HomeMy WebLinkAbout2007-048 RESOLUTION NO. 2007-048
a► RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
TENTATIVE TRACT MAP 2006-0082, A TEN LOT SUBDIVISION
CONSISTENT WITH A MASTER PLAN OF DEVELOPMENT ON
APN 030-421-005
(El Corte/Eddings)
WHEREAS, an application has been received from Royce Eddings (10780 Vista Rd,
Atascadero, CA 93422) Applicant and Property Owner, to consider a project consisting of a
Zone Change from RSF-X (Residential Single-family-X) to RSF-X/PD17 (Residential Single-
Family-X with a Planned Development Overlay 17) with corresponding Master Plan of
Development and Vesting Tentative Tract Map located at 8570 El Corte Road, (APN 030-421-
005); and,
WHEREAS, the Planning Commission has recommended that the site's Zoning District
be changed from RSF-X (Residential Single-Family-X) to RSF-X/PD 17 (Residential Single-
Family-X/Planned Development Overlay 17); and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2006-0031 were
prepared for the project and made available for public review in accordance with the
err
requirements of the California Environmental Quality Act(CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act(CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Tract Map application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of
Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on May 15, 2007 studied and considered Tentative Tract Map 2006-0082,
after first studying and considering the Proposed Mitigated Negative Declaration prepared for the
project, and
WHEREAS, the City Council of the City of Atascadero, at a duly noticed Public Hearing
held on June 12, 2007, studied and considered Tentative Tract Map 2006-0078, after first
studying and considering the Proposed Mitigated Negative Declaration prepared for the project;
and,
NOW THEREFORE, the City Council of the City of Atascadero takes the following
WW actions:
City of Atascadero
Resolution No.2007-048
Page 2 of 17
SECTION 1. Findings of Approval for Tentative Tract Map, the City Council of the
r City of Atascadero finds as follows:
1. The proposed subdivision, design and improvements as conditioned, is consistent with
the General Plan and applicable zoning requirements, including provisions of the PD-17
overlay district.
2. The proposed subdivision, as conditioned, is consistent with the Master Plan of
Development (CUP 2006-0178).
3. The site is physically suitable for the type of development proposed.
4. The site is physically suitable for the density of development proposed.
5. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
6. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
err
7. Covenants, Conditions and Restrictions (CC&R's) or equivalent shall be required that
incorporate the Master Plan of Development conditions of approval to ensure that the site
retains the proposed qualities (architecture, colors, materials,plan amenities, fencing, and
landscaping) over time.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
MW
City of Atascadero
Resolution No.2007-048
Page 3 of 17
SECTION 2. Approval. The City Council of the City of Atascadero, in a regular
session assembled on June 12, 2007, resolved to approve Tentative Tract Map (TTM 2006-0082)
am subject to the following:
1. Exhibit A: Tentative Tract Map
2. Exhibit B: Conditions of Approval/Mitigation Monitoring Program.
On motion by Council Member O'Malley and seconded by Council Member Brennler,
the foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Beraud, Brennler, Clay, O'Malley and Mayor Luna
NOES: None
ABSENT: None
ADOPTED: June 12, 2007
CITY O JATASCADERO
By: !.�y�---
Dr. eorge Luna, Mayor
ATTEST:
Marcia McClure Torgerson, C.M.C., Cit Jerk
APPROVYD AS TO FORM:
Patri�k,I.' nrigfit, City Attorney
City of Atascadero
Resolution No.2007-048
Page 4 of 17
Exhibit A:Tentative Tract Map
WNW
e
9
U
W
6
iT—'n1
I 1
//iii' �!�/I 111, �l ! °�■��
will
,;�;;;s `- ,s=ue'• iyi \I�n E�x(e
rlSfll �!� f\\\\,�h \� \ 3• \I\\ ,-`� S"II 1 \4
It
lilt
it
rr \
X .�♦♦
it \\
�Yttl�l�llll�
}9 / � rt uiunn
itt "I, 111
1\\ aE �/Vy/l '111lllitl �•
WIN I
it 1i
\ \ i1tit °
\\ t111 tIt
t!?lt3t!
�sssue 1
� �llet !! �!gl�ttli�llrl�t! � E.
