Loading...
HomeMy WebLinkAboutDRC_2011-05-12_AgendaPacketCALL TO ORDER CITY OF ATASCADERO DESIGN RE VIE W COMMITTEE A GENDA Committee Meeting Thursday, May 12, 2011 3:30 P.M. City Hall Conference Room 3 6907 El Camino Real Atascadero, California Roll Call: Chairperson, Roberta Fonzi Committee Member, Bob Kelley Committee Member, Chuck Ward Committee Member, Christian Cooper Committee Member, Susan DeCarli APPROVAL OF AGENDA PUBLIC COMMENT CONSENT CALENDAR 1. APPROVAL OF ACTION MINUTES FROM MEETING ON MARCH 10, 2011 DEVELOPMENT PROJECT REVIEW 2. EAGLE RANCH The Eagle Ranch Specific Plan proposes the annexation to the City of Atascadero of an undeveloped 3,450± acre area, located in the County adjacent to Atascadero's southern boundary. The majority of the site is part of the Historic Atascadero Colony and contains approximately 452± undeveloped Colony lots and a network of un -built Colony roads. The Specific Plan will propose reconfiguring these existing lots and roadways, and will identify a variety of land uses including housing, commercial uses, parks, trails, open space, and tourist -serving and resort facilities. Find ace book Faceon http://www.facebook.com/pages/City-of-Atascadero-Planning/175544509158142 City of Atascadero Design Review Committee Agenda COMMITTEE MEMBER COMMENTS AND REPORTS DIRECTOR'S REPORT ADJOURNMENT Next regular meeting of the Design Review Committee: to be determined. Regular Meeting, May 12, 2011 Page 2 of 2 Agendas, Minutes and Staff Reports are available online at www.atascadero.orQ under City Officials & Commissions, Design Review Committee. t:\dre design review committee\agendas\dre agenda 5-12-11.docx ITEM NUMBER: 2 DATE: 5-12-11 Atascadero Design Review Committee Report In Brief - Community Development Department Callie Taylor, Associate Planner, (805) 470-3448, ctaylor@atascadero.org Eagle Ranch Specific Plan Preliminary Project Review Design Review Committee Briefing PLN 2008-1280 / GPA 2008-0022 / SP 2008-0002 / ZCH 2008-0150 Applicant: RRM Design Group Owner: Eagle Ranch, LLC Project South west of City Location: boundary, accessed off Santa Barbara Road General Unincorporated within Plan & Sphere of Influence Zoning Identified for future annexation Project 3,460 acres Area: Existing Cattle Ranch Use: Project Description: 0— A �� Eagle Ranch N Specific Plan Area ti Al—der. Sphere of Influence I I� The Eagle Ranch Specific Plan proposes the annexation to the City of Atascadero of an undeveloped 3,450± acre area, located in the County adjacent to Atascadero's southern boundary. The majority of the site is part of the Historic Atascadero Colony and contains approximately 452± undeveloped Colony lots and a network of un -built Colony roads, originally established by E.G. Lewis' 1914 Atascadero Colony Map. The Specific Plan will propose reconfiguring these existing lots and roadways, and will identify a variety of land uses including housing, commercial uses, parks, trails, open space, and tourist -serving and resort facilities. Background: The Eagle Ranch area has been used historically for ranching and agricultural purposes and includes numerous structures that were used for these purposes. The site is characterized by ITEM NUMBER: 2 DATE: 5-12-11 sloping, oak covered hillsides and many areas with extremely steep, mountainous terrain. Other unique features include the headwaters of Atascadero Creek which originate on the ranch. The City's 2002 General Plan identifies the Eagle Ranch property as a future master plan area, and requires that a Specific Plan be approved by the City to provide a comprehensive development plan for the property. Entitlements that will be required include a General Plan Amendment, Prezoning, Annexation / LAFCO reorganization, Specific Plan, Vesting Tentative Tract Map, Multiple Conditional Use Permits, and an Environmental Impact Report. In June of 2003, the City approved bringing the Eagle Ranch property within the City's Sphere of Influence, and in 2008 the applicant submitted a City application