HomeMy WebLinkAbout2007-076 RESOLUTION NO. 2007-076
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CA,
APPROVING CONDITIONAL USE PERMIT 2007-0209
(MASTER PLAN OF DEVELOPEMNT)
ON APN 029-062-013
5440 Traffic Way
(Habitat for Humanity)
WHEREAS, an application has been received from Habitat for Humanity for San Luis
Obispo County (P.O. Box 613, San Luis Obispo, CA 93406) Applicants and Property Owners,
to consider a project consisting of a Zone Change from RMF-16 (Residential Multi-family-16) to
RMF-16/PD30 (Residential Multi-Family-16 with a Planned Development Overlay 30) with
corresponding Master Plan of Development and Vesting Tentative Parcel Map located at 5440
Traffic Way, (APN 029-062-013); and,
WHEREAS, the Planning Commission has recommended that the site's Zoning District
be changed from RMF-16 (Residential Multi-Family-16) to RMF-16 with PD 30 (Residential
Multi-Family-16 with a Planned Development Overlay 30); and,
WHEREAS, the Planned Development 30 Overlay Zone requires the adoption of a
Master Plan of Development, approved in the form of a Conditional Use Permit; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2007-0007 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act(CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of
Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on July 17, 2007 studied and considered the Conditional Use Permit 2007-
0209 (Master Plan of Development), after first studying and considering the Proposed Mitigated
Negative Declaration prepared for the project and recommended approval of the project to the
City Council, and,
err
City of Atascadero
Resolution No. 2007-076
Page 2 of 19
NOW, THEREFORE, the City Council of the City of Atascadero takes the following
actions:
SECTION 1. Findings for Approval of Conditional Use Permit. The City Council
finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including provisions of the PD-30 Overlay Zone; and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. The proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. The proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element; and
WW
6. The Master Plan of Development standards or processing requirements will enhance
the opportunity to best utilize special characteristics of an area and will have a
beneficial effect on the area; and
7. Benefits derived from the Master Plan of Development and PD overlay zone cannot
be reasonably achieved through existing development standards or processing
requirements.
SECTION 2. Findings for Approval of Tree Removal. The City Council finds as
follows:
1. The trees are obstructing proposed improvements that cannot be reasonably designed
to avoid the need for tree removal, as certified by a report from the Site Planner and
determined by the Community Development Department based on the following
factors:
■ Early consultation with the City;
■ Consideration of practical design alternatives;
■ Provision of cost comparisons (from applicant) for practical design alternatives; or
■ If saving tree eliminates all reasonable uses of the property.
■ If saving the tree requires the removal of more desirable trees.
City of Atascadero
Resolution No. 2007-076
Page 3 of 19
SECTION 3. Recommendation of Approval. The City Council of the City of
Atascadero, in a regular session assembled on August 28, 2007 resolved to approve Conditional
+wrr Use Permit 2007-0209 (Master Plan of Development) and Tree Removal Permit subject to the
following:
EXHIBIT A: Conditions of Approval/Mitigation Monitoring Program
EXHIBIT B: Master Plan of Development/ Site Plan
EXHIBIT C: Floor Plans
EXHIBIT D: Elevations
EXHIBIT E: Preliminary Landscape Plan
EXHIBIT F: Irrigation Plan
EXBIBIT G: Tree Removal Application
On motion by Council Member Beraud, and seconded by Council Member Brennler, the
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Council Members Beraud, Brennler, Clay and Mayor Luna
NOES: None
ABSTAIN: Council Member O'Malley
ABSENT: None
ADOPTED: August 28, 2007
AFCITSCADERO, CA
Mike Brennfer,Mayor Pro Tem
ATTEST:
hIL411,01t,1-
Marcia McClure Torgerson, C.M.C. ity Clerk
APPRO ED AS TO FORM:
Patrice:. Wight, City Attorney
r�r.
