Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC_2013-07-31_AgendaPacket
CALL TO ORDER CITY OF ATASCA DER 0 DESIGN RE VIE W COMMITTEE A GENDA Committee Meeting Wednesday, July 31, 2013 9:00 A.M. City Hall Conference Room 4 6907 El Camino Real Atascadero, California Roll Call: Chairperson Fonzi Committee Member Kelley (excused absence) Committee Member Anderson Committee Member Dariz Committee Member Kirk APPROVAL OF AGENDA PUBLIC COMMENT CONSENT CALENDAR 1. APPROVAL OF DRAFT ACTION MINUTES OF JUNE 26, 2013 DEVELOPMENT PROJECT REVIEW 2. PALOMA CREEK MARKET PLN 2009-1320 / CUP 2009-0239 / DRC 2012-0036 Property Paloma Creek Market INC, 5599 Hollister Ave, Goleta, CA 93117 Owner/Applicant: Project Title: Paloma Creek Market PLN 2009-1320 / PPN 2009-0244 / CUP 2009-0239 / DRC 2013-0036 Find us on FaCebooWtl)://www.facebook.com/i)lanningatascadero © City of Atascadero Design Review Committee Agenda Regular Meeting, July 31, 2013 Page 2 of 3 Project Location: 11250 Viejo Camino, Atascadero, CA 93422 Owner/Applicant: APN :045-342-014 (San Luis Obispo County) Project On June 26, 2013, DRC reviewed the proposed kitchen expansion and discussed the Description: site's existing non-compliance. DRC provided direction regarding several site items, and requested that the design of the kitchen's exhaust fan venting system and the revised Project landscape plan be brought back to DRC for additional review. In recent weeks staff has Description: met with the applicant to discuss these design issues and the applicant has provided updated plans for DRC review. General Plan Designation: GC General Commercial Zoning: CN Commercial Neighborhood Proposed exhaust fan and associated makeup air equipment were installed on the roof of the Environmental Consistent with previously certified environmental document Determination: the building permits. Due to the slope of the roof and the scale of the building, staff has Staff Staff recommends DRC review and approve the revised plans for the exhaust fan venting Recommendation: system and site landscape, and authorize the applicant to move forward with completing building permits and subsequent construction for the kitchen expansion and site compliance. 3. RESTAURANT, 7905 Morro Road PLN 2012-1433 / DRC 2012-0020 Property Ray Buban Owner/Applicant: Project Title: PLN 2012-1433 / DRC 2012-0020 Project Location: 7905 Morro Road (APN: 031-161-019) Atascadero, CA 93422 (San Luis Obispo County) Project DRC originally reviewed the subject site on March 28, 2012 to discuss the proposed Description: conversion of a strawberry stand to a restaurant. Per Atascadero Municipal Code Section 9-2.107, commercial remodels are reviewed by the DRC to ensure consistency with the City's appearance review standards. During the recent construction a kitchen ventilation system for the new restaurant, an exhaust fan and associated makeup air equipment were installed on the roof of the building. The equipment was not identified on the original plans approved by the DRC or the building permits. Due to the slope of the roof and the scale of the building, staff has concerns that the roof mounted equipment is highly visible, and therefore inconsistent with the screening requirements of the City's appearance review standards, as well as the DRC's original project approval. General Plan Designation: General Commercial (GC) Zoning: Commercial Professional (CP) Proposed Class 1 Categorical Exemption for an existing facility Environmental Determination: Staff Staff recommends DRC visit the site to observe the existing roof mounted equipment, Recommendation: and provide staff and the applicant direction regarding possible screening requirements or relocation. Staff recommends that the makeup air equipment be moved to the rear slope of the building where it would not be seen by the public right-of-way, and the exhaust fan located at the roof pitch be painted a compatible color to match the building architecture. The applicant may propose other screening options to be reviewed and considered by the DRC. City of Atascadero Design Review Committee Agenda Regular Meeting, July 31, 2013 Page 3 of 3 