Loading...
HomeMy WebLinkAbout102610 - Historic City Hall bid awardsAtascadero City Council Staff Report - Administrative Services ITEM NUMBER: C - 1 DATE: 10/26/10 Historic City Hall Project Bid Awards: ACH-03 Basement Wall & Floor Demolition, and ACH-04 Basement Electrical Demolition and Temporary Power Installation RECOMMENDATIONS: Council: 1. Award bid to, and authorize the City Manager to execute a contract with, Allied Industries in the amount of $178,000.00 for the ACH-03 Basement Wall and Floor Demolition services for the Historic City Hall Project; and, 2. Award bid to, and authorize the City Manager to execute a contract with, Rossi and Carr in the amount of $73,977.57 for the ACH-04 Basement Electrical Demolition and Temporary Power Installation services for the Historic City Hall Project. DISCUSSION: The first two bids for the Historic City Hall Project are ready to award and came in well below the expected budget. These two bids will be followed by others, as the City will hold multiple contracts using the multi -prime approach to construction management. The Historic City Hall Project is a large project. The demolition of the basement is the first step in restoring the building. The demolition will reveal additional information on the existing foundation and is expected to reduce the number of unknowns for future bids. ACH-03 Basement Wall & Floor Demolition ACH-03 Basement Wall & Floor Demolition was released for bidding on September 1, 2010. The bid was posted on the City's web site, in the Atascadero News, in plan rooms across California, and one large plan room in Georgia. The bid package ITEM NUMBER: C - 1 DATE: 10/26/10 includes the complete demolition and removal of the basement floor and non-bearing continuous masonry unit walls and unreinforced hollow clay block walls. In addition, included in this scope, are some exploratory excavations around and adjacent to some existing foundations. There is also a minor amount of site demolition included in this scope. Twelve contractors attended the mandatory pre-bid walk-through of the project site, many of whom were locally -based. Out of those twelve, five bids were received. Allied Industries out of North Hollywood, California, was the lowest responsive bidder with a bid of $178,000. The bid came in well under both the budgeted amount for this package and other bidders. Because there was a large range in the bids, representatives from Bernards contacted Allied Industries and were assured that they understood the scope of work and that they stand by their bid. Contractor Package budget Package bid Allied Industries $ 379,750.00 $178,000.00 The majority of this portion of the rehabilitation will fall under the "FEMA Mitigation" category of work. ACH-04 Basement Electrical Demolition & Temporary Power Installation ACH-04 Basement Electrical Demolition & Temporary Power Installation was also released for bidding on September 1, 2010. Like ACH-03, the bid package for ACH-04 was posted on the City's web site, in the Atascadero News, in plan rooms across California, and one large plan room in Georgia. The bid package includes the demolition, removal, labeling and storage of all electrical panels in the Basement. In addition, all switches and power outlets are to be removed in preparation for demolition. A new 400 amp temporary power supply and lighting system is to be installed to service the building with power and lighting for the duration of the project. Eleven contractors attended the mandatory pre-bid walk-through of the project site. Many of those contractors were locally -based. Out of those eleven, four bids were received. Rossi and Carr, out of Paso Robles, was the lowest responsive bidder. The bid came in well under the budgeted amount for this package. The budget was set at $162,750 and the bid from Rossi & Carr came in at $73,977.57 Contractor Package budget Package bid Rossi & Carr $ 162,750 $ 73,977.57 The majority of this portion of the rehabilitation will fall under the "FEMA Mitigation" category of work. ITEM NUMBER: C - 1 DATE: 10/26/10 Requests for Qualifications (RFQ) on bid package ACH-01 Deputy Inspection Services were received on October 15, 2010. Updates to Council will be forthcoming as progress continues on the selection of qualified Deputy Inspection Services. FISCAL IMPACT: PROJECTED FUNDING USES' Architecture and engineering $ 5,030,000 Construction costs: 6,686,400 ACH-3 Basement Wall and Floor Demolition $ 178,000 2,000,000 ACH-4 Basement Electrical Demolition and Temporary Power Installation 73,980 13,000,000 Remaining bid packages 24,619,020 $ 41,745,590 Total construction costs 24,871,000 Construction management 3,231,010 General conditions, construction support, and permitting 1,519,420 Contingency (20%) 5,032,300 TOTAL PROJECTED FUNDING USES $ 39,683,730 PROJECTED FUNDING SOURCES Expected FEMA funding $ 20,059,190 Expected Cal E MA funding 6,686,400 California Cultural Historic Endowment Grant 2,000,000 Redevelopment 2010 Bond Funds 13,000,000 TOTAL PROJECTED FUNDING SOURCES $ 41,745,590 FUNDING SURPLUS $ 2,061,860 The Project cost summary as presented to Council on July 27, 2010 estimated construction costs at $25,161,524 and a total project cost of $39,974,254. While there are still many more bids to come, the table above shows current projections to be about $290,520 lower than the July 2010 projections and about $2,061,860 lower than the current Project budget. ATTACHMENTS: Exhibit A —ACH-03 Bid Summary Exhibit B — ACH-04 Bid Summary Exhibit A Bid Summary TO: Public Works FROM: Lisa Cava, Deputy City Clerk f BID NUMBER: 2010-003 BID DESCRIPTION: City Hall Basement Electrical BID OPENING: 10-14-10 @ 2:00 pm Total Base Bid Vendor Amount A-1 Bid Alternate B-1 Bid Alternate B-2 add/deduct Rossi & Carr Black Dog Electric 73,977.57 63,700.00 21182,20 1,406.00 21,611.18 6,000.00 Advanced Electric Brannon, Inc 124,730.00 145,41100 240.00 1,62540 6,200,00 5,000,00 I City of Atascadero iffice of the City Clerk Exhibit B add/deduct ADD Bid Summary TO: Public Works FROM: Lisa Cava, Deputy City Clerk BID NUMBER: 2010-004 BID DESCRIPTION: City Hall Basement Wall & Floor Demo BID OPENING: 10-14-10 @ 2:30 pm Total Base Bid Vendor Amount A-1 Bid Alternate B-1 Bid Alternate B-2 Allied Industries 178,000.00 6,000.00 12,0()0.00 Central Coast Casualty Restoration 296,919.00 4,500.00 30,000-00 Channel :oast 319,500.00 21717-00 1,913.00 The Main Company, dba 332,500.00 400.00 5,000.00 Miller Environmental 341,000.00 14,000X0 - I 9'900.00 I Exhibit B add/deduct ADD