City of Atascadero
Resolution No. 2007-076
Page 4 of 19
EXHIBIT A:Conditions of Approval/Mitigation Monitoring Program
Planned Development-30/PLN 2007-12011CUP 2007-0209
�rinr
Conditions of Approval/ Timing Responsibil Mitigation
ity Measure
Mitigation Monitoring Program /Monitoring
FM: Find Map
BL:Business PS:Planning
5440 Traffic Way LiceServicesServiceses
GP: ading Permit BS:Building
BP:Building Pemit Services
FI:Final Inspection FD:Fire Departnent
PLN 20074201 TO:Temporary PD:Police
Occupancy Department
F0:Final CE:C4 Engineer
Planned Development Overlay 30 occupancy WW:Wastewater
CA:City Attorney
Planning Services
1. The approval of this use permit shall become final and effective for the purposes of FM PS
issuing building permits thirty(30)days following the City Council approval of ZCH
2007-0136 and ZCH 2007-0137 upon second reading,unless prior to that time,an
appeal to the decision is filed as set forth in Section 9-1.111(b)of the Zoning
Ordinance.
2. The Community Development Department shall have the authority to approve the BP/FM PS,CE
following minor changes to the project that(1)modify the site plan project by less
than 10%, (2)result in a superior site design or appearance,and/or(3)address a
construction design issue that is not substantive to the Master Plan of
Development.
�Itirlr __
3. Approval of this Conditional Use Permit shall be valid for twelve(12)months after BP/FM PS
its effective date. At the end of the period,the approval shall expire and become
null and void unless the project has received a building permit.
4. The applicant shall defend,indemnify,and hold harmless the City of Atascadero or Ongoing PS
its agents,officers,and employees against any claim or action brought to
challenge on approval by the City,or any of its entities,concerning the subdivision
5. All subsequent Tentative Map and construction permits shall be consistent with the BP/FM PS,CE
Master Plan of Development contained herein.
6. All site development shall comply with the standards of the Planned Development BP PS,BS
30 Overlay District.
7. All exterior elevations,finish materials and colors shall be consistent with the BP PS/BS
Master Plan of Development as shown in EXHIBITS B through F.
8. Driveway width shall be 20 feet,in accordance with Fire Department standards and BP PS, BS
shall be constructed of pavers and edged in a darker colored paver to provide
definition and reduce monotony.
9. All site work,grading,and site improvements shall be consistent with the Master BP/FM PS, BS,
Plan of Development as shown in EXHIBITS B through F as revised July 16"', CE
2007. Where discrepancies exist between the landscape plan and the grading
plan,the grading plan will take precedence.
61111111111111
City of Atascadero
Resolution No. 2007-076
Page 5 of 19
Conditions of Approval/ Timing Responsibil Mitigation
ity
Mitigation Monitoring Program tMeasure
(Monitoring
FM. Find Map
BL:Business PS:Planning
5440 Traffic Way License Seances
GP:Grading Permit BS:Building
BP:Building Permit Services
Fl:Final Inspection FD:Fire Department
PLN 2007-1201 TO:Temporary PD:Police
Occupancy Department
F0:Final CE:City Engineer
Planned Development Overlay 30 Occupancy WW:wastewater
CA City Attorney
10. All project landscaping and fencing shall be installed consistent with EXHIBITS B GP/BP PS
through F as revised July 16th,2007 with additional landscaping installed between
the front building and the edge of the driveway.
11. The proposed project shall incorporate colors consistent with the color boards for GP/BP PS
the project,on file in Community Development Department.
12. Prior to final inspection of building permits,all landscaping,consistent with Exhibits BP PS
E and F as revised July 16th.2007 shall be installed,including all irrigation
materials and working,with additional landscaping installed between the driveway
and the eastern(front)most building. The number of native oak trees in the
landscaping plan shall be reduced and replaced with a fast growing,urbanized
species.
13. The developer and/or subsequent owner(s)shall assume responsibility for the FM/ PS
continued maintenance of all landscape and common areas,consistent with Ongoing
EXHIBITS B through F,as revised July 16th,2007.
