HomeMy WebLinkAbout2006-090 RESOLUTION NO 2006-090
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
CONDITIONAL USE PERMIT 2005-0171 (MASTER PLAN OF
DEVELOPMENT)
ON APN 049-022-011
(2865 Ferrocarril Road / Tharp/Beck)
WHEREAS, an application has been received from Gary Tharp and Jim Beck (2865
Ferrocarril Road, CA 93422), Owner and Applicants, to consider a project consisting of a Zone
Change from RS (Residential Suburban) to RS / PD-16 (Residential Suburban with Planned
Development Overlay #16) with the adoption of a Master Plan of Development, and a five-lot
residential Tentative Tract Map on APN 049-022-011, and,
WHEREAS, the site's General Plan Designation is SE (Suburban Estates), and,
WHEREAS, the Planning Commission has recommended that the site's Zoning District
be changed from RS (Residential Suburban) to RS/PD-16 (Residential Suburban/Planned
Development Overlay#16), and,
WHEREAS, the PD-16 requires the adoption of a Master Plan of Development,
approved in the form of a Conditional Use Permit; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2006-0022 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA), and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to, and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone
Change application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of
Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on August 15, 2006, studied and considered the Master Plan of
Development (CUP 2005-0171), after first studying and considering the Proposed Mitigated
Negative Declaration prepared for the project, and
WHEREAS, the City Council of the City of Atascadero, at a duly noticed Public Hearing
held on September 26, 2006, studied and considered Conditional Use Permit 2005-0171 (Master
Plan of Development), after first studying and considering the Proposed Mitigated Negative
Declaration prepared for the project, and,
City of Atascadero
Resolution No 2006-090
Page 2 of 16
NOW, THEREFORE, the City Council of the City of Atascadero takes the following
actions
SECTION 1 Findings for Approval of Conditional Use Permit. The City Council
finds as follows
1 The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual, and,
2 The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including the PD-16 Ordinance, and,
3 The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4 That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5 That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
r surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
6 The Master Plan of Development standards or processing requirements will enhance
the opportunity to best utilize special characteristics of an area and will have a
beneficial effect on the area, and
7 Benefits derived from the Master Plan of Development and PD-16 overlay zone
cannot be reasonably achieved through existing development standards or processing
requirements, and,
SECTION 2. Approval. The City Council of the City of Atascadero, in a regular
session assembled on September 26, 2006, resolved to approve Conditional Use Permit 2005-
0171 (Master Plan of Development) subject to the following:
1 EXHIBIT A. Conditions of Approval/ Mitigation Monitoring Program
2 EXHIBIT B Master Plan of Development
�rlrr
City of Atascadero
Resolution No 2006-090
Page 3 of 16
err+'
On motion by Council Member Clay and seconded by Council Member Pacas, the
foregoing Resolution is hereby adopted in its entirety on the following roll call vote
AYES Council Members Clay, Pacas and Mayor O'Malley
NOES None
ABSENT Council Member Luna
One Vacancy
ADOPTED September 26, 2006
CITY OF ATASCADER
G
B y. _
Tom O' alley, Mayor
ATTEST
khalild4�— VXlkf-t--
Marcia McClure Torgerson, C M.0 , City lerk
APPR VD AS RM
PatricklAfight, City Attorney
City of Atascadero
Resolution No 2006-090
Page 4 of 16
err►'
EXHIBIT A:Conditions of Approval/Mitigation Monitoring Program
PO-16 Master Plan of Development(CUP 2005-0171/ZCH 2005-0107/TTM 2004-0059)
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program (Monitoring Measure
PS.Planning Services
BL Business License BS.Building Services
2865 Ferrocarril Road OP Grading Per-nit FD:Fie Deparknent
BP Building Permit PD:Police Departrent
PD-16 Master Plan of Development Fl:Final Inspection CE.City Engineer
TO:Teaporary WW Wastewater
CUP 2005-0171/ZCH 2005-0107/TTM 2004-0059 pawanc Ca Cityna«ney
F0:Final Occupancy
Planning Services
1 The approval of this conditional use permit shall become final and BP PS
effective following City Council approval.