�p■..rs■•••■••r°�wr•I III � S1
SSSSlSS
City of Atascadero
Resolution No.2007-048
Page 5 of 17
Exhibit B:Conditions of Approval/Mitigation Monitoring Program
Tentative Tract Map 2006-0088
41111111111111
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
BL:Business
8570 E/Corte Road License Planning
PS:PS:Ser
GP:Grading
Pemtit BS:Building
BP:Building Services
FD: Depatnent
m
FI:Final PD:Pd ce
Inspection t�arhnent
T0:Temporary CE:. ty Engineer
Occupancy WW:Wastewater
F0:Final CA City Aflomey
Occupancy
Planning Services
1. The approval of this zone change and use permit shall become final and effective FM PS
following City Council approval.
2. The approval of this use permit shall become final and effective for the purposes of FM PS
issuing building permits thirty(30)days following the City Council approval of ZCH
2006-0112 upon second reading, unless prior to that time,an appeal to the decision
is filed as set forth in Section 9-1.111(b)of the Zoning Ordinance.
3. The Community Development Department shall have the authority to approve the BP/FM PS,CE
following minor changes to the project that(1)modify the site plan project by less
than 10%,(2)result in a superior site design or appearance,and/or(3)address a
construction design issue that is not substantive to the Master Plan of Development.
4. Approval of this Conditional Use Permit shall be valid for twelve(12)months after its BP/FM PS
effective date. At the end of the period,the approval shall expire and become null
and void unless the project has received a building permit.
5. The applicant shall defend,indemnify,and hold harmless the City of Atascadero or its Ongoin PS
agents,officers,and employees against any claim or action brought to challenge an g
approval by the city,or any of its entities,concerning the subdivision.
6. All subsequent Tentative Map and construction permits shall be consistent with the BP/FM PS,CE
Master Plan of Development contained herein.
7. All exterior elevations,finish materials and colors shall be consistent with the Master BP PS
Plan of Development as shown in EXHIBIT D through Q with the following
modifications:
■ All exterior material finishes(siding,trim,doors,windows,light fixtures,garage
doors)shall be durable,high quality,and consistent with the architectural
appearance.
■ Windows shall be gridded on all four elevations.
■ Roofs shall be architectural grade dimensional shingles.
• Exterior stucco shall be smooth finish or similar. No knock-down finishes will be
permitted.
irrr
City of Atascadero
Resolution No.2007-048
Page 6 of 17
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
BL:Business
8570 E/Corte Road License SerPS:Planning
GP:Grading S:Buis
B
Permit BS:Bolding
PLN 2099-0795 BP:Building FD'Fire Depa lmrrt
effnit
FI:Final l PD:Police
InsDepartment
InspecTemporary CE:4 Engineer
Occupancy WW:Wastewater
F0:Final CA City Attorney
occuPany
8. All site development shall comply with the standards of the Planned Development 17 BP PS,BS
Overlay District.
■ All site work,grading,and site improvements shall be consistent with the Master BP/FM PS,BS,
Plan of Development as shown in EXHIBIT B,C and T. CE
9. All project fencing shall be installed consistent with EXHIBIT Band T subject to the GP/BP PS
following modifications:
■ Fencing material and treatment shall comply with the PD17 standards.
■ Final fence location shall be subject to staff approval.
■ Fencing shall be setback a minimum of 5-feet from the pedestrian pathway.
■ No fencing shall cross the creek channel nor shall be placed in any way which
restricts flow.
'" 0 Fencing adjacent to the open space easement shall be transparent in nature.
10. Final selection of colors and materials shall be subject to staff approval. GP/BP PS
11. A final landscape and irrigation plan shall be approved prior to the issuance of
building permits and included as part of site improvement plan consistent with
EXHIBIT T,and as follows:
• All exterior meters,air conditioning units and mechanical equipment shall be
screened with landscape material.
■ All areas shown on the landscape plan shall be landscaped by the developer
prior to the final of any single building permit on-site.
■ Final tree list shall be submitted with building permits,subject to staff approval.
• Street and open space trees shall be minimum 15-gallon size and double
staked.
■ Front yard areas shall be landscaped with drought tolerant species,subject to
staff approval.
12. The developer and/or subsequent owner shall assume responsibility for the
continued maintenance of all landscape and common areas,consistent with EXHIBIT
B and T.
+irrrr 13. Affordable Housing Requirement: The applicant shall deed restrict one unit at the GP/BP PS,CA
moderate income rate or shall pay in-lieu fees for each unit based on 5%of the
City of Atascadero
Resolution No.2007-048
Page 7 of 17
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
BL:Business PS:
8570 E/Corte Road License enning
GP:Grading BS:ServicesBuilding
Permit BS: lding
ServicesB
PLN 2099-0795 BP:BP:Building FD:Fire Department
Permit PD:Plice
Department
Inspection CE:CilitEngineer
En
T0:Temporary CE:C
�up�y CA CWastewater
FO:Final yAttomey
Occupancy
construction valuation of each unit.
