HomeMy WebLinkAbout2007-085RESOLUTION NO. 2007-085
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
CONDITIONAL USE PERMIT 2006-0184 (MASTER PLAN OF
DEVELOPMENT)
ON APN 029-322-0229 0239 024
5825 Ridgeway Ct.
(Beck)
WHEREAS, an application has been received from Jim and Adrienne Beck, 5825
Ridgeway Ct, Atascadero, Ca 93422, and Gary and Mary Tharp, 12250 San Antonio Rd,
Atascadero, Ca 93422 (Applicants and Property Owners), to consider a project consisting of a
Zone Change from RMF -10 (Residential Multi -family -10) to RMF-10/PD29 (Residential Multi -
Family -10 with a Planned Development Overlay #29) with corresponding Master Plan of
Development and Vesting Tentative Tract Map located at 5825 Ridgeway Ct, (APN 029-322-
022, 023, 024); and,
WHEREAS, the site's General Plan Designation is MDR (Medium Density Residential);
and,
WHEREAS, the Planning Commission has recommended that the site's Zoning District
be changed from RMF -10 (Residential Multi -Family -10) to RMF -10 with PD29 (Residential
Multi -Family -10 with a Planned Development Overlay #29); and,
WHEREAS, the Planned Development Overlay Zone #29 requires the adoption of a
Master Plan of Development, approved in the form of a Conditional Use Permit; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2007-0003 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of
Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on September 18, 2007 studied and considered the Conditional Use Permit
2006-0184 (Master Plan of Development), after first studying and considering the Proposed
Mitigated Negative Declaration prepared for the project, and,
City of Atascadero
Resolution No. 2007-085
Page 2 of 30
WHEREAS, the City Council of the City of Atascadero, at a duly noticed Public Hearing
held on October 9, 2007 studied and considered the Conditional Use Permit 2006-0184 (Master
Plan of Development), after first studying and considering the Proposed Mitigated Negative
Declaration prepared for the project, and,
NOW, THEREFORE, the City Council of the City of Atascadero takes the following
actions:
SECTION 1. Findings for Approval of Conditional Use Permit. The City Council
finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including provisions of the PD Overlay Zone #29; and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. The proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. The proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
6. The Master Plan of Development standards or processing requirements will enhance
the opportunity to best utilize special characteristics of an area and will have a
beneficial effect on the area; and
7. Benefits derived from the Master Plan of Development and PD Overlay Zone cannot
be reasonably achieved through existing development standards or processing
requirements; and,
SECTION 2. Findings for Approval of Tree Removal. The City Council finds as
follows:
1. The trees are obstructing proposed improvements that cannot be reasonably designed
to avoid the need for tree removal, as certified by a report from the Site Planner and
determined by the Community Development Department based on the following
factors:
■ Early consultation with the City;
City of Atascadero
Resolution No. 2007-085
Page 3 of 30
■ Consideration of practical design alternatives;
■ Provision of cost comparisons (from applicant) for practical design alternatives;
■ If saving tree eliminates all reasonable uses of the property; or
■ If saving the tree requires the removal of more desirable trees.
SECTION 3. Approval. The City Council of the City of Atascadero, in a regular
session assembled on October 9, 2007 resolved to approve Conditional Use Permit 2006-0184
(Master Plan of Development) and Tree Removal Permit subject to the following:
EXHIBIT A:
Conditions of approval / Mitigation Monitoring Program
EXHIBIT B:
Master Plan of Development / Site Plan
EXHIBIT C:
Floor Plan and Elevations — Lot 2
EXHIBIT D:
Floor Plan and Elevations — Lot 3
EXHIBIT E:
Floor Plan and Elevations — Lot 4
EXHIBIT F:
Floor Plan and Elevations — Lot 5
EXHIBIT G:
Floor Plan and Elevations — Lot 6
EXHIBIT H:
Floor Plan and Elevations — Lot 7
EXHIBIT I:
Floor Plan and Elevations — Lot 8
EXHIBIT J:
Preliminary Landscape Plan
EXHIBIT K:
Tree Protection Plan
EXBIBIT L:
Grading, Drainage, and Frontage Improvement Plan
1
1
City of Atascadero
Resolution No. 2007-085
Page 4 of 30
On motion by Council Member O'Malley and seconded by Council Member Clay, the
foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Beraud, Brennler, Clay, O'Malley and Mayor Luna
NOES: None
ABSENT: None
ADOPTED: October 9, 2007
CITY ATASCAD
!t�__
By:
r. Geo4e Luna, Mayor
ATTEST:
41uo- U1, - & C (Anc- / , -
Marcia McClure Torgerson, C.M.C., y Clerk
APPROVED AS TO FORM:
Robert Schultz, Interim ity ttorney
1
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 5 of 30
EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program
Planned Development -29 /PLN 2006-1117
Conditions of Approval /
Timing
Responsibility
Mitigation
/Monitoring
Measure
Mitigation Monitoring Program
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
GP: Grading
FD: Fire Department
PD: Police Department
Permit
CE: City Engineer
PLN 2006-7777
PeBuilding
CA Wastewater
FI: Final
Inspection
Planned Development Overlay X29
mrary
�rncyy
F0: Final
Occupancy
Planning Services
1. The approval of this use permit shall become final and effective for the purposes
FM
Ps
of issuing building permits thirty (30) days following the City Council approval of
ZCH 2006-0121 and ZCH 2007-0135 upon second reading, unless prior to that
time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the
Zoning Ordinance.
