Loading...
HomeMy WebLinkAboutAUP_2025-04-21_AgendaPacketAdministrative Use Permit HOW TO OBSERVE THE MEETING: Interested individuals may attend the meeting in-person at Atascadero City Hall. To observe remotely, the meeting may be livestreamed on Zoom. The video recording of the meeting will be available upon request. To observe remotely using the Zoom platform, please visit: To join the virtual hearing: https://us02web.zoom.us/j/84567568854 Webinar ID: 84 5 6756 8854 HOW TO SUBMIT PUBLIC COMMENT: Public comment may be provided in-person. Written public comments are accepted at aup-comments@atascadero.org by 5:00 pm the day before the meeting. Such email comments must identify the Agenda Item Number in the subject line of the email. The comments will be forwarded to the Administrative Hearing Officer and made a part of the administrative record. If a comment is received after the deadline for submission but before the close of the meeting, the comment will still be included as a part of the administrative record of the meeting but will be forwarded t o the Zoning Administrator the next business day. Please note, email comments will not be read into the record. AMERICAN DISABILITY ACT ACCOMMODATIONS: Any member of the public who needs accommodations should contact the City Clerk’s Office at cityclerk@atascadero.org or by calling (805) 470-3400 at least 48 hours prior to the meeting or time when services are needed. The City will use their best efforts to provide reasonable accommodations to afford as much accessibility as possible while also maintaining public safety in accordance with the City procedure for resolving reasonable accommodation requests. Administrative Use Permit agendas and staff reports may be viewed on the City's website: www.atascadero.org. Final Action Reports will be available after the meeting, and upon request from the Community Development Department. Copies of the staff reports or other documentation relating to each item of business referred to on the Agenda are on file in the Community Development Department and are available for public inspection on our website, www.atascadero.org. All documents submitted by the public during AUP meetings that are either read into the record or referred to in their statement will be noted in the audio recording and available for review by contacting the Community Development Department. All documents will be available for public inspection during City Hall business hours by appointment request. Administrative Use Permit Hearing A G E N D A The City of Atascadero’s Administrative Hearing Officer will hold a public hearing in person at 2:00 P.M. on Monday, April 21, 2025 at City Hall in Room 104 to consider the following project: 1. 2455 MONTEREY ROAD (USE25-0023) The application is to allow for two (2) oversized accessory structures (one existing, one proposed) on a 2.5-acre site zoned RS on APN 049-201-045, subject to conditions. The proposed project qualifies for a Class 3 categorical exemption from the provisions of the California Environmental Quality Act (California Public Resources Code §§ 21000, et seq., “CEQA”) and CEQA Guidelines (Title 14 California Code of Regulations §§ 15000, et seq.) pursuant to CEQA Guidelines Section 15303, Class 3 for new construction or conversion of small structures. Staff recommendation is to approve the project, subject to conditions. (Erick Gomez, Associate Planner) PLEASE NOTE: Any court challenge to the actions taken at the public hearing may be limited to considering only those issues raised at the public hearing described in this notice or in written correspondence to the City of Atascadero at, or prior to, the public hearing. Any decision of the Hearing Officer is final unless appealed to the Planning Commission within 14 days of the action. Any person aggrieved by the decision may file an appeal. Appeal forms are available in the Community Development Department or on the City’s website (www.atascadero.org). The fee for filing an appeal is $1,668 (fee as of 7-29-24) and must accompany the appeal documentation. CITY OF ATASCADERO ADMINISTRATIVE HEARING STAFF REPORT TO: Phil Dunsmore, Administrative Hearing Officer FROM: Kelly Gleason, Planning Manager PREPARED BY: Erick Gomez, Associate Planner & Amelia Aarestad, Planning Intern SUBJECT: Holzer Workshop RECOMMENDATION: The Administrative Hearing Officer approve Administrative Use Permit USE25-0023, allowing two (2) accessory structures that each individually exceed 100% of the floor area of the primary residential structure on a 2.5-acre lot, based on findings and subject to conditions of approval. DISCUSSION: PROJECT SUMMARY Jason Holzer proposes