COMMITTEE MEMBER COMMENTS AND REPORTS DIRECTOR'S REPORT ADJOURNMENT The next DRC meeting date is scheduled for 3: 30 pm, August 14, 2013. Agendas, Minutes and Staff Reports are available online at www.atascadero.ounder City Officials & Commissions, Design Review Committee. ITEM NUMBER: 1 DATE: 7/31/13 CITY OF A TASCADERO DESIGN REVIEW COMMITTEE DRAFT ACTION MINUTES Regular Meeting — Wednesday, June 26, 2013 - 3:30 P.M. City Hall Conf. Rm. 4 6907 EI Camino Real, Atascadero, California CALL TO ORDER —3:30 p.m. Chairperson Fonzi called the meeting to order at 3:30 p.m. ROLL CALL Present: Chairperson Fonzi Committee Member Kelley Committee Member Anderson Committee Member Dariz (arrived at 3:40pm) Committee Member Kirk Staff Present: Community Development Director Warren Frace Public Works Director Russ Thompson Senior Planner Callie Taylor Assistant Planner Alfredo Castillo Others Present: Chris Thomas - Representative, Paloma Creek Market Albeir Samaan - Owner, Paloma Creek Market Marty Mohammed - Inland Pacific Builders, Inc. Randy Alonzo - Inland Pacific Builders, Inc. Eddie Herrera - Representative, Inland Pacific Builders, Inc. Richard Davis - Estancia neighbor Rocko DeGasso - Estancia neighbor Approximately 5 additional Estancia neighbors APPROVAL OF AGENDA MOTION: By Committee Member Kelley and seconded by Committee Member Anderson to approve the Agenda. Motion passed 5:0 by a roll -call vote. PUBLIC COMMENT None Design Review Committee Draft Action Minutes June 26, 2013 CONSENT CALENDAR 1. APPROVAL OF DRAFT ACTION MINUTES OF JUNE 12, 2013 Page 2 of 7 MOTION: By Committee Member Kelley and seconded by Committee Member Kirk to approve the consent calendar. Motion passed 4:0 by a roll -call vote. DEVELOPMENT PROJECT REVIEW 2. PALOMA CREEK MARKET PLN 2009-1320 / PPN 2009-0244 / DRC 2012-0036 Property Paloma Creek Market INC, 5599 Hollister Ave, Goleta, CA 93117 Owner/Applicant: Project Title: Paloma Creek Market PLN 2009-1320 / PPN 2009-0244 / CUP 2009-0239 / DRC 2013-0036 Project Location: 11250 Viejo Camino, Atascadero, CA 93422 APN : 045-342-014 (San Luis Obispo County) Project A building permit application has been submitted to construct tenant improvements and Description: add a full restaurant cooking facility with fire hood suppression system at the Paloma Creek Market. The modifications would allow for full cooking facilities so that the existing business can sell food made onsite. The subject site was previous approved through a Conditional Use Permit and Precise Plan application in 2009. The site is currently not incompliance with the CUP, including standards for landscape, signage, trash storage, and parking. Prior to approving any building permits for expansion of the existing use, staff is bringing the project to DRC for discussion of the expansion and site consistency with the existing CUP approval. General Plan Designation: GC General Commercial Zoning: CN Commercial Neighborhood Proposed Environmental Consistent with previously certified environmental document Determination: Staff Staff recommends DRC discuss the proposed expansion of use and current non - Recommendation: compliance and provide direction regarding site improvements. Senior Planner Callie Taylor gave a brief presentation to the Design Review Committee, regarding the history and background of the project including the need for CUP compliance such as landscape, signs, parking and trash screening. Design Review Committee Draft Action Minutes June 26, 2013 XG]IVAILY, 111i1 1]=413=1Z7_1%I[*]Ll&' Page 3 of 7 Chairperson Fonzi • What is use to be added? (Owner, Albeir — add fried food / take out only, no on-site dining. Landscape is done, trees and rock installed) • Need more plants / work with city staff Committee Member Kirk • Was landscape not finaled? • Why is dumpster outside? • Need aesthetic modification • Move exhaust vent to side of building and landscape Committee Member Kelley • Driveway closure status? (Director Frace - 2nd driveway not primary issue) • Site needs more plantings • Meet minimum building code requirements • Noise from exhaust vent • 2nd driveway OK to leave as is Committee Member Dariz • Side vent concerns (Director Frace — appearance & CBC issue) • Vent system should be vertical, exiting at roof • Turf allowed? (Senior Planner Taylor— no, CUP condition requires landscape plan revisions to include drought tolerant plantings) Owner Albeir • Consider new location for vent PUBLIC COMMENT None MOTION: By Committee Member Fonzi and seconded by Committee Member Kelley to recommend that this project is reviewed again by the Design Review Committee, after the Applicant has achieved solutions to the following items: a) Updated landscape plan including drought tolerant plantings per the CUP condition of approval; b) Alternative location for exhaust vent to be proposed by applicant so that vent is adequately screened or catalogued; And, the following CUP compliance items for the site shall be implemented moving forward: 1. Landscape to be installed per approved plan, and to include irrigation and ongoing maintenance; Design Review Committee Draft Action Minutes June 26, 2013 Page 4 of 7 2. All banners and non -permitted signage to be removed from the site; 3. Stripe parking lot with 3 standard parking spaces; 4. Trash dumpsters shall remain stored in trash enclosure and shall not be left out on site; 5. North driveway on Viejo Camino permitted to remain open (closure per CUP not required); 6. All items must be completed prior to kitchen permit being finaled; 7. Site shall be maintained in good condition with ongoing compliance with the CUP. Motion passed by 5:0 by a roll call vote. DEVELOPMENT PROJECT REVIEW 3. LAS LOMAS SFR -3, ESTANCIA PLN 2099-0079 / ZCH 2003-0041 / DRC 2012-0019 Property Coastal Community Builders / Inland Pacific Builders, INC. Owner/Applicant: Project Title: Las Lomas / Woodlands Specific Plan PLN 2099-0079 / DRC 2012-0019 Project Location: 10 vacant Lots on lower Via Cielo, in the Las Lomas development Atascadero, CA 93422 (San Luis Obispo County) Project Description: Revised floor plans and elevations have been submitted for the ten remaining vacant SFR -3 "Estancia" lots at the Las Lomas development. Three floor plan options are proposed ranging in size from 2,330 sq. ft. to 2,745 sq. sf. Updated second unit plans are also proposed. Color schemes as well as conceptual site plan, landscape, and fencing designs are proposed for review. Appearance review by DRC and consistency with the Specific Plan are required to permit the proposed plans. General Plan Designation: (SFR -Y) Single -Family Residential -Y Zoning: Woodlands Specific Plan 1 Proposed Environmental Consistent with previously certified environmental document Determination: Staff Recommendation: Staff recommends DRC make a finding of consistency with the Specific Plan and the Appearance Review Manual, approving the new floors plans and elevations subject to conditions. Senior Planner Callie Taylor gave a brief presentation and advised the Design Review Committee that Staff supports the changes to the project. Design Review Committee Draft Action Minutes June 26, 2013 PUBLIC COMMENT a) Richard Davis - Likes process - Elevations much improved - Need fencing standard (wrought iron currently installed) - 2nd unit parking b) Rocko DeGasso - Site plan questions - Concerned with sewer (on-site pumps) - Concerned with casitas proximity (lot 72) — new location OK COMMITTEE DELIBERATIONS Committee Member Kelley • 2nd units - process Page 5 of 7 Chairperson Fonzi • Deed restriction loan issue (Director Frace — deed restriction removal would need Council action) • Color variety? (Senior Planner Taylor — No accent color proposed, neighbors like neutral color) • Casitas design too plain — entry window too small / door off -set • Fencing? • Landscaping? (Senior Planner Taylor — minimize turf) Senior Planner Taylor • Three car garage required for second units, plus guest parking required Committee Member Dariz • Garage variety good • Extend roof over front door of second unit, pergola is good. Gable roof is preferred. MOTION: By Committee Member Fonzi and seconded by Committee Member Kelley to recommend approval as submitted with the following conditions: a) Work with Staff to enhance second unit front elevation