14. This project is an Affordable Housing project and all units shall be deed restricted FM/BP PS,CA
at the very low income level for a period of 45 years,consistent with the City's
Redevelopment Plan.
15. A Tree Protection Plan shall be submitted with subsequent building permits for GP/BP PS
encroachment within the drip line of native trees located on the subject parcel and
any adjacent properties.The applicant will contract with a certified arborist to
monitor all activity within the drip lines of existing native oak trees.
BP PS
16. The emergency services and facility maintenance costs listed below shall be
100%funded by the project in perpetuity. The service and maintenance costs
shall be funded through a community facilities district established by the City at
the developer's cost. The funding mechanism must be in place prior to or
concurrently with acceptance of the final maps. The funding mechanism shall
be approved by the City Attorney, City Engineer and Administrative Services
Director prior to acceptance of any final map. The administration of the above
mentioned funds shall be by the City. Developer agrees to participate in the
community facilities district and to take all steps reasonably required by the City
with regard to the establishment of the district and assessment of the property.
■ All Atascadero Police Department service costs to the project.
■ All Atascadero Fire Department service costs to the project.
■ Off-site common City of Atascadero park facilities maintenance service
costs related to the project.
17. All tract maintenance costs listed below shall be 100% funded by the project in BP PS
goo perpetuity. The service and maintenance cost shall be funded through a Home
Owners Association established by the developer subject to City approval. The
City of Atascadero
Resolution No. 2007-076
Page 6 of 19
Conditions of Approval I Timing Responsibil Mitigation
Mitigation Monitoring Program iMeasure
/Monittoring
FM Fal MapBL:Business PS:Planning
5440 Trak License Way GP:Grading Permit BS:Buis
BP:Building Permit lding
Ser Bui
FI:Final Inspection Services
PLN 2007-1201 TO:Temporary FD:Fire Department
OPD:Police
Occupancy
FDepartment
0:Final
Occupancy CE:City Engineer
Planned Development Overlay 30 WW:Wastewater
CA City Attorney
Home Owners Association must be in place prior to, or concurrently with
acceptance of any final maps. The Home Owners'Association shall be approved
by the City Attorney, City Engineer and Administrative Services Director prior to
acceptance of any Final Map. The administration of the above mentioned funds,
and the coordination and performance of maintenance activities, shall be the
responsibility of the Home Owners'Association.
a) All streets, sidewalks, streetlights, street signs, roads, emergency access
roads,and sewer mains within the project.
b) All parks,trails, recreational facilities and like facilities.
c) All open space and native tree preservation areas.
d) All drainage facilities and detention basins.
e) All creeks,flood plains,floodways,wetlands, and riparian habitat areas.
f) All common landscaping areas, street trees, medians, parkway
two planters, manufactured slopes outside private yards, and other similar
facilities.
g) All frontage landscaping and sidewalks along arterial streets
18. Prior to final map,the applicant shall submit CC&Rs for review and approval by the BP PS, BS
Community Development Department. The CC&R's shall record with the Final
Map and shall include the following:
a) Provisions for maintenance of all common areas including access,
parking,street trees,fencing and landscaping in perpetuity.
b) A detailed list of each individual homeowner's responsibilities for
maintenance of the individual units.
c) A detailed list of each individual homeowner's responsibilities for
maintenance of the designated trash storage area.
d) Garages shall be maintained and used for vehicle parking.
e) No boats, RV's or other type of recreation vehicle may occupy a guest or
resident parking space, including within an individual garage.
f) A provision for review and approval by the City Community Development
Department for any changes to the CC&R's that relate to the above
requirements prior to the changes being recorded or taking effect.
The applicant may choose not to record CC&R's as shared facilities are
+rllr minimal. In this case,the applicant will be required to record a combination of
City of Atascadero
Resolution No. 2007-076
Page 7 of 19
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
FM'. Find Map
BL:Business PS:Planning
5440 Traffic Way License Services
GP:Grading Permit BS:Building
BP:Building Perint Services
FI:Final Inspection FD:Fire Department
PLN 2007-1201 TO:Temporary PD:Police
Occupancy Department
F0:Final CE:City Engineer
Planned Development Overlay 30 Occupancy WW:Wastewater
CA.City Attorney
deed restrictions alerting future owners to project conditions and maintenance
agreements for the shared maintenance of the drainage and shared parking
facilities.