to begin processing the proposed project. The Council authorized staff to initiate the General Plan Amendment, with the application to be reviewed and processed in a manner to facilitate citizen participation and public outreach as an important component of the planning process. The property owners of the Eagle Ranch held two community meetings at the Atascadero Lake Pavilion in January and May of 2008. The project development team presented the opportunities and constraints within the project, as well as conceptual land use possibilities at this meeting. Suggestions from the community for land uses beyond residential development ranged from provisions for open space, parks, trails, equestrian center and dude ranch to a high-end hotel with spa and wine tasting facilities. Project Proposal: The current conceptual land use plan has been developed by the applicant based on the site constraints, previous community meetings, as well as preliminary meetings with staff and the Council. As proposed, the project would use a clustered approach in order to minimize the impact on the site and maximize open space. Preliminary surveys and analysis have been conducted to identify major site constraints. Steep slopes, historical and cultural resources, native trees, creeks, riparian areas, wetlands, and areas of potential biological importance have been identified and mapped. A constraints map has been provided by the applicant to identify areas to be avoided and areas most feasible for development. The applicant has identified the following major project components: ■ Residential — Currently, 682 clustered lots. Single-family lots range from 4,500 sq. ft. to upwards of 5 acres. The multi -family residential component consists of 90 units near the Village and Park, including affordable units and senior housing. ■ Village Center — small scale retail and offices in middle of project. ■ Highway Commercial — Hotel proposed near US 101/Santa Barbara interchange. ■ Resort Hotel — Tourism component at existing Ranch headquarters. ■ Parks — A neighborhood public park is proposed adjacent to a creek side setting and within walking distance of the Village. ■ Open Space — The majority of the 3,500 acre site is proposed to remain as open space to be utilized for agricultural activities and conservation. ■ Schools — reviewing the need for a possible school site at Eagle Ranch. ■ Roads — Roads are, to the extent practicable, aligned to coincide with existing ranch roads and maintain a rural character. ITEM NUMBER: 2 DATE: 5-12-11 • Trails — Public pedestrian, bicycle and equestrian trails are proposed. In August of 2010, the City Council authorized the processing of the project Specific Plan concurrently with the project Environmental Impact Report. Michael Brandman and Associates (MBA) has been hired by the City to complete the EIR. Phase 1 of the EIR, which includes preliminary studies and constraints analysis to evaluate the currently proposed plan, is currently underway. The applicant is looking to obtain feedback from the EIR consultant regarding potential biological, archeological, traffic, and economic impacts and considerations in order to further refine the current project and create a predominantly self -mitigating plan. The current project plans will be further developed in the following months based on the preliminary EIR analysis and studies, public input, and City code compliance, plus Design Review Committee, Planning Commission, and City Council input. Staff and the applicant will be bringing the project before the Design Review Committee several times in order to fine tune many issues in the project design. DCR's Role: This first meeting is intended for overview of the proposed project, and obtain general feedback from the Committee. In subsequent meetings, DRC will be considering individual components and design issues of the project in more detail. The following will be key items for discussion in the development of the project design and Specific Plan: ❑ Overall