to construct a new 1,950 SF accessory structure with an attached 240 SF lean-to (open sided structure) and retroactively permit an existing / as-built 2,000 SF detached storage structure. The new 1,950 SF structure is a prefabricated metal building with a height of 15’-9”. The as-built storage structure is approximately 14’ in height and composed of a shed and a cargo container connected by a shed roof. Access to the structures will be via an existing driveway from Campo Road. The primary structure on the property is a 1,017 SF Single-Family Residence with an attached garage. The subject property is a 2.5-acre property in the Residential Suburban (RS) zoning district located at 2455 Monterey Road (APN 049-201-045). ANALYSIS Residential accessory structures, such as workshops and residential storage buildings, are allowed in the RS Zoning District. These structures are limited in size to 100% of the gross floor area of the principal structure, or up to 2,000 square feet, whichever is less (AMC § 9-6.106(b)(2)). Any accessory structures exceeding 50% of the floor area of the primary structure are subject to additional development standards outlined in AMC § 9-6.106(b)(3), including: • Location on a conforming lot or on a lot that is at least 1-ac in size • 10’ setback from the side and rear lot lines • 40’ setback from residences on neighboring properties • Minimal grading and disturbance of native trees • Neighborhood compatibility and design compatibility with the primary structure • Non-interference with sunlight or access necessary for adjacent properties ITEM #1 Department: Community Development Date: 04/21/2025 1 04/21/2025 | Item 1 | Staff Report Page 2 of 10 Projects unable to meet one or more of these standards may still be constructed subject to approval of an Administrative Use Permit (AUP). The proposed workshop is a 1,950 SF accessory structure with an attached 240 SF, open-sided shade structure. The existing, as-built storage structure is 2,000 SF. These accessory structures are 215% and 196% the size of the primary structure, respectively. Thus, an AUP is required to permit both structures. Both structures comply with all applicable standards of Atascadero Municipal Code (AMC) § 9- 6.106(b)(3), as listed above. Both the proposed workshop and the as-built storage structure will be located on a topographically flat location of the site to reduce grading. The proposed workshop will be located 118’ from the front property line, 68’ from the corner-front property line, 55’ from the rear property line, 287’ from the side property line, and 91’ from the nearest residence on a neighboring lot. The as-built storage building is located 68’ from the front property line, 150’ front the corner-front property line, 152’ from the rear property line, 174’ from the side property line, and over 150’ from the nearest residence on a neighboring lot. The proposed workshop will have brown metal siding with white trim . The as-built storage structure is composed of a shared roof over a small storage shed and a cargo container, with deep overhangs along the length of the cargo container. The structures are in theme with the agricultural style of the surrounding neighborhood. No tree removals are proposed; compliance with tree protection standards of the Native Tree Ordinance will be required during construction. An existing driveway allows access to the interior of the lot where the workshop is proposed. The cargo container associated with the as-built storage building has been architecturally modified with the addition of the shed roof and is considered a standard accessory structure rather than a stand-alone cargo container. However, it should be noted that cargo containers are allowed on residential properties over one acre in size provided they comply with the applicable setbacks, and are anchored on a foundation system. Design Review may be required on a case- by-case basis for cargo containers based on site characteristics and visibility. The project site is 2.5-acres and the as-built structure meets all required setbacks. Foundation details will be provided as part of the building permit submittal. Staff has determined that Design Review is unnecessary for this structure because it is not considered a stand-alone cargo container. The addition of the roof element provides an aesthetic and discrete use of the container as part of the overall as-built building. The property contains an existing fence that limits the site distance from Campo Road onto Monterey Road. A condition is included requiring that site fencing be brought into compliance with City Engineering standards for Site Distance. FINDINGS: AMC 9-1.112 requires the Administrative Hearing Officer to make the following 4 findings: 1. Modification of the applicable standard will not result in a project that is inconsistent with the General Plan. Discussion: The development of residential accessory uses is consistent with envisioned land uses for properties designated Suburban Estate (Residential Suburban zoning). 