and roofline, and enlarge window. Make second unit more compatible with main house. b) Fencing to match existing — all wrought iron c) Leave exterior colors neutral — as is d) Standard Conditions to be implemented at construction, as noted in staff report (Page 40) Design Review Committee Draft Action Minutes June 26, 2013 Page 6 of 7 e) Public Works Director Thompson to review sewer at lots 70 to 74 Motion passed by 5:0 by a roll call vote. DEVELOPMENT PROJECT REVIEW 4. WEST FRONT VILLAGE - TRACT 2970 PLN 2099-0997 / CUP 2003-0108 / DRC 2013-0038 Property Coast Community Builders, INC Owner/Applicant: Project Title: West Front Village Project Location: Tract 2970 Lots 29-49 Coromar Ct. / San Siemeon Ct. Project Description: Architectural Elevation and Floor Plan revisions to an approved Master Plan of Development (CUP) for Phase 3 of the West Front Village (Tract 2970) residential subdivision. Applicant is proposing revision to approved elevation D, E, and G and elimination of floor plan/elevation "F". General Plan Designation: Medium Density Residential (MDR) Zoning: RMF-10/PD-23 Proposed Environmental Consistent with previously approved certified mitigated negative declaration Determination: Staff Recommendation: Recommend approval of elevation and floor plan changes to the Planning Commission. Assistant Planner Alfredo Castillo gave a brief overview and advised the Design Review Committee of a few concerns Staff had on the project; 1. Plan D garages 2. Plan E — den/3rd bedroom COMMITTEE DELIBERATIONS Chairperson Fonzi • Arch styles • Concerned with protruding garage • Affordable units • Duplex distribution Design Review Committee Draft Action Minutes June 26, 2013 Page 7 of 7 Committee Member Kelley • Affordable units - timing? • Double garage doors are too narrow — 16ft ok • Add architectural upgrades — windows/hardware Committee Member Kirk • Den parking (Assistant Planner Castillo — guest parking needed) PUBLIC COMMENT None MOTION: By Committee Member Fonzi and seconded by Committee Member Kelley to recommend approval of elevation and floor plan changes to the Planning Commission submitted with the exception of the following conditions: a. Enlarge double garage door entry to 16ft width b. Add architectural upgrades (windows/hardware) to garage doors c. Add additional guest parking in front of unit E Motion passed by 5:0 by a roll call vote. COMMITTEE MEMBER COMMENTS AND REPORTS No DRC meeting for the next 4 Wednesdays. Bob / Economic Vitality Corporation. DIRECTOR'S REPORT None ADJOURNMENT - 5:00 p.m. City Staff will contact Committee for the next DRC meeting date; no items currently scheduled. MINUTES PREPARED BY: Warren Frace, Community Development Director t:\— design review committee\minutes\minutes 2013\draft action minutes 6-26-13.docx ITEM NUMBER: 2 DATE: 7/31/13 Atascadero Design Review Committee 1-7 Report In Brief - Community Development Department Callie Taylor, Senior Planner, (805) 470-3448, ctaylor@atascadero.org Paloma Creek Market CUP Site Compliance for Proposed Expansion of Use DRC Meeting #2 11250 Viejo Camino Applicant/ Paloma Creek Market Inc. Owner: Subject Address: 11250 Viejo Camino Site APN: 045-342-014 05 5 Project #: CUP 2009-0239 9318 PPN 2009-0244 9 ,,30 3800 DRC 2013-0036 General Plan: General Commercial (GC) h Zoning: Commercial Neighborhood N (CN)• Project Area: 0.16 acres Existing / Tenant improvements for an Proposed Use: existing market \ Staff recommends DRC review and approve the revised plans for the exhaust fan venting system and site landscape, and authorize the applicant to move forward with completing building permits and subsequent construction for the kitchen expansion and site compliance. ITEM NUMBER: 2 DATE: 7/31/13 Background On June 26, 2013, DRC reviewed the proposed kitchen expansion and discussed the site's existing non-compliance with the CUP. At that meeting, the DRC gave direction regarding the following compliance items: • All banners and non -permitted signage to be removed from the site • Three (3) standard parking spaces to be striped on site, consistent with the CUP • Landscape & irrigation to be installed, consistent