project layout, circulation, uses, concepts, and theme ❑ Neighborhood design and appearance; lot sizes and lot count; clustering of Colony lots ❑ Commercial and resort facilities (square footage, uses, locations) ❑ Trails, parks, open space ................................................................................................................................................................................................................................................................................................................................................................................._......................................................................................................................... ❑ Connections to existing neighborhoods (existing Colony roads and proposed connections) ❑ Street design (width, emergency access, pedestrian & bicycle access) ........................................................................................................................................................................................... .................................................................................................................................................. ❑ Road frontage improvements ❑ Environmental impacts (trees, creeks, slopes and hillsides) ITEM NUMBER: 2 DATE: 5-12-11 Exhibit 1: Eagle Ranch: Existing County Lots 4 OM t4W 2 WE Isk err 4 ITEM NUMBER: 2 DATE: 5-12-11 Exhibit 2: Eagle Ranch: Applicant's Constraint Map i u ac 1 mw �Cz��dA c�rcna' � x 1 z to 2 1 W y,�7y1 c 1 � U �y ti rd 4 3 ITEM NUMBER: DATE: 5-12-11 Exhibit 3: Conceptual Site Plan ITEM NUMBER: 2 DATE: 5-12-11 Exhibit 4: Road Layout Plan A- 1vt6r" IV- � r ^b � t r ° � � • � i# �'o•7R" F �. N�rG .� i[ � �3y 4 . rr � i1i .} •� t,z" 1"✓ fi._. Fig Y ,%J•�� • r ;. i A ♦, �.�P ?y-�� u � � ' AFF°r i -! !�. ��ell ���.�1.5�'ii'��''t'�'"" .ter � ey N" •-. � 1'- P Fr �• �,'_ Awt• ! X rLl; -9 �x :4� '+ l 7 i 7 ITEM NUMBER: 2 DATE: 5-12-11 Exhibit 5: Conceptual Trails Map ITEM NUMBER: 2 DATE: 5-12-11 Exhibit 6: Eagle Ranch Conceptual Project Description (June 2010) EAGLE RANCH VTM AND SPECIFIC PLAN rrm group IN Conceptual Project Description creating environments people enjoy" July 13, 2010 1. Recent Planning Activity Milestones - See attached Milestones Timeline 1998 through 8/2010 2. Overall Approach and Vision - The applicants overall vision for the Eagle Ranch is driven by a desire to have the project: • Reflect and build upon the history and heritage of Eagle Ranch. • Continue Eagle Ranch agricultural operations. • Be consistent and compatible with the character of the "Colony," the existing community, and the City concept of "elbow room" as expressed in the General Plan (Goal LOC I). • Use a clustered settlement approach that causes less environmental impact but is more environmentally balanced and economically rewarding than implementation of the existing 452 lots of record. • Create a small Village Center to create a "central gathering place" for residents and visitors to Eagle Ranch. • Keep large areas of Eagle Ranch in open space with limited public access to retain the conservation values and agriculture operations existing on the Ranch. • Create a public park and trails system for access to the surrounding neighborhood and limited areas of the ranch consistent with the protection of open space and active agriculture operations. • Be identified as a highly desirable, premier place to live in Atascadero, the north county and the state based upon the Eagle Ranch planning and development approach. • Be economically feasible to implement. Contribute positively to the fiscal condition of the City. • Complete the environmental review, City and LAFCO entitlements process in an efficient manner and within a reasonable time frame. 