2. The Community Development Department shall have the authority to approve the
BP/FM
PS, CE
following minor changes to the project that (1) modify the site plan project by less
than 10%, (2) result in a superior site design or appearance, and/or (3) address a
construction design issue that is not substantive to the Master Plan of
Development.
3. Approval of this Conditional Use Permit shall be valid for twelve (12) months after
BP/FM
PS
its effective date. At the end of the period, the approval shall expire and become
null and void unless the project has received a building permit.
4. The applicant shall defend, indemnify, and hold harmless the City of Atascadero
Ongoin
PS
or its agents, officers, and employees against any claim or action brought to
9
challenge an approval by the city, or any of its entities, concerning the subdivision
5. All subsequent Tentative Map and construction permits shall be consistent with
BP/FM
PS, CE
the Master Plan of Development contained herein.
6. All exterior elevations, finish materials and colors shall be consistent with the
BP
PS
Master Plan of Development as shown in EXHIBIT B through L with the following
modifications:
■ All exterior material finishes (siding, trim, doors, windows, light fixtures, garage
doors) shall be durable, high quality, and consistent with the architectural
appearance.
■ Windows shall be gridded on all four elevations.
■ Roofs shall be architectural grade dimensional shingles.
■ Eliminate Clipped roof corners from unit proposed for lot 8.
1
D
F�
City of Atascadero
Resolution No. 2007-085
Page 6 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
/Monitoring
Measure
Mitigation Monitoring Program
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
GP: Grading
FD: Fire Department
PD: Polbe Department
Permil
CE: City Engineer
2006-1117
Building
Permit
Ch Wastewater
�pe
FI: Final
Inspection
Development Overlay #29
PlannedO
Occupancy Occupancy
F0: Final
Occupancy
• Carriage door styles shall be utilized throughout the project and shall be
painted/colored to compliment the historic color schemes.
■ The belly -band shall be eliminated and the transition between materials shall
be historic in character, per staff approval.
■ The lower floor of lot 3 shall be stucco finish.
■ A permanent historical plaque shall be placed at the corner of Rosario and
Olmeda, design and text subject to staff approval.
7. All site development shall comply with the standards of the Planned Development
BP
PS, BS
Overlay District #29.
8. All site work, grading, and site improvements shall be consistent with the Master
BP/FM
PS, BS, CE
Plan of Development as shown in EXHIBIT B, J, K, and L. Where discrepancies
exist between the landscape plan and the grading plan, the grading plan will take
precedence. The following modification shall be required:
■ A rolled concrete curb shall be provided along Palma Avenue and the back
of sidewalk shall be located at the extent of the existing right-of-way.
■ The parking configuration as shown in the Master Plan of Development
(EXHIBIT B) shall take precedence over all other plans shown with the
following modifications
■ Condition the project that the applicant increase on -street parking
opportunities rather than approve the exhibit as presented. Staff is not
in support of widening the opposite side of Palma Avenue based on
current slope conditions. Eliminating the guest parking between the
units would provide two on -street parking spaces in front of the
proposed units, creating a reduction in standard parking requirements
of two spaces.
9. All project fencing shall be installed consistent with EXHIBIT Band J subject to
GP/BP
PS
the following modifications:
■ Fencing material and treatment shall comply with the PD -29 standards.
■ Fencing for the units shall be placed at the rear property lines. Fencing shall
be 4 -foot maximum solid or transparent fencing.
1
1
City of Atascadero
Resolution No. 2007-085
Page 7 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
GP: Grading
FD: Fire Department
PD: Police Department
Permit
CE: Cily Engineer
PLN 2006-1117
Permit icing
CA � nno ey
FI: Final
Inspection
Planned Development Overlay #29
��`e"
ncy
F0: Final
Occupancy
10. The proposed project shall incorporate dark earth -toned colors and shall utilize
GP/BP
PS
high quality decorative architectural materials compatible with the existing stone
walls surrounding the Colony Home. Dark split -faced block that is compatible with
the stone veneer may be utilized for the rear retaining walls.
11. A final landscape and irrigation plan shall be approved prior to the issuance of
BP
PS
building permits and included as part of site improvement plan consistent with
EXHIBIT J, and as follows:
■ All exterior meters, air conditioning units and mechanical equipment shall
be screened with landscape material.
• All areas shown on the landscape plan shall be landscaped by the
developer prior to the final of any single building permit on-site.
■ Final tree list shall be submitted with building permits, subject to staff
approval. Street trees within tree planters along Palma Avenue shall be
medium sided shade trees such as honey or purple robe locust. Planting
adjacent to parking spaces and within narrow planters shall consist of
ornamental grasses and compatible upright screen shrubs and vines.
Landscaping at the terraced walls shall consist of trailing plants and screen
shrubs.
