HomeMy WebLinkAbout2007-018 RESOLUTION NO. 2007-018
Now RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
CONDITIONAL USE PERMIT 2004-0137 AMENDMENT TO APPROVE
AN 80-ROOM HOTEL LOCATED AT APN 056-081-032
(9700 El Camino Real — Patel / Jacobson)
WHEREAS, an application has been received from JP Patel (3600 El Camino Real,
Atascadero, CA 93422) Applicant and Ted Jacobson (8055 Cristobal Avenue, Atascadero, CA
93422) Property Owner to consider an amendment to Master Plan of Development (CUP 2004-
0137)to establish an 80-room hotel; and,
WHEREAS, the site's current General Plan Designation is General Commercial (GC);
and,
WHEREAS, the site's current zoning is Commercial Tourist(CT); and,
WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2007-0002
were prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act(CEQA)have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit Amendment application was held by the Planning Commission of the City of
Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said
Master Plan of Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on April 3, 2007, studied and considered the Conditional Use Permit 2004-
0137 Amendment (Master Plan of Development), after first studying and considering the
Proposed Mitigated Negative Declaration prepared for the project, and,
WHEREAS, the City Council of the City of Atascadero, at a duly noticed Public Hearing
held on May 8, 2007, studied and considered Conditional Use Permit 2004-0137 Amendment
(Master Plan of Development), after first studying and considering the Proposed Mitigated
Negative Declaration prepared for the project, and,
�rrr
City of Atascadero
Resolution No. 2007-018
Page 2 of 23
NOW, THEREFORE, the City Council of the City of Atascadero takes the following
err actions:
SECTION 1. Findings for approval of Conditional Use Permit Amendment. The
City Council finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
SECTION 2. Findings for shared on-site and peak-hour parking reduction. The
City Council finds as follows:
The characteristics of a use or its immediate vicinity do not necessitate the number of
parking spaces, type of design, or improvements required by this title and that
reduced parking will be adequate to accommodate on the site all parking needs
generated by the use
SECTION 3. Findings for Approval of Tree Removal Permit. The City Council finds
as follows:
The tree is obstructing proposed improvements that cannot be
reasonably designed to avoid the need for tree removal, as certified by a
report from the Site Planner and determined by the Community
Development Department based on the following factors:
■ Early consultation with the City;
■ Consideration of practical design alternatives;
■ Provision of cost comparisons (from applicant) for practical
am
design alternatives;
City of Atascadero
Resolution No. 2007-018
Page 3 of 23
■ If saving tree eliminates all reasonable uses of the property;
war or
■ If saving the tree requires the removal of more desirable trees.
SECTION 3. Findings for approval of Height Exception. The City Council finds as
follows:
1. The proposed project will not result in substantial detrimental effects on the enjoyment
and use of adjoining properties; and,
2. The modified height will not exceed the lifesaving equipment capabilities of the Fire
Department.
SECTION 4. Approval. The City Council of the City of Atascadero, in a regular
session assembled on May 8, 2007, resolved to approve Conditional Use Permit 2004-0137
Amendment(Master Plan of Development) subject to the following:
EXHIBIT A: Conditions of Approval
EXHIBIT B: Master Plan of Development/Site Plan
EXHIBIT C: Elevations
EXHIBIT D: Landscape Plan
EXHIBIT E: Color and Materials Board
EXHIBIT F: Grading and Drainage Plan
EXHIBIT G: Hotel Site Sections
City of Atascadero
Resolution No. 2007-018
Page 4 of 23
On motion by Council Member O'Malley and seconded by Council Member Clay, the
foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Beraud, Brennler, Clay, O'Malley and Mayor Luna
NOES: None
ABSENT: None
ADOPTED: May 8, 2007
CITY ATASCADE O
By: �
Dr. George Luna, Mayor
ATTEST:
Marcia McClure Torgerson, C.M.C., Uy Clerk
r�r
APPROVED AS TO FORM:
Patrick L. Enri#t,. ity Attorney
w.r
City of Atascadero
Resolution No. 2007-018
Page 5 of 23
EXHIBIT A:Conditions of Approval/Mitigation Monitoring Program
rerltr
Master Plan of Development Amendment(CUP 20040137)-Hotel
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Real License FD:Fire Department
GP:Grading PD:Police Departnent
Master Plan of Development Amendment Permit CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Pemrt caCity ndomey
FI:Final
Inspecbm
T0:Temporary
Occupancy
F0:Final
Occupancy
Planning Services
1. This conditional use permit shall be for an 80-room hotel located on FM PS
parcel 056-081-032 regardless of owner.