3. Site Planning Approach - See attached Conceptual Land Use Plan The site planning approach is to identify areas where the residential entitlements of the existing lots of record can be clustered to reduce environmental impacts and use the routing of existing ranch roads where feasible to serve the clustered lots and other uses. In order to create a "neighborhood," the planning approach incorporates many elements of the City's General Plan such as affordable housing, a Village Center commercial area to serve residents' daily needs and provide a central sense of place, and a public park/trails system radiating from the village area to residential clusters within the project and connecting to the existing surrounding neighborhood. The plan will incorporate a Highway Commercial economic development area and an area identified for a future Resort Hotel/Dude Ranch to be consistent with the City Economic Development Vision. 4. Constraints Currently Identified - See attached Maps • Biology - Preliminary biological analysis was performed by consultants for the applicant to identify broad categories and approximate locations of potential area of biological importance. These included plants, animals, and fish. • Slopes - Topographical mapping of the site has been completed to identify slopes on the site. Slopes are a significant constraint to development on the site. • Flood - Base mapping for the site has incorporated FEMA mapping as a preliminary planning guideline, however the FEMA maps are thought to be somewhat antiquated and not reflective of specific site analysis. Eagle Ranch VTM and Specific Plan Conceptual Project Description July 13, 2010 ITEM NUMBER: 2 DATE: 5-12-11 rrm group IN creating environments people enjoy' • Archaeology - Preliminary archaeological field reconnaissance was conducted and likely locations of cultural resources were identified. These preliminary identifications act as a guide in planning/design but may need further investigation to closely determine the nature, extent, and importance of the resources. • Historical - Extensive effort has been expended in describing the history, remaining historical resources, and significance of Eagle Ranch throughout recent history. • Traffic - A preliminary review of the capacity of the Santa Barbara interchange was conducted to determine its remaining capacity. Further analysis specific to the project will need to be conducted. • Geology - A preliminary review identified geological features such as ancient landslide areas to be avoided by new development. Land Uses Proposed - See attached Conceptual Overall Project Statistics for areas, percentages, and comparisons • Highway Commercial - Approximately 10 acres is proposed in a location convenient to US 101 /Santa Barbara interchange. • Village Center - Approximately 5 acres is proposed for uses to serve the daily needs of Eagle Ranch residents. This area will likely contain retail shops or offices, postal facilities, meeting spaces and other functions needed and used by residents daily. The Village Center will reduce vehicle trips and provide a central gathering and focal "place" for the Eagle Ranch neighborhood. • Resort Hotel - Two feasibility studies have been completed by the applicant looking at the viability of this type of use. Both studies confirm the value of open space as an "attractor" for this use, and indicate potential future market support for a modest size but "upscale" facility. A critical prerequisite for a Resort Hotel is the need for Eagle Ranch to be well established as a high quality neighborhood "place" in advance of Resort Hotel development. A second prerequisite is for the City to have a vibrant, active tourism support infrastructure and track record of frequent successful community events before Resort Hotel operators will attempt to develop. • Single Family Residential - Preliminary site studies are based upon 452 SFD units reflecting the number of existing lots of record. However, the final number of homes may vary depending upon the financial feasibility of the project once all agency requirements are determined and costs accounted for. A variety of single family detached lot sizes are anticipated varying from approximately 8,OOOsf