HomeMy WebLinkAbout2010-009 Amendment No.1 Bernards CITY OF ATASCADERO
i918 i92'9 7
`,\�SCA►DF,j��
AMENDMENT NO 1 , January 12, 2011
To Contract #2010-009
BERNARDS
for
Construction Management / Project Management Services for
Historic City Hall Rehabilitation, FEMA Repair & Hazard Mitigation
1818 1979
AMENDMENT TO CONSULTANT SERVICES AGREEMENT
FOR THE
CITY OF ATASCADERO
BERNARDS
This document is the first amendment to the contract made and entered into between City of
Atascadero, a Municipal Corporation ("City") and Bernards ("Consultant"), dated May 01, 2010
The following scope of work and compensation is in addition to that specified in the above
referenced contract.
SCOPE OF SERVICE.
This phase of construction management consultant work includes providing the completion of
pre-construction management services, community outreach activities, and construction
management through June 2013 (anticipated completion date for the project) In addition, the
Consultant will provide services at the close-out of the project, supplying the City with required
documentation of the work completed
Consultant will provide all services necessary to complete the following
PRE-CONSTRUCTION MANAGEMENT SERVICES
1 Develop and issue remaining multi-prime bid packages
2 Assist City in pre-qualifying critical contractors for relevant experience
3 Maintain contact with potential bidders, including subcontractors and suppliers, on a
regular basis through the bid period Conduct a telephone, electronic and face to
face campaign to stimulate and maintain interest in bidding on the project.
4 Assist the City in preparing and placing public notices and advertisements relative to
intent to solicit bids on the project.
1
City of Atascadero
Bernards
5 Assist the City in development, processing and advertising of Requests for
Proposals (RFP's) for specialty consultants necessary to complete the project
including, but not limited to testing agencies, inspection services and environmental
health and hazardous material specialists
6 Review the construction cost estimates and provide analysis of cost and segregate
estimates to reflect bid packaging phasing
7 Manage bid documents by arranging for printing, binding and wrapping, arranging
for delivery to bidders, maintaining a complete list of all bidders that receive
documents
8 In conjunction with the City and the Architect, conduct pre-bid conference(s) as a
forum for presenting the project to potential bidders, and to respond to bidders'
questions
9 Coordinate all communications related to bidder inquiries, seek resolutions from the
appropriate party, and forward such information to the Architect and bidders in a
timely manner Co-operate with the Architect to issue addenda when necessary
10 Review each addendum during the Bid Phases for time, cost or constructability
impact and make appropriate comments and recommendations
11 Assist the City in evaluating the bids for completeness and full responsiveness,
including bid alternates and unit prices Conduct a pre-award conference with low
bidder when necessary, and make formal recommendation to the City with regard to
the construction contract award
12 Assist the City in the preparation of staff reports to the City Council for the award of
project contracts.
13 Assist the City in settling any disputes arising during bid time
14 Assist the City in obtaining bonds and insurance certificates from Contractor(s)
15 Assist the City in the determination and preparation of the Contractor's Notice to
Proceed
16 Conduct, in cooperation with the City and the Architect, a pre-construction
orientation conference Record, transcribe and distribute minutes to all parties
17 Provide Phase III cost estimate, and segregate estimates to reflect bid package
phasing
Amendment#1(January 12,2011) 2
792119.3
City of Atascadero
Bernards
COMMUNITY OUTREACH PROGRAM
1 Bernard's Outreach Coordinator will continue to work with the City Staff and local
community stakeholders in managing a comprehensive program aimed at continuing good
community relations, project information distribution, local contractor, vendor and supplier
participation and employment opportunities for local individuals seeking work.
2 Bernard's will work with local Builders Exchanges to develop a contact list of all Builders
Exchange members interested in working on the project as well as work with he local Blue
Book representatives to sort for all local contractors, vendors and suppliers within 30, 60,
90,120 miles radius of the restoration project.
3 Bernard's will electronically send bid notifications to all contractors, vendors and suppliers
in the data base, follow up the bid interest notification with telephone contact and then
personally contact interested contractors, vendors or suppliers to solidify their participation
in the project.