All site development for the office portion of the development shall remain
under the previous approval and all conditions of the previous approval shall
apply unless specifically amended by this resolution.
r 2. The approval of this use permit shall become final and effective for the FM PS
purposes of issuing building permits fourteen(14)days following the
Planning Commission approval unless prior to the time,an appeal to the
decision is filed as set forth in Section 9-1.111(b)of the Zoning
Ordinance.
3. The Community Development Department shall have the authority to BP/FM PS,CE
approve the following minor changes to the project that(1)modify the
site plan project by less than 10%,(2)result in a superior site design or
appearance,and/or(3)address a construction design issue that is not
substantive to the Master Plan of Development. The Planning
Commission shall have the final authority to approve any other changes
to the Master Plan of Development and any associated Tentative Maps
unless appealed to the City Council.
4. Approval of this Conditional Use Permit shall be valid for twelve(12) BP/FM PS
months after its effective date. At the end of the period,the approval
shall expire and become null and void unless the project has received a
building permit.
5. The applicant shall defend,indemnify,and hold harmless the City of Ongoing
Atascadero or its agents,officers,and employees against any claim or
action brought to challenge an approval by the city,or any of its entities,
concerning the subdivision.
6. All subsequent Tentative Map and construction permits shall be BP/FM PS, CE
consistent with the Master Plan of Development contained herein.
imp
City of Atascadero
Resolution No. 2007-018
Page 6 of 23
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
too PS:Planning Services
BL:Business BS:Building Ser es
9700 E/Camino Rea/ License FD:Fire Departrnent
GP:Grading PD:Police Department
Master Plan of Development Amendment Pernit CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Pem9t CA City Attorney
FI:Final
Inspection
TO:Temporary
Occupancy
F0:Final
Occupancy
7. All exterior elevations,finish materials,and colors shall be consistent BP PS
with the Master Plan of Development as shown in EXHIBIT B,C, D and
E with the following modifications:
■ All exterior material finishes shall be durable,high quality,and
consistent with the architectural appearance.
■ All trash storage,recycle storage,and air conditioning units shall be
screened from view behind architecturally compatible or landscaped
enclosures;
■ Any exterior light fixtures shall be compatible with building design,
subject to staff approval.
■ All colors shall be as depicted on the attached EXHIBIT E.
8. All site work,grading,and site improvements shall be consistent with the BP/FM PS, BS,CE
Master Plan of Development as shown in EXHIBIT C, F,and G and
shall include the following:
■ Parking stalls under the dripline of the existing 70"oak tree shall be at
current grade and shall be constructed of turf block back filled with
gravel. No excavation below existing grade shall occur without the
approval of the project arborist.
■ Pavers and/or colored,stamped concrete shall be installed per exhibit
B.
9. A final landscape and irrigation plan shall be approved prior to the BP PS, BS
issuance of building permits and included as part of site improvement
plan consistent with EXHIBIT D,and as follows:
■ All exterior meters,air conditioning units and mechanical equipment
shall be screened with landscape material.
■ All areas shown on the site plan not identified for a specific use shall
be landscaped by the developer prior to the final of any single
building permit on-site.
• Street trees shall be provided at a maximum of 30-feet on center
within the East Front parkway with the exception of the area beneath
the dripline of the existing oak tree.Should the oak tree require
removal,additional street trees shall be required at the above stated
interval.
tom' 2 All trees shall be a minimum 1.5'diameter at breast height including
City of Atascadero
Resolution No. 2007-018
Page 7 of 23
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
W" PS:Planning Services
BL:Business BS:Building Services
9700 El Camino Rea/ License FD:Fire Departnent
GP:Grading PD:Police Depa anent
Master Plan of Development Amendment Penrn CE:CIIyEngineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Perrin ca City Attorney
FI:Final
Inspection
TO:Temporary
Occupancy
F0:Final
Occupancy
parkway trees.
10. All native tree removals shall be mitigated for in accordance with the BP PS
Atascadero Native Tree Ordinance.Removal approval shall include the
existing 70"oak along East Frontage Road.