to over 1 acre. • Multi -Family Residential - Multi -Family dwellings are proposed in the area near the Village and Park. These units may be affordable dwellings and perhaps senior housing. These units may be for sale and/or rental housing. • Parks - A neighborhood public park is proposed. Its size will reflect at least the City parklands standards & requirements. The location considered is mostly flat land adjacent to a creek side setting and within walking distance of the Village. The park is envisioned to be focused primarily on passive activities (picnic, BBQ, etc.), some children's play structures, horseshoes, volleyball, and limited open turf areas to accommodate group and family play. • Open Space - Within the City portion of Eagle Ranch, significant open space areas are envisioned, likely measured in thousands of acres. Much of the open space will continue to be utilized for agricultural activities. The intent is to provide limited public access through and/or adjacent to these areas via public trails for pedestrian, bicyclists, and equestrians. me Eagle Ranch VTM and Specific Plan Conceptual Project Description July 13, 2010 ITEM NUMBER: DATE PA 5-12-11 rrm group IN creating environments people enjoy* Roads/Trails - Roads are to the extent practicable aligned to coincide with existing ranch roads. New roads will be necessary to reach some development areas. Trail systems are likewise aligned to follow existing ranch roads where practicable. Trails will be open to the public. To accommodate equestrian trail users a staging area will be developed to accommodate small trucks and trailers for visiting riders. Schools - Discussions with the District are ongoing regarding the necessity for a school site at Eagle Ranch. 6. Onsite Circulation Proposed - See attached Conceptual Overall Project Statistics for lengths and attached Conceptual Road and Trail Cross Sections for design • Roads - A variety of road widths are proposed in order to facilitate the terrain being traversed by the roads. Road widths are in general kept as narrow as practicable in order to be in keeping with the vision for the project and to avoid impacts to trees and other resources. • Trails - Public pedestrian, bicycle and equestrian trails are proposed and conceptually designed to lead to the Village Center and to connect with the surrounding neighborhood. Public Services/Utilities Approach - • Water - The project will be served by Atascadero Mutual Water Company (AMWC). The existing lots of record are "Colony" lots and therefore are shareholders and must be served by AMWC. AMWC has prepared a water supply analysis to review their ability to serve and concluded that capacity for Eagle Ranch is available. An application is pending with AMWC to annex a portion of the Eagle Ranch site that is inside the City SOI but not currently within the Colony boundary. The annexation area is the site of the Eagle Ranch Headquarters and site of the proposed Resort Hotel/Dude Ranch. • Sewer - Service will be provided by the City. • Law Enforcement - Service will be provided by the City. • Fire/Life Safety - Service will be provided by the City. 8. Affordable Housing - Affordable Housing is proposed within the Eagle Ranch to comply with City requirements. Approximately 90 units are anticipated to be developed mostly as attached dwellings near the Village Center. 9. Phased Approach - Eagle Ranch will be a phased project guided by the Specific Plan and the Vesting Tentative Subdivision Map. At this time the phase locations and sequence are unknown. 10. Entitlements Process & Environmental Review - • City - City approvals required are General Plan Amend ment/Pre•zoni ng, Specific Plan and Vesting Tentative Subdivision Map. • City - Certification of an Environmental Impact Report. • LAFCO - The City will be the applicant to annex the Eagle Ranch project area into the City corporate limits: this will require approval by LAFCO. 