with CUP requirements • Trash dumpsters shall remain stored in trash enclosure and shall not be left out on site • North driveway on Viejo Camino permitted to remain open (closure per CUP not required) • Site shall be maintained in good condition with ongoing compliance with the CUP DRC requested that the design of the kitchen's exhaust fan venting system and the revised landscape plan be brought back to DRC for additional review prior to permit issuance. The exhaust fan was to be relocated or screened to camouflage the exterior equipment. Location to comply with building and fire code setbacks. The landscape plan was to be updated to incorporate drought tolerant shrubs and screening plants consistent with CUP conditions. Revised Kitchen Ventilation System Location On July 11th, City Building and Planning staff met on site with the business owner and his project designer. It was determined that the existing location of the unpermitted exhaust fan on the side of the building does not meet the 10 setback required to the property line. The applicant is proposing to instead route the venting system vertically to exit through the roof. The new exhaust fan will be visible on the front slope of the roof, which faces EI Camino Real. It will be located towards the top of the two story structure, and will be painted to match the roof color. Both City Building and Planning staff agree that this is a preferred option, rather than exiting from the side of the building near the public sidewalk. A makeup air system will also be required as part of the overall kitchen ventilation system. The makeup air will be installed on the lower level roof, near Viejo Camino. A screening surround will be installed on all visible sides of the equipment. This lower location is preferred so that the equipment is not visible on the roof facing EI Camino Real. 5ti.�,; �Y �ooLGrl, IUALL En1va)o)a MDU. (2) 51 DES ITEM NUMBER: 2 DATE: 7/31/13 Elevation Drawing: Exhaust Fan & Makeup Air ?j 'Y L _ YSi• _ �' ClL _ ��' Qewc--1 iL ❑ i I� I`)�cNrtil i ! Updated Landscape Plan The applicant's designer has prepared an updated landscape plan to meet the conditions of the 2009 CUP. The landscape plan includes 5 new London plane sycamores as street trees along the EI Camino Real and Viejo Camino frontages. Boxwoods and blue agapanthus would be installed in rows along the frontages. Goldenrod and purple bell heath would be used as accent plants in wider planters and at the street corner. Staff believes that the proposed landscape plan is consistent with the intent of the original mitigation measures for drought tolerant shrubs and screening plants. It should be noted that due to the amount of concrete and hardscape installed on site, the amount of landscape area is significantly reduced from the original 2009 CUP approval. A wider concrete landing and staircase were installed near the front entrance at the street corner, and the planter which was planned to be in front of the parking spaces is currently concrete. The Viejo Camino driveway will also be left open, instead of replaced by landscape. The applicant is proposing to use three large movable planters in front of the standard parking spaces in order to add greenery to this area. However, the existing concrete is proposed to remain as is, and only the dirt areas will be landscaped. Staff agrees that this is the most feasible solution given the existing site improvements. ITEM NUMBER: 2 DATE: 7/31/13 Proposed Updated Landscape Plan Attachments Attachment 1- 2010 Aerial Photo of Site Attachment 2: 2009 CUP Landscape Plan & Condition of Approval Attachment 3: Site Photos- Taken March 2013 & May 2013 ITEM NUMBER: 2 DATE: 7/31/13 Attachment 1: Aerial Photo: 2010 ITEM NUMBER: 2 DATE: 7/31/13 Attachment 2: 2009 CUP Landscape Plan & Condition of Approval 2009 CUP Landscape Plan MHO cw ❑%EQLA b icc'ti �s ClRMA`�. n Kra ° FFE = 818.01' °o0bd00 • - �i. 0000 r O ° 1 0 r X x � eiorr�wroRrutEii� v' is G� fQ �oterli�ufx t ' Y weuaeu z v 9� OKA aar� � � x• u,� Conditions of Approval / Mitigation Monitoring Program 11250 Viejo Camino PLN 2009-1320 6. Enhanced landscaping to include drought tolerant