14. Workforce Housing: Prior to recordation of final map,the applicant shall enter into a BP PS,CA
legal agreement with the City to reserve%Z of the units for sale to residents or workers
within the City of Atascadero,including the affordable units. The agreement shall
include the following provisions:
■ The units shall be offered for sale to residents or workers within the City of
Atascadero for a minimum of 60-days. During this time period offers may
only be accepted from Atascadero residents or workers;
■ The applicant shall provide reasonable proof to the City that at least one of
the qualified buyers is a resident or worker within the City Limits of
Atascadero;
■ The Atascadero resident or worker restriction shall apply to the initial sale
only;
■ The applicant shall identify which units will be reserved;and
• The City Attorney shall approve the final form of the agreement.
orrr
15. A Tree Protection Plan shall be submitted with subsequent building permits for GP/BP PS
encroachment within the drip line of native trees located on the subject parcel and
any adjacent properties.The applicant will contract with a certified arborist to monitor
all activity within the drip lines of existing native oak trees and the existing riparian
vegetation.
16. The applicant shall contract with an arborist to monitor the construction of the
retaining wall adjacent to the riparian cottonwood tree.A mitigation deposit will be
required for the cottonwood tree to be in effect a minimum of 2 years after the date of
construction.
17. An address marker to include address for all units shall be located at the public street GP/BP PS
access point.The address marker shall be compatible with the project architecture.
18. The emergency services and facility maintenance costs listed below shall be BP PS
100%funded by the project in perpetuity. The service and maintenance costs
shall be funded through a community facilities district established by the City at
the developer's cost. The funding mechanism must be in place prior to or
concurrently with acceptance of the final maps. The funding mechanism shall be
approved by the City Attorney, City Engineer and Administrative Services Director
prior to acceptance of any final map. The administration of the above mentioned
funds shall be by the City. Developer agrees to participate in the community
facilities district and to take all steps reasonably required by the City with regard to
the establishment of the district and assessment of the property.
• All Atascadero Police Department service costs to the project.
■ All Atascadero Fire Department service costs to the project.
°s" 0 Off-site common City of Atascadero park facilities maintenance service costs
City of Atascadero
Resolution No.2007-048
Page 8 of 17
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
ilrllr BL Business
8570 E/Corte Road License Services
er Planning
GP:Grading BS: c it
Pemtit Seri aiding
BP:Building ���
PLN 2099-0795 Bernet PD:
Fin:Departrnent
B
PFinal PD:Police
Inspection Department
T0:Temporary CE:City Engineer
Occupancy Ck-
Wastewater
F0:Final CA C y AHomey
Occupancy
related to the project.
19. All tract maintenance costs listed below shall be 100% funded by the project in BP PS
perpetuity. The service and maintenance cost shall be funded through a Home
Owners Association established by the developer subject to City approval. The
Home Owners Association must be in place prior to, or concurrently with acceptance
of any final maps. The Home Owners Association shall be approved by the City
Attorney, City Engineer and Administrative Services Director prior to acceptance of
any Final Map. The administration of the above mentioned funds, and the
coordination and performance of maintenance activities, shall be the responsibility of
the Home Owners Association.
a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency
access roads,emergency access gates,and sewer mains within the project.
b) All parks,trails, recreational facilities and like facilities.
c) All open space and native tree preservation areas.
01110 d) All drainage facilities and detention basins.
e) All creeks,flood plains,floodways,wetlands, and riparian habitat areas.
f) All common landscaping areas, street trees, medians, parkway planters,
manufactured slopes outside private yards,and other similar facilities.
g) All frontage landscaping and sidewalks along arterial streets
20. Prior to final map, the applicant shall submit CC&Rs for review and approval by the BP PS, BS
Community Development Department. The CC&R's shall record with the Final Map
and shall include the following:
a) Provisions for maintenance of all common areas including access, parking,
street trees,fencing and landscaping in perpetuity.
b) A detailed list of each individual homeowner's responsibilities for
maintenance of the individual units.
c) Residents shall keep all trash receptacles within the unit's designated trash
storage area.
d) Garages shall be maintained and used for vehicle parking.
