Loading...
HomeMy WebLinkAboutResolution 098-86 RESOLUTION NO. 98-86 Nkw A RESOLUTION OF THE COUNCIL OF THE CITY OF ATASCADERO AMENDING CERTAIN SECTIONS OF RESOLUTION NO. 9-86 RELATING TO THE AMAPOA- TECORIDA DEVELOPMENT IMPACT FEE WHEREAS, the City Council of the City of Atascadero has adopted Ordinance No. 117 known as the Amapoa-Tecorida Development Impact Fee Ordinance, and WHEREAS, Section 3-9.04 and 3-9.06 of Ordinance No. 117 provides for the adoption of a fee schedule required to be paid by developers in the specified area. NOW THEREFORE, BE IT RESOLVED THAT: 1. The following fee schedule shall be effective 30 days after passage of said Ordinance. a) The development or construction of residential or non- residential buildings, and the person causing such to be constructed, shall pay a fee in the amount of: Commercial and Multifamily: $3 ,343 per cubic feet per second of runoff based on 3 cfs per acre, and Single Family: $2,996 per cubic feet per second of runoff, based on 1. 8 cfs per acre, on lots one acre or less. b) The development or construction of residential or non- residential additions or accessory uses to existing buildings, and the person causing such to be constructed, shall pay a fee in the amount of Commercial and Multifamily $0 . 58 per sq.ft. of building addition or accessory use, or the square footage that exceeds 40% coverage of the square feet of land area, whichever is less. If the addition or accessory use plus the existing building (s) does not exceed 40% coverage , then no fee ($0) is the minimum fee charged. For the purpose of this Resolution negative fee calculation means no fee ($0) . Single Family $2. 48 per sq.ft. of building addition or accessory use, or the square footage that exceeds 5% coverage (based on one acre maximum land area) of the square feet of land area, whichever is less. If the addition or accessory use plus the existing building (s) does not exceed 5% coverage, then no fee ($0) is the minimum fee charged. For the purpose of this resolution (RES NO 98-86) a negative fee calculation means no fee ($0) - c) The development or construction of residential or non- residential buildings on lots exceeding one acre, and the person causing such to be constructed, shall pay a fee in the amount of- Commercial and MultiFamily: Same as 1(a) Single Family: $2,996 per cubic feet per second of runoff based on 1.8 cfs per acre, for the first acre only, plus $2. 48 per sq.ft. of building area that exceeds 5% of one acre of land area (2178 sq. ft. ) . If the total land coverage is less than 5% of one acre, then only the .first acre fee will be charged. The Development Impact Fee is hereby identified and incorporated as a part of this resolution. d) All developments which were previously conditioned for deposits pursuant to Resolution No. 42-85 shall pay this fee as meeting the obligation of contribution to the future drainage improvements and will be payable upon notice after passage. Appropriate credits may be applied as determined by the Director of Public Works On motion byCOUNCILMAN HANDSITY and seconded by COUNCILWOMAN BORG )N the foregoing resolution is hereby adopted in its entirety by the following vote AYES: COUNCILrIEMBERS BORGESON, HANDSITY AND MAYOR PRO TEM b�OLINA NOES: NONE ABSENT: COUNCIL6701-1AN NORRIS AND MkYOR 11ACKEY DALE' ADOPTED: 9/8/86 (EXCUSED) ATTEST: j BOYD C. SHARITZ ✓ GEORCt MOLINA City Clerk Mayor Pro Tem APPROVED AS TO CONTENT APPROVED AS TO FORM PAUL M. SENSIBAUGH ROBERT M.- JONES Director of Public Works/ City Attorney City Engineer 2