11. The developer and/or subsequent owner shall assume responsibility for GP PS
the continued maintenance of all landscape and common areas, BP
consistent with EXHIBIT C and D.
12. All center signage shall be compatible with the building architecture and BP PS
design theme.
■ A maximum of 98 square-feet shall be permitted for the signage
facing the parking lot and post office(front and rear of the building).
■ A maximum of 52 square-feet shall be permitted for signage facing
am East Front Road and the office building(sides).
■ The monument sign and 2 directional signs shall be redesigned to
incorporate materials and colors compatible with the proposed
building.The base of the sign shall utilize brick veneer consistent
with the building fagade.
■ Any change in signage shall require Planning Commission review
and approval.
13. All pole lighting shall be decorative in nature per the existing CUP
approval and shall be no higher than 14-feet.
Office Building Amendments
14. A retaining wall shall be permitted along the EI Camino Real frontage,
subject to the following:
• The wall shall be stucco textured to match the office building
• The wall shall be a maximum of 4-feet in height.
• The wall shall be placed at the end of the parking stalls to retain the
8-foot landscape planter at sidewalk level.
• In addition to the required street trees,a revised landscape plan
will be required that includes larger shrubs and vines to screen
errr
City of Atascadero
Resolution No. 2007-018
Page 8 of 23
Conditions of Approval I Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
i PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Rea/ License FD:Fire Deparr ent
GP:Grading PD:Police Department
Master Plan of Development Amendment Penn CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Perrnit CACity Attorney
FI:Final
Inspection
T0:Temporary
Occupancy
F0:Final
Occupancy
parked vehicles.
15. The health care service use shall include a building alarm system to BP BS
ensure that he tenant space remains secure.
16. A minimum of 2 bike racks shall be provided; 1 at the office building site, BP PS
1 at the hotel site.
17. Rough knock-down skip troweled stucco shall be permitted on the
building.
City Engineer Project Conditions
18. Applicant shall slurry seal project frontage, along East Front Street, GP,BP CE
from property line to property line. Slurry seal shall slurry seal
entire width of frontage. A line extended perpendicular to the
centerline of East Front Street,from the Northwest property corner,
constitutes station 12+64 at the centerline of East Front Street.
19. Applicant shall install commercial driveway approach per Caltrans GP, BP CE
Standard A87;from stations 12+86 to 13+10
20. Applicant shall remove and replace concrete curb gutter and GP,BP CE
sidewalk that does not meet City Engineering Standards. All
broken, offset, displaced and degraded sidewalk along the frontage
shall be removed and replaced
21. Applicant shall install Caltrans standard guard rail A77A starting at GP, BP CE
station 13+71 and ending at 13+96 to protect the PG&E pole next
to the southbound traffic lane
22. Applicant shall paint the curb red along the entire property frontage GP,BP CE
per direction of City Engineer
City Engineer Standard Conditions
23. An engineer's estimate of probable cost shall be submitted for GP, BP CE
review and approval by the City Engineer to determine the amount
of the bonds required prior to issuance of building permits.
24. A six (6) foot Public Utility Easement (PUE) shall be provided GP, BP CE
contiguous to the property frontage and shall be recorded in a
separate document prior to issuance of building permit.
too
City of Atascadero
Resolution No. 2007-018
Page 9 of 23
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Rea/ License FD:F2 Department
GP:Grading PD:Police Department
Master Plan of Development Amendment Permit CE:City Engineer
BP:Building M wastewater
CUP 20040137- Hotel Permit Ca CityAttorney
FI:Final
Inspecton
TO:Temporary
Occupancy
F0:Final
Occupancy
25. The applicant shall acquire title interest in any off-site land that may GP,BP CE
be required to allow for the construction of the improvements. The
applicant shall bear all costs associated with the necessary
acquisitions. The applicant shall also gain concurrence from all
adjacent property owners whose ingress and egress is affected by
these improvements.
26. Slope easements shall be obtained by the applicant as needed to GP,BP CE
accommodate cut or fill slopes.
27. Drainage easements shall be obtained by the applicant as needed GP,BP CE
to accommodate both public and private drainage facilities.
28. Prior to the issuance of building permits the applicant shall submit GP, BP CE
plans and supporting calculations/reports including street
improvements, underground utilities, composite utilities, and
grading/drainage plans prepared by a registered civil engineer for
Irrr review and approval by the City Engineer.
