HomeMy WebLinkAbout2007-019 RESOLUTION NO. 2007-019
am RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
CONDITIONAL USE PERMIT 2004-0137 AMENDMENT TO APPROVE
39400 SQUARE-FEET OF HEALTH CARE SERVICE USE LOCATED AT
APN 056-081-032
(9700 El Camino Real — Jacobson)
WHEREAS, an application has been received from Ted Jacobson (8055 Cristobal
Avenue, Atascadero, Ca 93422) Applicant and Property Owner to consider an amendment to
Conditional Use Permit 2004-0137 to establish health care services within the office portion of
the development; and,
WHEREAS, the site's current General Plan Designation is General Commercial (GC);
and,
WHEREAS, the site's current zoning is Commercial Tourist(CT); and,
WHEREAS, the Planning Commission has recommended that "health care services" be
added as a conditional use within the Commercial Tourist (CT) zone; and,
err
WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2007-0002
were prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act(CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act(CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit Amendment application was held by the Planning Commission of the City of
Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said
Master Plan of Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on April 3, 2007, studied and considered the Conditional Use Permit 2004-
0137 Amendment, after first studying and considering the Proposed Mitigated Negative
Declaration prepared for the project, and,
WHEREAS, the City Council of the City of Atascadero, at a duly noticed Public Hearing
held on May 8, 2007, studied and considered Conditional Use Permit 2004-0137 Amendment,
after first studying and considering the Proposed Mitigated Negative Declaration prepared for the
project, and,
err
City of Atascadero
Resolution No. 2007-019
Page 2 of 11
NOW, THEREFORE, the City Council of the City of Atascadero takes the following
err actions:
SECTION 1. Findings for approval of Conditional Use Permit Amendment. The
City Council finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because of
the circumstances and conditions applied in the particular case, be detrimental to the
health, safety, or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in
the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the Land Use
Element.
SECTION 2. Findings for shared on-site and peak-hour parking reduction. The
City Council finds as follows:
The characteristics of a use or its immediate vicinity do not necessitate the number of
parking spaces, type of design, or improvements required by this title and that
reduced parking will be adequate to accommodate on the site all parking needs
generated by the use.
SECTION 3. Approval. The City Council of the City of Atascadero, in a regular
session assembled on May 8, 2007, resolved to approve Conditional Use Permit 2004-0137
Amendment subject to the following:
EXHIBIT A: Conditions of Approval
EXHIBIT B: Site Plan
City of Atascadero
Resolution No. 2007-019
Page 3 of 11
On motion by Council Member O'Malley and seconded by Council Member Clay, the
r.. foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Beraud, Brennler, Clay, O'Malley and Mayor Luna
NOES: None
ABSENT: None
ADOPTED: May 8, 2007
CITY O ATASCADERO
By:
Dr. Ge ge Luna, Mayor
CITY
ATTEST:
Marcia McClure Torgerson, C.M.C., City, lerk
irr
APPROVED AS TO FORM:
Patrick L. Eqighf, City Attorney
City of Atascadero
Resolution No. 2007-019
Page 4 of 11
EXHIBIT A:Conditions of Approval/Mitigation Monitoring Program
rrlrr
Master Plan of Development Amendment(CUP 20040137)-Health Care Services
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 El Camino Real License FD:Fire Deparbnent
GP:Grading PD:Police Department
Master Plan of Development Amendment Penmd CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137—Establishment of Health Care Services Pemd CA,City AUM
FI:Final
Inspection
TO:Temporary
OccWacy
F0:Final
Occupancy
Planning Services
1. This conditional use permit shall be for 3,400 square-feet of health care Ongoing PS
services medical offices located within the office portion of the
development located at 9700 EI Camino Real as shown on Exhibit B.
2. The approval of this use permit shall become final and effective for the BP PS
purposes of issuing building permits thirty(30)days following the second
reading of ZCH application 2006-0130.
�rrr
3. The Community Development Department shall have the authority to BP PS,BS,FD
approve improvements associated with the building code requirements
for covered drop-off areas and any other exterior,modifications related to
the permitting of medial facilities subject to the following:
• All improvements to the exterior of the building shall be
architecturally compatible with the building architecture.