2 04/21/2025 | Item 1 | Staff Report Page 3 of 10 2. Modification of the applicable standards will not result in a project that is inconsistent with the character of the neighborhood or contrary to its orderly development. Discussion: The project is appropriately designed and sited given the context of the site and neighborhood. The structures are compatible with neighboring development. Adja- cent lots are developed with single-family residences and accessory structures. The near- est neighboring residence is located approximately 83’ away from the location of the proposed new workshop. The as-built structure is over 150’ from the nearest neighbor- ing residence. 3. Modification of the applicable standard will not result in a project that is not in compli- ance with any pertinent City policy or criteria adopted by ordinance or resolution of the City Council. Discussion: The project, as conditioned, will not conflict with any applicable City policy or criteria and is consistent with all applicable provisions of the Atascadero Municipal Code. 4. Modification of the applicable standard will not result in the authorization of a use not otherwise allowed. Discussion: Residential accessory structures, such as workshops and sheds, are allowed in the RS Zoning District. ENVIRONMENTAL DETERMINATION: The proposed project qualifies for a Class 3 categorical exemption from the provisions of the California Environmental Quality Act (California Public Resources Code §§ 21000, et seq., “CEQA”) and CEQA Guidelines (Title 14 California Code of Regulations §§ 15000, et seq.) pursuant to CEQA Guidelines Section 15303, which exempts new construction or conversion of small structures. The Notice of Exemption is included as Attachment 2. CONCLUSION: • The request to allow a 1,950 SF detached workshop with a 240 SF lean-to (open-sided shade structure) and an as-built permitting of a detached, 2,000 SF storage structure meets all applicable requirements of the City Municipal Code. • All applicable findings for approval can be made. The structures are compatible with other on-site structures and neighboring development. CONDITIONS: 1. Approval of Administrative Use Permit USE25-0023, as depicted and described on the attachments, allows the construction of a 1950 SF workshop and 240 SF attached lean- to and as-built large roof structure (open-sided) and retention of an as-built storage structure totaling approximately 2,000 SF at 2455 Monterey Rd, Atascadero, CA 93422 (APN 049-201-045). The approval of these entitlements run with the land, regardless of the owner. 3 04/21/2025 | Item 1 | Staff Report Page 4 of 10 2. The approval of these entitlements shall become final and effective for the purposes of issuing building permits fourteen (14) days after the Administrative Officer action unless an appeal is made in accordance with the Atascadero Municipal Code. 3. Approval of these entitlements shall be valid for twenty-four (24) months after its effective date. At the end of the period, the approval shall expire and become null and void unless the project has received a time extension consistent with the Atascader o Municipal Code. 4. The Community Development Department shall have the authority to approve the following minor changes to the project that result in a superior site design or appearance. 5. The Applicant shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning this administrative use perm it. 6. Property fencing shall be brought into compliance with applicable requirements of the Atascadero Municipal Code and City Engineering Standards. A site distance analysis shall be submitted at the time of building permit applications. Any fencing and/or landscape features found to obstruct the line of sight shall be removed or reduced in height as required by City Engineering standards, to the satisfaction of the City Engineer. 