4 Organize and chair a meet the prime contractor's conference for those firms interested
developing a working contractual relationship with successful bidders on the projects
various trade packages
5 Work with local One Stop, EDD, and Workforce Development agencies in identifying
qualified trades people interested in finding work and provide a "meet the contractors"job
fair opportunity for each bid period scheduled
6 Manage the project website to be updated with real time information and monthly progress
reports to be screened by and attached to the City of Atascadero web site
7 Develop web based job site camera(s) to be accessible 24-7 by the community through the
City Web site Provide system infrastructure and deliver images to City in a format
acceptable for use with the City IT system Alternatively, the web based job site camera /
web link may be replaced by other, mutually agreeable, community outreach programming
that provides a similar, effective means to keep the public informed of project progress
8 Assist in the development of a public information program
9 Work with local stakeholders like the Historical Society, school district and special events
programmers to develop community events in the park designed to provide updates and
information and instill community pride
CONSTRUCTION MANAGEMENT SERVICES
1 Provide on-site Construction Manager and clerical support for the duration of the
construction process Administer the Prime Contractor's contracts and observe and
report on the progress of the work.
Amendment#I(January 12,2011) 3
792119.3
City of Atascadero
Bernards
2 Maintain all records on site in a systematic format, including but not limited to
correspondence, submittals, Requests for Information, Change Orders, inspection
records, daily reports, contractor payment records, claims and other documents that arise
during the course of the construction
3 Coordinate the review of shop drawings, product data, samples and other submittals
Establish and implement procedures for expediting the processing and approval of
submittals Manage the submittal schedule
4 Document all related data management and tracking of site/building conditions
5 Create and maintain a photographic record of the project in a bound and labeled form
6 Implement a Matrix of Responsibility for"controls" of documents
7 Collect and review Contractor's monthly labor reports, when submitted with the monthly
pay application, for completeness, and forward to City staff for City to review for labor
compliance
8 Conduct weekly jobsite progress meetings with the Contractors and appropriate
personnel to discuss issues relative to the progress of the work. Record, transcribe and
distribute minutes to all attendees, the City, the Architect and all other appropriate parties
9 Conduct weekly Owner's meetings to review all aspects of the project's status with City,
Architect/Engineer and regulatory agencies Facilitate the meetings and prepare meeting
agendas, minutes and actions items
10 Set up and prepare for pre-construction and post-construction meetings with utility
agencies and the Contractor
11 Attend City Council meetings when requested to inform the City Council of construction
related issues
12. Coordinate with the City's Building Inspector and construction special testing agency
Insure that all technical inspection reports and submittals for shop and mill tests for
materials and equipment, are in a format approved the City and are received on a daily
basis Assist the City in providing inspection of the project in accordance with regulatory
requirements. Assist the City to develop and implement an inspection program to meet
the various Codes and regulatory requirements
13 Oversee the site for safety issues and concerns, and notify Contractors, Architect,
Engineer and City in accordance with Cal-OSHA requirements
14 Manage any non-conforming work and resolve issues
Amendment#1(January 12,2011) 4
792119.3
City of Atascadero
Bernards
15 Review Contractor's recommendations related to any issues requiring corrective action
for contract compliance with the Architect, Building Inspector and the City staff, and
authorize most effective solution
16 Advise and assist the City in the use of contract provisions necessary to achieve contract
compliance
17 Review the progress of construction, observe work-in-place and manage stored materials
on a monthly basis In cooperation with the Building Inspector and the Architect, review
the Contractors' monthly payment requests and certify as accurate for the City's use in
processing payment to Contractors
18 Insure that, as part of monthly payment request, Contractor's "as-built" documents are up
to date and accurate
19 Review the contractor's schedule submittals, including Initial Contract Schedule,
approved Baseline Contract Schedule, required schedule updates, schedule revisions,
short interval schedules, recovery schedules and time extensions
20 Monitor the work progress against the schedule, advise the City of the status and
recommend action when progress is behind schedule
21 Manage the Change Order process by- establishing and implementing a change order
tracking and processing system, receiving change order requests from the Contractor,
Architect or the City, negotiating cost and time extensions on behalf of the City when
appropriate, evaluating costs and time with respect to the benefits to the project and
recommend dispositions, preparing Change Order documents for processing to the
Architect and the City and monitoring the change order contingency established in the
City's project budget.