• Any required covered canopy structure will be constructed of
architectural columns and shall include a tiled roof consistent with
the approved architecture.
• Parking shall not be reduced to accommodate any required site
improvements.
• Driveway widths shall not be decreased and all improvements shall
be reviewed by the City of Atascadero Fire Department.
4. Approval of this Conditional Use Permit shall be valid for twelve(12) 13P/ PS
months after its effective date. At the end of the period,the approval Ongoing
shall expire and become null and void unless the project has received a
building permit for all necessary Tenant Improvements and/or a business
license for a medical use.
5. The applicant shall defend, indemnify,and hold harmless the City of Ongoing
Atascadero or its agents,officers,and employees against any claim or
01111111111 action brought to challenge an approval by the city,or any of its entities,
City of Atascadero
Resolution No. 2007-019
Page 5 of 11
Conditions of Approval/ Timing Responsibility Mitigation
goo Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Bus ness BS:Building Se v rzs
9700 E/Camino Rea/ License FD:Fire Department
GP:Grading PD:Police Depa anent
Master Plan of Development Amendment Permit CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137—Establishment of Health Care Services Permit CA CityAdomey
FI:Final
Inspection
TO:Temporary
Occupancy
F0:Final
Occupancy
concerning the subdivision.
Mitigation Measures
Mitigation Measure 1.c.1: The following landscape mitigations shall apply: BP BS,PS,CE 1.0
■ The project landscaping shall include street trees along the EI Camino
Real and East Frontage Road frontage placed a minimum of 30 feet
on center or at locations complimentary to the architectural design of
the proposed buildings, subject to staff approval.
■ All proposed parking area trees shall be shade trees of 15-gallon size
and shall be double staked.
Mitigation Measure 1.c.2: The proposed buildings shall include the use of paint BP BS,PS,CE 1.c.2
and roof colors consistent with the architectural style as designed.The hotel
building shall incorporate high quality brick veneer of a dark earth toned color
as depicted on the attached elevation exhibit.The hotel building shall utilize
darker earth toned accents and fagade colors,subject to staff approval.
Awnings and/or similar accent features shall be included throughout the building
facade and along the lower floor level to enhance the architectural appearance
of the building and mitigate the proposed additional height.
Mitigation Measure 1.d.1: If exterior parking lot lighting is proposed, it shall be BP BS,PS,CE 1.d.1
designed to eliminate any off site glare. All exterior site lights shall utilize full
cut-off, "hooded"lighting fixtures to prevent offsite light spillage and glare.Any
luminaire pole height shall not exceed 14-feet in height, limit intensity to 2.0 foot
candles at ingress/egress, and otherwise 0.6 foot candle minimum to 1.0
maximum within the site. Fixtures shall be shield cut-off type and compatible
with neighborhood setting,subject to staff approval.
Mitigation Measure 3.b.1: BP,GP PS,CE 3.b.1
Naturally Occurring Asbestos(NOA)has been identified by the state Air
Resources Board as a toxic air contaminant.Serpentine and ultramafic rocks
are very common in the state and may contain naturally occurring asbestos.
Under the State Air Resources Board Air Toxics Control Measure (ATCM)for
Construction, Grading, Quarrying, and Surface Mining Operations, prior to any
grading activities at the site,the project proponent shall ensure that a geologic
evaluation is conducted to determine if naturally occurring asbestos is present
within the area that will be disturbed. If naturally occurring asbestos is found at
the site the applicant must comply with all requirements outlined in the
Asbestos ATCM for Construction, Grading, Quarrying,and Surface Mining
Operations. These requirements may include but are not limited to 1)an
Asbestos Dust Mitigation Plan which must be approved by the District before
construction begins, and 2)an Asbestos Health and Safety Program will also be
required for some projects.