11. "Green" Features & Objectives of the Conceptual Plan - • Village Center - reduces vehicle trips and vehicle miles travelled by providing a place for residents' daily needs and needs of visitors onsite and accessible via bike, walking and horseback. • Highway Commercial - Provides a potential place to accommodate overnight visitors to the Eagle Ranch neighborhood; provide places for Eagle Ranch residents 19 Eagle Ranch VTM and Specific Plan Conceptual Project Description July 13, 2010 ITEM NUMBER: DATE rrmg roup IN creating environments people enjoy' to obtain meals, goods and services on a scale somewhat larger than the commercial facilities in the Village Center. For the City, highway commercial is one critical leg of the three legged stool of environment, economy, and social justice that is part of balanced development. For the residents, highway commercial contributes to reduction of vehicle trips and miles travelled as it is accessible via bike, pedestrian, and equestrian trails. Road Design Approach - Roads within Eagle Ranch are designed to be as narrow as practicable to accommodate passenger and emergency vehicles. Improvements within the roadway are minimized to maintain a rural appearance and at the same time limit disturbance, minimize structural improvements (paved drainage swales, etc.), minimize grading that disturbs the environment, retain native oak trees and allow maximum maintenance of natural functions to accommodate drainage, etc. Oak Tree Retention, Removal and Disturbance Standards - Maintain native oak trees to the greatest extent practicable and consistent with the City regulations. Use early involvement of City retained environmental professionals and a professional arborist in the Eagle Ranch site plan development, in the field review of the site planning as it is developed, and finally in the creation of Specific Plan standards. Retain Open Space & Conservation Values - Observe City creek setback requirements and creek policies. Avoid disturbance of identified critical creek habitat areas such as steelhead fishery habitat and other critical areas. In large contiguous areas where settlement is not anticipated, retain open space, continue agriculture operations and retain conservation values and features. Allow controlled public access via a well defined system of trails to accommodate pedestrians, bicyclists and equestrians. Where needed, limit public access in favor of retaining conservation and environmental values. PA 5-12-11 HE ITEM NUMBER: 2 DATE: 5-12-11 Exhibit 7: Eagle Ranch Conceptual Project Statistics •• v •a Acreage Lots Item Acreage Lots Miles % of Project SUMMARY: Developed Areas 6,000 to 12,000 s.f. Lots Residential Development 459.2 682 13.3% Resort 36.1 1.0% Commercial 14.7 0.4% Village 3.2 0.1% Roads ROW 104.3 17.2 3.0% Total Developed Area 617.4 682 17.2 17.8% 2.5% Item Acreage Lots Miles % of Project SUMMARY: Open Space Areas Park 14.7 0.4% Staging Area 1.5 0.0% Trails 13.2 0.4% Open Space 2,813.2 81.3% Total Open Space 2,842.6 82.2% OTAL: PROJECT 3,460.0 682 17.2 100.090 Item Acreage Lots % of Project AREA A: Atascadero Avenue Entry 4,500 to 10,000 s.f. Lots 6.2 55 0.2% 1 ac to 5 ac Lots 19.6 11 0.6% Total Area A 25.8 66 0.7% Item Acreage Lots % of Project AREA B: Paloma Creek East 6,000 to 12,000 s.f. Lots 12.4 58 0.4% 10,000 to 20,000 s.f. Lots 2.4 8 0.1% 1 ac to 5 ac Lots 34.6 18 1.0% 5 ac to 20 ac Lots 36.5 3 1.1% Total Area B 85.7 87 2.5% Item Acreage Lots % of Project AREA C: Paloma Creek West 1 ac to 5 ac Lots 52.8 33 1.5% 5 ac to 20 ac Lots 19.3 2 0.6% Total Area C 72.1 35 2.1% Item Acreage Lots %of Project AREA D -E: Ranch Core East/West 0.5 ac to 1 ac Lots 29.8 24 0.9% 1 ac to 5 ac Lots 34.6 10 1.0% Total Areas D -E 64.4 34 1.91yo !tem Acreage Lots % of Project AREA F: Canyon Area 5 ac to 20 ac Lots 112.3 12 3.2% Total Area F 112.3 12 3.2% 13 ITEM NUMBER: DATE: ttem Acreage Lots %of Project AREA ": San Rafael Entry/The Knoll 10,000 sf to 20,000 sf Lots 32.3 111 0.9% 0.5 ac to 1 ac Lots 24.3 40 0.7% Total Areas G -H 56.6 151 1.6% tem Acreage Lots % of Project AREA 1: Village