■ Street trees shall be minimum 15 -gallon size and double staked.
■ Front yard areas not specifically conditioned shall be landscaped with
drought tolerant species, subject to staff approval.
12. The developer and/or subsequent owner(s) shall assume responsibility for the
FM /
PS
continued maintenance of all landscape and common areas, consistent with
Ongoin
EXHIBIT B, J, and L.
9
13. Affordable Housing Requirement: The applicant shall comply with the City
FM/BP
PS, CA
Council inclusionary housing policy and either deed restrict 20% of the proposed
units or pay an in -lieu fee based on 5% of the construction valuation of each new
and existing housing unit.
14. Workforce Housing: Prior to recordation of final map, the applicant shall enter into
BP
PS, CA
a legal agreement with the City to reserve 1/2 of the units for sale to residents or
workers within the City of Atascadero, including the affordable units. The
agreement shall include the following provisions:
■ The units shall be offered for sale to residents or workers within the
City of Atascadero for a minimum of 60 -days. During this time period
offers may only be accepted from Atascadero residents or workers;
■ The applicant shall provide reasonable proof to the City that at least
1
1
City of Atascadero
Resolution No. 2007-085
Page 8 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
/Monitoring
Measure
Mitigation Monitoring Program
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
GP: Grading
FD: Fire Departmnt
PD: Police Department
Pemwl
CE: City Engineer
PLN 2006-7777
BP: Building
Perrot
WW: Wastewater
Ca City Attorney
FI: Final
Inspection
Planned Development Overlay #29
��e"
ncy
F0: Final
Occupancy
one of the qualified buyers is a resident or worker within the City Limits
of Atascadero;
■ The Atascadero resident or worker restriction shall apply to the initial
sale only;
■ The applicant shall identify which units will be reserved; and
■ The City Attorney shall approve the final form of the agreement.
15. A Tree Protection Plan shall be submitted with subsequent building permits for
GP/BP
PS
encroachment within the drip line of native trees located on the subject parcel and
any adjacent properties. The applicant will contract with a certified arborist to
monitor all activity within the drip lines of existing native oak trees.
16. The emergency services and facility maintenance costs listed below shall be
BP
PS
100% funded by the project in perpetuity. The service and maintenance costs
shall be funded through a community facilities district established by the City at
the developer's cost. The funding mechanism must be in place prior to or
concurrently with acceptance of the final maps. The funding mechanism shall
be approved by the City Attorney, City Engineer and Administrative Services
Director prior to acceptance of any final map. The administration of the above
mentioned funds shall be by the City. Developer agrees to participate in the
community facilities district and to take all steps reasonably required by the
City with regard to the establishment of the district and assessment of the
property.
■ All Atascadero Police Department service costs to the project.
■ All Atascadero Fire Department service costs to the project.
■ Off-site common City of Atascadero park facilities maintenance service
costs related to the project.
17. All tract maintenance costs listed below shall be 100% funded by the project in
BP
PS
perpetuity. The service and maintenance cost shall be funded through a Home
Owners Association established by the developer subject to City approval. The
Home Owners Association must be in place prior to, or concurrently with
acceptance of any final maps. The Home Owners Association shall be approved
by the City Attorney, City Engineer and Administrative Services Director prior to
acceptance of any Final Map. The administration of the above mentioned funds,
and the coordination and performance of maintenance activities, shall be the
responsibility of the Home Owners Association.
a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency
access roads, emergency access gates, and sewer mains within the
project.
b) All parks, trails, recreational facilities and like facilities.
c Allo ens ace and native tree preservation areas.
1
1
City of Atascadero
Resolution No. 2007-085
Page 9 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
/Monitoring
Measure
Mitigation Monitoring Program
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
FD: Fire Department
GP: Grading
PD: Police Department
Permit
CE: City Engineer
PLN 2006-1117
BP:
eriniicing
WW:Wastewater
CA City ey
FI: Final
Inspection
Planned Development Overlay #29
T0:occuupancyparg cry
F0: Final
Occupancy
d) All drainage facilities and detention basins.
e) All creeks, flood plains, floodways, wetlands, and riparian habitat areas.
f) All common landscaping areas, street trees, medians, parkway
planters, manufactured slopes outside private yards, and other similar
facilities.
g) All frontage landscaping and sidewalks along arterial streets
18. Prior to final map, the applicant shall submit CC&Rs for review and approval by
BP
PS, BS
the Community Development Department. The CC&R's shall record with the Final
Map and shall include the following:
a) Provisions for maintenance of all common areas including access,
parking, street trees, fencing and landscaping in perpetuity.
b) A detailed list of each individual homeowner's responsibilities for
maintenance of the individual units.
c) Residents shall keep all trash receptacles within the unit's designated
trash storage area.
d) Garages shall be maintained and used for vehicle parking.
e) No boats, RV's or other type of recreation vehicle may occupy a guest or
resident parking space, including within an individual garage.
f) A provision for review and approval by the City Community Development
Department for any changes to the CC&R's that relate to the above
requirements prior to the changes being recorded or taking effect.
The applicant may choose not to record CC&R's as shared facilities are
minimal. In this case, the applicant will be required to record a combination of
deed restrictions alerting future owners to project conditions and maintenance
agreements for the shared maintenance of the drainage and shared parking
facilities.
19. Approval of this permit shall include the removal of 8 Native Trees. The applicant
BP
PS, BS
shall be required to pay mitigation fees or provide replantings on-site per the
requirements of the Atascadero Native Tree Ordinance. Any additional removals
shall be subject to Planning Commission approval.
■ A mitigation deposit shall be collected for all native trees impacted 40% or
greater. The deposit shall be released no sooner than 18 months following
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 10 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
FD: Fire Department
GP: Grading
PD: Police Department
Permit
CE: City Engineer
PLN2006-1117
BP:
erBNiding
WW: ��omey
FI: Final
Inspection
Planned Development Overlay #29
TO:Tenwrary
Occwarq
F0: Final
Occwancy
final of the unit(s) impacting the trees.
20. The applicant must provide for the repair and maintenance of on-site shared
FM
CE
improvements. This includes guest parking areas that cross property lines, shared
driveways, and common drainage facilities. The two methods that may be used
are:
a. Homeowners Association. This private organization would be responsible for
the maintenance, repair and replacement of the facilities.
b. Other form of non -revocable maintenance agreement approved by the City
Engineer and the Community Development Director.
The City Engineer and City Attorney shall approve the final form prior to
recordation.
21. Rosario shall include a red curb to ensure that no parking is allowed along the
GP, BP
CE
Rosario Ave. frontage.
22. The applicant shall work with the Post Office during the building permit process to
GP, BP
PS
locate mail boxes. A 5 -foot path of travel shall be maintained along all project
frontages.
23. A repair permit for the carriage House shall be approved and finaled prior to final
GP, BP
PS
of the last residential unit.
24. The tract improvement landscape plan shall include upgrades to landscaping
GP, BP
PS
along the Ridgeway Court frontage in front of the existing Colony House.
City Engineer Project Conditions
25. Project shall include construction of curb, gutter and sidewalk along entire
GP, BP
CE
frontage of Palma Avenue, Rosario Avenue and Ridgeway Court, as modified on
the Tentative Parcel Map.
26. In accordance with municipal code section 9-4.160, the applicant shall overlay
GP, BP
CE
Rosario Avenue across the frontage of the property to a width of the street plus
10'.
27. In accordance with municipal code section 9-4.160, the applicant shall overlay
GP, BP
CE
Palma Avenue across the frontage of the property to a width of 1/2 the street plus
10'.
28. A qualified stone mason shall be used as a consultant for the demolition and
GP, BP
PS
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 11 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
FD: Fire Department
GP: Grading
PD: Police Department
Permit
CE: City Engineer
PLN 2006411 `7
Permit Building
WW: CM Attorney
FI: Final
Inspection
Planned Development Overlay #29
TO: Temporary
Occupancy
F0: Final
Occupancy
reassembly of the historic wall.
City Engineer Standard Conditions
29. In the event that the applicant bonds for the public improvements required as a
GP, BP
CE
condition of this map, the applicant shall enter into a Subdivision Improvement
Agreement with the City Council.
30. An engineer's estimate of probable cost shall be submitted for review and
GP, BP
CE
approval by the City Engineer to determine the amount of the bond.
31. The Subdivision Improvement Agreement shall record concurrently with the Final
FM
CE
Map.
32. A six (6) foot Public Utility Easement (PUE) shall be provided contiguous to the
GP, BP
CE
property frontage.
33. The applicant shall acquire title interest in any off-site land that may be required to
GP, BP
CE
allow for the construction of the improvements. The applicant shall bear all costs
associated with the necessary acquisitions. The applicant shall also gain
concurrence from all adjacent property owners whose ingress and egress is
affected by these improvements.
34. Slope easements shall be obtained by the applicant as needed to accommodate
GP, BP
CE
cut or fill slopes.
35. Drainage easements shall be obtained by the applicant as needed to
GP, BP
CE
accommodate both public and private drainage facilities.
36. A preliminary subdivision guarantee shall be submitted for review in conjunction
FM
CE
with the processing of the tract map.
37. The final map shall be signed by the City Engineer prior to the map being placed
FM
CE
on the agenda for City Council acceptance.
38. Prior to recording the tract map, the applicant shall pay all outstanding plan
FM
CE
check/inspection fees.
39. Prior to recording the map, the applicant shall bond for or complete all
FM
CE
improvements required by these conditions of approval.
40. Prior to recording the tract map, the applicant shall bond for or set monuments at
FM
CE
all new property corners. A registered civil engineer or licensed land surveyor
shall indicate by certificate on the parcel map, that corners have been set or shall
be set by a datespecific and that they will be sufficient to enable the survey to be
7
U
E
r-7
City of Atascadero
Resolution No. 2007-085
Page 12 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
GP: Grading
FD: Fre Department
PD: Police Department
Permit
CE: City Engineer
PLN 2006-7777
Pe rBuilding
� Wastewater
FI: Final
Inspection
Planned Development Overlay #29
TO:
para"
ncy
F0: Final
Occupancy
retraced.