29. Submit calculations to support the design of any structures or pipes. GP, BP CE
Closed conduits shall be designed to convey the 10-year flow with
gravity flow, the 25-year flow with head, and provide safe
conveyance for the 100-year overflow.
30. Provide for the detention and metering out of developed storm GP,BP CE
runoff so that it is equal to or less than undeveloped storm runoff.
31. Drainage basins shall be designed to desilt,detain and meter storm GP, BP CE
flows as well as release them to natural runoff locations.
32. Show the method of dispersal at all pipe outlets. Include GP, BP CE
specifications for size&type.
33. Show method of conduct to approved off-site drainage facilities. GP, BP CE
34. Concentrated drainage from off-site areas shall be conveyed GP,BP CE
across the project site in drainage easements. Acquire drainage
easements where needed. Drainage shall cross lot lines only where
a drainage easement has been provided. If drainage easement
cannot be obtained the storm water release must follow the exact
historic path,rate and velocity as prior to the subdivision.
35. All public improvements shall be constructed in conformance with GP,BP CE
the City of Atascadero Engineering Department Standard
Specifications and Drawings or as directed by the City Engineer
atm
City of Atascadero
Resolution No. 2007-018
Page 10 of 23
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
iftl PS:Planning Services
BL:Business BS:Building Services
9700 El Camino Rea/ license FD:Fin:Depart ent
GP:Grading PD:Poke Department
Master Plan of Development Amendment Permit CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Pemrit CA Cayntroney
FI:Final
Inspection
TO:Temporary
Occupancy
F0:Final
Occupancy
36. Project shall include construction of curb, gutter and sidewalk along GP,BP CE
entire frontage.
37. Alignment of frontage improvements shall be approved by the City GP,BP CE
Engineer.
38. All utilities shall be undergrounded on project frontage GP,BP CE
39. All onsite sewer mains shall be privately owned and maintained. FM CE
40. Applicant shall pay sewer extension (Annexation), Connection and BP CE
Reimbursement fees (if applicable) upon issuance of building
permit.
41. Gravity sewer mains within the subdivision shall be eight(8)inches BP CE
in diameter.
am 42. Drainage piping serving fixtures which have flood level rims located BP CE
below the elevation of the next upstream manhole cover of the
public or private sewer serving such drainage piping shall be
protected from backflow of sewage by installing an approved type
backwater valve. Fixtures above such elevation shall not discharge
through the backwater valve.
Building Services
43. A soils investigation prepared by a licensed Geotechnical Engineer is GP PS
to be provided for the project. The report is to be provided at the time BP
of building permit submittal along with the building plans for review by
the Building Division. Recommendations contained in the report are
to be incorporated into the project plans.
Mitigation Measures
Mitigation Measure 1.c.1: The following landscape mitigations shall apply: BP BS,PS,CE 1.c.1
■ The project landscaping shall include street trees along the EI
Camino Real and East Frontage Road frontage placed a minimum
of 30 feet on center or at locations complimentary to the
architectural design of the proposed buildings, subject to staff
approval.
■ All proposed parking area trees shall be shade trees of 15-gallon
size and shall be double staked.
ii" Mitigation Measure 1.c.2: The proposed buildings shall include the use of BP BS,PS,CE 1.c.2
paint and roof colors consistent with the architectural style as designed. The
City of Atascadero
Resolution No. 2007-018
Page 11 of 23
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
iM PS:Planning Services
BL:Business BS:Building Services
9700 El Camino Real License FD:Fire Departrnent
GP:Grading PD:Police Department
Master Plan of Development Amendment Permit CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Permit CaC4Attorney
FI:Final
Inspection
TO:Ter paay
Occupancy
FO:Final
Occupancy
hotel building shall incorporate high quality brick veneer of a dark earth
toned color as depicted on the attached elevation exhibit.The hotel building
shall utilize darker earth toned accents and facade colors, subject to staff
approval.Awnings and/or similar accent features shall be included
throughout the building facade and along the lower floor level to enhance
the architectural appearance of the building and mitigate the proposed
additional height.