plants shall be provided within all new planter areas and along the EI Camino Real frontage. Appropriate screen plants shall be provided between the frontages and parking stalls/parking lot areas. All turf shall be eliminated and replaced with drought tolerant species and shall be irrigated with drip irrigation. ITEM NUMBER: 2 DATE: 7/31/13 Attachment 3: Site Photos: March 2013 & May 2013 Corner of EI Camino Real .STOP ir OPEN View of planter fronting ECR n 'VIP, ��.eIF . i• MR ITEM NUMBER: 2 DATE: 7/31/13 a View from ECR, looking at existing parking i ITEM NUMBER: 3 DATE: 7/31/13 n Ir ,F Atascadero Design Review Committee 71 IL " 'a'e� Report In Brief - Community Development Department r Callie Taylor, Senior Planner, (805) 470-3448, ctaylor@atascadero.org Restaurant Conversion at 7905 Morro Road Screening of Roof Mounted Kitchen Ventilation System ❑ Potential screening or relocation of roof mounted kitchen ventilation system: exhaust fan and associated makeup air equipment Staff recommends DRC visit the site to observe the existing roof mounted equipment, and provide staff and the applicant direction regarding possible screening requirements or relocation. Staff's recommendation is to move the makeup air equipment to the rear slope of the building where it would not be seen by the public right-of-way, and the exhaust fan located at the roof pitch could be painted a compatible color to match the building architecture. The applicant may propose other screening options to be reviewed and considered by the DRC. ITEM NUMBER: 3 DATE: 7/31/13 Background DRC originally reviewed the subject site on March 28, 2012 to discuss the proposed conversion of a fruit stand to a restaurant. Per Atascadero Municipal Code Section 9- 2.107, commercial remodels are reviewed by the DRC to ensure consistency with the City's appearance review standards. In 2012, DRC reviewed and approved the proposed building elevation changes, exterior deck/patio seating, paint colors, parking, landscape areas to be planted, and overall site and building design. Floor Plan approved 2012 for New Restaurant New detached strawberry building to hold stand to Existing walk in residence refrigerator ""' in back to remain ,b . 1 �1'� .. n• Convert strawberry Kitchen stand to i restaurant ire -w air noon per maursarerz zcecz �� c� rar a Winer -- — awde gae�w�xn aezcersc ran (E) 1 bedroom Re5idenr-e _ _ pox �rrz cov ��y a � res snarl be an aoaan. fma[im 5ernor rnw w ror Boas n ad -11 ro oe -F - a .ea Wrcn yae awe. New deck and seating area a� zee neer rc�. ar a� verer w ea,e .ra, ITEM NUMBER: 3 DATE: 7/31/13 Current Review Item Construction of the restaurant conversion has been ongoing since permits were issued in April 2012. Recently, the kitchen ventilation system for the new restaurant was installed. The roof mounted equipment includes an exhaust fan (located at the corner of the building at the pitch of the roof) and the associated makeup air equipment (installed on the front roof slope above the main entrance). The roof mounted equipment was not identified on the original plans approved by the DRC or the building permits. Due to the slope of the roof and the scale of the building, the roof mounted equipment, is highly visible. City standards require that all ground mounted and roof mounted equipment be screened from public view. Efforts are made with each project to plan the equipment to be located in the least visible areas, or construct screening systems where feasible. City Staff is concerned that due to the size and location of the makeup air system, a roof screen would look out of place and out of scale with the simple building roof slope. Therefore, staff recommends that the makeup air equipment be moved to the rear slope of the building where it would not be seen from the public right-of-way. The exhaust fan located at the roof pitch could take on the appearance of a chimney by leaving it in its existing location and simply painting it a compatible color to match the building architecture. The applicant may propose other screening options to be reviewed and considered by the DRC. Photo of Existing Roof Mounted Equipment: