Loading...
HomeMy WebLinkAboutResolution 2005-016 RESOLUTION NO. 2005-016 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT 2004-0143 (MASTER PLAN OF DEVELOPMENT) ON APN 049-311-003 (1565 El Camino Real/Alvarez) WHEREAS, an application has been received from Steve Alvarez (1565 EI Camino Real, CA 93422), Applicant, and Property Owner, to consider a project consisting of a Zone Change from RSF-X (Residential Single-Family) to RSF-X / PD-17 (Residential Single-Family with Planned Development Overlay #17) with the adoption of a Master Plan of Development, and a seven lot-residential Tentative Tract Map on APN 049-311-003; and, WHEREAS, the site's General Plan Designation is SFR-X (Single-Family Residential - X); and, WHEREAS, the Planning Commission has recommended that the site's Zoning District be changed from RSF-X (Residential Single-Family-X) to RSF-X/PD-17 (Residential Single- Family-X/Planned Development Overlay#17); and, WHEREAS, the PD-17 requires the adoption of a Master Plan of Development, "W approved in the form of a Conditional Use Permit; and, WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2004-0050 were prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act(CEQA); and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Change application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of Development; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on March 15, 2005, studied and considered Conditional Use Permit 2004- 0143 (Master Plan of Development), after first studying and considering the Proposed Mitigated Negative Declaration prepared for the project, and WHEREAS,the City Council of the City of Atascadero, at a duly noticed Public Hearing held on April 12, 2005, studied and considered Conditional Use Permit 2004-0143 (Master Plan of Development), after first studying and considering the Proposed Mitigated Negative Declaration prepared for the project, and City of Atascadero Resolution No.2005-016 Page 2 of 27 NOW, THEREFORE, the City Council of the City of Atascadero takes the following actions: SECTION 1. Findings for Approval of Conditional Use Permit. The City Council finds as follows: 1. The proposed project or use is consistent with the General Plan and the City's Appearance Review Manual; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance)including the PD-17 Ordinance; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. 6. The Master Plan of Development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area; and 7. Benefits derived from the Master Plan of Development and PD-25 overlay zone cannot be reasonably achieved through existing development standards or processing requirements. SECTION 2. Approval. The City Council of the City of Atascadero, in a regular session assembled on April 12, 2005, resolved to approve Conditional Use Permit 2004-0143 (Master Plan of Development) subject to the following: EXHIBIT A: Conditions of Approval/Mitigation Monitoring Program EXHIBIT B: Master Plan of Development EXHIBIT C: Landscape Plan EXHIBIT D: Tree Protection plan EXHIBIT E: Grading and Drainage Plan EXHIBIT F: Unit 1: Floor Plans EXHIBIT G: Unit 1: Elevations EXHIBIT H: Unit 2: Floor Plans EXHIBIT 1: Unit 2: Elevations "a" EXHIBIT J: Unit 2: Elevations "b" EXHIBIT K: Color and Materials Board City of Atascadero Resolution No.2005-016 Page 3 of 27 On motion by Mayor Pro Tem O'Malley and seconded by Council Member Luna, the foregoing Resolution is hereby adopted in its entirety on the following roll call vote: AYES: Council Members Clay, Luna, O'Malley, Pacas and Mayor Scalise NOES: None ABSENT: None ADOPTED: April 12, 2005 CITY OF ATASC BPERO ; L Wen Scali ayor a_ ATTEST: Marcia McClure Torgerson, C.M.C., 4y Clerk APPRO AS TO FORM: Patric En4- t, City Attorney City of Atascadero Resolution No.2005-016 Page 4 of 27 EXHIBIT A:Conditions of Approval/Mitigation Monitoring Program PD-17 Master Plan of Development(CUP 2004-0143)/ZCH 2004-0093 Conditions of Approval I Timing Responsibility Mitigation /Monitoring Measure Mitigation Monitoring Program PS:Planning Services BL:Business License BS:Building Services 1565 EI Camino Real GP:Grading Pemnit FD:Fire Department BP:BuildingPemit PD:Police oep anent PD-17 Master Plan of Development Fl:Fenalinspection CE: Wastewater Engineer TO:Temporary CA CO t CUP 2004-0143/ZCH 2004-0093 Occupancy F0:Final Occupancy Planning Services 1. The approval of this zone change and use permit shall become final BP PS and effective following City Council approval. 2. Approval of this Conditional Use Permit shall be valid for twenty-four FM PS (24)months after its effective date. At the end of the period,the approval shall expire and become null and void unless the project has received a building permit. 3. Subsequent changes to the Master Plan of Development shall be on-going PS approved by the City Council. 4. The Community Development Department shall have the authority BP/FM PS to approve the following minor changes to the project the(1)modify ° the site plan project by less than 10%,(2)result in a superior site design or appearance,and/or(3)address a construction design issue that is not substantive to the Master Plan of Development. Any other changes to the Master Plan of Development shall be subject to City Council approval.Any associated Tentative Maps unless shall be subject to Planning Commission approval. 5. The applicant shall defend,indemnify,and hold harmless the City of ongoing PS Atascadero or its agents,officers,and employees against any claim or action brought to challenge an approval by the city,or any of its entities,concerning the subdivision. 6. All site work,grading,and site improvements shall be consistent with BP/FM PS the Master Plan of Development as shown in EXHIBIT B. 7. All subsequent Maps and construction permits shall be consistent BP/FM PS with the Master Plan of Development contained herein. 8. The developer and/or subsequent owner shall assume responsibility for the continued maintenance of all landscape and common areas, consistent with EXHIBIT C. Prior to final map, the applicant shall submit a covenant for review and approval by the Community Development Department. The covenant shall record with the Final Map and shall include the following: a) Residents shall keep all trash receptacles within the unit's designated trash storage area. City of Atascadero Resolution No.2005-016 Pae 5 of 27 Conditions of Approval/ Timing Responsibility Mitigation /Monitoring Measure Mitigation Monitoring Program PS:Planning Services BL:Business License BS:Building Services 1565 EI Camino Real GP:Grading Pemtit FD:Fire Departmnt BP:Building Pem'd PD:Police Department PD-17 Master Plan of Development Fl:Final Inspection CE: W Eng r TO:Temporary cA city Wastewater CUP 2004-0143/ZCH 2004-0093 Occupancy F0:Final Occupancy b) Garages shall be maintained and used for vehicle parking. c) No boats, RV's or other type of recreation vehicle may occupy a guest or resident parking space, including within an individual garage. d) All site development, fencing,and landscaping is subject to the Master Plan of Development for the project. 9. All exterior material finishes(stone,siding,stucco facades,accent BP PS materials,lighting,garage doors)shall be durable,high quality,and consistent with the architectural appearance of each home. 10. All exterior elevations,finish materials and colors shall be consistent BP PS with the Master Plan of Development as shown in EXHIBITS G,I,J and K,and shall include the following,subject to staff approval: ■ The residence on Lot 1 shall extend the porch to wrap along the EI Camino Real elevation. ■ A minimum of 3 roof colors shall be included throughout the fir project.All roofing shall be dimensional shingles and shall include a blend of earth toned colors. ■ Column posts shall be a minimum 6"x 6"dimension. ■ As shown,all garage doors shall be ordered in paint grade and painted to match the body color of the home;or shall be ordered from the factory in a matching body color or a color compatible with the color scheme,subject to staff approval prior to ordering. ■ Proposed stacked stone shall be compatible with the color scheme of each unit and shall include a variety of earth toned colors. ■ All residential lighting shall be compatible with the architectural style and scale of the units as identified in project exhibits. ■ The staggered shingle gable accents on unit 1 design shall be painted an accent color consistent with the overall color scheme,subject to staff approval. ■ Provide additional stonework to Elevation#1. ■ Provide a variety of stonework materials amongst the homes. 11. A final landscape and irrigation plan shall be approved prior to the BP PS issuance of building permits and included as part of site improvement plan consistent with EXHIBIT C,and shall include the following: City of Atascadero Resolution No.2005-016 Page 6 of 27 Conditions of Approval/ Timing Responsibgity Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 1565 El Camino Real GP Grading Permit FD:Fire Department PD-17 Master Plan of Development BP Finalispacron Perrint PD PoY E EngineDoWer ant CE:City Engineer TO:Temporary WW:Wastewater CUP 2004-0143/ZCH 2004-0093 �„ancy CA,City F0:Final O=parq ■ Decorative ribbon driveways are required as an amenity component of the Planned Development,per Exhibit B. ■ All exterior meters,air conditioning units,and mechanical equipment shall be screened with landscape material. Trash/recycle container areas shall be screened with fencing or landscape. • The developer shall landscape all front and street-facing side yards. All landscape maintenance shall be the responsibility of the individual property owner. ■ All proposed tree locations,species,and sizes shall be as identified in EXHIBITS C. Trees shall be double staked. Utilities shall be located to not interfere with tree planting locations. ■ Drainage detention basin and conditioned Open Space parcel shall be landscaped by the developer and maintained by the homeowner's association or other mechanism approved by the City. • Add one high-quality earth-toned picnic table to the landscaped drainage detention basin. ■ Remove lawn area in all front yards. ■ Substitute plant materials with drought-resistant plant materials. 12. A Tree Protection Plan consistent with EXHIBIT D shall be BP PS submitted with subsequent building permits for encroachment within the drip line of native trees located on the subject parcel and any adjacent properties. The applicant will contract with a certified arborist to monitor all activity within the drip lines of existing native oak trees. Failure to observe tree mitigation and arborist monitoring requirements shall result in a minimum of double penalties, additional Planning Commission review,and additional mitigation. 13. All project fencing shall be installed consistent with EXHIBIT B and BP PS C,subject to the following modifications: ■ Fencing material and treatment shall comply with the PD25 standards. ■ All fencing shall be recessed from the fagade of the units along all street and parking court frontages. • Fencing and landscape shall be designed and installed for easy removal at the cul-de-sac terminus for future street extension. errM Drainage detention basin shall not be fenced. City of Atascadero Resolution No.2005-016 Page 7 of 27 Conditions of Approval/ Timing Responsibility Mitigation /Monitoring Measure Mitigation Monitoring Program PS:Planning Services BL:Business License BS:Building Saes 1565 EI Camino Real GP:Grading Penni) FD:Fre DepaNnent BP:Building Pernit PD:Police DeWrnent PD-17 Master Plan of Development Fl:Final Inspedbn CE:City�mer T0:Temporary CA CO Attorney CUP 200401432CH 20040093 occupancy FO:Final Occupancy ■ Project shall not be gated. 14. Affordable Housing Requirement: The applicant shall either deed FM, BP PS,CE restrict a minimum of 1 residential unit for 30 year at a moderate income rate with recordation of the final map or shall pay an in lieu fee equal to 5%of the construction valuation of each unit. 15. Workforce Housing: FM,BP PS,CE Prior to recordation of final map,the applicant shall enter into a legal agreement with the City to reserve '/2 of the units for sale to residents or workers within the City of Atascadero, including the affordable units. The agreement shall include the following provisions: The units shall be offered for sale to residents or workers within the City of Atascadero for a minimum of 60-days. During this time period offers may only be accepted from Atascadero residents or workers; The applicant shall provide reasonable proof to the City that at I*W least one of the qualified buyers is a resident or worker within the City Limits of Atascadero; The Atascadero resident or worker restriction shall apply to the initial sale only; The applicant shall identify which units will be reserved;and The City Attorney shall approve the final form of the agreement. 16. The emergency services and facility maintenance costs listed below shall be 100%funded by the project in perpetuity. The service and maintenance costs shall be funded through a community facilities district established by the City at the developer's cost. The funding mechanism must be in place prior to or concurrently with acceptance of the final maps. The funding mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above mentioned funds shall be by the City. Developer agrees to participate in the community facilities district and to take all steps reasonably required by the City with regard to the establishment of the district and assessment of the property. ■ All Atascadero Police Department service costs to the project. ■ All Atascadero Fire Department service costs to the project. ■ Off-site common City of Atascadero park facilities maintenance fir' service costs related to the project. City of Atascadero Resolution No.2005-016 Page 8 of 27 Conditions of Approval! Timing Responsibility Mitigation /Monitoring Measure Mitigation Monitoring Program PS:Planning Services BL:Business license BS:Building Sendces 1565 EI Camino Real GP:GradingPemdt FD:FireDepartnent BP:Building Pemtit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection VCJW W��ter TO:Temporary CA Co Anomey CUP 2004-01431ZCH 2004.0093 occupancy F0:Final Occupancy 17. All tract maintenance costs listed below shall be 100%funded by the project in perpetuity. The service and maintenance cost shall be funded through a Home Owners Association established by the developer subject to City approval. The Home Owners Association must be in place prior to,or concurrently with acceptance of any final maps. The Home Owners Association shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any Final Map. The administration of the above mentioned funds, and the coordination and performance of maintenance activities, shall be the responsibility of the Home Owners Association. a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access roads, emergency access gates, and sewer mains within the project. b) All parks,trails, recreational facilities and like facilities. c) All open space and native tree preservation areas. d) All drainage facilities and detention basins. Wit•` e) All creeks, flood plains, floodways, wetlands, and riparian habitat areas. f) All common landscaping areas, street trees, medians, parkway planters, manufactured slopes outside private yards, and other similar facilities. All frontage landscaping and sidewalks along arterial streets 18. Deed notice shall be recorded with each lot notifying each property FM PS,CE owner that the on-site roadway shall be extended to serve future residential subdivisions to the east. 19. The drainage detention basin shall be located on an independent lot FM PS,CE to be owned by the Homeowners Association and to be landscaped and maintained by the Association. Building Services 20. A soils investigation prepared by a licensed Geotechnical BP FM Engineer is to be provided for the project. The report is to be provided at the time of building permit submittal along with the building plans for review by the Building Division. Recommendations contained in the report are to be incorporated into the project plans. Fire Marshal 21. All street names shall be reviewed and approved by the FM PS,FD,PD Community Development Department,the Fire Department,and tr• the Police Department.Street names and addresses shall be approved and assigned prior to recordation of the final map. City of Atascadero Resolution No.2005-016 Page 9 of 27 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 1565 El Camino Real GP:Graft Pmt FD:Fee DepaArrent BP:Building Permit PD:Police Deparurent PD-17 Master Pian of Development Fl:Finallnspecton CE City Engineer TO:Temporary WW:Wastewater �� CUP 2004-01432CH 2004-0093 „ CA Citynnomey FO:Final Occupancy 22. Provide a letter from the Atascadero Mutual Water Company BP PS/FD stating the minimum expected water available to the site. Amount available must meet minimum requirement specified in the California Fire Code. 23. Note that approved address signage is to be provided. BP PS/FD 24. Note on plans that fire lanes shall be delineated to restrict parking BP PS/FD as required by the Fire Authority. Engineering Conditions: City Engineer Project Conditions Drainage: 25. All drainage facilities shall be designed and constructed in BP PW accordance with the current City of Atascadero Engineering Standards. 26. The applicant shall submit drainage calculations for review and BP PW approval of the City Engineer. 27. All drainage basins shall detain the difference in the 2-year storm BP PW runoff or the undeveloped site and the 50-year storm runoff of the developed site. The outlet pipe or channel shall be sized for the 2-year storm peak runoff rate for the undeveloped site at full capacity. 28. The applicant shall address storm water detention to the BP/FM PW satisfaction of the City Engineer,prior to grading and drainage approval,or approval of the final map. 29. A homeowners association or other funding and maintenance FM PW agreement shall be submitted for approval by the City Engineer and the City Attorney prior to recording the final map. The agreement shall cover scheduled maintenance of the drainage facilities. 30. Existing drainage patterns from adjacent properties shall not be BP PW obstructed. 31. All drainage from improvements shall cross property lines within BP PW drainage easements. 32. Drainage at the rear of the lots must be carried across property BP PW lines in a closed conduit. Frontage Improvements: BP PW 33. Project shall include construction of curb,gutter and sidewalk BP PW along entire EI Camino Real frontage. 34. Alignment of frontage improvements shall be approved by the City BP PW Engineer. 35. The entry location of project on EI Camino Real shall be located in BP PW such a location as to provide adequate site distance for vehicles exiting project. 36. All utilities shall be undergrounded on EI Camino Real BP PW City of Atascadero Resolution No.2005-016 Pae 10 of 27 Conditions of Approval/ Timing Responsibility Mitigation /Monitoring Measure Mitigation Monitoring Program PS:Planning Services BL:Business License BS:Building Services 1565 EI Camino Real GP:GradingPernnil FD:Fire Deparlunent BP:Building Permil PD:Police Depanrnant PD-17 Master Plan of Development FI:Final Inspection CE:ChyNneer TO:Ter porary WW:Wastewater Occupancy 2004-0143/ZCH 2004-0093 , CA City Attorney F0:Final Occupancy Improvement Maintenance: Street Improvements and landscaping. 37. All street improvements shall be constructed in accordance with BP PW City of Atascadero Engineering Standards. 38. Prior to recording the final map, provisions for the repair and FM PW maintenance of all street and landscaping improvements shall be included in the CC&R's for this tract. Included shall be a mechanism to maintain the streets and landscaping,such as a homeowners association. The City Engineer and City Attorney shall approve the final form prior to recordation. Wastewater: 39. All onsite sewer mains shall be privately owned and maintained. BP PW 40. Prior to recording the final map,provisions for the repair and BP PW maintenance of the private SS shall be included in the CC&R's for this tract. Included shall be a mechanism to maintain the private sewer and structures,such as a homeowners association. The City Engineer and City Attorney shall approve the final form prior to recordation. 41. Applicant shall pay sewer extension(Annexation), Connection BP PW and Reimbursement fees(if applicable)upon issuance of building permit. 42. Gravity mains within the subdivision shall be eight(8) inches in BP PW diameter. 43. Drainage piping serving fixtures which have flood level rims BP PW located below the elevation of the next upstream manhole cover of the public or private sewer serving such drainage piping shall be protected from backflow of sewage by installing an approved type backwater valve. Fixtures above such elevation shall not discharge through the backwater valve. 44. All sanitary sewer(SS) mains shall terminate in manholes unless BP PW extension of the main,at some later date,is anticipated. If extension of a SS main is anticipated,said SS main may terminate in a cleanout providing the next downstream manhole is less than 300 linear feet from the cleanout and that the point of termination is not a reasonable location for a SS main angle point or intersection. City Engineer Standard Conditions 45. In the event that the applicant is allowed to bond for the public BP BS improvements required as a condition of this map,the applicant shall enter into a Subdivision Improvement Agreement with the City Council. 46. An engineer's estimate of probable cost shall be submitted for BP PW review and approval by the City Engineer to determine the amount of the bond. 47. The Subdivision Improvement Agreement shall record FM PW concurrently with the Final Map. City of Ataseadero Resolution No.2005-016 Page 11 of 27 Conditions of Approval/ Timing Responsibility Mitigation /Monitoring Measure Mitigation Monitoring Program PS:Planning Services BL'Business Licerm BS:Building Services1565 El Camino Real GP:GradingPemt FD:Fire Department BP:Building Perrd PD:Police Department PD-17 Master Plan of Development Fl:Final lrspectlon CE: W �� T0:Temporary CA C ty Attorney CUP 2004-0143/ZCH 2004-0093 occupancy F0:Final Occupancy 48. All public improvements shall be constructed in conformance with BP PW the City of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer. 49. The applicant shall be responsible for the relocation and/or BP PW alteration of existing utilities. 50. The applicant shall install all new utilities (water, gas, electric, BP BS cable TV and telephone) underground. Utilities shall be extended to the property line frontage of each lot or its public utility easement. 51. The applicant shall monument all property corners for construction BP PW control and shall promptly replace them if disturbed. 52. A preliminary subdivision guarantee shall be submitted for review BP PW in conjunction with the processing of the parcel map. 53. All existing and proposed utility, pipeline, open space, or other BP PS/PW easements are to be shown on the parcel map. If there are building or other restrictions related to the easements, they shall be noted on the parcel map. The applicant shall show all access ,r+ restrictions on the parcel map. 54. Prior to recording the tract map, the applicant shall submit a map FM PS/PW drawn in substantial conformance with the approved tentative map and in compliance with all conditions set forth herein shall be submitted for review and approval by the City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. 55. Prior to recording the tract map, the applicant's surveyor shall set FM PW monuments at all new property corners or shall indicate, by certificate on the final map,that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. 56. Prior to recording the tract map, the applicant shall pay all FM BS outstanding plan check/inspection fees. 57. Prior to recording the tract map,the applicant shall have the map FM PW reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company, which indicates their review of the map. The letter shall identify any new easements, which may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the parcel map. 58. Upon recording the final map, the applicant shall provide the City FM PW with a black line clear Mylar(0.4 mil) copy and a blue line print of the recorded map. 59. Prior to the final inspection of any public improvements, the BP PW applicant shall submit a written statement from a registered civil City of Atascadero Resolution No.2005-016 Pae 12 of 27 Conditions of Approval/ Timing Responsiiaiiity mitigation Mitigation Monitoring Program (Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 1565 EI Camino Real GP:Grading Pemd FD:Fre DepaNnent BP:Building Perrtrt PD:Police Department PD-17 Master Plan of Development Fl:Finallnspectbn CE City Engineer TO Temporary WW:wastewater CUP 20040143/ZCH 20040093 Ox,� CA City Attomey F0:Final Occuparp engineer that all work has been completed and is in full compliance with the approved plans. AMWC Conditions 60. Before the issuance of building permits, the applicant shall submit plans to AMWC for the water distribution facilities needed to serve the project. AMWC shall review and approve the plans before construction begins on the water system improvements. All water distribution facilities shall be constructed in conformance with AMWC Standards and Details and the California Waterworks Standards (Code of Regulations Title 22, Division 4, Chapter 16). All cross-connection devices shall conform to AWWA and California Department of Health Services standards. 61. Before the.- stai:t of GeRstru--fie-A en the water systefR rnproyemelcil;G, the appliGant shall pay all installation and 62. Before issuance of building permits, the applicant shall obtain a "Will Serve"letter from AMWC for the newly created lots within the subdivision. 63. The applicant shall provide AMWC with easements for those water facilities proposed for operation and maintenance by AMWC that are constructed outside of publicly maintained right-of-ways. AMWC shall review the form and content of the easements before recordation. 64. The applicant shall submit a hydraulic analysis with the first plan check submittal of the water system improvements for the project. The analysis should take into account the fire flows required by the Uniform Fire Code and requirements of the California Waterworks Standards. The applicant is responsible for designing and constructing water system improvements that will provide water at pressures and flows adequate for the domestic and fire protection needs of the project. 65. The applicant shall obtain a separate landscape-irrigation meter(s) from AMWC for any common areas within the project. 66. Landscaping for the common areas shall be drought-tolerant. 67. Before construction of the water system improvements, AMWC shall review and approve the irrigation plans for the common areas within the project. 68. These conditions are limited to this specific plan submittal and for the purpose for which the applicant made the submittal. Conditions and/or comments are not a commitment by AMWC to serve the project. AMWC may consider these conditions invalid if there are changes in plans, circumstances, or agency rules, City of Atascadero Resolution No.2005-016 Pae 13 of 27 Conditions of Approval/ Timing Responsibility Mitigation /Monitoring Measure Mitigation Monitoring Program PS:Planning Services BL Business License BS:Building Services 1565 EI Camino Real GP:Grading Perm) FD:Fre Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development Fl:Final Inspection CE: W Engineer TO:Tenpomry CA City Wastewater CUP 2004-0143/ZCH 2004-0093 ocwpancv torney F0:Final Occupancy regulations, or policies. These conditions of approval supercede all other conditions of approval previously recommended by AMWC for this project. Mitigation Measures Mitigation Measure 1.d.1: Exterior lighting shall be limited to wall mounted BP PS 1.d.1 building lighting only.All exterior lighting shall be designed to eliminate any off site glare and shall utilize full cut-off,"hooded"lighting fixtures to prevent offsite light spillage and glare. Fixtures shall be shield cut-off type and compatible with historic setting,subject to staff approval. Mitigation Measure 3.b.1: The project shall be conditioned to comply with BP BS 3.b.1 all applicable District regulations pertaining to the control of fugitive dust (PM-10) as contained in sections 6.3,6.4 and 6.5 of the April 2003 Air Quality Handbook. • Asbestos has been identified by the state Air Resources Board as a toxic air contaminant. Serpentine and ultramafic rocks are very common in the state and may contain naturally occurring asbestos. Under the State Air Resources Board Air Toxics Control Measure(ATCM)for Construction, Grading,Quarrying, Yid and Surface Mining Operations,prior to any grading activities at the site,the project proponent shall ensure that a geologic evaluation is conducted to determine if naturally occurring asbestos is present within the area that will be disturbed. If Naturally Occurring Asbestos(NOA)is found at the site the applicant must comply with all requirements outlined in the Asbestos ATCM for Construction, Grading,Quarrying,and Surface Mining Operations. . If NOA is not present,an exemption request must be filed with the District. If NOA is found at the site the applicant must comply with all requirdments outlined in the Asbestos ATCM. This may include development of an Asbestos Dust Mitigation Plan and an Asbestos Health and Safety Program for approval by the APCD. Should Naturally Occurring Asbestos be identified within the area of construction,and the worked area will be less than or equal to one acre,then the dust control measures identified below are required. If the disturbed area is greater than one acre,additional requirements may include but are not limited to 1)an Asbestos Dust Mitigation Plan which must be approved by the District before construction begins,and 2) an Asbestos Health and Safety Program will also be required for some projects. ■ Dust Control Measures for Construction and Grading Operation Projects One Acre or Less: No person shall engage in any construction or grading operation on property where the area to be disturbed is one(1.0)acre or less unless all of the following dust mitigation measures are initiated at the start and maintained throughout the duration of the construction or grading activity: A Construction vehiclespeed at the work site must be limited City of Atascadero Resolution No.2005-016 Page 14 of 27 Conditions of Approval/ Timing Responsibility Mitigation (Monitoring Measure Mitigation Monitoring Program PS:Planning Services BL:Business License BS:Building Services 1565 EI Camino Real GP:Grading Permit FD:Fie Department BP:Building Perrrit PD:Police Department PD-17 Master Plan of Development Fl:Final CE:City Engineer P WW:wastewater CUP 2004-0143/ZCH 2004-0093 �T„�y ry CnCity Attorney F0:Fnal Occupancy to fifteen (15)miles per hour or less; (B) Prior to any ground disturbance,sufficient water must be applied to the area to be disturbed to prevent visible emissions from crossing the property line; (C)Areas to be graded or excavated must be kept adequately wetted to prevent visible emissions from crossing the property line; (D)Storage piles must be kept adequately wetted,treated with a chemical dust suppressant,or covered when material is not being added to or removed from the pile; (E) Equipment must be washed down before moving from the property onto a paved public road;and (F)Visible track-out on the paved public road must be cleaned using wet sweeping or a HEPA filter equipped vacuum device within twenty-four(24)hours. Mitigation Measure 4.e.1: The Grading Plan shall identify tree protection BP PS 4.e.1 fencing around the dripline of each existing on-site or off-site native tree within 20 feet of construction activity. Mitigation Measure 4.e.2: Grading and excavation and grading work shall GP PS 4.e.2 be consistent with the City of Atascadero Tree Ordinance. Special precautions when working around native trees include: 1. All existing trees outside of the limits of work shall remain. 2. Earthwork shall not exceed the limits of the project area. 3. Low branches in danger of being torn from trees shall be pruned prior to any heavy equipment work being done. 4. Vehicles and stockpiled material shall be stored outside the dripline of all trees. 5. All trees within the area of work shall be fenced for protection with 4-foot chain link,snow or safety fencing placed per the approved tree protection plan. Tree protection fencing shall be in place prior to any site excavation or grading. Fencing shall remain in place until completion of all construction activities. 6. Any roots that are encountered during excavation shall be clean cut by hand and sealed with an approved tree seal. Mitigation Measure 4.e.3: An arborists report shall be required prior to GP PS 4.e.3 project implementation. The report shall identify each native tree proposed for removal and each tree within the project area subject to potential impact. The report shall provide recommendations for tree pruning,tree protection of existing native trees to remain, and identify native tree impact/replacement mitigation per the Atascadero Municipal Code Section 9-11.105. City of Atascadero Resolution No.2005-016 Pae 15 of 27 Conditions of Approval/ riming Responsibility Mitigation fir+` Mitigation Monitoring Program /Monitoring Measure PS:Planning SwAoss BL:Business License BS:Building Services 1565 El Camino Real GP:Grading Permit FD:Fre Department BP Buibng Perm! PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer T0:Ternporary WW:wastewater CUP 2004-0143/ZCN 20040093 poc�ny CA City Attorney F0:Final Occupancy Mitigation Measure 6.b: The grading permit application plans shall include GP CE 6.b erosion control measures to prevent soil,dirt,and debris from entering the storm drain system during and after construction. A separate plan shall be submitted for this purpose and shall be subject to review and approval of the City Engineer at the time of Building Permit application. Mitigation Measure 6.c.d: A soils report shall be required to be submitted GP BS 6.c.d with a future building permit by the building department.The building plans will be required to follow the recommendations of the soils report to assure safety for residents and buildings. Mitigation Measure 8.e.f: The developer is responsible for ensuring that all BP CE 8.e.f contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices,citations,or stop work orders. Mitigation Measure 11.d: All construction activities shall comply with the Ongoing BS/PS 11.d City of Atascadero Noise Ordinance for hours of operation. Construction activities shall be limited to the following hours of operation: s 7 a.m.to 7 p.m. Monday through Friday s 9 a.m.to 6 p.m. Saturday s No construction on Sunday Further, particularly loud noises shall not occur before 8 a.m. on weekdays and not at all on weekends. The hours of construction may be modified by the Community Development Director upon a determination that unusually loud construction activities are having a significant impact on the neighbors. Failure to comply with the above-described hours of operation may result in withholding of inspections and possible construction prohibitions,subject to the review and approval of the Community Development Director. A sign shall be posted on-site with the hours of operation and a telephone number of the person to be contacted in the event of any violations. The details of such a sign shall be approved by staff during the Grading Plan/Building Permit review process. qtr tascader° City of A 2005-016 Resolution 0f 21 . ter Plah of peveloPment 1 EXNIg►T g'Mas 1 M IIq A hI NOW 17, t t B �yy • - I r I 1 t: �l .? ✓✓y ...._ .fit..:' °�.W"ry�t"`--'w v y-- b City of Atascadero Resolution No.2005-016 Page 17 of 27 EXHIBIT C: Landscape Plan R I � a � , i . 0 p� r LM : r - • I x __ I y _.__...._...._...._..._........_...._...._................_.1._-..._....._...._...._...._..._..._........_...._..._............ — - City of Atascadero Resolution No.2005-016 Page 18 of 27 EXHIBIT D:Tree Protection Plan �111rr' jilt it Mlal' a:?�l�i1� II H 31 frr litl+i lil i , rs ........ .. II 11E t r- ! . It N Ii I ♦ , ..... . qy .,. w..... 4r men .....v...........m...........n...........a......................a....._...u1.._.......a..........e...........n,.......A........._.............:..........i........... ti( City of Atascadero Resolution No.2005-016 Page 19 of 27 EXHIBIT E:Grading and Drainage Plan s L_ TINr , a i i f Q5 ........... , 1 I ! ----- -- it 6 O City of Atascadero Resolution No.2005-016 Page 20 of 27 EXHIBIT F: Unit 1: Floor Plans Tovo Bedrriam, ,Ti vn ath,'K rben, Dinin&,Great .Roam,Heated Laundry'":Rriarn, L,,a7 Fm rt Porch," Two Car.Garage,-Approximate# 1133 Square.Feet **.Owo- NECER C3 FEB 10 5 C nY tr7�pMENr f Mqs SulrE " { GREM 90 ,kSn.,M',Yr BED rol", FloorPlan i ,Ob' iFi' I i'AgMM4.� { i { City of Atascadero Resolution No.2005-016 Page 21 of 27 EXHIBIT G: Unit 1:Elevations g '4 '44 Z: Ny y. ........... TZ, City of Atascadero Resolution No.2005-016 Page 22 of 27 EXHIBIT H: Unit 2: Floor Pians Cllr►'' ice. tc�r �idenceRECEIVED Three"Bedrooms Tu+r,Bath, Kitci�en, Dariiog, Livarr B 10 2005 Room,Heated'Lamndry Room,'Large Front iO?rlra Tura-Carrage, p�rl�xrrnatel7� 19SS:Sgtra 'R t tNIUNR'r 1iEi+El ol'MENr , j OWD 3 K 5UI?E �r i ) SED Z 1 s DINING 16 'LIVING � •Pt►k��iiwwCN isnYiw', twor Plan City of Atascadero Resolution No.2005-016 Page 23 of 27 EXHIBIT 1: Unit 2: Elevations"A" ............ rw Y 7 ,jq m City of Atascadero Resolution No.2005-016 Page 24 of 27 EXHIBIT J: Unit 2: Elevations"B" )%or, 01 1,"11 .1 al WR sya Tit'w ,14, City of Atascadero Resolution No.2005-016 Page 25 of 27 EXHIBIT K: Color and Materials Board �%w One Ston&sixence ca Tarr Bedlroom, Tara-Bath, Kirshen, Dini% G ut FEB f. 2005 &rrrr,Heated Lrrrdry ivae Int 1?mzh, - TVG�arrrcxge,. rriximae 1 X33 Sgsrrxrre coauwm�aullrn ,k � . James!iWlesidin staggerCd edge Hanoi Eik7taqft Prestique-Forest Green 3t-yw d � '' S1�r'win=' itiarrrs WAtd. Buaglebouse Gray SW 2845 .dames Hardle sTRIM Roycraft Bogle Ore= SW 2847 Scicct Calnnnil ACCENT Roycraft Copper Red SW 2839 Csttared fine �`r' Eucalypwtus--csv2005ot {{ 6 3 j B I� a 1 t See file for colors City of Atascadero Resolution No.2005-016 Page 26 of 27 EXHIBIT K: Color and Materials Board One S JUsid ence WED Three Bedroom, Two.Bath, K khen, D ni% living ,Kr om,Reated Larttdry,loom,Loge Fmot Porch, FSB 1.0 200 '-wo CarGarzr , r�1,ppmxzmately 1,155.Spam.Fee cowuNnY DINLOPMEN ECk Rr,afYm�+ _. Prestique—Foeaat C)rcen. 30-yea James Hardie siding � SakctCedancrlit Sherwin-41ma'mrs: WALL Sunglehouse 0 my SW2645 TR M Royerreft Bottle Orr SW 2847 ACCENT Poyeaft Copper Red SW 2839 G tared sfolw Euv lyptus--csv2OQ5dt I. 1 Front £ vution rr ,r See file for colors City of Atascadero Resolution No.2005-016 Page 27 of 27 EXHIBIT K: Color and Materials Board �lllr/ 4� >�, rtaren, .Dxnzv. uian ar.: �d uray^'R,o�m,.I, e lmnt Pab; Flwi I'D 2005. " �«. . it T` ?64r Garage,Appmx mated T��S.S gttu Fe ��r1�r DMWWirr EYk ItnaJI�'' Prestigus--W"tredwood 30-year James Hardie siding Solesct Cadannitl �bers��Wtlums: WALL oycraftSuccla SW 2842 Tllr M Royc"gess W.290 ACCLM . Pollshad'Mat3agmy SW-18H CaNured Sols Euealyptul »csv20050t z �M1 1 Frame i tion "13" See file for colors