e) No boats, RV's or other type of recreation vehicle may occupy a guest or
resident parking space,including within an individual garage.
iftof) A provision for review and approval by the City Community Development
Department for any changes to the CC&R's that relate to the above
City of Atascadero
Resolution No.2007-048
Page 9 of 17
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
illlin BL:Business
8570 E/Corte Road License PS:Plann ng
Services
GP:Grading
Ser Building
Permit
PLN 2099-0795 8BPP::Building ���
FD:Fire Department
FI:Fina PD:Police
Department
InspecfiCE:City itEngineer
T0:Temporary CE:City
Occupancy CA City AWastewater
F0:Final CA ttorney
Occupancy
requirements prior to the changes being recorded or taking effect.
21. Approval of this permit shall include the removal of 1 Native Tree.The applicant shall BP PS, BS
be required to pay mitigation fees or provide replantings on-site per the requirements
of the Atascadero Native Tree Ordinance.Any additional removals shall be subject to
Planning Commission approval.
■ A mitigation deposit shall be collected for the two valley oak trees located
adjacent to the pedestrian pathway linking La Linia Ave to EI Corte.
22. The applicant must provide for the repair and maintenance of on-site shared FM CE
improvements.This includes roads,sidewalks,street trees,streetlights,private sewer
system,drainage facilities,recreation areas and common landscaping.The two
methods that may be used are:
a) Homeowners Association.This private organization would be responsible for
the
maintenance, repair and replacement of the facilities.
arr
b) Assessment District and Landscape and Lighting District. Funds for the
maintenance,repair and replacement of the facilities would be collected on
the
property tax bill and distributed to the City.
The City Engineer and City Attorney shall approve the final form prior to recordation.
23. The pedestrian bridge shall be maintained by the homeowners association and shall GP CE
be constructed to be low maintenance.Design of the bridge shall be approved by the
City Engineer and Planning Department
24. The perimeter retaining walls shall be maintained by the Homeowners Association. FM CE/PS
25. The cul-de-sac shall be named Erica Court.
City Engineer Project Conditions
26. The public walkway between Bella Casa Court and La Linia Road shall be contained FM CE
within a public access easement.
27. Bella Casa Court shall be located within a public access easement. FM CE
City Engineer Standard Conditions
.r 28. In the event that the applicant bonds for the public improvements required as a GP, BP CE
condition of this map, the applicant shall enter into a Subdivision Improvement
City of Atascadero
Resolution No.2007-048
Page 10 of 17
Conditions of Approval/ Timing Responsibil Mitigation
ity Measure
/Monit
Mitigation Monitoring Program toring
�
BL:Business PS:Planning
8570 E/Corte Road Lice r se Services
GP:Grading BS:Building
Pennt Services
PLN 2099-0795 Pennnit g FD:Pini eepartrnent
FI:Final PD:Police
CE:CoDeparrent
Inspection
TO:Temporary CE:CEngineer
�upwy WW:Wastewater
FO:Final CA Co Attorney
Occupancy
Agreement with the City Council.
29. An engineer's estimate of probable cost shall be submitted for review and approval GP,BP CE
by the City Engineer to determine the amount of the bond.
30. The Subdivision Improvement Agreement shall record concurrently with the Final FM CE
Map.
31. A six (6) foot Public Utility Easement (PUE) shall be provided contiguous to the GP, BP CE
property frontage.
32. The applicant shall acquire title interest in any off-site land that may be required to GP, BP CE
allow for the construction of the improvements. The applicant shall bear all costs
associated with the necessary acquisitions.The applicant shall also gain concurrence
from all adjacent property owners whose ingress and egress is affected by these
improvements.
33. Slope easements shall be obtained by the applicant as needed to accommodate cut GP, BP CE
iiurr or fill slopes.
34. Drainage easements shall be obtained by the applicant as needed to accommodate GP,BP CE
both public and private drainage facilities.
35. A preliminary subdivision guarantee shall be submitted for review in conjunction with FM CE
the processing of the tract map.
36. The final map shall be signed by the City Engineer prior to the map being placed on FM CE
the agenda for City Council acceptance.
37. Prior to recording the tract map, the applicant shall pay all outstanding plan FM CE
check/inspection fees.
38. Prior to recording the map,the applicant shall bond for or complete all improvements FM CE
required by these conditions of approval.
39. Prior to recording the tract map,the applicant shall bond for or set monuments at all FM CE
new property comers. A registered civil engineer or licensed land surveyor shall
indicate by certificate on the parcel map,that corners have been set or shall be set by
a date specific and that they will be sufficient to enable the survey to be retraced.