19. Approval of this permit shall include the removal of 2 Native Trees. The applicant BP PS, BS
shall be required to pay mitigation fees per the requirements of the Atascadero
Native Tree Ordinance. Any additional removals shall be subject to Planning
Commission approval.
• A mitigation deposit shall be collected for all native trees impacted 40% or
greater. The deposit shall be released no sooner than 18 months following
final of the unit(s)impacting the trees.
20. The applicant must provide for the repair and maintenance of on-site shared FM CE
improvements.This includes guest parking areas that cross property lines,shared
driveways,and common drainage facilities.The two methods that may be used
are:
a. Homeowners Association.This private organization would be responsible for the
itrrri maintenance, repair and replacement of the facilities.
b.Other form of non-revocable maintenance agreement approved by the City
Engineer and the Community Development Director.
The City Engineer and City Attorney shall approve the final form prior to
recordation.
City Engineer Project Conditions
1. In the event that the applicant bonds for the public improvements required as GP, BP CE
a condition of this project, the applicant shall enter into a Subdivision
Improvement Agreement with the City Council.
2. An engineer's estimate of probable cost shall be submitted for review and GP, BP CE
approval by the City Engineer to determine the amount of the bond.
3. The Subdivision Improvement Agreement shall record concurrently with any FM CE
Final Map.
4. A six (6) foot Public Utility Easement (PUE) shall be provided contiguous to GP, BP CE
the property frontage.
5. The applicant shall acquire title interest in any off-site land that may be GP, BP CE
required to allow for the construction of the improvements.The applicant shall
bear all costs associated with the necessary acquisitions. The applicant shall
also gain concurrence from all adjacent property owners whose ingress and
ii egress is affected by these improvements.
City of Atascadero
Resolution No. 2007-076
Page 8 of 19
Conditions of Approval I Timing Responsibil Mitigation
ity Measure
Mitigation Monitoring Program
/Monitoring
FM. Final Map
BL:Business PS:Planning
5440 Traffic Way License Services
GP:Grading Permit BS:Building
BP:Building Pemit Services
FI:Final Inspection FD:Fire Department
PLN 20074201 TO:Temporary PD:Police
Occupancy Department
F0:Final CE:City Engineer
Planned Development Overlay 30 Occupancy WW:Wastewater
CA City Attorney
6. Slope easements shall be obtained by the applicant as needed to GP, BP CE
accommodate cut or fill slopes.
7. Drainage easements shall be obtained by the applicant as needed to GP, BP CE
accommodate both public and private drainage facilities.
8. A preliminary subdivision guarantee shall be submitted for review in FM CE
conjunction with the processing of the parcel map.
9. The final map shall be signed by the City Engineer prior to the map being FM CE
placed on the agenda for City Council acceptance.
10. Prior to recording the parcel map, the applicant shall pay all outstanding plan FM CE
check/inspection fees.
11. Prior to recording the map, the applicant shall bond for or complete all FM CE
improvements required by these conditions of approval.
12. Prior to recording the parcel map,the applicant shall submit a copy of a valid FM CE
tax bond.
13. Prior to recording the parcel map, the applicant shall bond for or set FM CE
monuments at all new property corners.A registered civil engineer or licensed
land surveyor shall indicate by certificate on the parcel map,that corners have
been set or shall be set by a date specific and that they will be sufficient to
enable the survey to be retraced.
14. Prior to recording the parcel map, the applicant shall submit a map drawn in FM CE
substantial conformance with the approved tentative map and in compliance
with all conditions set forth herein. The map shall be submitted for review and
approval by the City in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
15. All existing and proposed utility, pipeline, open space,or other easements are FM CE
to be shown on the parcel map. If there are building or other restrictions
related to the easements, they shall be noted on the parcel map. The
applicant shall show all access restrictions on the parcel map.