41. Prior to recording the tract map, the applicant shall submit a map drawn in
FM
CE
substantial conformance with the approved tentative map and in compliance with
all conditions set forth herein. The map shall be submitted for review and approval
by the City in accordance with the Subdivision Map Act and the City's Subdivision
Ordinance.
42. All existing and proposed utility, pipeline, open space, or other easements are to
FM
CE
be shown on the final/parcel map. If there are building or other restrictions related
to the easements, they shall be noted on the final/parcel map. The applicant shall
show all access restrictions on the final/parcel map.
43. Prior to recording the tract map, the applicant shall have the map reviewed by all
FM
CE
applicable public and private utility companies (cable, telephone, gas, electric,
Atascadero Mutual Water Company). The applicant shall obtain a letter from
each utility company indicating their review of the map. The letter shall identify
any new easements that may be required by the utility company. A copy of the
letter shall be submitted to the City. New easements shall be shown on the parcel
map.
44. Prior to the issuance of building permits the applicant shall submit plans and
GP, BP
CE
supporting calculations/reports including street improvements, underground
utilities, composite utilities, and grading/drainage plans prepared by a registered
civil engineer for review and approval by the City Engineer.
45. Submit calculations to support the design of any structures or pipes. Closed
GP, BP
CE
conduits shall be designed to convey the 10 -year flow with gravity flow, the 25 -
year flow with head, and provide safe conveyance for the 100 -year overflow.
46. Provide for the detention and metering out of developed storm runoff so that it is
GP, BP
CE
equal to or less than undeveloped storm runoff.
47. Drainage basins shall be designed to desilt, detain and meter storm flows as well
GP, BP
CE
as release them to natural runoff locations.
48. Show the method of dispersal at all pipe outlets. Include specifications for size &
GP, BP
CE
type.
49. Show method of conduct to approved off-site drainage facilities.
GP, BP
CE
50. Concentrated drainage from off-site areas shall be conveyed across the project
GP, BP
CE
site in drainage easements. Acquire drainage easements where needed.
Drainage shall cross lot lines only where a drainage easement has been provided.
If drainage easement cannot be obtained the storm water release must follow the
1
n
1
City of Atascadero
Resolution No. 2007-085
Page 13 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
license
FD: Fire Department
GP: Grading
PD: Police Department
Penn it
CE: City Engineer
PLN 2006-1777
BP: Building
CA ryesAttorrnney
FI: Final
Inspection
Planned Development Overlay X29
To: Tempora y
occupancy
F0: Final
Occupancy
exact historic path, rate and velocity as prior to the subdivision.
51. Applicant shall submit erosion control plans and a Storm Water Pollution
GP, BP
CE
Prevention Plan (SWPPP), as applicable. The Regional Water Quality Control
Board shall approve the SWPPP.
52. All public improvements shall be constructed in conformance with the City of
GP, BP
CE
Atascadero Engineering Department Standard Specifications and Drawings or as
directed by the City Engineer
53. Off-site streets shall be improved consistent with the Tentative Tract Map.
GP, BP
CE
54. Alignment of frontage improvements shall be approved by the City Engineer.
GP, BP
CE
55. All utilities shall be undergrounded on project frontage
GP, BP
CE
56. Applicant shall pay sewer extension (Annexation), Connection and
BP
CE
Reimbursement fees (if applicable) upon issuance of building permit.
57. Drainage piping serving fixtures which have flood level rims located below the
BP
CE
elevation of the next upstream manhole cover of the public or private sewer
serving such drainage piping shall be protected from backflow of sewage by
installing an approved type backwater valve. Fixtures above such elevation shall
not discharge through the backwater valve.
Mitigation Measures
Mitigation Measure 1.b.1: All houses constructed along the Palma Ave frontage on
BP
PS
1.b.1
slopes of 20% or greater shall be painted darker earth toned historic colors to blend
with the natural surrounding and existing Colony Home.
Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any off site
BP
PS
1.d.1
glare. All exterior site lights shall utilize full cut-off, "hooded" lighting fixtures to
prevent offsite light spillage and glare. Any luminaire pole height shall not exceed
14 -feet in height, limit intensity to 2.0 foot candles at ingress /egress, and otherwise
0.6 foot candle minimum to 1.0 maximum in parking areas. Fixtures shall be shield
cut-off type.
Mitigation Measure 3.b.1: The project shall be conditioned to comply with all
BP
BS, PS
3.b.1
applicable District regulations pertaining to the control of fugitive dust (PM -10) as
contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality Handbook.