Core 4,500 to 10,000 sf Lots 4.2 28 0.1% 6,000 to 12,000 sf Lots 29.0 179 0.8% Total Area 1 33.2 207 1.0% [TOTAL: SINGLE FAMILY 450.2 592 13.09' ,tem Acreage Lots Densrfq du/ ac `t of Project AREA I: Village Core Multi -Family Multi -Family- Lots 9.0 90 10.0 0.3% Total Area I - MF 9.0 90 0.3% [TOTAL: ALL LOTS 459.2 682 13.39' item __I_Aaeage % of Project Additional OS Areas (Optional) Private Open Space 110.8 ` 3.29 Public OS w/in Road ROWs 50.0 1.49 Total Open Space 160.8 4.69 .tem Acreage Lots Density du/ac %of Project Open Space OS Without Additional Areas 2,842.6 82.2% OS Incl. Additional OS Areas 3,003.4 86.8% ttem ROW Paved Miles Paved ac ROW ac %of Project Roads Class I Multi -Use 12 8 Main Loop 60 24 3.2 9.3 23.2 0.7% Resort loop/Cul-de-sacs 50 24 6.1 17.8 37.1 1.1% Standard Curb and Gutter 50 32 0.9 3.4 5.3 0.2% Curb and Gutter 50 24 1.1 3.2 6.7 0.2% One -Way Access Road 20 12 0.7 1.0 1.7 0.0% Urban Neighborhood 50 24 0.5 1.3 2.7 0.1% Sloping Section 50 28 1.3 4.4 7.8 0.2% Low -Impact Court' 100 68 0.7 6.2 9.1 0.3% Parallel Parking* 60 40 0.8 4.1 6.2 0.2% Driveway 20 16 1.8 3.6 4.4 0.1% Total Roads 17.2 54.2 104.31 3.0% .tem Width Paved Miles Paved ac Acreage % of Project Trails Class I Multi -Use 12 8 3.2 3.1 4.6 0.1% Class I Multi -Use: Spurs 12 8 0.2 0.2 0.4 0.0% Equestrian: One -Way Road 6 0.7 0.0 0.5 0.0% Equestrian: Existing Roads 6 4.1 0.0 3.0 0.1% Equestrian 6 3.9 0.0 2.8 0.1% Sidewalks 5 5 3.1 1.9 1.9 0.1% Total Trails 15.2 5.2 13.2 OA% 14 2 Exhibit 8: Concept Plan: Commercial Area ITEM NUMBER: 2 DATE: 5-12-11 FAMILY COTTAGES MEETING PAVILLION rommmmoonrmvw ~ rovmELpmnILLx7m / 15 ITEM NUMBER: 2 DATE: 5-12-11 Exhibit 9: Draft Commercial Area Program Components 3/10/2011— Applicant's First Rough Draft - Eagle Ranch Commercial Area Program Components 1. Eagle Ranch Village Area/Park/Multi-Family— Program components + Restaurant Deli — 2000sf interior, plus exterior dining area of 700sf + Postal Pickup/Drop off Building — 300sf interior, plus 400 outside area + 1500sf community meeting room w/ public restrooms + 4000sf of single story offices (3-4 separate buildings) + Plaza & access from park across the street + Vehicle/customer Parking + Restaurant delivery + Garden areas, ped. Pathways, bike parking 2. Highway Commercial area + 100 room lodge building (2 story) — rooms 400 -450sf ea + 50 cottage rooms — 450 — 550 sf ea + 50 family cottages - 1 bedroom suites 600-650 sf ea + Pool & lounge area w/ bar/towel pavilion + Full service restaurant — 3 meals per day, 150 indoor seats (free standing) + Restaurant back of house + Bar area indoor 25 seats also service to pool area and outdoor dining + Outdoor dining area 50 seats + Outdoor fireplace area near bar & outdoor dining + 4 tennis Courts w/ bar & towel pavilion + Meeting Pavilion for 500 people in chairs (350 at tables, break out space & restrooms, kitchen service from restaurant) + Kids play area, garden areas, pathways, etc. + Guest Parking 3. Resort Hotel + 100 cottage style rooms — 75 cottage suites —1 bedroom suites 650sf ea + 25 2 bedroom suites 750 - 800sf ea + Reception/Arrival building (adaptive re -use of existing building) + Restaurant/bar — seats 100 + 50 outdoor dining + Pool area w/ Bar & Snack Pavilion (750 sf) +Tennis courts Zea + Spa treatment building (6 treatment rooms, reception, plunge pool & lounging area, hot tubs/spas (4ea), tanning salon 2 rooms) + Meeting pavilion for 250 in chairs, 150 at tables + Equestrian/roundup guest, cowboy & horse gathering area + Remote horse tie up, seating & breakfast/lunch, restroom, pavilion cook out area 16 Exhibit 10: Concept Plan: Resort Area I TRIAN ROUJLTPAREA F% I R) RECEPTION! F r %T1 IRF WIVAL Qa am ]A W -T - lzw iROAOt� --- POOL W/ BAR & SNACK PAVILLION OUTDOOR '0 'T , T AMPHITtIIA Null 11 CA TO HOL F - KEEPING F ST I I., CARRI, TENNIS COURTS WITII SHADE STRUCTURE SBA TREATMENT ITEM NUMBER: 2 DATE: 5-12-11 —TWO BEDROOM COTTAGES ONE BEDROOM COTTAGES -A 17 Exhibit 11: Concept Plan: Village Area La ITEM NUMBER: 2 DATE: 5-12'11 18