City of Atascadero
Resolution No. 2007-019
Page 6 of 11
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 El Camino Real License FD:Fire Departnenl
GP:Grading PD:Police Depatnent
Master Plan of Development Amendment Peal CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137—Establishment of Health Care Services Permit CA City Attorney
FI:Final
Inspection
TO:Temporary
Occupancy
FO:Final
Occupancy
Mitigation Measure 3.b.1: The project shall be conditioned to comply with all BP,GP BS,PS,CE 3.b.1
applicable District regulations pertaining to the control of fugitive dust(PM-10)
as contained in sections 6.3,6.4 and 6.5 of the April 2003 Air Quality
Handbook.
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune according to
manufacturer's specifications.
■ Fuel all off-road and portable diesel powered equipment, including but not
limited to bulldozers,graders,cranes, loaders,scrapers, backhoes,
generator sets, compressors,auxiliary power units,with ARB certified
motor vehicle diesel fuel (Non-taxed version suitable for use off-road).
■ Maximize to the extent feasible,the use of diesel construction equipment
meeting the ARB's 1996 or newer certification standard for off-road heavy-
duty diesel engines.
■ Install diesel oxidation catalysts(DOC), catalyzed diesels particulate filters
(CDPF)or other District approved emission reduction retrofit services
(Required for projects grading more than 4.0 acres of continuously worked
area).
Section 6.4: Activity Management Techniques
■ Develop a comprehensive construction activity management plan designed
to minimize the amount of large construction equipment operating during
any given time period.
■ Schedule of construction truck trips during non-peak hours to reduce peak
hour emissions.
■ Limit the length of the construction workday period, if necessary.
■ Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading, demolition and
building plan notes:
A. Reduce the amount of the disturbed area where possible.
B. Use of water trucks or sprinkler systems in sufficient quantities to
prevent airborne dust from leaving the site. Increased watering
frequency would be required whenever wind speeds exceed 15 mph.
Reclaimed (non-potable)water should be used whenever possible.
C. All dirt stockpile areas should be sprayed daily as needed.
D. Permanent dust control measures identified in the approved project re-
vegetation and landscape plans should be implemented as soon as
possible following completion of any soil disturbing activities.
E. Exposed ground areas that are planned to be reworked at dates
greater than one month after initial grading should be sown with a fast-
germinating native grass seed and watered until vegetation is
established.
F. All disturbed soil areas not subject to re-vegetation should be
City of Atascadero
Resolution No. 2007-019
Page 7 of 11
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 El Camino Rea/ License FD:Fire Deparhnent
GP:Grading PD:Police Depa anent
Master Plan of Development Amendment Perrnit CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137—Establishment of Health Care Services Pernit CACity adomey
FI:Final
Inspecdon
TO:Temporary
Occupancy
F0:Final
Occupancy
stabilized using approved chemical soil binder,jute netting,or other
methods approved in advance by the APCD.
G. All roadways, driveways, sidewalks, etc,to be paved should be
complete as soon as possible. In addition, building pads should be
laid as soon as possible after grading unless seeding or soil binders
are used.
H. Vehicle speed for all construction vehicles shall not exceed 15 mph on
any unpaved surface at the construction site.
I. All trucks hauling dirt,sand, soil, or other loose materials are to be
covered or should maintain at least two feet of freeboard(minimum
vertical distance between top of load and top of trailer)in accordance
with CVC Section 23114.
J. Install wheel washers where vehicles enter and exit unpaved roads
onto streets,or wash off trucks and equipment leaving the site.
K. Sweep streets at the end of each day if visible soil material is carried
onto adjacent paved roads. Water sweepers with reclaimed water
should be used where feasible.
The contractor or builder shall designate a person or persons to monitor the
dust control program and to order increased watering,as necessary,to prevent
transport of dust off site. The name and telephone number of such persons
shall be provided to the APCD prior to land use clearance for map recordation
and land use clearance for finish grading of any structure.
Mitigation 3.b.2:The applicant shall contact the APCD for any permits BP APCD 3.b.2
necessary related to developmental burning of vegetative material and/or
construction permit requirements.
Mitigation Measure 4.e.1: Grading and excavation and grading work shall be BP PS 4.e.1
consistent with the City of Atascadero Tree Ordinance. Special precautions
when working around native trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be pruned prior
to any heavy equipment work being done.