■ Asbestos has been identified by the state Air Resources Board as a toxic air
contaminant. Serpentine and ultramafic rocks are very common in the state
and may contain naturally occurring asbestos. Under the State Air
1
1
City of Atascadero
Resolution No. 2007-085
Page 14 of 30
Conditions of Approval /
Mitigation Monitoring Program
5825 Ridgeway Ct
Planned Development Overlay,#29
Timing
BL: Business
LiceA
GP: Grading
Permit
BP: Building
rni
FI: Final
Inspectbn
T0:occupancy Tenpery
pancy
F0: Final
Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Depart hent
CE: City Engineer
Wastewater
CA City nne
Mitigation
Measure
Resources Board Air Toxics Control Measure (ATCM) for Construction,
Grading, Quarrying, and Surface Mining Operations, prior to any grading
activities at the site, the project proponent shall ensure that a geologic
evaluation is conducted to determine if naturally occurring asbestos is present
within the area that will be disturbed. If Naturally Occurring Asbestos (NOA)
is found at the site the applicant must comply with all requirements outlined in
the Asbestos ATCM for Construction, Grading, Quarrying, and Surface
Mining Operations. If NOA is not present, an exemption request must be filed
with the District. If NOA is found at the site the applicant must comply with all
requirements outlined in the Asbestos ATCM. This may include development
of an Asbestos Dust Mitigation Plan and an Asbestos Health and Safety
Program for approval by the APCD. Should Naturally Occurring Asbestos be
identified within the area of construction, and the worked area will be less
than or equal to one acre, then the dust control measures identified below are
required. If the disturbed area is greater than one acre, additional
requirements may include but are not limited to 1) an Asbestos Dust
Mitigation Plan which must be approved by the District before construction
begins, and 2) an Asbestos Health and Safety Program will also be required
for some projects.
• Dust Control Measures for Construction and Grading Operation Projects One
Acre or Less: No person shall engage in any construction or grading
operation on property where the area to be disturbed is one (1.0) acre or less
unless all of the following dust mitigation measures are initiated at the start
and maintained throughout the duration of the construction or grading activity:
(A) Construction vehicle speed at the work site must be limited to
fifteen(15) miles per hour or less;
(B) Prior to any ground disturbance, sufficient water must be applied to the
area to be disturbed to prevent visible emissions from crossing the
property line;
(C) Areas to be graded or excavated must be kept adequately wetted to
prevent visible emissions from crossing the property line;
(D) Storage piles must be kept adequately wetted, treated with a chemical
dust suppressant, or covered when material is not being added to or
removed from the pile;
(E) Equipment must be washed down before moving from the property onto
a paved public road;
(F) Visible track -out on the paved public road must be cleaned using wet
sweeping or a HEPA filter equipped vacuum device within twenty-four
24 hours
1
1
City of Atascadero
Resolution No. 2007-085
Page 15 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
/Monitoring
Measure
Mitigation Monitoring Program
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
FD: Fre Departrnent
GP: Grading
PD: Police Department
Permit
CE: City Engineer
PLN 2006-7777
BP:
erree ding
cn City Ano ey
FI: Final
Inspection
Planned Development Overlay #29
T0: Tempo ary
Occupancy
F0: Final
Occupancy
Mitigation Measure 3.b.2: Naturally Occurring Asbestos (NOA) has been identified
BP
Ps
3.b.2
by the state Air Resources Board as a toxic air contaminant. Serpentine and
ultramafic rocks are very common in the state and may contain naturally occurring
asbestos. Under the State Air Resources Board Air Toxics Control Measure (ATCM)
for Construction, Grading, Quarrying, and Surface Mining Operations, prior to any
grading activities at the site, the project proponent shall ensure that a geologic
evaluation is conducted to determine if naturally occurring asbestos is present within
the area that will be disturbed. If naturally occurring asbestos is found at the site the
applicant must comply with all requirements outlined in the Asbestos ATCM for
Construction, Grading, Quarrying, and Surface Mining Operations. These
requirements may include but are not limited to 1) an Asbestos Dust Mitigation Plan
which must be approved by the District before construction begins, and 2) an
Asbestos Health and Safety Program will also be required for some projects.
Mitigation Measure 4.e.1: The Grading Plan shall identify tree protection fencing
BP
Ps
4.e.1
around the dripline, or as recommended by the project arborist, of each existing on-
site or off-site native tree.
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 16 of 30
Conditions of Approval /
Mitigation Monitoring Program
5825 Ridgeway Ct
PLN 2006-7777
Planned Development Overlay #29
Timing
BL: Business
License
GP: Grading
P@rmA
Pei icing
FI: Final
Inspection
T0: Temporary
Ooculiarq
F0: Final
Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
: Fire Depaent
FDrtm
PD: Police Department
CE: City Engineer
Ck Wastewater
o
Mitigation
Measure
Mitigation Measure 4.e.2: The developer shall contract with a certified arborist
GP
Ps
4.e.2
during all phases of project implementation. The certified arborists shall be
responsible for monitoring the project during all phases of construction through
project completion, as follows:
(a) A written agreement between the arborist and the developer outlining a arborist
monitoring schedule for each construction phase through final inspection shall
be submitted to and approved by planning staff prior to the issuance of
building/grading permits.
(b) Arborist shall schedule a pre -construction meeting with engineering /planning
staff, grading equipment operators, project superintendent to review the project
conditions and requirements prior to any grubbing or earth work for any portion
of the project site. All tree protection fencing and trunk protection shall be
installed for inspection during the meeting. Tree protection fencing shall be
installed at the line of encroachment into the tree's root zone area.
