HomeMy WebLinkAboutResolution 2005-017 RESOLUTION NO. 2005-017
RESOLUTION OF THE CITY COUNICL
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
VESTING TENTATIVE TRACT MAP 2004-0062, A SIX LOT
SUBDIVISION CONSISTENT WITH A MASTER PLAN OF
DEVELOPMENT,APN 049-311-003
(1565 El Camino Real/Alvarez)
WHEREAS, an application has been received from Steve Alvarez (1565 EL Camino
Real, CA 93422), Applicant, and Property Owner, to consider a project consisting of a Zone
Change from RSF-X (Residential Single-Family) to RSF-X / PD-17 (Residential Single-Family
with Planned Development Overlay #17) with the adoption of a Master Plan of Development,
and a seven-lot residential Tentative Tract Map on APN 049-311-003; and,
WHEREAS, the site's General Plan Designation is SFR-X (Single-Family Residential -
X); and,
WHEREAS, the Planning Commission has recommended that the site's Zoning District
be changed from RSF-X (Residential Single-Family-X) to RSF-X/PD-17 (Residential Single-
Family-X/Planned Development Overlay#17); and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2005-0005 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act(CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and property noticed Public Hearing upon the subject Vesting
Tentative Tract Map application was held by the Planning Commission of the City of Atascadero
at which hearing evidence, oral and documentary, was admitted on behalf of said application;
and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on March 15, 2005, studied and considered Vesting Tentative Tract Map
2004-0062, after first studying and considering the Proposed Mitigated Negative Declaration
prepared for the project; and,
WHEREAS,the City Council of the City of Atascadero, at a duly noticed Public Hearing
held on April 12, 2005, studied and considered Vesting Tentative Tract Map 2004-0062, after
first studying and considering the Proposed Mitigated Negative Declaration prepared for the
project; and,
�✓ NOW, THEREFORE, the City Council of the City of Atascadero takes the following
actions:
City of Atascadero
Resolution No.2005-017
Page 2 of 15
NNW SECTION 1. Findings of Approval for Vesting Tentative Tract Map, the City
Council finds as follows:
1. The proposed subdivision, design and improvements as conditioned, is consistent with
the General Plan and applicable zoning requirements.
2. The proposed subdivision, as conditioned, is consistent with the proposed Planned
Development Overlay District#17 Master Plan of Development (CUP 2004-0143).
3. The site is physically suitable for the type of development proposed.
4. The site is physically suitable for the density of development proposed.
5. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
6. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
7. Covenants, Conditions and Restrictions (CC&R's), or similar for of maintenance
mechanism, shall be required that incorporate the planned development conditions of
approval to ensure that the site retains the qualities (architecture, colors, materials, street
amenities, fencing, and landscaping) over time.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
SECTION 2. Approval. The City Council of the City bf Atascadero, in a regular
session assembled on April 12, 2005, resolved to approve Vesting Tentative Tract Map (TTM
2004-0062) subject to the following:
1. Exhibit A: Vesting Tentative Tract Map 2004-0062
2. Exhibit B: Conditions of Approval/Mitigation Monitoring Program.
City of Atascadero
Resolution No.2005-017
Page 3 of 15
On motion by Mayor Pro Tem O'Malley and seconded by Council Member Luna, the
foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Clay, Luna, O'Malley, Pacas and Mayor Scalise
NOES: None
ABSENT: None
ADOPTED: April 12, 2005
CITY OF ATASC ERO
By:c
dy Sc ' e,-Mayor
ATTEST:
Marcia McClure Torgerson, C.M.C., City Oerk
APPROVED AS TO FORM:
f a-
Patrick IlEnri*, ity Attorney
titre
City of Atascadero
Resolution No.2005-017
Page 4 of 15
Exhibit A:Vesting Tentative Tract Map 2004-0062
Wr+°
w
a pp} 91g�� yy
Jill
fit� 3 q
p fill
M X
/RST
R
�(] d 1
t� 1, �tiri os e
U lit
° i7 _
ELCAMINO REAL
x
.0
i
yet
�i
City of Atascadero
Resolution No.2005-017
Page 5 of 15
Exhibit B:Conditions of Approval I Mitigation Monitoring Program
Ntirr Tentative Tract Map 20040062
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pemrt PS:Planning Services
BP:Building Permit BS:Building Services
1565 Ell Camino Real SIP:Subdivision FD:Fire Department
Ir provement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary WW:Wastewater
TTM 20040062 Occupancy CA City Attorney
FI:Final irspectcn AMWC:Water Cone.
F0:Final Occupancy
Planning Services
1. The approval of this Tentative Tract Map shall not become final FM PS
and effective following approval of Zone Change 2004-0093
and CUP 2004-0143.
2. Approval of this Tentative Tract Map shall be valid for two years FM PS
after its effective date. At the end of the period, the approval
shall expire and become null and void unless an extension of
time is granted pursuant to a written request received prior to
the expiration date.
3. The Community Development Department shall have the FM PS
authority to approve minor changes to the project that(1) result
in a superior site design or appearance, and/or (2) address a
design issue that is not substantive to the Tentative Tract Map
and that the Final Map is in substantial conformance with the
Tentative Map.
4. The Tract Map shall be subject to additional fees for park or FM PS
recreation purposes (QUIMBY Act) as required by City
Ordinance.
5. The applicant shall record CC&R's for the subdivision subject to FM PS
the review and approval of the City Engineer, City Attorney and
Planning Services. The CC&R's shall identify the maintenance
responsibilities of all private driveways, sewer facilities,
drainage facilities, common parking areas, site lighting,
landscape areas, fencing, and other common facilities. The
CC&R's shall also state that all exterior colors, exterior
materials,yard fencing and site landscaping shall be consistent
with the overall master plan of development. Any subsequent
changes to the CC&R's related to items required by the Master
Plan of Development or this approval shall be subject to City
approval.
6. The granting of this entitlement shall apply to the property On going PS
located at 1565 EI Camino Real(APN 049-311-003) regardless
of owner.
7. The Final Map shall be drawn in substantial conformance with FM PS
the approved tentative map, and in compliance with all
conditions set forth herein, shall be submitted for review and
approval in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
City of Atascadero
Resolution No.2005-017
Page 6 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pe net PS:Planning Services
BP:Building Pemil BS:Binding Services
1565 Ell Camino Real SIP:SubdiJsion FD:Fire Department
Inprovensnt Plans PD:Police Depanmenl
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary WW:Wastewater
TTM 20040062 Oc iparwy Ca CO Attorney
FI:Feral inspection AMWC:Water Comp.
F0:Final O=pawy
8. The subdivider shall defend, indemnify, and hold harmless the FM PS
City of Atascadero or its agents, officers, and employees
against any claim or action brought to challenge an approval by
the city,or any of its entities,concerning the subdivision.
9. Deed notice shall be recorded with each lot notifying each FM PS,CE
property owner that the on-site roadway shall be extended to
serve future subdivisions to the east.
10. The drainage detention basin shall be located on an FM PS,CE
independent lot to be owned by the Homeowners Association
and to be landscaped and maintained by the Association.
11. The developer and/or subsequent owner shall assume
responsibility for the continued maintenance of all landscape
and common areas,consistent with EXHIBIT C.
Prior to final map, the applicant shall submit a covenant for
review and approval by the Community Development
Department. The covenant shall record with the Final Map and
shall include the following:
a) Residents shall keep all trash receptacles within the unit's
designated trash storage area.
b) Garages shall be maintained and used for vehicle parking.
c) No boats, RV's or other type of recreation vehicle may
occupy a guest or resident parking space, including within
an individual garage.
d) All site development,fencing,and landscaping is subject to
the Master Plan of Development for the project.
12. Affordable Housing Requirement: The applicant shall either FM,BP PS,CE
deed restrict a minimum of 1 residential unit for 30 year at a
moderate income rate with recordation of the final map or shall
pay an in lieu fee equal to 5%of the construction valuation of
each unit.
13. Workforce Housing: FM,BP PS,CE
Prior to recordation of final map,the applicant shall enter into a
legal agreement with the City to reserve 1/2 of the units for sale
to residents or workers within the City of Atascadero, including
the affordable units. The agreement shall include the following
provisions:
The units shall be offered for sale to residents or workers
within the City of Atascadero for a minimum of 60-days.
During this time period offers may only be accepted from
City of Atascadero
Resolution No.2005-017
Page 7 of 15
Conditions of Approval I Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pemrit PS:Planning Services
BP:Building Permit BS:Building Services
1565 EI Camino Real SIP:Subdiviscn FD:FireDeparlrnent
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary WW:Wastexater
TTM 2004-0062 occupancy CA City Attorney
Fi:Final inspection AMWC:Water Comp.
F0:Final Occupancy
Atascadero residents or workers;
The applicant shall provide reasonable proof to the City that
at least one of the qualified buyers is a resident or worker
within the City Limits of Atascadero;
The Atascadero resident or worker restriction shall apply to
the initial sale only;
The applicant shall identify which units will be reserved;and
The City Attorney shall approve the final form of the agreement.
14. The emergency services and facility maintenance costs listed
below shall be 100%funded by the project in perpetuity. The
service and maintenance costs shall be funded through a
community facilities district established by the City at the
developer's cost. The funding mechanism must be in place
prior to or concurrently with acceptance of the final maps.
The funding mechanism shall be approved by the City
Attorney,City Engineer and Administrative Services Director
prior to acceptance of any final map. The administration of
the above mentioned funds shall be by the City. Developer
agrees to participate in the community facilities district and to
take all steps reasonably required by the City with regard to
the establishment of the district and assessment of the
property.
■ All Atascadero Police Department service costs to the
project.
• All Atascadero Fire Department service costs to the project.
• Off-site common City of Atascadero park facilities
maintenance service costs related to the project.
15. All tract maintenance costs listed below shall be 100% funded
by the project in perpetuity. The service and maintenance cost
shall be funded through a Home Owners Association
established by the developer subject to City approval. The
Home Owners Association must be in place prior to, or
concurrently with acceptance of any final maps. The Home
Owners Association shall be approved by the City Attorney,City
Engineer and Administrative Services Director prior to
acceptance of any Final Map. The administration of the above
mentioned funds, and the coordination and performance of
maintenance activities, shall be the responsibility of the Home
Owners Association.
*Awl a) All streets, bridges, sidewalks, streetlights, street signs,
roads, emergency access roads, emergency access gates,
City of Atascadero
Resolution No.2005-017
Page 8 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pemtit PS:Planning Services
BP:Building Perr it BS:Building Services
1565 EI Camino Real SIP:Subdidsicn FD:Fire Depanrnent
Improvement Plans PD:Police Deparbnent
Vesting Tentative Tract Map FM:Final Map CE City Engineer
TO:Tenporary WW:Wastewater
TTM 20040062 occnpency CA CO Attorney
FI:Final inspection AMWC:Water Comp.
FO:Final Occupancy
and sewer mains within the project.
b) All parks,trails, recreational facilities and like facilities.
c) All open space and native tree preservation areas.
d) All drainage facilities and detention basins.
e) All creeks, flood plains, floodways, wetlands, and riparian
habitat areas.
f) All common landscaping areas, street trees, medians,
parkway planters, manufactured slopes outside private
yards,and other similar facilities.
g) All frontage landscaping and sidewalks along arterial
streets
Fire Marshal
16. All street names shall be reviewed and approved by the FM PS,FD,PD
Community Development Department,the Fire Department,
and the Police Department.Street names and addresses
shall be approved and assigned prior to recordation of the
final map.
17. Provide a letter from the Atascadero Mutual Water Company BP PS/FD
stating the minimum expected water available to the site.
Amount available must meet minimum requirement specified
in the California Fire Code.
18. Note that approved address signage is to be provided. BP PS/FD
19. Note on plans that fire lanes shall be delineated to restrict BP PS/FD
parking as required by the Fire Authority.
Engineering Conditions:
City Engineer Project Conditions
Drainage:
20. All drainage facilities shall be designed and constructed in BP PW
accordance with the current City of Atascadero Engineering
Standards.
21. The applicant shall submit drainage calculations for review BP PW
and approval of the City Engineer.
22. All drainage basins shall detain the difference in the 2-year BP PW
storm runoff or the undeveloped site and the 50-year storm
runoff of the developed site. The outlet pipe or channel shall
be sized for the 2-year storm peak runoff rate for the
undeveloped site at full capacity.
23. The applicant shall address storm water detention to the BP/FM PW
satisfaction of the City Engineer,prior to grading and d I
City of Atascadero
Resolution No.2005-017
Page 9 of 15
Conditions of Approval I Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pemtil PS:Planning Services
BP:Building Persil BS:Building Services
1565 El Camino Real SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary WW:Wastewater
TTM 20040062 Oc u,parwy Ca Cay Adomey
FI:Final inspection AMWC:Water Corrp.
F0:Final Occupancy
drainage approval,or approval of the final map.
24. A homeowners association,or other funding and FM PW
maintenance agreement shall be submitted for approval by
the City Engineer and the City Attorney prior to recording the
final map. The agreement shall cover scheduled
maintenance of the drainage facilities.
25. Existing drainage patterns from adjacent properties shall not BP PW
be obstructed.
26. All drainage from improvements shall cross property lines BP PW
within drainage easements.
27. Drainage at the rear of the lots must be carried across BP PW
property lines in a closed conduit.
Frontage Improvements: BP PW
28. Project shall include construction of curb, gutter and sidewalk BP PW
along entire EI Camino Real frontage.
29. Alignment of frontage improvements shall be approved by the BP PW
City Engineer.
30. The entry location of project on EI Camino Real shall be BP PW
located in such a location as to provide adequate site
►'" distance for vehicles exiting project.
31. All utilities shall be undergrounded on EI Camino Real BP PW
Improvement Maintenance:
Street Improvements and landscaping.
32. All street improvements shall be constructed in accordance BP PW
with City of Atascadero Engineering Standards.
33. Prior to recording the final map,provisions for the repair and FM PW
maintenance of all street and landscaping improvements shall
be included in the CC&R's for this tract. Included shall be a
mechanism to maintain the streets and landscaping,such as
a homeowners association. The City Engineer and City
Attorney shall approve the final form prior to recordation.
Wastewater:
34. All onsite sewer mains shall be privately owned and BP PW
maintained.
35. Prior to recording the final map, provisions for the repair and BP PW
maintenance of the private SS shall be included in the
CC&R's for this tract. Included shall be a mechanism to
maintain the private sewer and structures,such as a
homeowners association. The City Engineer and City
Attorney shall approve the final form prior to recordation.
36. Applicant shall pay sewer extension(Annexation), BP PW
Connection and Reimbursement fees (if applicable) upon
issuance of building permit.
W 37. Gravity mains within the subdivision shall be eight(8) inches BP PW
in diameter.
City of Atascadero
Resolution No.2005-017
Page 10 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
y GP:Grading Pam* PS:Planning Services
BP:Budding Pernit BS:Bullclag Services
1565 El Camino Real SIP:SubdKtiDn FD:FireDepadment
Improvement Plans PD:Police DepaNnent
Vesting Tentative Tract Map FM:Final Map CE:Cay Engineer
TO:Temporary WW:Wastewater
TTM 20040062 Occupancy CA cilyAttomey
FI:Final inspection AMWC:Water Cone.
F0:Final Occupancy
38. Drainage piping serving fixtures which have flood level rims BP PW
located below the elevation of the next upstream manhole
cover of the public or private sewer serving such drainage
piping shall be protected from backflow of sewage by
installing an approved type backwater valve. Fixtures above
such elevation shall not discharge through the backwater
valve.
39. All sanitary sewer(SS) mains shall terminate in manholes BP PW
unless extension of the main,at some later date,is
anticipated. If extension of a SS main is anticipated,said SS
main may terminate in a cleanout providing the next
downstream manhole is less than 300 linear feet from the
cleanout and that the point of termination is not a reasonable
location for a SS main angle point or intersection.
City Engineer Standard Conditions
40. In the event that the applicant is allowed to bond for the BP BS
public improvements required as a condition of this map,the
applicant shall enter into a Subdivision Improvement
Agreement with the City Council.
fir► 41. An engineer's estimate of probable cost shall be submitted for BP PW
review and approval by the City Engineer to determine the
amount of the bond.
42. The Subdivision Improvement Agreement shall record FM PW
concurrently with the Final Map.
43. All public improvements shall be constructed in conformance BP PW
with the City of Atascadero Engineering Department Standard
Specifications and Drawings or as directed by the City
Engineer.
44. The applicant shall be responsible for the relocation and/or BP PW
alteration of existing utilities.
45. The applicant shall install all new utilities (water, gas, electric, BP BS
cable TV and telephone) underground. Utilities shall be
extended to the property line frontage of each lot or its public
utility easement.
46. The applicant shall monument all property corners for BP PW
construction control and shall promptly replace them if
disturbed.
47. A preliminary subdivision guarantee shall be submitted for BP PW
review in conjunction with the processing of the parcel map.
48. All existing and proposed utility, pipeline, open space, or BP PS/PW
other easements are to be shown on the parcel map. If there
are building or other restrictions related to the easements,
s they shall be noted on the parcel map. The applicant shall
show all access restrictions on the parcel map.
City of Atascadero
Resolution No.2005-017
Page 11 of 15
Conditions of Approval 1 Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Perini! PS:Planning Services
BP:Building Perm! &S:Building Services
1565 EI Camino Real SIP:Subdivsbn FD:FireDepartnent
Inprovement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary WW:Wastewater
TTM 20040062 pcapam CA City Attorney
FI:Final inspection AMWC:Water Cane.
F0:Final Occupancy
49. Prior to recording the tract map, the applicant shall submit a FM PS/PW
map drawn in substantial conformance with the approved
tentative map and in compliance with all conditions set forth
herein shall be submitted for review and approval by the City
in accordance with the Subdivision Map Act and the City's
Subdivision Ordinance.
50. Prior to recording the tract map,the applicant's surveyor shall FM PW
set monuments at all new property corners or shall indicate,
by certificate on the final map, that corners have been set or
shall be set by a date specific and that they will be sufficient
to enable the survey to be retraced.
51. Prior to recording the tract map, the applicant shall pay all FM BS
outstanding plan check/inspection fees.
52. Prior to recording the tract map, the applicant shall have the FM PW
map reviewed by all applicable public and private utility
companies (cable, telephone, gas, electric, Atascadero
Mutual Water Company). The applicant shall obtain a letter
from each utility company, which indicates their review of the
$w.r map. The letter shall identify any new easements, which
may be required by the utility company. A copy of the letter
shall be submitted to the City. New easements shall be
shown on the parcel map.
53. Upon recording the final map, the applicant shall provide the FM PW
City with a black line clear Mylar(0.4 mil)copy and a blue line
print of the recorded map.
54. Prior to the final inspection of any public improvements, the BP PW
applicant shall submit a written statement from a registered
civil engineer that all work has been completed and is in full
compliance with the approved plans.
AMWC Conditions
1. Before the issuance of building permits, the applicant shall
submit plans to AMWC for the water distribution facilities
needed to serve the project. AMWC shall review and
approve the plans before construction begins on the water
system improvements. All water distribution facilities shall be
constructed in conformance with AMWC Standards and
Details and the California Waterworks Standards (Code of
Regulations Title 22, Division 4, Chapter 16). All cross-
connection devices shall conform to AWWA and California
Department of Health Services standards.
2.
City of Atascadero
Resolution No.2005-017
Page 12 of 15
Conditions of Approval/ Tilling Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pemrt PS:Planning Services
BP:Building Permil BS:Building Services
1565 EI Camino Real SIP:Subdivision FD:FireDepaNnent
Inprovement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary WW:Wastewater
TTM 20040062 Occupm CA City Attorney
FI:Final inspection AMWC:Water Corp.
F0:Final Occupancy
3. Before issuance of building permits,the applicant shall obtain
a "Will Serve" letter from AMWC for the newly created lots
within the subdivision.
4. The applicant shall provide AMWC with easements for those
water facilities proposed for operation and maintenance by
AMWC that are constructed outside of publicly maintained
right-of-ways. AMWC shall review the form and content of
the easements before recordation.
5. The applicant shall submit a hydraulic analysis with the first
plan check submittal of the water system improvements for
the project. The analysis should take into account the fire
flows required by the Uniform Fire Code and requirements of
the California Waterworks Standards. The applicant is
responsible for designing and constructing water system
improvements that will provide water at pressures and flows
adequate for the domestic and fire protection needs of the
project.
.� 6. The applicant shall obtain a separate landscape-irrigation
meter(s) from AMWC for any common areas within the
project.
7. Landscaping for the common areas shall be drought-tolerant.
Mitigation Measures
Mitigation Measure 1.d.1: Exterior lighting shall be limited to wall BP PS 1.d.1
mounted building lighting only.All exterior lighting shall be designed to
eliminate any off site glare and shall utilize full cut-off,"hooded"lighting
fixtures to prevent offsite light spillage and glare.Fixtures shall be
shield cut-off type and compatible with historic setting,subject to staff
approval.
Mitioation Measure 3.b.1: The project shall be conditioned to comply BP BS 3.b.1
with all applicable District regulations pertaining to the control of
fugitive dust(PM-10)as contained in sections 6.3, 6.4 and 6.5 of the
April 2003 Air Quality Handbook.
• Asbestos has been identified by the state Air Resources
Board as a toxic air contaminant. Serpentine and
ultramafic rocks are very common in the state and may
contain naturally occurring asbestos. Under the State Air
Resources Board Air Toxics Control Measure(ATCM)for
Construction, Grading, Quarrying,and Surface Mining
Operations,prior to any grading activities at the site,the
project proponent shall ensure that a geologic evaluation is
conducted to determine if naturally occurring asbestos is
present within the area that will be disturbed. If Naturally
'iirr• Occurring Asbestos(NOA)is found at the site the applicant
must comply with all requirements outlined in the Asbestos
City of Atascadero
Resolution No.2005-017
Page 13 of 15
Conditions of Approval I Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
1565 EI Camino Real SIP:Subdivision FD:Fro Department
Inprovement Plans PD:Police Depanment
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
T0:Temporary WW:Wastewater
TTM 2004-0062 occupancy CA:City Altomey
FI:Final inspection AMWC:Water Comp.
F0:Final Ocouparicy
ATCM for Construction, Grading,Quarrying, and Surface
Mining Operations. . If NOA is not present, an exemption
request must be filed with the District. If NOA is found at
the site the applicant must comply with all requirements
outlined in the Asbestos ATOM. This may include
development of an Asbestos Dust Mitigation Plan and an
Asbestos Health and Safety Program for approval by the
APCD.Should Naturally Occurring Asbestos be identified
within the area of construction,and the worked area will be
less than or equal to one acre,then the dust control
measures identified below are required. If the disturbed
area is greater than one acre,additional requirements may
include but are not limited to 1)an Asbestos Dust Mitigation
Plan which must be approved by the District before
construction begins, and 2)an Asbestos Health and Safety
Program will also be required for some projects.
■ Dust Control Measures for Construction and Grading
Operation Projects One Acre or Less: No person shall
engage in any construction or grading operation on
property where the area to be disturbed is one(1.0)acre or
less unless all of the following dust mitigation measures are
initiated at the start and maintained throughout the duration
of the construction or grading activity:
(A)Construction vehicle speed at the work site must be
limited to fifteen (15)miles per hour or less;
(B) Prior to any ground disturbance,sufficient water must
be applied to the area to be disturbed to prevent visible
emissions from crossing the property line;
(C)Areas to be graded or excavated must be kept
adequately wetted to prevent visible emissions from
crossing the property line;
(D) Storage piles must be kept adequately wetted,treated
with a chemical dust suppressant, or covered when
material is not being added to or removed from the
pile;
(E) Equipment must be washed down before moving from
the property onto a paved public road; and
(F)Visible track-out on the paved public road must be
cleaned using wet sweeping or a HEPA filter equipped
vacuum device within twenty-four(24)hours.
Mitigation Measure 4.e.1: The Grading Plan shall identify tree BP PS
protection fencing around the dripline of each existing on-site or off-
site native tree within 20 feet of construction activity.
City of Atascadero
Resolution No.2005-017
Pae 14 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Pemrt BS:Building Services
1565 EI Camino Real SIP:Subdivision FD:ReDepadrrent
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary WW:Wastewater
TTM 20040062 Occupancy CA:City Attorney
FI:Final inspection AMWC:Water Comp,
F0:Final Occupancy
Mitigation Measure 4.e.2: Grading and excavation and grading work GP PS 4.e.2
shall be consistent with the City of Atascadero Tree Ordinance.
Special precautions when working around native trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be
pruned prior to any heavy equipment work being done.
4. Vehicles and stockpiled material shall be stored outside the
dripline of all trees.
5. All trees within the area of work shall be fenced for protection
with 4-foot chain link,snow or safety fencing placed per the
approved tree protection plan. Tree protection fencing shall
be in place prior to any site excavation or grading. Fencing
shall remain in place until completion of all construction
activities.
6. Any roots that are encountered during excavation shall be
clean cut by hand and sealed with an approved tree seal.
Mitigation Measure 4.e.3: An arborists report shall be required prior to OP PS 4.e.3
project implementation. The report shall identify each native tree
proposed for removal and each tree within the project area subject to
potential impact. The report shall provide recommendations for tree
pruning,tree protection of existing native trees to remain,and identify
native tree impact/replacement mitigation per the Atascadero
Municipal Code Section 9-11.105.
Mitigation Measure 6.b: The grading permit application plans shall GP CE 6.b
include erosion control measures to prevent soil,dirt,and debris from
entering the storm drain system during and after construction. A
separate plan shall be submitted for this purpose and shall be subject
to review and approval of the City Engineer at the time of Building
Permit application.
Mitigation Measure 6.c.d: A soils report shall be required to be GP BS 6.c.d
submitted with a future building permit by the building department.The
building plans will be required to follow the recommendations of the
soils report to assure safety for residents and buildings.
Mitigation Measure 8.e.f: The developer is responsible for ensuring BP CE 8.e.f
that all contractors are aware of all storm water quality measures and
that such measures are implemented. Failure to comply with the
approved construction Best Management Practices will result in the
issuance of correction notices,citations,or stop work orders.
City of Atascadero
Resolution No.2005-017
Page 15 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
'itrrr'
GP:Grading Pemtit PS:Planning Services
1565 E! Camino Real BP:Building Pemri BS:Building Services
SIP:Subdivision FD:Fire Departrnent
Vesting Tentative Tract Map � nalllVapnent � PD:CitPolice EngineDeparter p M Engheer
TTM 20040062 TO:Temporary WW:Wastewater
Occupancy CA City Attorney
FI:Final inspection AMWC:Water Cone.
F0:Final Occupancy
Mitigation Measure 11.d: All construction activities shall comply with Ongoing BS/PS 11.d
the City of Atascadero Noise Ordinance for hours of operation.
Construction activities shall be limited to the following hours of
operation:
• 7 a.m.to 7 p.m. Monday through Friday
• 9 a.m.to 6 p.m. Saturday
• No construction on Sunday
Further,particularly loud noises shall not occur before 8 a.m.on
weekdays and not at all on weekends.
The hours of construction may be modified by the Community
Development Director upon a determination that unusually loud
construction activities are having a significant impact on the neighbors.
Failure to comply with the above-described hours of operation may
result in withholding of inspections and possible construction
prohibitions,subject to the review and approval of the Community
Development Director.
,%W A sign shall be posted on-site with the hours of operation and a
telephone number of the person to be contacted in the event of any
violations. The details of such a sign shall be approved by staff during
the Grading Plan/Building Permit review process.
�MrrY'