7. A building permit application shall be submitted to bring the as-built structure into compliance with any applicable standards of the Atascadero Municipal Code and/or building codes. All outdoor storage shall be limited to that allowed by the Atascadero Municipal Code for residential uses. ACTION: ☐ APPROVE ☐ APPROVE AS MODIFIED ☐ DENY ☐ CONTINUE TO ALLOW _________________________________________________________ SIGNED: Phil Dunsmore, Administrative Hearing Officer Date ATTACHMENTS: 1. Site and Zoning Map 2. Notice of Exemption 3. Project Plans 4. Photographs of As-Built Storage Structure 4 04/21/2025 | Item 1 | Staff Report Attachment 1: Site and Zoning Maps Page 5 of 10 5 04/21/2025 | Item 1 | Staff Report Attachment 2: Notice of Exemption Page 6 of 10 CITY OF ATASCADERO NOTICE OF EXEMPTION 6500 Palma Avenue Atascadero, CA 93422 805.461.5000 Date Received Stamp TO: Clerk-Recorder Office County of San Luis Obispo 1055 Monterey Street Suite D120 San Luis Obispo, CA 93408 Office of Planning and Research P.O. Box 3044, Room 113 Sacramento, CA 95812-3044 FROM: City of Atascadero Community Development Department 6500 Palma Avenue Atascadero, CA 93422 SUBJECT: Filing of Notice of Exemption in Compliance with Sections 15062 and 21152 of the Public Resources Code Project Title: USE25-0023, Holzer Workshop Project Applicant: Jason Holzer, 2455 Monterey Rd, Atascadero, CA 93422 planning@atascadero.org; (805) 461-5035 Project Location: 2455 Monterey Rd, Atascadero, CA 93422 (APN 049-201-045) Project Description: Administrative Use Permit allowing the construction of a 1,950 SF accessory structure with a 240 SF lean to structure (open sided) on a 2.5-acre (ac) property in the Residential Suburban (RS) zoning district located at 2455 Monterey Road (APN 049-201-045). The structure is a prefabricated metal building with a maximum height of 15’-9”. Access to the structure will be from within the site, utilizing an existing access point along Campo Road. The property is developed with an approximately 1,017 SF Single-Family Residence and an existing, as-built 2,000 SF storage structure that will be retroactively permitted. Name of Public Agency Approving Project: City of Atascadero Name of Person or Agency Carrying Out Project: Jason Holzer Exempt Status: Ministerial (Sec. 15268); General Rule Exemption (Sec. 15061. c); Declared Emergency (Sec. 15269(a)); X Categorically Exempt (Sec. 15301 - 15333); Emergency Project (Sec. 15269(b)(c)); Statutory Exemption (Sec. 15261 - 15285) 6 04/21/2025 | Item 1 | Staff Report Attachment 2: Notice of Exemption Page 7 of 10 Reasons why the project is exempt: The project is exempt from environmental review pursuant to CEQA Guidelines Section 15303 (New Construction or Conversion of Small Structures). The proposed project will install a new 1,950 SF accessory structure with a 240 SF attached lean-to (open sided) in the rear yard of a developed property and allow permitting of existing storage structure. The area of disturbance on the property is limited. The are no sensitive environmental resources on the project or unusual environmental circumstances surrounding the project site. There are no scenic or historical resources in the vicinity of the project site. The site is not a listed hazardous waste site property. There are no cumulative impacts from associated successive projects. Lead Agency Contact Person: Erick Gomez, Planner (805) 470-3436 egomez@atascadero.org Date Exemption Accepted: 04/21/2025 _________________________ 04/21/2025 7 04/21/2025 | Item 1 | Staff Report Attachment 3: Project Plans Page 8 of 10 SEE FOLLOWING SHEETS 8 GENERAL CONSTRUCTION NOTES 1.ALL WORK SHALL CONFORM WITH THE: 2022 CBC (2021 IBC AND CALIFORNIA AMENDMENTS) 2022 CEC (2020 NEC AND CALIFORNIA AMENDMENTS) 2022 CMC (2021 IAPMO UMC AND CALIFORNIA AMENDMENTS) 2022 CPC (2021 IAPMO UPC AND CALIFORNIA AMENDMENTS) 2022 CENC AND T-24. 2022 CALIFORNIA GREEN BUILDING CODE 2022 CFC (2021 IFC AND CALIFORNIA AMENDMENTS) 2022 ATASCADERO MUNICIPAL CODE THESE NOTES SHALL APPLY TO ALL DRAWINGS UNLESS OTHERWISE NOTED OR SHOWN. FEATURES OF CONSTRUCTION SHOWN ARE TYPICAL AND THEY SHALL APPLY GENERALLY THROUGHOUT SIMILAR CONDITIONS. ALL OMISSIONS OR CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE WORKING DRAWINGS AND/OR GENERAL NOTES SHALL BE BROUGHT TO THE ATTENTION OF THE ARHCITECT/ ENGINEER BY THE GENERAL CONTRACTOR BEFORE PROCEEDING WITH ANY WORK SO INVOLVED. 2. ALL WORK AND CONSTRUCTION METHODS AND MATERIALS SHALL COMPLY WITH ALL PROVISIONS OF THE BUILDING CODES AND OTHER RULES, REGULATIONS AND ORDINANCES GOVERNING THE CONSTRUCTION SITE. BUILDING CODE REQUIREMENTS IN ALL CASES TAKE PRECEDENCE OVER THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF ANYONE SUPPLYING LABOR AND/OR MATERIALS TO BRING TO THE ATTENTION OF THE ARCHITECT/ENGINEER ANY DISCREPANCIES OR CONFLICTS BETWEEN THE REQUIREMENTS OF THE CODE AND THE DRAWINGS. 3. DO NOT SCALE THE DRAWINGS. DIMENSIONS SHOWN SHALL TAKE PRECEDENCE OVER DRAWING SCALE OR PROPORTION. LARGE SCALE DRAWINGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS. 4. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. UNLESS OTHERWISE SHOWN, THEY DO NOT INDICATE METHOD OF CONSTRUCTION. CONTRACTOR SHALL SUPERVISE AND DIRECT WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. OBSERVATION VISITS TO THE SITE BY FIELD REPRESENTATIVES OF THE ARCHITECT/ENGINEER SHALL NOT INCLUDE INSPECTIONS OF THE PROTECTIVE MEASURES OR THE CONSTRUCTION PROCEDURES REQUIRED FOR SAME, WHICH ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ANY SUPPORT SERVICES PERFORMED BY THE ARCHITECT/ENGINEER DURING CONSTRUCTION SHALL BE DISTINGUISHED FROM CONTINUOUS AND DETAILED INSPECTION SERVICES WHICH ARE FURNISHED BY OTHERS. THESE SUPPORT SERVICES PERFORMED SOLELY FOR THE PURPOSE OF ASSISTING IN QUALITY CONTROL AND IN ACHIEVING CONFORMANCE WITH CONTRACT DRAWINGS AND SPECIFICATIONS, AND THEREFORE THEY DO NOT GUARANTEE CONTRACTOR'S PERFORMANCE AND SHALL NOT BE CONSTRUED AS SUPERVISION OF CONSTRUCTION. 5. CONTRACTOR HEREBY GUARANTEES TO THE OWNER AND THE ARCHITECT/ENGINEER THAT ALL MATERIALS, FIXTURES, AND EQUIPMENT FURNISHED TO THE PROJECT ARE NEW UNLESS OTHERWISE SPECIFIED. CONTRACTOR ALSO WARRANTS THAT ALL WORK WILL BE OF GOOD QUALITY AND FREE FROM ANY FAULTS AND DEFECTS FOR A PERIOD OF ONE YEAR AFTER THE DATE OF SUBSTANTIAL COMPLETION, UNLESS A GREATER WARRANTY OR GUARANTEE IS REQUIRED BY THE PROJECT SPECIFICATIONS. 6. ANYONE SUPPLYING LABOR AND/OR MATERIALS TO THE PROJECT SHALL CAREFULLY EXAMINE ALL SUBSURFACES TO RECEIVE WORK. ANY CONDITIONS DETRIMENTAL TO WORK SHALL BE REPORTED IN WRITING TO THE CONTRACTOR PRIOR TO BEGINNING WORK. COMMENCEMENT OF WORK SHALL IMPLY ACCEPTANCE OF ALL SUBSURFACES. 7. REFER TO ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR DEPRESSED SLABS CURB, FINISHES, TEXTURES, CLIPS, GROUNDS, ETC., NOT SHOWN ON STRUCTURAL DRAWINGS. 8. ANY MATERIALS STORED AT THE SITE SHALL BE COMPLETELY SUPPORTED FREE OF THE GROUND, COVERED AND OTHERWISE PROTECTED TO AVOID DAMAGE FROM THE ELEMENTS. 9. MORE DETAILED INFORMATION SHALL TAKE PRECEDENCE OVER LESSER DETAILED INFORMATION. SPECIFICATIONS SHALL TAKE PRECEDENCE OVER DRAWINGS. 10. GRADING PLANS, DRAINAGE IMPROVEMENTS, ROAD AND ACCESS REQUIREMENTS AND ENVIRONMENTAL HEALTH CONSIDERATIONS SHALL COMPLY WITH ALL APPLICABLE CODES AND LOCAL ORDINANCES. 11. THE CONTRACTOR AND ALL SUB-CONTRACTORS WILL BE HELD ACCOUNTABLE TO THE ABOVE GENERAL NOTES FOR THE CONSTRUCTION OF THE PROJECT. 12. THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE OR DISBURSE ANY EXCESS MATERIAL FROM PROJECT SITE. 13. THIS SET OF PLANS TO BE ON JOB SITE AT ALL TIMES DURING CONSTRUCTION. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE APPROVED PLANS. NO CHANGES OR REVISIONS TO THE APPROVED PLANS OR SPECIFICATIONS SHALL BE PERMITTED UNLESS SUBMITTED TO AND APPROVED BY THE BUILDING OFFICIAL. THE ISSUANCE OF A PERMIT SHALL NOT PREVENT THE BUILDING OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS OR OMISSIONS FROM THE APPROVED PLANS AND SPECIFICATIONS. [CBC 108] 14. ALL CONTRACTORS AND SUB-CONTRACTORS MUST HAVE ON FILE WITH THE BUILDING DEPARTMENT, A LIST OF ALL SUCH CONTRACTORS AND SUB-CONTRACTORS WITH APPROPRIATE CURRENT BUSINESS LICENSE NUMBERS. 15. UNLESS NOTED OTHERWISE, ALL VESTIBULES, CLOSETS, COLUMNS, PROJECTIONS, RECESSES, OR OTHER ADJACENT AREAS WITHIN SCHEDULED AREA SHALL HAVE FINISHES AS SCHEDULED FOR THE RESPECTIVE SPACES IN WHICH THEY OCCUR. 16. CONTRACTOR SHALL VERIFY ALL SETBACKS, EASEMENTS, CONTOURS, AND BUILDING PAD PRIOR TO CONSTRUCTION. 17. TRUSS CALCULATIONS FOR APPROVED PROJECTS ARE REQUIRED TO BE ON THE JOB SITE AT TIME OF FRAMING INSPECTION WITH THE APPROPRIATE REQUIRED SIGNATURES AND STATEMENT AS FOLLOWS: TRUSS CALCULATIONS SHALL INCLUDE THE WET-STAMP AND SIGNATURE OF THE TRUSS DESIGN ENGINEER. IN ADDITION, THEY SHALL INCLUDE ON THE COVER SHEET A WET- SIGNED STATEMENT FROM THE PROJECT'S DESIGN ENGINEER THAT TRUSS CALCULATIONS AND LAYOUTS ARE IN SUBSTANTIAL CONFORMANCE WITH THE STRUCTURAL DESIGN AND INTENT OF THE STRUCTURE. FAILURE TO PROVIDE THEM AS STATED WILL RESULT IN A CORRECTION AND A FAILURE TO PASS FRAMING INSPECTION. [BSP] 18. VERIFY LOCATION OF ALL UTILITY TIE-INS AT STREET AND POINT OF CONNECTIONS AT BUILDING PRIOR TO CONSTRUCTION. 19. A COPY OF SOILS REPORT SHALL BE ON SITE DURING FOUNDATION INSPECTION. 20. ALL PROPERTY CORNERS SHOULD BE ESTABLISHED AT THE TIME OF FOUNDATION INSPECTION WITH THE MARK OF A LICENSED SURVEYOR. ARCHITECTURAL PLANS FOR A NEW METAL BUILDING 2455 MONTEREY ROAD AIR QUALITY CONTROL DURING CONSTRUCTION/GROUND DISTURBING ACTIVITIES, THE FOLLOWING PARTICULATE (DUST) CONTROL MEASURES SHALL BE IMPLEMENTED. THE CONTRACTOR OR BUILDER SHALL BE DESIGNATED TO MONITOR THE DUST CONTROL PROGRAM AND ORDER INCREASED WATERING, AS NECESSARY, TO PREVENT TRANSPORT OF DUST OFF SITE. THEIR DUTIES SHALL INCLUDE HOLIDAY AND WEEKEND PERIODS WHEN WORK MAY NOT BE IN PROGRESS. THEIR CONTACT INFORMATION SHALL BE PRESENTED TO THE APCD PRIOR TO COMMENCEMENT OF CONSTRUCTION. 1. REDUCE THE AMOUNT OF DISTURBED AREA WHERE POSSIBLE 2. USE OR WATER TRUCKS OR SPRINKLER SYSTEMS IN SUFFICIENT QUANTITIES TO PREVENT AIRBORNE DUST FROM LEAVING THE SITE. INCREASED WATERING FREQUENCY WOULD BE REQUIRED WHENEVER WIND SPEEDS EXCEED 15 MPH. RECLAIMED (NONPOTABLE) WATER SHOULD BE USED WHENEVER POSSIBLE; 3. ALL DIRT STOCK-PILE AREAS SHOULD BE SPRAYED DAILY AS NEEDED; 4. ALL ROADWAYS, DRIVEWAYS, SIDEWALKS, ETC TO BE PAVED SHALL BE COMPLETED AS SOON AS POSSIBLE; AND 5. BUILDING PADS SHALL BE LAID AS SOON AS POSSIBLE AFTER GRADING UNLESS SEEDING OR SOIL BINDERS ARE USED. DURING INITIAL GRADING/SCRAPING, BURNING SHALL NOT BE ALLOWED, OR IF NO ALTERNATIVE IS AVAILABLE, THE APPLICANT SHALL OBTAIN A BURN PERMIT FROM THE APCD AND COUNTY FIRE/CALIFORNIA DEPARTMENT OF FORESTRY, AND COMPLY WITH ALL CONDITIONS REQUIRED BY THESE AGENCIES. GENERAL GRADING NOTES 1. ANY AND ALL SITE WORK AND GRADING SHALL BE IN ACCORDANCE WITH CBC CHAPTER 18 AND CBC APPENDIX J AND ANY APPLICABLE LOCAL ORDINANCES. 2.A SOILS ENGINEER SHALL DETERMINE GRADING PERFORMED IS IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED PLANS AND IS SUITABLE TO SUPPORT THE INTENDED STRUCTURE(S). 3. THE BOTTOM OF ALL EXCAVATIONS SHOULD BE OBSERVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PROCESSING OR PLACING FILL. 4. AN ENCROACHMENT PERMIT IS REQUIRED FOR ANY WORK DONE WITHIN A RIGHT OF WAY MAINTAINED BY THE PRESIDING JURISDICTION. 5. MAXIMUM CUT AND FILL SLOPE TO BE 2:1. 6. THE EXISTING GROUND SURFACE SHOULD BE PREPARED FOR GRADING BY REMOVING ALL VEGETATION, TREES, LARGE ROOTS, DEBRIS, NON-COMPLYING FILL, AND ALL OTHER ORGANIC MATERIAL. VOIDS CREATED BY REMOVAL OF SUCH MATERIALS SHOULD NOT BE BACKFILLED UNTIL THE UNDERLYING SOIL HAS BEEN OBSERVED BY A SOILS ENGINEER. 7. FILL AND BACKFILL SHOULD BE PLACED AT NEAR OPTIMUM MOISTURE IN LAYERS WITH LOOSE THICKNESS NOT GREATER THAN EIGHT (8) INCHES AND COMPACTED TO A MINIMUM OF 90% OF THE MAXIMUM DRY DENSITY OBTAINABLE BY TEST METHOD ASTM-D 1557, AND CERTIFIED BY A SOILS ENGINEER. 8. IMPORT SOILS USED TO RAISE SITE GRADE SHOULD BE EQUAL TO OR BETTER THAN ON-SITE SOILS IN STRENGTH, EXPANSION AND COMPRESSIBILITY CHARACTERISTICS. IMPORT SOIL CAN BE EVALUATED BUT WILL NOT BE PRE-QUALIFIED BY THE GEOTECHNICAL ENGINEER. FINAL COMMENTS ON THE CHARACTERISTICS OF THE IMPORT SOIL WILL BE PROVIDED AFTER THE MATERIAL IS STOCKPILED AT THE PROJECT SITE. 9. FINAL SITE GRADE SHOULD BE SUCH THAT ALL WATER IS DIVERTED AWAY FROM THE STRUCTURE(S) A MINIMUM OF 5% FOR 10 FEET. WATER SHALL NOT POND. ALL SURFACE WATER SHOULD BE DIRECTED INTO APPROVED DISCHARGE STRUCTURES. 10. ACCESS ROAD/DRIVEWAYS: ANY ROAD GRADE IN EXCESS OF 12% SHALL BE PAVED WITH A NON-SKID MATERIAL. GRADE FOR FIRE ACCESS SHALL NOT EXCEED 20%. 11. ALL NON-PERMITTED FILL SHALL BE REMOVED BY CONTRACTOR. 12. ELECTRICAL, TELECOMMUNICATIONS, AND OTHER UTILITIES SHALL BE INSTALLED UNDERGROUND IN AN APPROVED METHOD OF CONSTRUCTION. THIS REGULATION APPLIES TO UTILITIES ON SITES THAT ARE 5 ACRES OR LESS AND SERVING NEW STRUCTURES AND/OR NEW UTILITY DISTRIBUTIONS. 13. UTILITY TRENCH BACKFILL SHOULD BE GOVERNED BY THE PROVISIONS OF THIS REPORT RELATING TO MINIMUM COMPACTION STANDARDS. IN GENERAL, SERVICE LINES INSIDE THE PROPERTY LINES MAY BE BACKFILLED WITH NATIVE SOILS COMPACTED TO A MINIMUM OF 90% OF MAXIMUM DENSITY. BACKFILL OF OFF SITE SERVICE LINES WILL BE SUBJECT TO THE SPECIFICATIONS OF THE JURISDICTIONAL AGENCY OR THE GEOTECHNICAL REPORT, WHICHEVER IS GREATER. 14. LINED DRAINAGE SWALES AND DOWN DRAINS SHOULD BE PROVIDED AT THE TOPS OF CUT AND FILL SLOPES TO DIVERT DRAINAGE AWAY FROM SLOPE FACES. 15. FILL SLOPES SHOULD BE KEYED AND BENCHED INTO FIRM NATURAL GROUND WHEN THE EXISTING SLOPE TO RECEIVE FILL IS 5:1 OR STEEPER, HORIZONTAL TO VERTICAL. THE KEYS SHOULD BE TILTED INTO THE SLOPE A MINIMUM OF 2%, SHOULD BE A MINIMUM OF ONE EQUIPMENT WIDTH AND SHOULD BE A MINIMUM OF THREE (3) FEET DEEP ON THE OUTSIDE EDGE. ALL KEYS AND BENCHES SHOULD BE OBSERVED AND VERIFIED BY THE GEOTECHNICAL ENGINEER. FIRE SAFETY PLAN THE APPROVED PROJECT ALLOWED TO BE CONSTRUCTED BY THIS BUILDING PERMIT SHALL CONFORM TO THE FIRE SAFETY PLAN REQUIREMENTS AS DEEMED NECESSARY BY THE FIRE DEPARTMENT HAVING JURISDICTION FOR THIS PERMIT. PRIOR TO BEGINNING CONSTRUCTION THE PROPERTY OWNER SHALL READ THE FIRE SAFETY PLAN ISSUED BY THE FIRE DEPARTMENT AND BECOME FULLY AWARE OF ALL NECESSARY FIRE PROTECTION REQUIREMENTS. 