(c) As specified by the arborist report and City staff:
■ Prune all trees in active development areas to be saved for structural
strength and crown cleaning by a licensed and certified arborist;
■ Remove all debris and spoils from the lot cleaning and tree pruning.
• In locations where paving is to occur within the tree canopy, grub only and
do not grade nor compact. Install porous pavers over a three-inch bed of 3/4
inch granite covered with one -inch pea gravel for screeding. If curbs are
required, use pegged curbs to secure the porous pavers. Pegged curbs are
reinforced six to eight curbs poured at grade with a one -foot by one -foot
pothole every four to six linear feet.
■ All trenching or grading within the protected root zone area, outside of the
tree protection fence shall require hand trenching or preserve and protect
roots that are larger than 2 inches in diameter.
■ No grading or trenching is allowed within the fenced protected area.
■ Any roots that are 4 inches in diameter or larger are not to be cut until
inspected and approved by the on-site arborist.
(d) Upon project completion and prior to final occupancy a final status report shall
be prepared by the project arborist certifying that the tree protection plan was
implemented, the trees designated for protection were protected during
construction, and the construction -related tree protection measures are no
longer required for tree protection.
1
1
City of Atascadero
Resolution No. 2007-085
Page 17 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
FD: Fire Department
GP: Grading
PD: Police Department
PerrM
CE: City Engineer
PLN 2006-I f I7
BP:
errBuilding
WW: Wastewater
FI: Final
Inspection
Planned Development Overlay #29
T0: occ�upancyanq ary
F0: Final
Occupancy
Mitigation Measure 4.e.3: Grading and excavation and grading work shall be
GP, BP
PS
4.e.3
consistent with the City of Atascadero Tree Ordinance. Special precautions when
working around native trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be pruned prior to
any heavy equipment work being done.
4. Vehicles and stockpiled material shall be stored outside the dripline of all
trees.
5. All trees within the area of work shall be fenced for protection with 4 -foot
chain link, snow or safety fencing placed per the approved tree protection
plan. Tree protection fencing shall be in place prior to any site excavation
or grading. Fencing shall remain in place until completion of all
construction activities.
6. Any roots that are encountered during excavation shall be clean cut by
hand and sealed with an approved tree seal.
Mitigation Measure 4.e.4: Erosion control hydroseed/slope stabilization shall
BP
CE, PS
4.e.4
consist of native species matching the existing plant species within the tributary
stream. The seed and plant material shall not contain any introduced plant species.
Mitigation Measure 5.a.1: A "HS" (Historic Site) zoning designation shall be placed
ZCH
PS
5.a.1
over Lot 1.
Mitigation Measure 5.a.2: The existing retaining wall shall be disassembled and
BP
PS
5.a.2
reconstructed as an entry feature on the corner of Rosario and Palma Avenues. Any
remaining rock shall be used as accent features of the remaining lots and shall be
focused on enhancing and preserving the additional stone walls on Lot 1, the Colony
Home lot. All other retaining walls shall be constructed of high quality material and
shall compliment the architectural style of the project. None of the walls shall be
used as project signage.
Mitigation Measure 5.a.3: CC&R's recorded for the development shall include a
FMP
PS
5.a.3
statement addressing the historic nature of Lot 1.
Mitigation Measure 5.a.4: Any exterior building modifications or site plan changes
Ongoing
PS
5.a.4
not represented in the proposed project that could occur during the Building Permit
application process or during construction shall be consistent with the Secretary of
the Interior's Standards for Rehabilitation & Illustrated Guidelines for Rehabilitating
Historic Buildings and shall meet the provisions of CEQA -Section 15064.5, as
approved by Planning Staff.
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 18 of 30
Conditions of Approval /
Timing
Responsibility
Mitigation
/Monitoring
Measure
Mitigation Monitoring Program
PS: Planning Services
BL: Business
BS: Building Services
5825 Ridgeway Ct
License
FD: Fire Department
GP: Grading
PD: Police Department
Permit
CE: Cily Engineer
PLN 2006-1117
BP: Building
WW:oratio ey
FI: Final
Inspection
Planned Development Overlay #29
��a"
F0: Final
Occupancy
Mitigation Measure 5.a.5: The existing carriage house/drive through out -building
BP
Ps
5.a.5
shall be restored and maintained in a structurally and aesthetically sound condition.
All modifications or repairs necessary for such shall be consistent with the Secretary
of the Interior's Standards for Rehabilitation & Illustrated Guidelines for
Rehabilitating Historic Buildings and shall meet the provisions of CEQA -Section
15064.5, as approved by Planning Staff.
Mitigation Measure 5.a.6: All recommendations of the Historic Analysis shall be
BP
Ps
5.a.6
implemented and adhered to throughout construction and the life of the historic
Colony Home.
Mitigation Measure 6.b: The grading permit application plans shall include erosion
GP, BP
CE
6.b
control measures to prevent soil, dirt, and debris from entering the storm drain
system during and after construction. A separate plan shall be submitted for this
purpose and shall be subject to review and approval of the City Engineer at the time
of Building Permit application. (See section 8 of the document).
