Loading...
HomeMy WebLinkAboutDRC_2013-04-10_AgendaCALL TO ORDER CITY OF ATASCADER0 DESIGN RE VIE W COMMITTEE A GENDA Committee Meeting Wednesday, April 10, 2013 3:30 P.M. City Hall Conference Room 4 6907 El Camino Real Atascadero, California Roll Call: Chairperson, Roberta Fonzi Committee Member, Bob Kelley Committee Member, Duane Anderson Committee Member, Mark Dariz Committee Member, Susan DeCarli APPROVAL OF AGENDA PUBLIC COMMENT CONSENT CALENDAR 1. APPROVAL OF DRAFT ACTION MINUTES OF MARCH 14, 2013 ©Find us on http://wwwfacebook.com/planninoatascadero Facebo- City of Atascadero Design Review Committee Agenda DEVELOPMENT PROJECT REVIEW Regular Meeting, April 10, 2013 Page 2 of 2 2. PLN 2013-1449 / CUP 1992-011, TACO BELL, 7385 EL CAMINO REAL Property Owner Adobe Plaza, LLC, 16530 Ventura Blvd, Encino, CA 93416 Applicant: Engen Enterprises, 31192 LaBaya Drive, Unit 8, Westlake Village, CA 93162 Project Title: Taco Bell with an Existing Drive-thru in a Commercial Retail Zone PLN 2013-1449 / CUP 1992-011 Project Location: 7385 EI Camino Real, Atascadero, CA 93422 (APN 030-121-043) San Luis Obispo County Existing / Restaurant with an existing drive-thru service window 0.51 acres Proposed Use: General Plan Designation: General Commercial (GC) Zoning: Commercial Retail (CR) Staff Staff is recommending the following items be conditions as a part of an issued building permit for consistency with Conditional Use Permit 1992-011_ Recommendation: 1. Replacement of the existing drive approach with Caltrans Standard A87 drive approach that includes a four -foot (4') wide pedestrian path. 2. Require a drainage study and accommodation of drainage on-site as a part of the building permit. 3. The existing fence abutting the residential uses be replaced with a solid masonry wall that is six -feet (6') in height, consistent with the approved CUP. 4. The gates of the trash enclosures be replaced with decorate fencing or other type of decorative fencing that is consistent with the revised architecture of the building. 5. Existing lights be modified and shielded to avoid light glare into the neighboring residents. Staff is supportive of the overall project. The applicant has met with Staff in numerous occasions for potential new sites, however the site works for the current operations. The project is substantially consistent with the previously approved CUP. Any recommendations would be added as conditions to be performed as a part of the building permit process. The applicant is looking to submit for building permits in early summer with construction to commence in the Fall of 2013. COMMITTEE MEMBER COMMENTS AND REPORTS DIRECTOR'S REPORT ADJOURNMENT City Staff will contact Committee for next DRC meeting date; no items currently scheduled Agendas, Minutes and Staff Reports are available online at www.atascadero.or? under City Officials & Commissions, Design Review Committee.