16. Prior to recording the parcel map, the applicant shall have the map reviewed FM CE
by all applicable public and private utility companies (cable, telephone, gas,
electric, Atascadero Mutual Water Company). The applicant shall obtain a
letter from each utility company indicating their review of the map. The letter
shall identify any new easements that may be required by the utility company.
A copy of the letter shall be submitted to the City. New easements shall be
shown on the parcel map.
City of Atascadero
Resolution No. 2007-076
Page 9 of 19
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
fM: ArA Map
BL:Business
pS:Planning
5440 Trak Way License Services
GP:Grading Permit BS:Building
BP:Building Pemrt Services
FI:Final Inspection FD:Fire Department
PLN 2007-7201 To:Temporary PD:Police
Occupancy Department
F0:Final CE:City Engineer
Planned Development Overlay 30 °ocepanCY WW:wastewater
CA City Attorney
17. Prior to the issuance of building permits the applicant shall submit plans and GP, BP CE
supporting calculations/reports including street improvements, underground
utilities, composite utilities, and grading/drainage plans prepared by a
registered civil engineer for review and approval by the City Engineer.
18. Prior to the issuance of building permits the applicant shall submit calculations GP, BP CE
to support the design of any structures or pipes. Closed conduits shall be
designed to convey the 10-year flow with gravity flow, the 25-year flow with
head,and provide safe conveyance for the 100-year overflow.
19. Prior to the issuance of building permits the applicant shall provide for the GP, BP CE
detention and metering out of developed storm runoff so that it is equal to or
less than undeveloped storm runoff.
20. Drainage basins shall be designed to desilt, detain and meter storm flows as GP, BP CE
well as release them to natural runoff locations.
21. Prior to the issuance of building permits the applicant shall show the method GP, BP CE
of dispersal at all pipe outlets. Include specifications for size&type.
low
22. Prior to the issuance of building permits the applicant shall show method of GP, BP CE
conduct to approved off-site drainage facilities.
23. Concentrated drainage from off-site areas shall be conveyed across the GP, BP CE
project site in drainage easements. Acquire drainage easements where
needed. Drainage shall cross lot lines only where a drainage easement has
been provided. If drainage easement cannot be obtained the storm water
release must follow the exact historic path, rate and velocity as prior to the
subdivision.
24. All public improvements shall be constructed in conformance with the City of GP, BP CE
Atascadero Engineering Department Standard Specifications and Drawings or
as directed by the City Engineer
25. Project shall include construction of curb, gutter and sidewalk along entire GP, BP CE
frontage.
26. Alignment of frontage improvements shall be approved by the City Engineer. GP, BP CE
27. All utilities shall be underground on project frontage. GP, BP CE
28. Applicant shall pay sewer extension (Annexation), Connection and BP CE
Reimbursement fees(if applicable)upon issuance of building permit.
29. Drainage piping serving fixtures which have flood level rims located below the BP CE
elevation of the next upstream manhole cover of the public or private sewer
serving such drainage piping shall be protected from backflow of sewage b
City of Atascadero
Resolution No. 2007-076
Page 10 of 19
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
i� FM: Fnal Map
BL:Business PS:Planning
5440 Trac Way License Services
GP:Grading Permit BS:Building
BP:Building Pemit Services
FI:Final Inspection FD:Fire Department
PLN 2007-1201 TO:Temporary PD:Police
Occupancy Department
F0:Final CE:City Engineer
Planned Development Overlay 30 Occupancy y,,W Wastewater
CA:City Attorney
installing an approved type backwater valve. Fixtures above such elevation
shall not discharge through the backwater valve.
Mitigation Measures
Mitigation Measure 3.b.1: The project shall be conditioned to comply with all BP,GP BS,PS,CE 3.b.1
applicable District regulations pertaining to the control of fugitive dust(PM-10)as
contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality Handbook.
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune according to manufacturer's
specifications.
■ Fuel all off-road and portable diesel powered equipment, including but not
limited to bulldozers,graders, cranes, loaders, scrapers, backhoes, generator
sets, compressors, auxiliary power units,with ARB certified motor vehicle diesel
fuel (Non-taxed version suitable for use off-road).
• Maximize to the extent feasible,the use of diesel construction equipment
meeting the ARB's 1996 or newer certification standard for off-road heavy-duty
diesel engines.
Install diesel oxidation catalysts (DOC), catalyzed diesels particulate filters
(CDPF)or other District approved emission reduction retrofit services (Required
for projects grading more than 4.0 acres of continuously worked area).
Section 6.4: Activity Management Techniques
• Develop a comprehensive construction activity management plan designed to
minimize the amount of large construction equipment operating during any
given time period.
■ Schedule of construction truck trips during non-peak hours to reduce peak hour
emissions.
■ Limit the length of the construction workday period, if necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading, demolition and building
plan notes:
■ Reduce the amount of the disturbed area where possible.
• Use of water trucks or sprinkler systems in sufficient quantities to prevent
airborne dust from leaving the site. Increased watering frequency would be
required whenever wind speeds exceed 15 mph. Reclaimed(non-potable)
water should be used whenever possible.
■ All dirt stockpile areas should be sprayed daily as needed.
• Permanent dust control measures identified in the approved project re-
vegetation and landscape plans should be implemented as soon as possible
following completion of any soil disturbing activities.
■ Exposed ground areas that are planned to be reworked at dates greater than
one month after initial grading should be sown with a fast-germinating native
grass seed and watered until vegetation is established.
r All disturbed soil areas not subject to re-vegetation should be stabilized using
City of Atascadero
Resolution No. 2007-076
Page 11 of 19
Conditions of Approval I Timing Responsibil Mitigation
ity
Mitigation Monitoring Program tMeasure
/Monitoring
FM. Final Wp
iY BL:Business PS:Planning
5440 Trak Way License Services
GP:Grading Permit BS:Building
BP:Building Permit Services
FI:Final Inspection FD:Fire Department
PLN 2007-1201 TO:Temporary PD:Police
Occupancy Department
F0:Final CE:City Engineer
Planned Development Overlay 30 occupancy M Wastewater
CA:City Attorney
approved chemical soil binder,jute netting,or other methods approved in
advance by the APCD.
■ All roadways, driveways, sidewalks, etc,to be paved should be completed as
soon as possible. In addition, building pads should be laid as soon as possible
after grading unless seeding or soil binders are used.
■ Vehicle speed for all construction vehicles shall not exceed 15 mph on any
unpaved surface at the construction site.
■ All trucks hauling dirt, sand, soil, or other loose materials are to be covered or
should maintain at least two feet of freeboard (minimum vertical distance
between top of load and top of trailer)in accordance with CVC Section 23114.
■ Install wheel washers where vehicles enter and exit unpaved roads onto
streets,or wash off trucks and equipment leaving the site.
• Sweep streets at the end of each day if visible soil material is carried onto
adjacent paved roads. Water sweepers with reclaimed water should be used
where feasible.
■ The contractor or builder shall designate a person or persons to monitor the
dust control program and to order increased watering,as necessary,to prevent
transport of dust off site. The name and telephone number of such persons
shall be provided to the APCD prior to land use clearance for map recordation
and land use clearance for finish grading of any structure.
VIrw
Mitigation Measure 4.e.1: The grading plan shall identify tree protection fencing BP,GP PS a.e.1
around the dripline of each native tree and/or native shrub mass,on or off site,
which is not proposed for removal, and is within 20 feet of construction activity.
Mitigation Measure 4.e.2: Grading and excavation work shall be consistent with the BP,GP PS
City of Atascadero Tree Ordinance. Special precautions when working around
native trees include:
■ All existing trees outside of the limits of work shall remain.
■ Earthwork shall not exceed the limits of the project area.
• Low branches in danger of being torn from trees shall be pruned prior to any
heavy equipment work being done.
• Vehicles and stockpiled material shall be stored outside the dripline of all trees.
■ All trees within the area of work shall be fenced for protection with 4-foot chain
link, snow or safety fencing placed per the approved tree protection plan. Tree
protection fencing shall be in place prior to any site excavation or grading.
Fencing shall remain in place until completion of all construction activities.
■ Any roots that are encountered during excavation shall be clean cut by hand
and sealed with an approved tree seal.
■ All recommendations detailed in the Arborist's Report, dated February 12, 2007,
and amended April 6,2007 by A&T Arborists shall be followed, including:
fencing, soil aeration, chip mulch,trenching, grading, exposed roots, paving,
equipment operations, existing surfaces,construction materials and waste,
preconstruction meeting, pruning, landscape, and utility placement.
■ All recommendations detailed in the Arborist's Report, dated February 9,2007,
prepared by A&T Arborists specifically for the 65"Valley oak, shall be followed,
including: pruning, drainage holes,vacuuming, screen, annual treatments,
annual inspections, keeping dripline free of plantings and/or storage, no
am irrigation and no excavation.
City of Atascadero
Resolution No. 2007-076
Page 12 of 19
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program iit Measure
9 9 9 /Monitoring
FM: Final Map
BL:Business PS:Planning
5440 Trac Way License Seances
GP:Grading Permit BS:Building
BP:Building Permit Services
FI:Final Inspection FD:Fire Department
PLN 2007-120-1 TO:Temporary PD:Police
Occupancy Department
F0:Final CE:City Engineer
Planned Development Overlay 30 Occupancy WW Wastewater
CA:City Attorney
Mitigation Measure 4.e.3: All recommendations in the Arborist Report, prepared by BP,GP PS,BS 4.e.2
A&T Arborist and all addendums and supplements shall be followed. All impacts to
native trees shall be mitigated in accordance with the Atascadero Municipal Code
Section 9-11.105.
Mitigation Measure 5.d.1: Should any cultural resources be unearthed during site BP,GP PS,BS
development work,the provisions of CEQA-Section 15064.5,will be followed to
reduce impacts to a non-significant level.
Mitigation Measure 5.1 In the event of the accidental discovery or recognition of BR GP PS,BS
any human remains,there shall be no further excavation or disturbance of the site or
any nearby area reasonably suspected to overlie adjacent human remains until the
coroner of the county in which the remains are discovered has been contacted to
determine that no investigation of the cause of death is required, and to determine if
the remains are of Native American heritage. If the remains are of Native American
Heritage,the coroner shall contact the Native American Heritage Commission within
24 hours.
Mitigation Measure 6.a.1: All construction on site shall comply with the seismic BP BS,PS,CE
construction standards for Seismic Construction Zone 4 per the California 2001
Building Code.
Mitigation Measure 6.a.2: Prior to issuance of building permits, a geological site BP BS,PS,CE
study shall be submitted for review. This study shall address seismic ground
shaking and liquefaction potential and make recommendations for minimizing any
potential hazards. All recommendations of the study shall be implemented during
the construction of the dwelling units.
Mitigation Measure 6.b.1: All cut and fill slopes shall be hydro seeded with an BP BS,PS,CE
appropriate erosion control method (erosion control blanket, hydro-mulch, or straw
mulch appropriately anchored)immediately after completion of earthwork. All
disturbed slopes shall have appropriate erosion control methods in place. Duration
of the project: The contractor will be responsible for the clean up of any mud or
debris that is tracked onto public streets by construction vehicles.
Mitigation Measure 6.c.d.1: A soils report shall be required to be submitted with a BP PS 6.c.1
building permit by the building department.The building plans will be required to
follow the recommendations of the soils report to assure safety for residents and
buildings.
Mitigation Measure 8.e.f.1: The developer is responsible for ensuring that all BP,GP PS,BS,CE 8.e.f.1
contractors are aware of all storm water quality measures and that such measures
are implemented. Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction notices, citations, or
stop orders.
+rirr
City of Atascadero
Resolution No. 2007-076
Page 13 of 19
Conditions of Approval/ Timing Responsibil Mitigation
ity Measure
Mitigation Monitoring Program /Monitoring
FM. Final Map
BL:Business PS:Planning
Lice5440 Traffic Way GP: Services
GP:Grading Penni[ BS:Building
BP:Building Permit Serves
FI:Final Inspection FD:Fire Department
PLN 2007-�20� TO:Temporary PD:Police
Occupancy Department
F0:Final CE:City Engineer
Planned Development Overlay 30 Occupancy CA:City
teWaty
CA: Allomey
Mitigation Measure 11.d.1: All construction activities shall comply with the City of BP,GP PS,BS,CE 11.d.1
Atascadero Noise Ordinance for hours of operation.
woo
4ow
City of Atascadero
Resolution No. 2007-076
Page 14 of 19
EXHIBIT B: Master Plan of Development/Site Plan
err
11 7'1
s
s
gg
I
a
6 % `
i
,.,.i '
rilYl►
City of Atascadero
Resolution No. 2007-076
Page 15 of 19
EXHIBIT C: Floor Plans
arm
a
t-
W
x
yy$e N
EJ &M
W
r _.........._.. LL
II b 11 � O
� daQ U
Oo�NZQ
wH
� Wo Q
Haa
ElOR
8
N1..
iN ;�jjl��i,i i a
I 1 I�1
Inti s4„iiN�EIC�
arra
City of Atascadero
Resolution No. 2007-076
Page 16 of 19
EXHIBIT D: Elevations
liililY
Foil
5 d 3m -
FIND
E EM
� 1
u�u
yy d
L1 d
0 �
00
�] J
O N 1SS �
9gyp
rA
Cl1 n.
n �
p ov
:. ul
BE)B
Z m
� a d
I F-•
� r
-n
i
E .s
.z
N
x
t
y
�r
City of Atascadero
Resolution No. 2007-076
Page 17 of 19
EXHIBIT E: Landscape Plan
1011
Fr,
o l l I I i Ii iloll
° � � r
Q
I;
oo c®do c
AVM 314JYMl OY49
� I!
e
o �
dJ�
I
rk�
t
;{ ♦ fi
■
City of Atascadero
Resolution No. 2007-076
Page 18 of 19
EXHIBIT F: Irrigation Plan
AVM W j-gvr21t OrvS
� � N
�I
I
II
�_ Jlv4��N'tt� II
.ii i II
s,. I
.I{ I
{ (441 I
i
m " I
L 2
I
�I ®S
City of Atascadero
Resolution No. 2007-076
Page 19 of 19
EXHIBIT G:Tree Removal Application
OWN
TRP 200
LCopASjAPR 1 0 207ITY OF ATASCADERO
UtiiTY OTNELOPIV11 T TREE REMOVAL PERMIT
SECTION 11.05 8.5
OWNER 1: A"'s� � 7C CONTACT:
ADDRESS: ADDRESS: 2 ZV4 4.•�� Ste..R_fes
PHONE#: PHONE#:
FAX#: FAX#:
OWNER 2: ARBORIST:wi/l"'�(:yam ��
Q�L 7
ADDRESS: ADDRESS: ?20.
PHONE#: PHONE#:
FAX k FAX#:
t—ABORIST CERTIFICATION#:-W_&__QZ_1L f ,ARBORIST SIGNATURE-- 1: ,
Site Address:
Site APN:
Reason for Removal:
List all trees to be removed:
SPECIES SIZE(dbh) NUMBER TO BE CONDITION OF TREE
REMOVED
I. 0t. `' 1
2. ba �.� 1
3.
Property owner certifies that they have read and understood Atow'dero Municipal Code Section 9-f 1,105. Tree removal is not to
facilitate future development.
A plot pian shall be included showing all proposed improvements on the property,trees to be removed,and trees to
remain. The trees sban correspond with the numbers above.
Signature of Property Owner Date Signature of Property Owner Date
Signature,City of Atascadero Date