22 Monitor the Contractor's offsite handling, transportation and storage of historical building
materials
23 Receive and evaluate all claims by the Contractor against the City for additional cost or
time due to any alleged cause Obtain factual information concerning the claim and make
recommendations for settlements
24 Assist the City to resolve disputes arising from construction and funding issues
25 Prepare and distribute a Monthly Project Status Report which includes work progress,
budget evaluation, schedule report, construction photographs and other pertinent
information
Amendment#1 (January 12,2011) S
792119.3
City of Atascadero
Bernards
26 Receive and review Operation and Maintenance Manuals, warranties and guarantees and
extra material stock required in the Contract Documents, receive and review Contractor's
"As-Built" redlined plans and specifications and transmit to Architect for preparation of
"Record Drawings and Specifications", assist the City in close-out procedures required in
the General Conditions
27 In conjunction with the Architect, and at the conclusion of all corrective and punch list
items, make a final comprehensive review of the project and provide a report to the City
indicating the projects acceptability under the Contract Documents, recommend when to
file the Notice of Completion and when to process the Contractor's final payment.
28 Provide all project files, prepared for final audit for the funding agency(s) and be prepared
to support the payment requests, in detail, as needed and prepare other construction
documentation typical for a project of this type All files will be turned over by the
Consultant after the completion of the project.
29 Prepare and turn over to City an electronic copy of project files after the completion of the
Project. The files will be in a form mutually agreeable to consultant and City
30 Maintain and update a project-based web site to display meeting notes, plans and other
relevant documents during the construction phase of the project.
31 Manage site general condition activities and assist City in the procurement of site general
conditions, goods and services
QUALIFICATIONS
1 Document reproduction /delivery costs to be reimbursed by the City
2 All costs for deputy inspections to be paid directly by the City
3 The duration for Phase II and III of the Project will be February 15, 2011 through
June 30, 2013
The City of Atascadero will provide the following
1 Temporary field office with restroom
2 Temporary architect's/inspector's field office
3 Bid document reproduction/delivery
4 Bid advertisement
5 Jobsite security
Amendment#1 (January 12,2011) 6
792119.3
City of Atascadero
Bernards 1*
6 Jobsite perimeter barricading (portion that is not to be provided by contractors)
7 Temporary installation and cost of power, water and sewer
8 Phone and data service, including phone handsets and monthly service cost
9 Janitorial service
10 Insurance course of construction hazard insurance for building and for temporary field
office
COMPENSATION.
Services will be conducted on a time and material basis, not to exceed the contractual amount
of $2,876,562 00 Total fee includes Phase III cost estimate (not to exceed cost $35,000)
Reimbursables (and/or general conditions) will be billed for actual costs only, with no mark up,
up to a maximum amount of $165,585 00, for the duration of this phase of the contract. The
reimbursable allowance of $165,585 00 is included in the total contract amount of
$2,876,562.00
Billable time will be invoiced at the following hourly rates
Project Executive $17200
Program Manager/Project Manager 15000
Construction Manager 11000
Superintendent 1 13500
Superintendent II 13500
Clerical 5700
Historical Consultant to be determined, (not more than $150 00/hr)
These hourly rates may increase at the rate of 3% per year, or CPI, if Consultant can show
that actual costs have increased by that increment.
TOTAL COST OF CONTRACT AMMENDMENT NOT TO EXCEED $2,876,562.00
WITHOUT PRIOR WRITTEN AUTHORIZATION
Amendment#1 (January 12,2011) 7
792119.3
City of Atascadero
Bernards 1—*.
The contractual amount for staff time is separated into the following categories of work:
Estimated Contract Amount
FEMA Repair $1,094,897
FEMA Hazard Mitigation 1,153,189
City Repair 509,674
FEMA Administration 118.800
TOTAL $ 2,876,562
Billable time will be clearly delineated by the categories shown above based on asks
performed Reimbursables and staff time that cross categories will be billed proportionally,
based on each category's percentage of the construction contract.
Any additional services authorized by the City of Atascadero, which are not included in the
scope of services as defined by this contract, must be approved in the form of a City of
Atascadero Change Order prior to performing additional work. Such services will be billed at
the same hourly rates as the contract amount. Payment will be made within 30 days after
receipt and approval of invoice
Payments to the consultant in excess of the contract amount of$2,876,562 00 will not be
made unless written authorization is executed prior to the date of the additional requested
work. Any charges incurred outside of these contract terms will not authorized for payment.
Except as modified by this agreement, the terms of the Consultant Services Agreement
entered by the parties on May 01, 2010 shall remain in full force and effect.
AGREED to this 12th day of January, 2011 by the parties as follows
CITY OF ATASCADERO BERNARDS
Wade G McKinney, City Manag r Michael Cawlina
President CM Services
Approved as to foP' 4/1,
r-
By- _ -�
Brian Pierik, City Attorney