4. Vehicles and stockpiled material shall be stored outside the dripline of
all trees.
5. All trees within the area of work shall be fenced for protection with 4-
foot chain link, snow or safety fencing placed per the approved tree
protection plan. Tree protection fencing shall be in place prior to any
site excavation or grading. Fencing shall remain in place until
completion of all construction activities.
6. Any roots that are encountered during excavation shall be clean cut by
hand and sealed with an approved tree seal.
Mitigation Measure 4.e.2: The developer shall contract with a certified arborist BP PS 4.e.2
during all phases of project implementation. The certified arborists shall be
responsible for monitoring the project during all phases of construction through
project completion,as follows:
City of Atascadero
Resolution No. 2007-019
Page 8 of 11
Conditions of Approval/ Timing Responsibility Mitigation
,w Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Rea/ License FD:Fire Department
GP:Grading PD:Poke Department
Master Plan of Development Amendment Perak CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137—Establishment of Health Care Services Pearn CA.Citynttomey
FI:Final
Inspection
TO:Temporary
Occupancy
F0:Final
Occupancy
(a) A written agreement between the arborist and the developer outlining a
arborist monitoring schedule for each construction phase through final
inspection shall be submitted to and approved by planning staff prior to the
issuance of building/grading permits.
(b) Arborist shall schedule a pre-construction meeting with engineering
/planning staff,grading equipment operators, project superintendent to
review the project conditions and requirements prior to any grubbing or
earth work for any portion of the project site. All tree protection fencing and
trunk protection shall be installed for inspection during the meeting. Tree
protection fencing shall be installed at the line of encroachment into the
tree's root zone area.
(c) As specified by the arborist report and City staff:
■ Prune all trees in active development areas to be saved for structural
strength and crown cleaning by a licensed and certified arborist.
■ Remove all debris and spoils from the lot cleaning and tree pruning.
■ In locations where paving is to occur within the tree canopy,grub only
and do not grade or compact. Install porous pavers over a three-inch
bed of 3/4 inch granite covered with one-inch pea gravel for screeding. If
curbs are required, use pegged curbs to secure the porous pavers.
Pegged curbs are reinforced six to eight curbs poured at grade with a
one-foot by one-foot pothole every four to six linear feet.
■ All trenching or grading within the protected root zone area,outside of
the tree protection fence shall require hand trenching or preserve and
protect roots that are larger than 2 inches in diameter.
• No grading or trenching is allowed within the fenced protected area.
■ Any roots that are 4 inches in diameter or larger are not to be cut until
inspected and approved by the on-site arborist.
(d) Upon project completion and prior to final occupancy a final status report
shall be prepared by the project arborist certifying that the tree
protection plan was implemented,the trees designated for protection
were protected during construction, and the construction-related tree
protection measures are no longer required for tree protection.
Mitigation Measure 4.e.3: All tree removals shall be mitigated in accordance GP,BP PS 4.e.3
with the Atascadero native Tree Ordinance.
Mitigation Measure 6.b.1: The grading permit application plans shall include GP PS,BS,CE 6.b.1
erosion control measures to prevent soil, dirt,and debris from entering the
storm drain system during and after construction. A separate plan shall be
submitted for this purpose and shall be subject to review and approval of the
City Engineer at the time of Building Permit application.
aw
City of Atascadero
Resolution No. 2007-019
Page 9 of 11
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 El Camino Rea/ License FD:Fire Departnent
GP:Grading PD:Police Department
Master Plan of Development Amendment Pend CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137—Establishment of Health Care Services Permit CA.City Afton"
FI:Final
Inspeclion
TO:Temporary
occupaq
FO:Final
Occupancy
Mitigation Measure 6.c.1: A soils report shall be required to be submitted with a BP,GP PS,BS,CE 6.c.1
future building permit by the building department.
Mitigation Measure 8.e.f.1: The developer is responsible for ensuring that all GP PS,BS,CE 8.0.1
contractors are aware of all storm water quality measures and that such
measures are implemented. Failure to comply with the approved construction
Best Management Practices will result in the issuance of correction notices,
citations,or stop orders.