40. Prior to recording the tract map,the applicant shall submit a map drawn in substantial FM CE
conformance with the approved tentative map and in compliance with all conditions
set forth herein. The map shall be submitted for review and approval by the City in
accordance with the Subdivision Map Act and the City's Subdivision Ordinance.
errs+
City of Atascadero
Resolution No.2007-048
Page 11 of 17
Conditions of Approval I Timing Responsibil Mitigation
ity
Mitigation Monitoring Program tMeasure
/Monitoring
BL:Business PS:Planning
8570 E/Corte Road License ng Services
BS:Building
Pemrt Grad'
Services
BP:Building
PLN 2099-0795 Permit PD:
Fire Department
FI:Final DeparPD:Police
Inspection CE:COhent
10:Temporary CE:CEngineer
Occupancy CA,Wastewater
F0:Final CA C ty Attorney
Occupancy
41. All existing and proposed utility, pipeline, open space, or other easements are to be FM CE
shown on the final/parcel map. If there are building or other restrictions related to the
easements,they shall be noted on the final/parcel map. The applicant shall show all
access restrictions on the final/parcel map.
42. Prior to recording the tract map, the applicant shall have the map reviewed by all FM CE
applicable public and private utility companies (cable, telephone, gas, electric,
Atascadero Mutual Water Company). The applicant shall obtain a letter from each
utility company indicating their review of the map. The letter shall identify any new
easements that may be required by the utility company. A copy of the letter shall be
submitted to the City. New easements shall be shown on the parcel map.
43. Prior to the issuance of building permits the applicant shall submit plans and GP,BP CE
supporting calculations/reports including street improvements, underground utilities,
composite utilities, and grading/drainage plans prepared by a registered civil
engineer for review and approval by the City Engineer.
44. Submit calculations to support the design of any structures or pipes. Closed conduits GP,BP CE
low shall be designed to convey the 10-year flow with gravity flow, the 25-year flow with
head,and provide safe conveyance for the 100-year overflow.
45. Provide for the detention and metering out of developed storm runoff so that it is GP, BP CE
equal to or less than undeveloped storm runoff.
46. Drainage basins shall be designed to desilt, detain and meter storm flows as well as GP, BP CE
release them to natural runoff locations.
47. Show the method of dispersal at all pipe outlets. Include specifications for size&type GP, BP CE
of rip rap.
48. Concentrated drainage from off-site areas shall be conveyed across the project site GP, BP CE
in drainage easements. Acquire drainage easements where needed. Drainage shall
cross lot lines only where a drainage easement has been provided. If drainage
easement cannot be obtained the storm water release must follow the exact historic
path,rate and velocity as prior to the subdivision.
49. Applicant shall submit erosion control plans and a Storm Water Pollution Prevention GP, BP CE
Plan (SWPPP). The Regional Water Quality Control Board shall approve the
SW PPP.
50. All public improvements shall be constructed in conformance with the City of GP, BP CE
Atascadero Engineering Department Standard Specifications and Drawings or as
directed by the City Engineer
51. The on-site streets shall be improved consistent with the Tentative Tract Map. GP, BP CE
�rrw
City of Atascadero
Resolution No.2007-048
Page 12 of 17
Conditions of Approval/ Timing Responsibil Mitigation
ity
Mitigation Monitoring Program tMeasure
/Monitoring
111111 BL:Business PS:Planning
8570 E/Corte Road License Services
GP:Grading BS:Building
Permit Services
BP:Building FD:Fire Department
PLN 2099-0795 Penn it PD:Police
FI:Final Deparhnent
Inspection CE:City Engineer
T0:Temporary WW:Wastewater
Occupant/' CA City Attorney
F0:Final
Occupancy
52. Off-site streets shall be improved consistent with the Tentative Tract Map. GP, BP CE
53. Alignment of frontage improvements shall be approved by the City Engineer. GP,BP CE
54. A mechanism to provide for the funding of maintenance for lighting, street GP, BP CE
improvements, special paving surfaces, sewer, storm drain, common area
landscape,open space,and hardscape shall be provided.
55. All utilities shall be undergrounded on project frontage GP,BP CE
56. A mechanism must be provided to fund the maintenance of all sewer mains GP, BP CE
throughout the project area. The developer shall establish a benefit maintenance
assessment district, or similar funding mechanism, approved by the City, to provide
sufficient funds, on an annual basis, to pay for the maintenance activities on the
sewer mainline and related facilities within the project area.
