Loading...
HomeMy WebLinkAboutDRC_2013-08-28_MinutesCirl OF CITY OF '1 DESIGN REVIEW COMM/TTEE MeetingACTION MINUTES egular August 28, 201311 Conf.City Hall 1` 11 Palma Avenue, Atascadero, • 0 . a A Committee Member Kelley called the meeting to order at 4:00 pm. ROLL CALL Present: Chairperson Fonzi (excused absence) Committee Member Kelley Committee Member Anderson Committee Member Dariz Committee Member Kirk Staff Present: Community Development Director Warren Frace Senior Planner Callie Taylor Others Present: Jennifer Renick — Applicant Architect Korey Dudley - Owner Emily Baranek — Applicant Harry Hamilton - Engineer APPROVAL OF AGENDA MOTION: By Committee Member Kirk and seconded by Committee Member Dariz to approve the Agenda. Motion passed 4:0 by a roll -call vote. (Fonzi — absent) PUBLIC COMMENT None Design Review Committee Action Minutes August 28, 2013 CONSENT CALENDAR Page 2 of 4 • •N: By Committee Member-secondedCommittee MemberDariz to. = Motion passed 4:0 by a roll -call vote. (Fonzi — absent) 2. MONTESSORI SCHOOL ADDITION: CUP AMENDMENT PLN 2013-1469/AMENDMENT TO CUP 15-88/TRP 2013-0164/DRC 2013-0040 Property Owner: Korey Dudley /Applicant: Semmes & Co. Builders, Inc. Project Title: Montessori School Classroom Addition PLN 2013-1469 / Amendment to CUP 15-88 / TRP 2013-0164 / DRC 2013-0040 Project Location: 3025 Monterey, Atascadero, CA 93422 APN : 049-202-020 (San I ,is Obispo County) Project A Conditional Use Permit Amendment is proposed to add a new classroom building to Description: the existing Children's House Montessori school. The site was originally permitted through CUP in 1989 to allow for approximately 6000 sq. ft. of buildings. The proposed amendment would add an additional 2,100 sq. ft. classroom building towards the rear of the site, thereby allowed up to 140 students to be served at the school. Additional parking spaces are proposed to serve the added facility space. City Staff is recommending conditions of approval to meet Building Codes and Municipal Code requirements, including minor modifications to the site plan as discussed in the staff report. General Plan Designation: Rural Estate (RE) Zoning: Residential Suburban (RS) Proposed Environmental Categorically exempt from CEQA Determination: Staff Staff recommends that the DRC recommend the Planning Commission approve the Recommendation: proposed classroom addition, subject to minor site plan modifications and project conditions as discussed in the staff report. Senior Planner Taylor gave a brief presentation to the Design Review Committee, which covered the history and parking of this project. Applicant Dudley • School background • 105 students enrolled Design Review Committee Action Minutes August 28, 2013 COMMITTEE DELIBERATIONS Page 3 of 4 Committee Member Kelley • Parking LID required? • Setbacks apply to parking/HVAC? (applicant - shown on original CUP should be exempt) • Site parking ok as shown on plans • DG okay instead of paving • Restroom fixture calculations / CUP caps occupancy — look into with Building Dept. Community Development Director Frace • DRC has discretion concerning CUP exemption Senior Planner Taylor • Is paving required? • Route of travel to existing sidewalk maybe required by Building Dept. Committee Member Kirk • Frontage improvements? (Senior Planner Taylor — No) Committee Member Dariz • Wheel stops? — berm in place • How did 8000sf discrepancy happen? (Senior Planner Taylor — old CUP not as clear, will clarify allowances with amendment) PUBLIC COMMENT None MOTION: By Committee Member Kelley and seconded by Committee Member Kirk to approve the project as presented, with the following conditions: a) Additional site parking ok with setback as shown on plans b) Decomposed granite parking surface ok instead of paving Motion passed by 4:0 by a roll call vote. (Fonzi — absent) Design Review Committee Action Minutes August 28, 2013 Page 4 of 4 COMMITTEE MEMBER COMMENTS AND REPORTS None - :101 Z4 1 Next Design Review Committee meeting scheduled for September 11, 2013 at 3:30pm. Frace, mumty 'Development Director ADOPTED: SEPTEMBER 11TH, 2013 t:\— design review committee\minutes\minutes 2013\ action minutes 8-28-13.docx