage Tanks
57. The water shall meet the physical,chemical and
bacteriological standards of the State Department of Public
Health and the US Environmental Protection Agency.
Where an analysis indicates that the source initially would
not meet such standards,the applicant shall provide a
proposed method of water treatment,or condition of,such
as chlorinating,filtration,or chemical adjustment to meet
such standards.
Atascadero Mutual Water Company(AMWC):
58. The applicant shall provide a 30-foot wide access and water FM CE/AMWC
main easement across Parcel 1 of Parcel Map AT 01-060
recorded in 56-PM-37 in the office of the County Recorder
(APN 49-291-005). The easement shall parallel,more or
less,the easterly boundary of Parcel 1. The easement
shall be bounded on the south by the existing 50-foot wide
access and water main easement across Parcel 1 and
Parcel 2 of said parcel map and shall be bounded on the
north by the northwesterly boundary of Parcels 1 and 2.
The easement shall connect the existing dirt roadway on
the River Parcel(APN 49-011-001)to the existing access
and water main easement across Parcel 1 and Parcel 2
that benefits AMWC.
City of Ataseadero
Resolution No.2002-054
Page 25
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 FM:Final Map PS:Planning Services
GP:Grading Pemtit
BP:Building Perm t BS:Building Services
TO:Temporary Occupancy FD:Fire Department
F0:Fined Occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
CA City Adomey
AMWQ Atascadero
Mutual Water Company
59. The applicant shall retain the existing 50-foot wide access FM CE/AMWC
and water main easement that benefits AMWC across
Parcel 1 and Parcel 2 of Parcel Map AT 01-060. Said map
is recorded in 56-PM-37 in the office of the County
Recorder(APN's 49-291-005,024). Recording of the final
map shall not eliminate or otherwise alter the existing 50-
foot wide access and water main easement across Parcel 1
and Parcel 2 that benefits AMWC.
60. The applicant shall provide a 50-foot wide access and water FM CE/AMWC
main easement to AMWC across the proposed subdivision.
The easement shall follow the roadway alignment shown on
tentative map.
61. The applicant shall provide 10-foot wide water line FM CE/AMWC
easements to AMWC. The easements shall be parallel to
the side lot lines of Lot Nos. 1 through 5 and be bounded
on the south by the proposed road right-of-way shown on
the tentative map and on the north by the northerly tract
boundary. The easements shall be in a form approved by
AMWC.
62. The applicant shall provide an access and water main IP CE/AMWC
easement across the property to north of the River Parcel
(commonly referred to as the Rochelle Property)to AMWC.
The easement shall include any bridge,at-grade crossing,
underpass or other means used to cross the Union Pacific
Railroad right-of-way to gain access to the property east of
the tracks.
63. All access rights granted by the applicant to AMWC relative FM CE/AMWC
to these conditions of approval shall be equal or superior to
the rights granted the property owners within the
subdivision. The easements shall benefit AMWC and all
future property owners of the River Parcel or subdivisions
thereof. The applicant shall not place restrictions on the
access rights granted by the easements required by these
conditions of approval such as,but not limited to,
prohibitions against hauling hazardous materials or large
equipment or hours of use.
Building Department Conditions
64. A soils investigation prepared by a licensed Geotechnical
Engineer is to be provided for the project. The report is to
be provided at the time of building permit submittal along
with the building plans for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
Fire Department Conditions
City of Atascadero
Resolution No.2002-054
Page 26
Conditions of Approval Timing Responsibility Mitigation
Ferrocarril Road De Anza Estates /Monitoring Measure
Tentative Tract Map 2002-0014 PM:Final Map pS:PlanningSavices
GP:Grading Permit
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fre Department
F0:Final Occupancy PD:Police Department
IP:Improvement Plans CE:City Engineer
WW:Wastewater
Ca city Attorney
AMWC:Atascadero
Mutual Water Company
65. Fire hydrants shall be provided along streets per City IP FD
standards. Dry water mains and hydrants shall be installed
regardless of the status of annexation to the Atascadero
Mutual Water Company service area.
If development precedes annexation to the Atascadero
Mutual Water Company service area then the following
conditions shall apply:
a. A secondary water supply for fire protection is
to be provided with an on-site water tank.
The tank shall be sized in accordance with
NFPA 1142 for fire department use. It shall
supply a wet or dry barrel type fire hydrant
with one 4'/"and one 2'/"outlet in a
location approved by the Fire Authority. A fire
pump is to be provided which shall furnish not
less than 150 percent of rated capacity at a
total head of not less than 65 percent of total
rated head.The shutoff total head for
horizontal shaft pumps shall not exceed 140
percent of the total rated head.The inlet
pressure available from a water supply shall
be figured on a basis of flow of 150 percent of
the rated capacity of the pump,as indicated
by flow test.The pressure in public mains
shall not be reduced in pressure below 20 psi
while the pump is operating at 150 percent of
its rated capacity.
b. Minimum fire flow is to be 1000 gallons per
minute at 20 psi for a 120 minute duration.
Alternatives may be considered by the Fire
Chief if the minimum fire flow is not
obtainable.
City Council Condition
66. The tract map shall be permitted to be recorded in the FM PS
following phases.
Phase 1: Lot 11, 12, 13, 14 and Lot 16 with open space
and trail easements recorded.
Phase 2: Lots 1-10 and Lot-15.