57. All onsite sewer mains shall be privately owned and maintained. FM CE
58. Prior to recording the final map, provisions for the repair and maintenance of the FM CE
private SS shall be included in the CC&R's for this tract. Included shall be a
mechanism to maintain the private sewer and structures, such as a homeowners
association. The City Engineer and City Attorney shall approve the final form prior to
recordation.
59. Applicant shall pay sewer extension (Annexation), Connection and Reimbursement BP CE
fees(if applicable)upon issuance of building permit.
60. Gravity mains within the subdivision shall be eight(8)inches in diameter. BP CE
61. Drainage piping serving fixtures which have flood level rims located below the BP CE
elevation of the next upstream manhole cover of the public or private sewer serving
such drainage piping shall be protected from backflow of sewage by installing an
approved type backwater valve. Fixtures above such elevation shall not discharge
through the backwater valve.
62. All sanitary sewer (SS) mains shall terminate in manholes unless extension of the BP CE
main, at some later date,is anticipated. If extension of a SS main is anticipated,said
SS main may terminate in a cleanout providing the next downstream manhole is less
than 300 linear feet from the cleanout and that the point of termination is not a
reasonable location for a SS main angle point or intersection.
Atascadero Mutual Water Company
61. Before the issuance of building permits,the applicant shall submit plans to AMWC
for the water distribution facilities needed to serve the project. AMWC shall
"' review and approve the plans before construction begins on the waters stem
City of Atascadero
Resolution No.2007-048
Page 13 of 17
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program iMeasure
/Monittoring
am BL:Business PS:Planning
8570 E/Corte Road License Seances
GP:Grading BS:Building
Permit Services
PLN 2099-0795 PPfBtuilding FD:Fire Department
FI:Final PD:Police
Dep
Inspection arfient
CE:City,
T0:Temporary Engineer
yup--y CAVVWWastewater
C
F0:Final
Atlon ey
Occupancy
improvements. All water distribution facilities shall be constructed in conformance
with AMWC Standards and Details and the California Waterworks Standards
(Code of Regulations Title 22, Division 4, Chapter 16). All cross-connection
devices shall conform to AWWA and California Department of Health Services
standards.
62. Before issuance of building permits,the applicant shall obtain a"Will Serve"letter
from AMWC for the newly created lots within the subdivision.
Mitigation Measure 1.c.1:All retaining walls shall be constructed of dark color split face BP PS 1.c.1
block or of similar color and texture to blend into the surrounding natural environment.
Mitigation Measure 1.c.2: each unit shall be painted with darker earth toned colors.All BP PS 1.c.2
materials shall be high quality and designed to blend with the surrounding
environment.
Mitigation Measure 3.b.1: The project shall be conditioned to comply with all BP BS 3.b.1
applicable District regulations pertaining to the control of fugitive dust(PM-10)as
contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality Handbook.
• Asbestos has been identified by the state Air Resources Board as a toxic air
contaminant. Serpentine and ultramafic rocks are very common in the state
and may contain naturally occurring asbestos. Under the State Air Resources
Board Air Toxics Control Measure(ATCM)for Construction, Grading,
Quarrying,and Surface Mining Operations, prior to any grading activities at the
site,the project proponent shall ensure that a geologic evaluation is conducted
to determine if naturally occurring asbestos is present within the area that will
be disturbed. If Naturally Occurring Asbestos(NOA)is found at the site the
applicant must comply with all requirements outlined in the Asbestos ATCM for
Construction, Grading, Quarrying,and Surface Mining Operations. If NOA is
not present, an exemption request must be filed with the District. If NOA is
found at the site the applicant must comply with all requirements outlined in the
Asbestos ATCM. This may include development of an Asbestos Dust Mitigation
Plan and an Asbestos Health and Safety Program for approval by the APCD.
Should Naturally Occurring Asbestos be identified within the area of
construction, and the worked area will be less than or equal to one acre,then
the dust control measures identified below are required. If the disturbed area is
greater than one acre,additional requirements may include but are not limited
to 1)an Asbestos Dust Mitigation Plan which must be approved by the District
before construction begins,and 2)an Asbestos Health and Safety Program will
also be required for some projects.
• Dust Control Measures for Construction and Grading Operation Projects One
Acre or Less: No person shall engage in any construction or grading operation
on property where the area to be disturbed is one(1.0)acre or less unless all of
torr the following dust mitigation measures are initiated at the start and maintained
throughout the duration of the construction or grading activity:
City of Atascadero
Resolution No.2007-048
Page 14 of 17
Conditions of Approval/ Timing Responsibrl Mitigation
ity Measure
Mitigation Monitoring Program /Monitoring
BL:Business PS:Planning
8570 E/Corte Road License Sevices
GP:Grading BS:Building
Permd Series
BP:Building FD:Flee Departrnent
PLN 2099-0795 Fi�� PD:Police
Inspection Departinent
CE:City Engineer
TO:Temporary WW:Wastewater
Occr>PanY CA City Attorney
F0:Final
Occupancy
(A)Construction vehicle speed at the work site must be limited to fifteen(15)
miles per hour or less;
(B)Prior to any ground disturbance, sufficient water must be applied to the
area to be disturbed to prevent visible emissions from crossing the
property line;
(C)Areas to be graded or excavated must be kept adequately wetted to
prevent visible emissions from crossing the property line;
(D)Storage piles must be kept adequately wetted,treated with a chemical
dust suppressant,or covered when material is not being added to or
removed from the pile;
(E)Equipment must be washed down before moving from the property onto a
paved public road; and
(F)Visible track-out on the paved public road must be cleaned using wet
wr sweeping or a HEPA filter equipped vacuum device within twenty-four
24 hours.
Mitigation Measure 3.b.2: Naturally Occurring Asbestos(NOA)has been identified by BP PS 3.b.2
the state Air Resources Board as a toxic air contaminant. Serpentine and ultramafic
rocks are very common in the state and may contain naturally occurring asbestos.
Under the State Air Resources Board Air Toxics Control Measure(ATCM)for
Construction, Grading, Quarrying,and Surface Mining Operations, prior to any grading
activities at the site,the project proponent shall ensure that a geologic evaluation is
conducted to determine if naturally occurring asbestos is present within the area that
will be disturbed. If naturally occurring asbestos is found at the site the applicant must
comply with all requirements outlined in the Asbestos ATCM for Construction, Grading,
Quarrying, and Surface Mining Operations. These requirements may include but are
not limited to 1)an Asbestos Dust Mitigation Plan which must be approved by the
District before construction begins, and 2)an Asbestos Health and Safety Program will
also be required for some projects.
Mitigation Measure 4.b.1: Replace willow tree removals at a ratio of 3:1 for any willow BP PS
removals necessary to construct the pedestrian connection to La Linia Ave.Willow
stakes shall be spaced approximately 4-feet apart according to ACOE
recommendations. Stakes shall be placed deep enough to reach water during summer
months with 50%-80%of the stakes below ground.Willow stakes should be collected
from existing native willow trees in the vicinity of the project area (preferably the ones
being removed).
Mitigation Measure 4.b.2: prior to issuance of building permits,the Cottonwood tree GP PS 4.e.4
shall be treated to eliminate existing mistletoe plants.
i�rrr
City of Atascadero
Resolution No.2007-048
Page 15 of 17
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
lrll/ BL:Business PS:Planning
8570 E/Corte Road License Seroces
GP:Grading BS:Building
Permit Senrices
PLN 1099-0795 PernkBuilding FD:Foe Deparhr ent
FI:Final PD:Police
Deparinent
E:Cty
Inspection Cil
T0:Temporary CE:C Engineer
WW:Wastewater
Occupancy CA City Attorney
F0:Final
Occupancy
Mitigation Measure 4.e.1: The Grading Plan shall identify tree protection fencing GP/BP PS 4.e.1
around the dripline,or as recommended by the project arborist,of each existing on-
site or off-site native tree.
Mitigation Measure 4.e.2: Grading and excavation and grading work shall be GP PS 4.e.2
consistent with the City of Atascadero Tree Ordinance. Special precautions when
working around native trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be pruned prior to any
heavy equipment work being done.
4. Vehicles and stockpiled material shall be stored outside the dripline of all
trees.
5. All trees within the area of work shall be fenced for protection with 4-foot
chain link,snow or safety fencing placed per the approved tree protection
plan. Tree protection fencing shall be in place prior to any site excavation or
grading. Fencing shall remain in place until completion of all construction
activities.
6. Any roots that are encountered during excavation shall be clean cut by hand
and sealed with an approved tree seal.
irrr
City of Atascadero
Resolution No.2007-048
Page 16 of 17
Conditions of Approval/ Timing Responsibil Mitigation
Mitigation Monitoring Program ity Measure
/Monitoring
i1IM BL:Business PS:Planning
8570 E/Corte Road License Sees
GP:Grading BS:Building
Permit Serves
PLN 2099-0795 PeBuilding FD:Fire Department
FI:Final Department
Police
Inspection ky
CE:C
TO:Temporary CE:City Engineer
Occupancy K-Wastewater
C
FO:Final
ACtyAttaney
Occupancy
Mitigation Measure 4.e.3: The developer shall contract with a certified arborist during GP PS 4.e.3
all phases of project implementation. The certified arborists shall be responsible for
monitoring the project during all phases of construction through project completion,as
follows:
(a) A written agreement between the arborist and the developer outlining a arborist
monitoring schedule for each construction phase through final inspection shall be
submitted to and approved by planning staff prior to the issuance of
building/grading permits.
(b) Arborist shall schedule a pre-construction meeting with engineering/planning
staff,grading equipment operators, project superintendent to review the project
conditions and requirements prior to any grubbing or earth work for any portion of
the project site. All tree protection fencing and trunk protection shall be installed
for inspection during the meeting. Tree protection fencing shall be installed at the
line of encroachment into the tree's root zone area.
(c) As specified by the arborist report and City staff:
• Prune all trees in active development areas to be saved for structural strength
Willie and crown cleaning by a licensed and certified arborist;
■ Remove all debris and spoils from the lot cleaning and tree pruning.
■ In locations where paving is to occur within the tree canopy,grub only and do
not grade nor compact. Install porous pavers over a three-inch bed of/,inch
granite covered with one-inch pea gravel for screeding. If curbs are required,
use pegged curbs to secure the porous pavers. Pegged curbs are reinforced
six to eight curbs poured at grade with a one-foot by one-foot pothole every
four to six linear feet.
■ All trenching or grading within the protected root zone area, outside of the tree
protection fence shall require hand trenching or preserve and protect roots that
are larger than 2 inches in diameter.
■ No grading or trenching is allowed within the fenced protected area.
■ Any roots that are 4 inches in diameter or larger are not to be cut until
inspected and approved by the on-site arborist.
(d) Upon project completion and prior to final occupancy a final status report
shall be prepared by the project arborist certifying that the tree protection plan
was implemented,the trees designated for protection were protected during
construction, and the construction-related tree protection measures are no longer
required for tree protection.
Mitigation Measure 6.b: The grading permit application plans shall include erosion GP CE 6.b
control measures to prevent soil,dirt, and debris from entering the storm drain system
during and after construction.
Mitigation Measure 6.c.d: A soils report shall be required to be submitted with a future GP BS 6.c.d
building permit by the building department.The building pians will be required to follow
the recommendations of the soils report to assure safety for residents and buildings.
City of Atascadero
Resolution No.2007-048
Page 17 of 17
Conditions of Approval I Timing Responsibil Mitigation
ity Measure
Mitigation Monitoring Program /Monitoring
BL:Business PS:Planning
1
8570 E/Corte Road Lice Services
Ser
GP:Grading BS:Building
Permit Services
BP:Building FD:Fire Departnenl
PLN 2099-0795 Permit PD:Police
FI:Final Departnent
Inspection CE:City Engineer
TO:Temporary WK Wastewater
OccWarcY CA Cry Attorney
FO:Final
Occupancy
Mitigation Measure 8e.f.1: A Stormwater Pollution Prevention Plan (SWPPP)/Erosion BP CE 8.e.f
Control Plan shall be submitted and approved by the City Engineer prior to the
issuance of the building permit. The plan shall include storm water measures for the
operation and maintenance of the project for the review and approval of the City
Engineer. The Building Permit application plans shall identify Best Management
Practices(BMPs)appropriate to the uses conducted on site that effectively prohibit the
entry of pollutants into storm water runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for ensuring that all BP BS,PS,CE 8.ef.2
contractors are aware of all storm water quality measures and that such measures are
implemented. Failure to comply with the approved construction Best Management
Practices will result in the issuance of correction notices,citations,or stop work orders.
Mitigation Measure 11.d: All construction activities shall comply with the City of Ongoing BS/PS 11.d
Atascadero Noise Ordinance for hours of operation.
Mitigation Measure 15.a.b.1: Frontage improvements shall be required along EI Corte BP CE 15.a.b.1
Rd and La Linia Ave.Additional improvements may be required, subject to the
approval of the City Engineer.
�rrr
�rw