Mitigation Measure 11.d.1: All construction activities shall comply with the City BP,GP PS,BS,CE 11.d.1
of Atascadero Noise Ordinance for hours of operation.
Mitigation Measure 15.a.b.1: Required fair share contributions to the Santa BP,GP PS,CE 15.a.b.1
Rosa/101 interchange improvements(signal and associated improvements)
for the hotel portion of the proposed project shall be as follows:
a. E. Front Street/NB 101 On-Ramp Intersection: 17.5%
b. W. Front Street/SB 101 On-Ramp Intersection: 9.7%
Fees due shall be required prior to, or currently with, issuance of building
err permits for the proposed hotel development. Impacts from the proposed office
complex are anticipated in the General Plan and no additional fair share
payments will be required for the addition of medical office uses.
The fairshare contribution would be based on a maximum of$600,000 or the
engineers estimate at the time of the payment of the fee,which ever is lower.
If the fairshare fee is paid and no reimbursement plan is filed by the W. Front
Street project(required to construct the signals)within two years of Caltrans
permit approval,the fees paid by the applicant would be returned to the
applicant and the mitigation measure would be removed from the requirements
for this project.
Mitigation Measure 15.d.1: Improvements to East Front shall include the BP,GP PS,CE 15.d.1
following:
1. The applicant shall use a Caltrans standard Slurry Seal on East Front.
2. A City standard 423 driveway approach shall be used with a maximum
width of 36'.
3. Painted median tapers that conform to the Caltrans Highway Design
Manual, Section 400 design standards shall be installed. Deviations to
the Caltrans standard shall be justified by the applicant and approved
by the City Public Works Director. The southern median taper shall be
located so that the taper starts near the southern property line. This
will provide a longer left turn center lane for vehicles heading south on
East Front Street.
4. All painted medians shall be marked with Caltrans standard thermal
paint and appropriately colored.
5. A guardrail shall be installed in front of the power pole on East Front.
i111trrr
City of Atascadero
Resolution No. 2007-019
Page 10 of 11
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Rea/ License FD:Fire Departrent
GP:Grading PD:Police Department
Master Plan of Development Amendment Penn CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137—Establishment of Health Care Services Perrrn Ca Cityntarney
FI:Final
Inspecton
TO:Temporary
Occupancy
F0:Final
Occupancy
Mitigation Measure 15.f.1: The maximum use intensities shall be as follows: BP,GP PS,CE 15.f.1
1. 11,000 sf office
2. 1,400 sf retail/restaurant
3. 3,400 sf medical offices
4. 80-room hotel
Any increases in parking demand or turn-over rates will require additional
Parking analysis. If any additional impacts occur, subsequent environmental
documentation will be required.
Mitigation Measure 15.f.2: Shared parking shall be required throughout the site. BP,GP PS,CE 15.f.2
No reserved parking shall be permitted.
m
am
City of Atascadero
Resolution No. 2007-019
Page 11 of 11
EXHIBIT B:Site Plan
�rrw
kP� $
__
� i- "�' -'—'—T I�t -- ;g a� �• € sem'
N
Fj
�y 8 C .e 1Il4
— F1 -t
Ale
Iwj
a,
A
c
NJ
3,400 square foot
AF`s I __I '� medical office use on
J I
I.; R _lllFl first floor.
I I .
I
I��
u 1 yy
Cl 9 111 j tj
1 e �
IsR
�R
�I y II e a COMPOSITE UTILITY PLAN _ ERIC J GOBLER �a.��11
a _ __
88a a R c ATASCADERO 8_ PROJECT S
(P R $ PORPORTIONLorE3,3,9Loox cx ii CIVIL ENGINEERING ^y�y 'i4
.. PER 9a9Ro1ar93.APx:oas—oai—ou
R S 9110 ATASCAc�RO AVE -
970o EL CAMINO REAL,ATASCACERO ATASCAO.RC.'r .93123
£ $ CITY OF ATASCADERO ,E+,ILp�w' ij6t LrErto P..