Mitigation Measure 6.c.d: A soils report shall be required to be submitted with a
GP, BP
CE
6.c.d.
future building permit by the building department. The building plans will be required
to follow the recommendations of the soils report to assure safety for residents and
buildings.
Mitigation Measure 8e.f.1: A Stormwater Pollution Prevention Plan
GP, BP
CE
8.0.1
(SWPPP)/Erosion Control Plan shall be submitted and approved by the City
Engineer prior to the issuance of the building permit. The plan shall include storm
water measures for the operation and maintenance of the project for the review and
approval of the City Engineer. The Building Permit application plans shall identify
Best Management Practices (BMPs) appropriate to the uses conducted on site that
effectively prohibit the entry of pollutants into storm water runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for ensuring that all
BP, GP
CE
8.0.2
contractors are aware of all storm water quality measures and that such measures
are implemented. Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction notices, citations, or
stop work orders.
Mitigation Measure 11.d: All construction activities shall comply with the City of
GP, BP
PS
11.d
Atascadero Noise Ordinance for hours of operation.
Mitigation Measure 15.a.b.1: Full frontage improvements shall be required along
PI
CE
15.a.b.1
Palma Avenue, Rosario Avenue, and Ridgeway Court, per the standards and
approval of the City Engineer.
L_
I
II
City of Atascadero
Resolution No. 2007-085
Page 19 of 30
EXHIBITB: Master Plan of Development / Site Plan
h
fiv tit
al 1A Of
IN URI W
U
0
CL
0—
cz
gig
r
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 20 of 30
EXHIBIT C: Floor Plan and Elevations - Lot 2
PinnpiAwy
RIDGEWAY COURT
LOT 2, ROSARIO AVE.
R
7
sm"
A0.1
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 21 of 30
EXHIBIT D: Floor Plan and Elevations - Lot 3
RIDGEWAY COURT
' OT 3, ROSARIO AVE.
RIDGEWAY COURT
LOT 3, ROSARIO AVE.
0
A0.0
1
1
City of Atascadero
Resolution No. 2007-085
Page 22 of 30
EXHIBIT E: Floor Plan and Elevations - Lot 4
WT"-,
RIDGEWAY COURT
I OT 4 ROSARIO AVF.
E
LEVEL UN S"crVAnR. RIDGEWAY COURT
LOT 4, ROSARIO AVE.
SHEET
A0.0
LOT a
SHEET
A0.1
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 23 of 30
EXHIBIT F: Floor Plan and Elevations - Lot 5
1
My"
""'
RIDGEWAY "'"'
LOT 5, PALI
RIDGEWAY COURT
LOT 5, PALMA AVE.
A0.0
SHEET
A0.1
1
1
City of Atascadero
Resolution No. 2007-085
Page 24 of 30
EXHIBIT G: Floor Plan and Elevations - Lot 6
RinGFWAY COURT
P,
RIDGEWAY COURT
LOT 6, PALMA AVE.
A0.1
B
E0-T
ar:va
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 25 of 30
EXHIBIT H: Floor Plan and Elevations - Lot 7
r„ ym v�ry
Pinr.PWAV (:C11 IRT
)A
RIDGEWAY COURT
LOT 7, PALMA AVE.
SHEET
A0.0
amm
A0.1
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 26 of 30
EXHIBIT I: Floor Plan and Elevations - Lot 8
W. JR LEAL Nxc xrw[ 4x s. i _
/AY COURT
PALMA AVE.
RIDGEWAY COURT
LOT 8, PALMA AVE.
SHEET
A0.1
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 27 of 30
EXHIBIT J: Preliminary Landscape Plan
\ r� 'otlauvoovar
-11 O 1-111 rNlYd d0 tliNtl00 31 t �
�°0 ....+ +WONVW AVM3ff61tl ur �'
g
;. NIVId .IdVOQ�NVI 'WY7�r]d
3 R3�"«Y�.Xryk-
rt
�* la6
ROS p,Ri0 PtiE
la
ix`ANS�t�''.�
3 R3�"«Y�.Xryk-
rt
�* la6
ROS p,Ri0 PtiE
la
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 28 of 30
EXHIBIT K: Tree Protection Plan
„�.. iA Ziiiii
v
N I XP��
Pi
O 411
I, lift
f
m
m
D
D�
D0�
Om>
anO
m
800
�Zn
D
D
Z
U9
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 29 of 30
EXHIBIT L: Grading, Drainage and Frontage Improvement Plan (1 of 2)
i
�Dy a
C)
NDO��
O
M
�
.
A Z n F
�D�f
B 9 g
Z
I --j
1
1
1
City of Atascadero
Resolution No. 2007-085
Page 30 of 30
EXHIBIT L: Grading, Drainage and Frontage Improvement Plan (2 of 2)
M
f
y
>> 56
n -<Di
[N
..13
°°oo�`�
CA
O
.2
8
0
'
Z
M
M
r
y
>> 56
n -<Di
[N
..13
°°oo�`�
CA
O
.2
8
0
'
M
M
r
y
>> 56
n -<Di
°°oo�`�
CA
O
.2
Z