2. Approval of this Conditional Use Permit shall be valid for twenty-four(24) FM PS
months after its effective date At the end of the period,the approval
shall expire and become null and void unless the project has received a
building permit.
3 Subsequent changes to the Master Plan of Development shall be On-going PS
approved by the Planning Commission,independent of Council action.
4 The Community Development Department shall have the authority to BP/FM PS
approve the following minor changes to the project the(1)modify the site
plan project by less than 10%, (2)result in a superior site design or
appearance,and/or(3)address a construction design issue that is not
substantive to the Master Plan of Development. The Planning
Commission shall have the final authority to approve any other changes
to the Master Plan of Development and any associated Tentative Maps.
Any other changes to the Master Plan of Development shall be subject to
City Council approval.Any associated Tentative Maps shall be subject to
Planning Commission approval
5 The applicant shall defend,indemnify and hold harmless the City of ongoing PS
Atascadero or its agents,officers,and employees against any claim or
action brought to challenge an approval by the city or any of its entities,
concerning the subdivision.
6 All site work,grading,and site improvements shall be consistent with the BP/FM PS
Master Plan of Development as shown in EXHIBIT B
7 All subsequent Maps and construction permits shall be consistent with BP/FM PS
the Master Plan of Development contained herein and the Tentative
Tract Map
8 Prior to recordation of the final map the applicant shall submit,for review BP PS
and approval:
- Fencing plan,including materials and treatments
fir - Trail signing Ian
City of Atascadero
Resolution No 2006-090
Page 5 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program (monitoring Measure
PS:Planning Ser es
BL.Business License BS:Budding Services
2865 Ferrocarril Road OP Grading Pern-A FD:FoeDeparhnent
BR Building Pertrd PD:Police Depatrnent
PD-16 Master Plan of Development Fl:Final Inspection CE City Engineer
TO:Temporary WW.Wastewater
CUP 2005-0171/ZCH 2005-0107=M 20040059 occupancy CA,City/ftxney
FO Final Occupancy
■ Landscaping plan for all disturbed site area.
• Project shall not be gated.
9 Affordable Housing Requirement: The applicant shall either deed restrict FM, BP PS,CE
a minimum of 1 residential unit for 30 years at a moderate income rate
with recordation of the final map or shall pay an in lieu fee equal to 5%of
the construction valuation of each unit built in the tract including the
existing house.
10 Workforce Housing: FM, BP PS,CE
Prior to recordation of final map, the applicant shall enter into a legal
agreement with the City to reserve '/2 of the units for sale to residents or
workers within the City of Atascadero, including the affordable units. The
agreement shall include the following provisions
• The units shall be offered for sale to residents or workers within the
City of Atascadero for a minimum of 60-days. During this time
period offers may only be accepted from Atascadero residents or
workers,
°111111rir" ■ The applicant shall provide reasonable proof to the City that at least
one of the qualified buyers is a resident or worker within the City
Limits of Atascadero-
■ The Atascadero resident or worker restriction shall apply to the
initial sale only
• The applicant shall identify which units will be reserved,and the City
Attorney shall approve the final form of the agreement.
11 The emergency services and facility maintenance costs listed below
shall be 100%funded by the project in perpetuity The service and
maintenance costs shall be funded through a community facilities
district established by the City at the developer's cost. The funding
mechanism must be in place prior to or concurrently with acceptance
of the final maps. The funding mechanism shall be approved by the
City Attorney City Engineer and Administrative Services Director prior
to acceptance of any final map The administration of the above
mentioned funds shall be by the City Developer agrees to participate
in the community facilities district and to take all steps reasonably
required by the City with regard to the establishment of the district and
assessment of the property
• All Atascadero Police Department service costs to the project.
■ All Atascadero Fire Department service costs to the project.
■ Off-site common City of Atascadero park facilities maintenance service
costs related to the project.