Mitigation Measure 1.d.1: If exterior parking lot lighting is proposed, it shall BP BS,PS,CE 1.d.1
be designed to eliminate any off site glare. All exterior site lights shall utilize
full cut-off, "hooded"lighting fixtures to prevent offsite light spillage and
glare.Any luminaire pole height shall not exceed 14-feet in height, limit
intensity to 2.0 foot candles at ingress/egress,and otherwise 0.6 foot candle
minimum to 1.0 maximum within the site. Fixtures shall be shield cut-off
type and compatible with neighborhood setting,subject to staff approval.
Mitigation Measure 3.b.1: BP,GP PS,CE 3.b.1
wrrr Naturally Occurring Asbestos(NOA)has been identified by the state Air
Resources Board as a toxic air contaminant. Serpentine and ultramafic
rocks are very common in the state and may contain naturally occurring
asbestos. Under the State Air Resources Board Air Toxics Control Measure
(ATCM)for Construction, Grading, Quarrying, and Surface Mining
Operations, prior to any grading activities at the site,the project proponent
shall ensure that a geologic evaluation is conducted to determine if naturally
occurring asbestos is present within the area that will be disturbed. If
naturally occurring asbestos is found at the site the applicant must comply
with all requirements outlined in the Asbestos ATCM for Construction,
Grading, Quarrying,and Surface Mining Operations. These requirements
may include but are not limited to 1)an Asbestos Dust Mitigation Plan which
must be approved by the District before construction begins,and 2)an
Asbestos Health and Safety Program will also be required for some projects.
Mitigation Measure 3.b.1: The project shall be conditioned to comply with all BP,GP BS,PS,CE 3.b.1
applicable District regulations pertaining to the control of fugitive dust(PM-
10)as contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality
Handbook.
Section 6.3: Construction Equipment
■ Maintain all construction equipment in proper tune according to
manufacturer's specifications.
■ Fuel all off-road and portable diesel powered equipment, including but
not limited to bulldozers,graders,cranes, loaders,scrapers, backhoes,
generator sets, compressors, auxiliary power units,with ARB certified
motor vehicle diesel fuel(Non-taxed version suitable for use off-road).
■ Maximize to the extent feasible,the use of diesel construction
equipment meeting the ARB's 1996 or newer certification standard for
off-road heavy-duty diesel engines.
City of Atascadero
Resolution No. 2007-018
Page 12 of 23
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Rea/ License FD:Fire Depatmnt
GP:Grading PD:Police Department
Master Plan of Development Amendment Pemrt CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Perrrat Ca Citynttomey
Fl:Final
Inspection
TO:TwWray
Occupancy
F0:Final
Occupancy
■ Install diesel oxidation catalysts (DOC),catalyzed diesels particulate
filters(CDPF)or other District approved emission reduction retrofit
services (Required for projects grading more than 4.0 acres of
continuously worked area).
Section 6.4: Activity Management Techniques
■ Develop a comprehensive construction activity management plan
designed to minimize the amount of large construction equipment
operating during any given time period.
■ Schedule of construction truck trips during non-peak hours to reduce
peak hour emissions.
■ Limit the length of the construction workday period, if necessary.
■ Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading,demolition and
building plan notes:
A. Reduce the amount of the disturbed area where possible.
B. Use of water trucks or sprinkler systems in sufficient quantities to
prevent airborne dust from leaving the site. Increased watering
frequency would be required whenever wind speeds exceed 15
mph. Reclaimed (non-potable)water should be used whenever
possible.
C. All dirt stockpile areas should be sprayed daily as needed.
D. Permanent dust control measures identified in the approved project
re-vegetation and landscape plans should be implemented as soon
as possible following completion of any soil disturbing activities.
E. Exposed ground areas that are planned to be reworked at dates
greater than one month after initial grading should be sown with a
fast-germinating native grass seed and watered until vegetation is
established.
F. All disturbed soil areas not subject to re-vegetation should be
stabilized using approved chemical soil binder,jute netting,or other
methods approved in advance by the APCD.
G. All roadways, driveways, sidewalks, etc,to be paved should be
complete as soon as possible. In addition, building pads should be
laid as soon as possible after grading unless seeding or soil
binders are used.
H. Vehicle speed for all construction vehicles shall not exceed 15 mph
on any unpaved surface at the construction site.
I. All trucks hauling dirt,sand,soil,or other loose materials are to be
covered or should maintain at least two feet of freeboard (minimum
vertical distance between top of load and top of trailer)in
accordance with CVC Section 23114.
J. Install wheel washers where vehicles enter and exit unpaved roads
onto streets,or wash off trucks and equipment leaving the site.
am K. Sweep streets at the end of each day if visible soil material is
City of Atascadero
Resolution No. 2007-018
Page 13 of 23
Conditions of Approval/ Timing Responsibility Mitigation
rrrsr
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Rea/ License FD:Fire Depatrrrent
GP:Grading PD:Police Depa anent
Master Plan of Development Amendment Penrit CE:Ck Engineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Pemrt caC4Attomey
FI:Final
Inspection
TO:Temporary
Occupancy
F0:Final
Occuparcy
carried onto adjacent paved roads. Water sweepers with reclaimed
water should be used where feasible.
The contractor or builder shall designate a person or persons to monitor the
dust control program and to order increased watering,as necessary,to
prevent transport of dust off site. The name and telephone number of such
persons shall be provided to the APCD prior to land use clearance for map
recordation and land use clearance for finish grading of any structure.
Mitigation 3.b.2:The applicant shall contact the APCD for any permits BP APCD 3.b.2
necessary related to developmental burning of vegetative material and/or
construction permit requirements.
Mitigation Measure 4.e.1: Grading and excavation and grading work shall BP PS 4.e.1
be consistent with the City of Atascadero Tree Ordinance. Special
precautions when working around native trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be pruned
prior to any heavy equipment work being done.
am 4. Vehicles and stockpiled material shall be stored outside the dripline
of all trees.
5. All trees within the area of work shall be fenced for protection with
4-foot chain link,snow or safety fencing placed per the approved
tree protection plan. Tree protection fencing shall be in place prior
to any site excavation or grading. Fencing shall remain in place
until completion of all construction activities.
6. Any roots that are encountered during excavation shall be clean cut
by hand and sealed with an approved tree seal.
Mitigation Measure 4.e.2: The developer shall contract with a certified BP PS 4.e.2
arborist during all phases of project implementation. The certified arborists
shall be responsible for monitoring the project during all phases of
construction through project completion, as follows:
(a) A written agreement between the arborist and the developer outlining a
arborist monitoring schedule for each construction phase through final
inspection shall be submitted to and approved by planning staff prior to
the issuance of building/grading permits.
(b) Arborist shall schedule a pre-construction meeting with engineering
/planning staff, grading equipment operators, project superintendent to
review the project conditions and requirements prior to any grubbing or
earth work for any portion of the project site. All tree protection fencing
and trunk protection shall be installed for inspection during the meeting.
Tree protection fencing shall be installed at the line of encroachment
into the tree's root zone area.
(c) As specified by the arborist report and City staff:
�rrrr III Prune all trees in active development areas to be saved for
City of Atascadero
Resolution No. 2007-018
Page 14 of 23
Conditions of Approval/ Timing Responsibility Mitigation
Ourw
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Real License FD:Fire Departnent
GP:Grading PD:Police Department
Master Plan of Development Amendment Pennit CE:City Engineer
BP:Building WW:Wastewater
CUP 2004-0137- Hotel Permt CACnynnomey
FI:Final
nspecWn
T0:Temporary
occWanc-y
F0:Final
Occupancy
structural strength and crown cleaning by a licensed and certified
arborist.
• Remove all debris and spoils from the lot cleaning and tree pruning.
■ In locations where paving is to occur within the tree canopy,grub
only and do not grade or compact. Install porous pavers over a
three-inch bed of 3/inch granite covered with one-inch pea gravel
for screeding. If curbs are required, use pegged curbs to secure the
porous pavers. Pegged curbs are reinforced six to eight curbs
poured at grade with a one-foot by one-foot pothole every four to six
linear feet.
• All trenching or grading within the protected root zone area, outside
of the tree protection fence shall require hand trenching or preserve
and protect roots that are larger than 2 inches in diameter.
■ No grading or trenching is allowed within the fenced protected area.
■ Any roots that are 4 inches in diameter or larger are not to be cut
until inspected and approved by the on-site arborist.
(d) Upon project completion and prior to final occupancy a final status
report shall be prepared by the project arborist certifying that the tree
protection plan was implemented,the trees designated for protection
were protected during construction, and the construction-related tree
protection measures are no longer required for tree protection.
Mitigation Measure 4.e.3: All tree removals shall be mitigated in accordance GP,BP PS 4.e.3
with the Atascadero native Tree Ordinance.
Mitigation Measure 6.b.1: The grading permit application plans shall include GP PS,BS,CE 6.b.1
erosion control measures to prevent soil, dirt, and debris from entering the
storm drain system during and after construction. A separate plan shall be
submitted for this purpose and shall be subject to review and approval of the
City Engineer at the time of Building Permit application.
Mitigation Measure 6.c.1: A soils report shall be required to be submitted BP,GP PS,BS,CE 6.0
with a future building permit by the building department.
Mitigation Measure 8.e.f.1: The developer is responsible for ensuring that GP PS,BS,CE 8.0.1
all contractors are aware of all storm water quality measures and that such
measures are implemented. Failure to comply with the approved
construction Best Management Practices will result in the issuance of
correction notices,citations, or stop orders.
Mitigation Measure 11.d.1: All construction activities shall comply with the BP,GP PS,BS,CE 11.d.1
City of Atascadero Noise Ordinance for hours of operation.
tart
City of Atascadero
Resolution No. 2007-018
Page 15 of 23
Conditions of Approval/ Timing Responsibility Mitigation
wow Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Rea/ License FD:Fire Department
GP:Grading PD:Police Department
Master Plan of Development Amendment Permit CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Permit C,C;ly Attorney
FI:Final
Inspection
T0:Temporary
occupancy
F0:Final
Occupancy
Mitigation Measure 15.a.b.1: Required fair share contributions to the Santa BP,GP PS,CE 15.a.b.1
Rosa/101 interchange improvements(signal and associated
improvements)for the hotel portion of the proposed project shall be as
follows:
a. E. Front Street/NB 101 On-Ramp Intersection: 17.5%
b. W. Front Street/SB 101 On-Ramp Intersection: 9.7%
Fees due shall be required prior to,or currently with, issuance of building
permits for the proposed hotel development. Impacts from the proposed
office complex are anticipated in the General Plan and no additional fair
share payments will be required for the addition of medical office uses.
The fairshare contribution would be based on a maximum of$600,000 or the
engineers estimate at the time of the payment of the fee,which ever is
lower.
If the fairshare fee is paid and no reimbursement plan is filed by the W.
Front Street project(required to construct the signals)within two years of
Caltrans permit approval,the fees paid by the applicant would be returned to
+err the applicant and the mitigation measure would be removed from the
requirements for this project
Mitigation Measure 15.d.1: Improvements to East Front shall include the BP,GP PS,CE 15.d.1
following:
1. The applicant shall use a Caltrans standard Slurry Seal on East
Front.
2. A City standard 423 driveway approach shall be used with a
maximum width of 36'.
3. Painted median tapers that conform to the Caltrans Highway
Design Manual, Section 400 design standards shall be installed.
Deviations to the Caltrans standard shall be justified by the
applicant and approved by the City Public Works Director. The
southern median taper shall be located so that the taper starts near
the southern property line. This will provide a longer left turn center
lane for vehicles heading south on East Front Street.
4. All painted medians shall be marked with Caltrans standard thermal
paint and appropriately colored.
5. A guardrail shall be installed in front of the power pole on East
Front.
City of Atascadero
Resolution No. 2007-018
Page 16 of 23
Conditions of Approval/ Timing Responsibility Mitigation
arrr
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business BS:Building Services
9700 E/Camino Rea/ License FD:Fire Department
GP:Grading PD:Poke Department
Master Plan of Development Amendment Permit CE:City Engineer
BP:Building WW:Wastewater
CUP 20040137- Hotel Pemdt Ca City Attorney
FI:Final
Inspection
T0:Temporary
Occupancy
F0:Final
Occup-Y
Mitigation Measure 15.f.1: The maximum use intensities shall be as follows: BP,GP PS,CE 15.f.1
1. 11,000 sf office
2. 1,400 sf retail/restaurant
3. 3,400 sf medical offices
4. 80-room hotel
Any increases in parking demand or turn-over rates will require additional
Parking analysis. If any additional impacts occur,subsequent environmental
documentation will be required.
Mitigation Measure 15.f.2: Shared parking shall be required throughout the BP,GP PS,CE 15.f.2
site. No reserved parking shall be permitted.
�lrr
ilrllir
City of Atascadero
Resolution No. 2007-018
Page 17 of 23
EXHIBIT B: Master Plan of DevelopmentlSite Plan
---,,P-'_._ �-���Q:L mss•= _ ''7�
p, t
S F�
e
" S
N6 A4 O �\
lowH
4- r
■■■■■■■■■ -■as-a- ■0-0-■-■ 0 AN■■■�■■ list
AA
All 0
■ is .fin. 6 �° ''� 2 �$� � E,x ■ I$€p
■ �I', �� _" �� 1 � a � �A AAA JAI
■ Dt
� .I I a��� a� I �• I ��_�� 11 �� ■ �
I gg
■ � � �ii�i� aan'� a N� � -- �' �1 ■ 9
Previously approved
r.
01
■ s ! a� i section —no changes
9
except those
---- �'' I specifically noted in
■ � N lig iAA
resolution conditions
T •
-
', T •
■ �Y as ■
■ : ■
■ -- --- -- __ - ■
■
AA AA
e � �a F € ■
■ R q
3 $Y 1 ;:� d COMPOSITE UTIUTY PLAN _ ERIC J. GOBLER ��pOy
!9 g ![ ATASCADERO NOTEC PROJECT =E
� g R & CIVIL ENGINEERING .41 -
_ a r T..Lar 3,Ki 11
_ ^ PCR 9 8 0 8 010161,CPN:056-091-00E 9110 ATASCAR 934E y.•, •� ��'
v g # ^ 9J00 EL CAMINO REAL,ATDAATA-A—..CA
$
CITY OF ATASCAATA-A—..ROSCAOERO
City of Atascadero
Resolution No. 2007-018
Page 18 of 23
EXHIBIT C: Elevations
rad
F
a" �k• �, Y �$ ;l/
0"N
4�
5
x
� t
4
x�
w � �:
\
e r
s�
� F
e
2. 'V�4
g
�rrr
City of Atascadero
Resolution No. 2007-018
Page 19 of 23
EXHIBIT D: Landscape Plan
�r
Al
F
f..
i
k
� � c
3! '}i ill"I
ra r
IS
;.
_ ♦k M 4,�
City of Atascadero
Resolution No. 2007-018
Page 20 of 23
EXHIBIT E: Color and Materials Board
y / 4
�
y r
�L6
f ��"� f /:',�� � � yet: ��• � ��,,
;qr /rtY
1
h ,
g%
;`tyy
City of Atascadero
Resolution No. 2007-018
Page 21 of 23
tow See project file for specific proposed color selections
arrr
City of Atascadero
Resolution No. 2007-018
Page 22 of 23
EXHIBIT F:Grading and Drainage Plan
wwrr
t Y5 h A Yh , i
a"S sL ylrix[ T,'. EA45T "kwrir
as e
OMPaq xAr i
h
�xY�-vy,a z4P �s�
-4g. �.,4v
X L
a .�
4
a'z M T etA�: n
l A
ratgf a ;.. I
F .y ah :pt . ( T.,
Ab
a'v1 a ..srAa b ll
I"sj sr .ta xa A'x �5y S y ; '1
Ik
L`
4lt?
-
n kr.
EL. C,44~ FlEA4L. x
N
CRAOINC AMCORAINU P4AM
ENCINEFFING �,ab
xi 4TASCAbCRb iip7[t
PRO IECT CIVi� !
•: n+exaxm an rw me aei usx A AbcAncu All Q t<
AfS nOr
At scAucN6 C vJ z + .
,. .........(•17Y OF AHF.TASCALaCRO
ST'
11 �•..�
City of Atascadero
Resolution No. 2007-018
Page 23 of 23
EXHIBIT G: Hotel Site Sections
a�111�
Y t k cn v, n�� s na,tira 5e e n „uocc
- y -.A t 3.OY Otl39 JSY OS 6 Ifo A !W N'C9 d pkpflY b1A ,! x '
. 1 Y x01 b9d
33NI`JN3 liA.l�
aNIN iD7ff7Xd 131DH 4H30V.%SYIY
s 90� f �1N3 y
vlas+e#'
a
,..
x
Co
Gt
_ r
e.
i
I ,:t
x" 03 v
� a r
i
j
e:
✓e•� Eti 2 4
a
1
�':
r_
tow j
I
I