12. All tract maintenance costs listed below shall be 100% funded by the
project in perpetuity The service and maintenance cost shall be funded
City of Atascadero
Resolution No 2006-090
Page 6 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS.Planning Services
BL.Business License BS.Budding Semes
2865 Ferrocarril Road GP Grading Permit FD:Fre Depatrient
BP Building Pemd PD:Police Depatnent
PD-16 Master Plan of Development Fl:Final Inspection CE City Engineer
T0:Temporary WW:Wastewater
CUP 2005-0171/ZCH 2005-0107/TTM 20040059 Occupancy C^City Attorney
F0:Final Occupancy
through a Maintenance Agreement established by the developer subject
to City approval. The Agreement must be in place prior to, or
concurrently with acceptance of any final maps. The Agreement shall be
approved by the City Attorney City Engineer and Administrative Services
Director prior to acceptance of any Final Map. The administration of the
above mentioned funds, and the coordination and performance of
maintenance activities,shall be the responsibility of the home owners.
• All streets, bridges, sidewalks, streetlights, street signs, roads,
emergency access roads, emergency access gates, and sewer mains
within the project.
• All parks,trails recreational facilities and like facilities.
• All open space and native tree preservation areas.
• All drainage facilities and detention basins.
■ All creeks flood plains floodways wetlands and riparian habitat
areas.
13 In conjunction with the recordation of the final tract map,the developer FM PS,CE
shall record an Open Space Easement and a Pedestrian Access
Easement,reviewed and approved by the Community Development
Department. These easements shall also be shown on the face of the
final tract map and shall be consistent with the easement shown on the
approved tentative tract map.
14 The Developer shall construct a Class 1 trail for pedestrian and BP/GP PS/PW
equestrian access. The trail shall begin on the north side of the Paseo
Del Lago and Chico Road intersection and shall extend northerly across
the project property to the property boundary with the Atascadero Mutual
Water Company's 'River Parcel. The trail shall meet the following
requirements:
• The trail shall be 6 feet wide along the Chico Road extension,widening
to 8-feet within the Open Space Easement crossing the project
property
■ The trail shall be constructed with a decomposed granite finished
surface.
• The Chico Road improvements and construction of the trail shall be in
conformance with all City requirements and the agreement entered
into between Mr Beck and Mr Munoz,dated August 23,2006.
Building Services
15 A soils investigation prepared by a licensed Geotechnical Engineer is BP FM
to be provided for the project. The report is to be provided at the time
of building permit submittal along with the building plans for review by
r the Building Division. Recommendations contained in the report are to
City of Atascadero
Resolution No 2006-090
Page 7 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program (monitoring Measure
PS:Planning Services
BL.Business License BS:Building Services
2865 Ferrocarril Road OP GradingPyrint FD:FiireDeparinant
BR Building Permit PD:Police Depalinent
PD-16 Master Plan of Development FI:Final Inspection CE.City Engineer
TO:Tenporary WW:Wastewater
CUP 2005-0171/ZCH 2005-0107/TTM 20040059 Occupancy CA CityAgorney
F0:Final Occupancy
be incorporated into the project plans
Fire Marshal
16. All street names shall be reviewed and approved by the Community FM PS, FD,PD
Development Department,the Fire Department, and the Police
Department. Street names and addresses shall be approved and
assigned prior to recordation of the final map
17 Note on plans that fire lanes shall be delineated to restrict parking as BP PS/FD
required by the Fire Authority
Engineering Conditions:
City Engineer Project Conditions
18. Applicant shall construct the extension of Chico Road to the 401A City BP CE
Standard modified as shown on the tentative map.
19 A railing shall be provided along the top of the retaining wall on Chico GP,BP CE,BS
Road adjacent to the horse trail/pedestrian access in conformance with
the California Building Code
City Engineer Standard Conditions
20 In the event that the applicant bonds for the public improvements GP BP CE
required as a condition of this map the applicant shall enter into a
Subdivision Improvement Agreement with the City Council
21 An engineer's estimate of probable cost shall be submitted for review and GP BP CE
approval by the City Engineer to determine the amount of the bond.
22. The Subdivision Improvement Agreement shall record concurrently with FM CE
the Final Map.
23 A six(6)foot Public Utility Easement(PUE)shall be provided contiguous GP BP CE
to the property frontage.
24 The applicant shall acquire title interest in any off-site land that may be GP,BP CE
required to allow for the construction of the improvements. The applicant
shall bear all costs associated with the necessary acquisitions. The
applicant shall also gain concurrence from all adjacent property owners
whose ingress and egress is affected by these improvements.
25 Slope easements shall be obtained by the applicant as needed to GP, BP CE
accommodate cut or fill slopes.
26. Drainage easements shall be obtained by the applicant as needed to GP, BP CE
vow
City of Atascadero
Resolution No 2006-090
Page 8 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS.Planning Services
BL.Business License BS.Building Services
2865 Ferrocarril Road OP ung Pennit FD:Fn;Deparhnent
BP'Budding Pemrt PD:Police Depatrnent
PD-16 Master Plan of Development FI:Finallnspecton CE.City Engineer
TO:Tenporary WW.Wastewater
CUP 2005-0171/ZCH 2005-0107/17M 20040059 Dccupaxy CA City Attorney
FO:Final Occupancy
accommodate both public and private drainage facilities.
27 A preliminary subdivision guarantee shall be submitted for review in FM CE
conjunction with the processing of the tract map.
28. The final map shall be signed by the City Engineer prior to the map being FM CE
placed on the agenda for City Council acceptance.
29. Prior to recording the tract map the applicant shall pay all outstanding FM CE
plan check/inspection fees.
30 Prior to recording the map the applicant shall bond for or complete all FM CE
improvements required by these conditions of approval
31 Prior to recording the tract map the applicant shall bond for or set FM CE
monuments at all new property corners. A registered civil engineer or
licensed land surveyor shall indicate by certificate on the parcel map,that
corners have been set or shall be set by a date specific and that they will
be sufficient to enable the survey to be retraced.
�11>fi►
32. Prior to recording the tract map the applicant shall submit a map drawn FM CE
in substantial conformance with the approved tentative map and in
compliance with all conditions set forth herein. The map shall be
submitted for review and approval by the City in accordance with the
Subdivision Map Act and the City's Subdivision Ordinance.
33. All existing and proposed utility pipeline open space, or other FM CE
easements are to be shown on the final/parcel map If there are building
or other restrictions related to the easements, they shall be noted on the
final/parcel map The applicant shall show all access restrictions on the
final/parcel map
34 Prior to recording the tract map the applicant shall have the map FM CE
reviewed by all applicable public and private utility companies (cable,
telephone gas, electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility company indicating their
review of the map The letter shall identify any new easements that may
be required by the utility company A copy of the letter shall be submitted
to the City New easements shall be shown on the parcel map.
35. Prior to the issuance of building permits the applicant shall submit plans GP,BP CE
and supporting calculations/reports including street improvements,
underground utilities composite utilities and grading/drainage plans
prepared by a registered civil engineer for review and approval by the
City Engineer
36 Submit calculations to support the design of any structures or pipes. GP BP CE
Closed conduits shall be designed to convey the 10-year flow with gravity
flow, the 25-year flow with head, and provide safe conveyance for the
City of Atascadero
Resolution No 2006-090
Page 9 of 16
/
Timing Responsibility Mitigation
Conditions of Approval
(Monitoring Measure
Mitigation Monitoring Program
PS.Planning Serv;ces
BL.Business License BS.Building Services
2865 Ferrocarril Road OP GradingPynnit FD:Fre Department
BP Building Permit PD:Police Department
PD-16 Master Plan of Development FI:Final Inspection CE:City Engineer
TO:Temporary WW'Wastewater
CUP 2005-0171/ZCH 2005-0107/TTM 20040059 Occupancy CA City Mornay
F0:Final Occupancy
100-year overflow
37 Show the method of dispersal at all pipe outlets. Include specifications for GP,BP CE
size&type
38. Concentrated drainage from off-site areas shall be conveyed across the GP, BP CE
project site in drainage easements. Acquire drainage easements where
needed Drainage shall cross lot lines only where a drainage easement
has been provided If drainage easement cannot be obtained the storm
water release must follow the exact historic path, rate and velocity as
prior to the subdivision.
39 Applicant shall submit erosion control plans and a Storm Water Pollution GP BP CE
Prevention Plan (SWPPP). A SWPPP is required where greater than 1
acre is disturbed by construction of the project. The Regional Water
Quality Control Board shall approve the SWPPP
40 All public improvements shall be constructed in conformance with the GP BP CE
City of Atascadero Engineering Department Standard Specifications and
Drawings or as directed by the City Engineer
41 The on-site residential streets shall be improved consistent with the GP, BP CE
Tentative Tract Map
42. Off-site streets shall be improved consistent with the Tentative Tract Map GP, BP CE
43. Alignment of frontage improvements shall be approved by the City GP BP CE
Engineer
44 A mechanism to provide for the funding of maintenance for lighting,street GP BP CE
improvements, special paving surfaces, sewer storm drain, common
area landscape open space and/or hardscape shall be provided.
45 All utilities shall be undergrounded on project frontage GP, BP CE
AMWC Conditions
46. Before issuance of building permits the applicant shall obtain a 'Will
Serve letter from AMWC for the newly created lots within the
subdivision.
Mitigation Measures
Mitigation Measure 1.c.1 Individual units shall be painted with earth toned BP PS
colors All materials shall be high quality and designed to blend with the
surrounding environment.
1hrr Mitigation Measure 1.c.2: Ano ens ace easement and a BP PS
City of Atascadero
Resolution No 2006-090
Page 10 of 16
r Conditions of Approval/ Timing Responsibility Mitigation
(Monitoring Measure
Mitigation Monitoring Program
PS:Planning Services
BL.Business License BS:Bubrig Semites
2865 Ferrocarril Road GP GradngPwnt FD:1 reDepar4nent
BP Buidng Pemit PD:Police Depark mnt
PD-16 Master Plan of Development Fl:Finallnspeclion �wase
TO Tenporary CA. Attorney
CUP 2005-0171/ZCH 2005-0107/TTM 2004-0059 occupancy CXy
F0:Final Occupancy
pedestrian/equestrian trail shall be incorporated into the design along the
western edge of the project to maintain the rural visual character of the
project site
Mitigation Measure 1.d.1 All lighting shall be residential in nature.A BP PS
maximum of 1 common light post may be permitted at the terminus of the
driveway for safety Any such light post and fixture shall be full cut-off and
a maximum of 12-feet in height. The light shall be placed on a motion
sensor and shall not be left on past 10pm.
Mitigation Measure 3.b.1 The project shall be conditioned to comply with BP BS
all applicable District regulations pertaining to the control of fugitive dust
(PM-10)as contained in sections 6.3 6 4 and 6 5 of the April 2003 Air
Quality Handbook.
■ Asbestos has been identified by the state Air Resources Board as a
toxic air contaminant. Serpentine and ultramafic rocks are very
common in the state and may contain naturally occurring asbestos.
Under the State Air Resources Board Air Toxics Control Measure
(ATCM)for Construction, Grading Quarrying and Surface Mining
r Operations prior to any grading activities at the site the project
proponent shall ensure that a geologic evaluation is conducted to
determine if naturally occurring asbestos is present within the area
that will be disturbed If Naturally Occurring Asbestos (NOA)is found
at the site the applicant must comply with all requirements outlined in
the Asbestos ATCM for Construction, Grading Quarrying and Surface
Mining Operations. If NOA is not present, an exemption request must
be filed with the District. If NOA is found at the site the applicant must
comply with all requirements outlined in the Asbestos ATCM. This
may include development of an Asbestos Dust Mitigation Plan and an
Asbestos Health and Safety Program for approval by the APCD
Should Naturally Occurring Asbestos be identified within the area of
construction and the worked area will be less than or equal to one
acre then the dust control measures identified below are required If
the disturbed area is greater than one acre additional requirements
may include but are not limited to 1)an Asbestos Dust Mitigation Plan
which must be approved by the District before construction begins,
and 2)an Asbestos Health and Safety Program will also be required
for some projects
■ Dust Control Measures for Construction and Grading Operation
Projects One Acre or Less. No person shall engage in any
construction or grading operation on property where the area to be
disturbed is one(1 0)acre or less unless all of the following dust
mitigation measures are initiated at the start and maintained
throughout the duration of the construction or grading activity-
1 Construction vehicle speed at the work site must be limited to
fifteen (15)miles per hour or less,
V41W 2. Prior to any ground disturbance, sufficient water must be applied
City of Atascadero
Resolution No 2006-090
Page 11 of 16
` ✓ Conditions of Approval! Timing Responsibility Mitigation
!Monitoring Measure
Mitigation Monitoring Program
PS.Planning Services
BL.Business License BS:Building Services
GR Grading Pemrl FD:Fire Department
2865 Ferrocarril Road BP BuildingPemd PD:Police Department
PD-16 Master Plan of Development FI:Final Inspection �A
Engineer
TO:Temporary CA City Attorney
Wastewater
CUP 2005-0171/ZCH 2005-0107/TTM 20040059 occupancy
FO:Final Occupancy
to the area to be disturbed to prevent visible emissions from
crossing the property line;
3 Areas to be graded or excavated must be kept adequately wetted
to prevent visible emissions from crossing the property line,
4 Storage piles must be kept adequately wetted treated with a
chemical dust suppressant,or covered when material is not being
added to or removed from the pile,
5. Equipment must be washed down before moving from the
property onto a paved public road and
6 Visible track-out on the paved public road must be cleaned using
wet sweeping or a HEPA filter equipped vacuum device within
twenty-four(24)hours.
Mitigation Measure 4.b.1 Prior to issuance of grading/building permits the BP PS
small riparian scrub area at the northwest corner and freshwater marsh
area at the southern tip of the property shall be fenced with protective
fencing at the limit of the area plus 5 feet. There shall be no construction
activity or storage of materials or vehicles in these areas. All sanitation
facilities shall be placed outside these areas and outside the dripline of any
native tree
Mitigation Measure 4.b.2: The developer shall contract with a qualified GP/BP PS
biologist to perform surveys for both the vernal pool fairy shrimp and
botanical resources prior to issuance of any site disturbance permits The
surveys are to be completed no more than three(3)weeks prior to the
issuance of grading/building permits or other site disturbance
Mitiqation Measure 4.d.1 In accordance with the Migratory Bird Treaty Act GP PS
of 1918 the applicant shall contact the United States Fish and Wildlife
Service(USFWS)for direction. The applicant shall provide copies of all
correspondence with USFWS prior to issuance of grading/building permits
and shall incorporate all recommended mitigation measures into the
project design.
BP PS
Mitigation Measure 4.e.1 The Grading Plan shall identify tree protection
fencing around the dripline or as recommended by the project arborist, of
each existing on-site or off-site native tree.
At no time shall tree roots be ripped with construction equipment.
If any roots over 2 inches are accidentally ripped they shall be cut
perpendicular to the direction of growth with a handsaw and no
tree wound paint shall be applied.
Mitigation Measure 4.e.2: Grading and excavation and grading work shall GP PS
fir+ be consistent with the City of Atascadero Tree Ordinance Special
precautions when working around native trees include
City of Atascadero
Resolution No 2006-090
Page 12 of 16
Conditions of Approval/ Timing Responsibility Mitigation
/Monitoring Measure
Mitigation Monitoring Program
PS.Planning SerHces
BL.Business License BS:Butlding Services
GP'Grading Pan d FD:Foe Depainent
2865 Ferrocar111 Road PD:PdceDepatrnent
8P'Building Pemrt CE Gry Engineer
PD-16 Master Plan of Development FI:Finallnspectbn tECityEev�
TO:Temporary CA a A ewati
CUP 2005-0171/ZCH 2005-0107/TTM 20040059 Occupancy
F0:Final Occupancy
1 All existing trees outside of the limits of work shall remain
2. Earthwork shall not exceed the limits of the project area.
3 Low branches in danger of being torn from trees shall be pruned prior
to any heavy equipment work being done.
4 Vehicles and stockpiled material and sanitation facilities shall be
stored outside the dripline of all native trees.
5 All trees within the area of work shall be fenced for protection with 4-
foot chain link,snow or safety fencing placed per the approved tree
protection plan Tree protection fencing shall be in place prior to any
site excavation or grading. Fencing shall remain in place until
completion of all construction activities.
6 Any roots that are encountered during excavation shall be clean cut by
hand and sealed with an approved tree seal
�11tr►' Mitigation Measure 4.e.3 The developer shall contract with a certified GP PS
arborist during all phases of project implementation. The certified arborists
shall be responsible for monitoring the project during all phases of
construction through project completion, as follows
1 A written agreement between the arborist and the developer outlining
an arborist monitoring schedule for each construction phase through
final inspection shall be submitted to and approved by planning staff
prior to the issuance of building/grading permits.
2. Arborist shall schedule a pre-construction meeting with engineering
/planning staff grading equipment operators project superintendent to
review the project conditions and requirements prior to any grubbing
or earth work for any portion of the project site All tree protection
fencing and trunk protection shall be installed for inspection during the
meeting Tree protection fencing shall be installed at the line of
encroachment into the tree s root zone area
2. As specified by the arborist report and City staff•
• Prune all trees in active development areas to be saved for
structural strength and crown cleaning by a licensed and certified
arborist.
• Remove all debris and spoils from the lot cleaning and tree
pruning.
• In locations where paving is to occur within the tree canopy grub
only and do not grade nor compact. Install porous pavers over a
three-inch bed of%inch granite covered with one-inch pea gravel
for screeding. If curbs are required use pegged curbs to secure
' '` the porous pavers. Pegged curbs are reinforced six to eight curbs
City of Atascadero
Resolution No 2006-090
Page 13 of 16
Conditions of Approval/ Timing Responsibility Mitigation
/Monitoring Measure
Mitigation Monitoring Program
PS.Planning Services
BL Business License BS.Building Services
GP'Grading Parrot FFD:Fire Departnent
2865 Ferrocarril Road BP'Building Penrit PD:Police Departrnent
PD-16 Master Plan of Development Fl:Final Inspection wEengineert
TO:Tengorary VVacity Attorneywater
2005-0171/ZCH 2005-0107=M 20040059 Occupancy
F0:Final Occupancy
poured at grade with a one-foot by one-foot pothole every four to
six linear feet.
■ All trenching or grading within the protected root zone area outside
of the tree protection fence shall require hand trenching or
preserve and protect roots that are larger than 2 inches in
diameter
• No grading or trenching is allowed within the fenced protected
area
• Any roots that are 4 inches in diameter or larger are not to be cut
until inspected and approved by the on-site arborist.
• Pathways driveways, and parking areas that run under tree
canopies shall be made out of porous pavers to allow oxygen and
moisture to reach root systems
• Utilities such as water gas, power cable storm drainage
telephone and sewer should be directed away from under canopies
and the critical root zone(CRZ)of the trees. If this is not possible
or feasible then they should be bored under the tree at a minimum
depth of 3 feet. Consult with the Arborist for further direction if
necessary
• Where a building is placed within the canopy of a tree the
IrrY foundation or walls should be designed so that it bridges across
any root system.
■ Any foundation or other structure that encroaches within the
dripline of trees shall be dug by hand or a small piece of
equipment.
4 Upon project completion and prior to final occupancy a final status
report shall be prepared by the project arborist certifying that the
tree protection plan was implemented the trees designated for
protection were protected during construction,and the
construction-related tree protection measures are no longer
required for tree protection
Mitigation Measure 5.b.1 The project architect shall prepare development GP PS
plans that avoid the archaeological site. In the event that testing reveals
archaeological deposits with integrity and significant scientific values, the
project plan should be designed to minimize disturbance of site soils and
thereby protect the resources. If testing shows the deposits to be shallow
depleted and generally insignificant,then plans need not be prepared to
avoid impacts
Mitigation Measure 5.b.2: Prior to issuance of grading/building permits the GP PS
developer shall have a Phase II archaeological investigation to determine
the dimensions of the archaeological deposits,their physical
characteristics and material contents Different areas should be
systematically sampled and all recovered materials should be thoroughly
processed identified and analyzed Before Phase II sampling begins,the
project archaeologist should prepare a comprehensive research design
err► which includes a sampling strategy and an analytical framework.
City of Atascadero
Resolution No 2006-090
Page 14 of 16
Conditions of Approval/ Timing Responsibility Mitigation
/Monitoring Measure
Mitigation Monitoring Program
PS.Planning Services
BL.Business License BS.Building Services
GP Grading Permit FD:Fire Depatrnent
2865 Ferrocarril Road BP BuildigPernit PD:PoliceDeparhnent
PD-16 Master Plan of Development Fl:Finallnspec6on �w
Engineer
TO:Terrporxy WA W ty Wastewater
CUP 2005-0171/ZCH 2005-0107=M 2004-0059 Occupacy
F0:Final Occupancy
Mitigation Measure 5.b.3 The data from the Phase II sampling shall be GP PS
evaluated and using the California Environmental Quality Act guidelines a
determination shall be made regarding classification of the site as an
'important cultural resource
Mitigation Measure 5.b.4 If the Phase II testing shows that significant GP PS
resources do exist then a Phase III mitigation and management plan shall
be prepared to deal with expected impacts The project archaeologist shall
aide in developing a mitigation plan with the goal of preserving the
archaeological resource.
Mitigation Measure 5.b.5 The Developer shall contact and work closely GP PS
with both the Chumash and the Salianian Tribes during any Phase II
Cultural Resource Assessment to insure that any cultural resources are
preserved.
Mitigation Measure 5.d.1 In the event of the accidental discovery or GP PS
recognition of any human remains,the following steps shall be taken--
There shall be no further excavation or disturbance of the site or any
nearby area reasonably suspected to overlie adjacent human remains until
the coroner of the county in which the remains are discovered has been
contacted to determine that no investigation of the cause of death is
required and to determine if the remains are of Native American heritage
If the remains are of Native American Heritage the coroner shall contact
the Native American Heritage Commission within 24 hours
Mitigation Measure 6.a.c.1 Prior to issuance of grading/building permits, GP CE
the developer shall submit a geotechnical investigation that addresses
earthquake and liquefaction potential Based on this report,all
recommendations for building and site design shall be implemented
Mitigation Measure 8e.f.1 A Stormwater Pollution Prevention Plan BP CE
(SWPPP)/Erosion Control Plan shall be submitted and approved by the
City Engineer prior to the issuance of the building permit. The plan shall
include storm water measures for the operation and maintenance of the
project for the review and approval of the City Engineer The Building
Permit application plans shall identify Best Management Practices (BMPs)
appropriate to the uses conducted on site that effectively prohibit the entry
of pollutants into storm water runoff
Mitigation Measure 8.e.f.2. The developer is responsible for ensuring that BP BS,PS,CE
all contractors are aware of all storm water quality measures and that such
measures are implemented Failure to comply with the approved
construction Best Management Practices will result in the issuance of
correction notices citations or stop work orders
Mitigation Measure 11.d All construction activities shall comply with the Ongoing BS/PS
err City of Atascadero Noise Ordinance for hours of operation.
City of Atascadero
Resolution No 2006-090
Page 15 of 16
fir►' Conditions of Approval/ Timing Responsibility Mitigation
/Monitoring Measure
Mitigation Monitoring Program
PS.Planning Services
BL Business License BS.Building Services
GP'Grading Perm t FD:Fire Department
2865 Ferrocarril Road PD:PoliceDepartinent
BP'Build ng Pemit CE.City Engineer
PD-16 Master Plan of Development FI:Final Inspection WW:Wastewater
CUP 2005-01712CH 2005-0107/TTM 2004TQ Temporary CA City Atlomey0059 occupancy
F0:Final Occupancy
Mitigation Measure 13.a.1 The Developer shall insure that structures GP/BP PS/BS
and/or septic systems are not built within the Atascadero Mutual Water
Company easement, nor will development of the project interfere with
maintenance or operation of any existing water lines.
Mitigation Measure 14.b.1 The construction of the equestrian/pedestrian Ongoing AMWC
trail shall not cross the Atascadero Mutual Water Company(AMWC)
property(River Parcel)until such time as AMWC allows such public
access.
Mitigation Measure 15.a.b.1 Chico Road shall be extended to provide BP CE
ingress/egress to the four new residential units.
v,400,
i
,
City of Atascadero
Resolution No 2006-090
Page 16 of 16
EXHIBIT B: Master Plan of Development
I
z 'tnv t az
E b 3
Hal
Y�x a
�Q, 1
ft
IL
4
i
Open space
easement with
public access
trail to Salinas11 I y
River e
I
fall"
U► 1. o gg
N {
' n 84d
'�+be