1. WHEN FIRE SPRINKLERS ARE REQUIRED, A FIRE SPRINKLER PLAN AND PERMIT FOR RESIDENTIAL PROJECTS ARE REQUIRED. PROVIDE APPROVED PLANS TO BUILDING INSPECTOR PRIOR TO THE TIME OF FRAMING INSPECTION 2. PRIOR TO FINAL APPROVAL, THE PROPERTY SHALL BE IN COMPLIANCE WITH THE VEGETATION CLEARANCE. WHERE APPLICABLE, PROVIDE FIREBREAK WITHIN 30' AND 100' OF EACH BUILDING OR STRUCTURE. DOWNED LOGS, STUMPS, DEAD AND DYING WOODY SURFACE FUELS SHALL BE REMOVED. REMOVE SURFACE FUELS GREATER THAN 4 INCHES AND LOWER LIMBS OF TREES UP TO 6 FEET WITHIN AREAS OF CONTINUOUS TREE CANOPY PROJECT DESCRIPTION NEW 1,950 SQ FT METAL BUILDING WITH 240 SQ FT LEAN TO PER PLANS ATTACHED. PROJECT STATISTICS LOT SIZE 2.50 ACRES OCCUPANCY (CBC 310.1)U CONSTRUCTION TYPE VB (EX) RESIDENCE 1,017 SQ FT (N) METAL BUILDING WORKSHOP 1,950 SQ FT (N) LEAN TO (RIGHT SIDE) 240 SQ FT FIRE SPRINKLERS NO WUI NO SHEET INDEXSHEET INDEXEROSION CONTROL 1. EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES MUST BE IN PLACE AND FUNCTIONAL PRIOR TO THE FIRST INSPECTION. NO INSPECTIONS CAN BE PERFORMED IF THEY ARE NOT IN PLACE OR HAVE FAILED TO PROVIDE EROSION CONTROL. FAILURE TO MAINTAIN EROSION CONTROL WILL CAUSE INSPECTIONS TO BE DELAYED UNTIL EROSION CONTROL MEASURES ARE FUNCTIONAL. 2. EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AND MAINTAINED TO THE SATISFACTION OF THE BUILDING OFFICIAL AND PUBLIC WORKS DIRECTOR DURING ALL DEMOLITIONS, CONSTRUCTION AND GROUND DISTURBING ACTIVITIES 3. THE ADJOINING STREET SHALL BE CLEANED BY SWEEPING TO REMOVE DIRT, DUST, MUD AND CONSTRUCTION DEBRIS AT THE END OF EACH DAY. 4. TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED WHEN PERMANENT IMPROVEMENTS, PLANTINGS AND FACILITIES ARE IN PLACE. TEMPORARY MEASURES SHALL BE REMOVED PRIOR TO FINAL INSPECTION APPROVALS 5. THE FOLLOWING PERSON SHALL BE RESPONSIBLE FOR IMPLEMENTING & MONITORING THE APPROVED EROSION & SEDIMENTATION CONTROL PLAN: JASON HOLZER PROJECT INFORMATION OWNER JASON HOLZER PROJECT ADDRESS 2455 MONTEREY ROAD ATASCADERO, CA 93422 LEGAL DESCRIPTION CY ATAS PM 67/85-87 PAR 1 APN 049-201-045 PHONE 805-674-2682 EMAIL HOLZERJCEQUIP@GMAIL.COM SEPARATE PERMIT REQUIREMENTS 1. NO OTHER PERMITS ARE REQUIRED FOR THIS PROJECT STATEMENT OF SPECIAL INSPECTIONS: ('22 CBC Section 1704.3): SPECIAL INSPECTIONS ARE NOT REQUIRED FOR THIS PROJECT VICINITY MAP METAL BUILDING QUALITY METAL CARPORTS 9191 W WHITESBRIDGE AVE FRESNO, CA 93706 DESIGN AND DRAFTING DH DRAFT AND DESIGN 610 10TH ST, SUITE A PASO ROBLES, CA 93446 805.975.3071 T-1.1 TITLE SHEET, PROJECT INFORMATION C-1.1 A-1.1 FLOOR PLAN, ELECTRIC PLAN PL A N P R E P A R E D F O R : SHEET NUMBER: SHEET TITLE: PROJECT NO. DRAWN BY FILE NAME DATE C: \ U s e r s \ d j h 1 1 \ D r o p b o x \ p r o j e c t s 2 0 2 5 \ h o l z e r J a s o n \ 0 0 0 0 0 0 \ p r o j e c t T e m p l a t e \ S h e e t s \ T - 1 T I T L E S H E E T . d w g D a n a H u m p h r e y 1 / 2 7 / 2 0 2 5 6 : 2 8 : 3 0 P M D J H D R A F T & D E S I G N 610 10TH ST. SUITE A PASO ROBLES CA 93446 DJH1132@GMAIL.COM 805.975.3071 AT A S C A D E R O , C A 9 3 4 2 2 24 5 5 M O N T E R E Y R O A D JA S O N H O L Z E R 1/27/2025 6:29 PM ---- T-1 TITLE SHEET.DWG DJH TITLE SHEET T-1.1 A-2.1 ELEVATIONS SITE PLAN A-3.1 PERSPECTIVE VIEW CONSULTANTS 9 SITE PLAN 1" = 20' ELE C ELE C ELE C ELE C WATER WATER MO N T E R E Y R O A D CAMPO ROAD 68'-5" TO PROPERTY LINE 55 ' - 0 " TO P R O P E R T Y L I N E PROVIDE TREE PROTECTION FENCING WITHIN 30' OF CONSTRUCTION UNDERGROUND WATER SUPPLY FROM CITY CONNECTION PROPERTY LINE (E) ELECTRICAL UNDERGROUND. (E) DRIVEWAY WATER WATER ELEC ELEC ELEC GENERAL SITE PLAN NOTES LEGEND 1.SLOPE GRADE AWAY FROM BUILDING AT 5% FOR 10' DISTANCE. EXISTING GRADE TO REMAIN UNLESS NOT ABLE TO MEET THIS REQUIREMENT. NOTIFY ARCHITECT IMMEDIATELY. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREVENTION OF WIND EROSION AND DUST WITHIN THE AREAS OF OPERATION. METHOD OF CONTROL SHALL BE SELECTED BY THE CONTRACTOR BUT SHALL SATISFY REQUIREMENTS. 3.HAY BALES WILL BE PLACED AS AN EROSION CONTROL MEASURE AS DIRECTED BY THE COUNTY PUBLIC WORKS DEPARTMENT IF THE CONSTRUCTION IS NOT COMPLETED PRIOR TO 180 DAYS FROM DATE OF CONSTRUCTION. 4.INFORMATION PERTAINING TO EXISTING UNDERGROUND FACILITIES AS SHOWN HEREIN IS FOR INFORMATION PURPOSES ONLY. UTILITIES SHOWN IN PLAN VIEW MAY NOT BE SHOWN IN PROFILE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT "UNDERGROUND SERVICE ALERT" AT 1-800-642-2444 FOR LOCATION OF ALL UNDERGROUND FACILITIES. ALL UNDERGROUND UTILITIES SHOWN ON THESE PLANS WERE DELINEATED BASED ON THE BEST AS-BUILT INFORMATION AVAILABLE AT THE TIME. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE ACTUAL LOCATIONS OF THE CABLE TV., FIBER OPTIC, WATER, SEWER, DRAINAGE, OR OTHER UNDERGROUND FACILITIES IN THE FIELD PRIOR TO CONSTRUCTION AND SHALL NOTIFY THE ENGINEER IMMEDIATELY IN THE EVENT THAT POTENTIAL CONFLICTS OR INTERFACES ARE DISCOVERED. 5.ALL UTILITY COMPANIES MUST BE NOTIFIED PRIOR TO THE START OF CONSTRUCTION. LEGEND JOINT WIRE TRENCH PER PG&E ET W G UTILITY SERVICES PG UTILITY TRENCH DETAIL TREE PROTECTION DETAIL TREE PROTECTION FENCE TREE PROTECTION FENCING 4'-6" METAL STAKES 3 WIRE OR NYLON ZIP TIES PER STAKE 4' HIGH, CHAIN LINK, SNOW, OR ORANGE SAFETY FENCE 1.STAKE BENEATH DRIP LINE, MAXIMUM DISTANCE IS 8'-0" FROM EACH STAKE. 2.TIGHTLY STRETCH THE 4'-0" HIGH FENCING TO PREVENT DROOPING. 3.TIE FENCE AND STAKE TOGETHER IN UPRIGHT POSITION WITH A MINIMUM OF THREE TIES PER STAKE. 4.FENCE COMPLETELY AROUND ORIGINAL DRIP LINE TO AVOID COMPACTION FROM VEHICLES AND MATERIAL DURING CONSTRUCTION. ANY WORK WITHIN FENCE LINE REQUIRES ARBORIST MONITORING. 5.REQUEST A TREE INSPECTION. 6' MINIMUM WIDTH FOR 2"DR I P L I N E CAL. TREES OR SMALLER 4' - 0 " ONE FOOT FOR EACH INCH OF TREE DIAMETER, OR 1/2 HEIGHT OF TREE, WHICHEVER IS GREATER 2"x4" STANDARDS + 1"x4" RAILS OR ORANGE SAFETY FENCING MAY BE USED. IF THE REMOVAL OF OAK TREES IS APPROVED, THE TREES WILL NEED TO BE REPLACED WITH TREES OF THE SAME SPECIES AT A RATIO DETERMINED BY THE GOVERNING AGENCY. TREE WILL NEED TO BE IRRIGATED AND MAINTAINED FOR A MINIMUM OF 5 YEARS OR UNTIL ESTABLISHED. PLANTING LOCATIONS WILL BE DETERMINED BY THE COUNTY AND WILL COMPLY WITH THE DEPARTMENT'S POLICIES AND GUIDELINES FOR PLANTING. SETBACK LINE PROPOSED 30' X 65' WORKSHOP W/ 12' X 20' LEAN TO 10'-0" REAR S E T B A C K 25'-0" FRONT SETBACK EXISTING RESIDENCE BUILT 1977 CHICKEN COOP N 28 30' 18" E 413.95' S 4 7 0 9 ' 4 7 " E 27 6 . 3 6 N 34 20' 52" E 357.70 N 5 8 5 5 ' W 23 1 . 5 8 PROPERTY FENCE LINE PROPERTY FENCE LINE PROPERTY FENCE LINE PROPERTY FENCE LINE EXISTING DRIVEWAY 5% / 1 0 ' 5% / 10' 5% / 1 0 ' 5% / 10' (EX) OVERHEAD ELECTRICAL 200 amp SERVICE P (EX) WATER SERVICE LOCATION WV (EX) SEPTIC AND LEACH FIELD EXISTING CONCRETE ACCESS NEIGHBORING HOUSE NEIGHBORING GARAGE CONCRETE12'-0" WORKSHOP 83 ' - 5 " 90 ' - 8 " EXISTING ROOF COVERED C-TRAIN STRUCTURE 2,000 SF - UNPERMITTEDOAK TREE R=12' OAK TREE R=15' OAK TREE R=15' 25 ' - 0 " SE T B A C K 5'-0" SIDE SETBACK 30 ' - 0 " 68 ' - 0 " P L A N P R E P A R E D F O R : SHEET NUMBER: SHEET TITLE: PROJECT NO. DRAWN BY FILE NAME DATE C: \ U s e r s \ d j h 1 1 \ D r o p b o x \ p r o j e c t s 2 0 2 5 \ h o l z e r J a s o n \ 0 0 0 0 0 0 \ p r o j e c t T e m p l a t e \ S h e e t s \ C - 1 G E N E R A L S I T E P L A N . d w g Da n a H u m p h r e y 1/ 1 6 / 2 0 2 5 9 : 5 3 : 4 6 A M D J H D R A F T & D E S I G N 610 10TH ST. SUITE A PASO ROBLES CA 93446 DJH1132@GMAIL.COM 805.975.3071 AT A S C A D E R O , C A 9 3 4 2 2 24 5 5 M O N T E R E Y R O A D JA S O N H O L Z E R 2/13/2025 1:08 PM ---- C-1 GENERAL SITE PLAN.DWG DJH GENERAL SITE PLAN C-1.1 10 FLOOR PLAN 1/4" = 1'-0" FLOOR PLAN NOTES 1.IN ACCORDANCE WITH CRC R311.3 LANDINGS AT DOORS ARE TO HAVE A LENGTH IN THE DIRECTION OF TRAVEL OF AT LEAST 36 INCHES ON EACH SIDE OF THE DOOR. 12 ' - 0 " X 1 0 ' - 0 " GA R A G E D O O R ( C H A I N H O I S T ) 3'-0" LANDING CONCRETE12'-0" WORKSHOP 24" X 36" 36 " X 3 6 " 30 6 8 24 " X 3 6 " 12 ' - 0 " X 1 0 ' - 0 " GA R A G E D O O R ( C H A I N H O I S T ) LEAN TO 24" X 36" 3'-0"1'-1"4'-0" 30'-0" 42'-0" 24" X 36" 6'-8"5'-3" 6' - 8 " 5' - 4 " 12'-0" 20 ' - 0 " 5' - 0 " 2' - 0 " 65 ' - 0 " 12 ' - 0 " X 1 0 ' - 0 " GA R A G E D O O R ( C H A I N H O I S T ) 2' - 0 " 2' - 0 " 14'-2" 3068 6'-0"2'-10" 6' - 9 " 8' - 1 " 24 " X 3 6 " 3' - 2 " 24 " X 3 6 " 12 ' - 0 " 24 " X 3 6 " 27 ' - 0 " 65 ' - 0 " 30'-0" 3070 3070 3' - 0 " LA N D I N G 3' - 0 " LA N D I N G 3' - 0 " LA N D I N G P L A N P R E P A R E D F O R : SHEET NUMBER: SHEET TITLE: PROJECT NO. DRAWN BY FILE NAME DATE C: \ U s e r s \ d j h 1 1 \ D r o p b o x \ p r o j e c t s 2 0 2 5 \ h o l z e r J a s o n \ 0 0 0 0 0 0 \ p r o j e c t T e m p l a t e \ S h e e t s \ A - 1 . 1 F L O O R P L A N . d w g Da n a H u m p h r e y 1/ 1 6 / 2 0 2 5 9 : 5 8 : 1 9 A M D J H D R A F T & D E S I G N 610 10TH ST. SUITE A PASO ROBLES CA 93446 DJH1132@GMAIL.COM 805.975.3071 AT A S C A D E R O , C A 9 3 4 2 2 24 5 5 M O N T E R E Y R O A D JA S O N H O L Z E R 1/27/2025 6:29 PM ---- A-1.1 FLOOR PLAN.DWG DJH FLOOR PLAN A-1.1 11 12 3.5 ELEVATION MATERIALS AND NOTES =SIDING COLOR EARTH BROWN =26 GAUGE PBR PANEL FOR SIDING AND ROOF =ROOF COLOR PEWTER GRAY BACK ELEVATION 1/4" = 1' RIGHT SIDE ELEVATION 1/4" = 1' FRONT ELEVATON 1/4" = 1' LEFT SIDE ELEVATION 1/4" = 1' =TRIM, GARAGE DOOR, MAN DOOR COLOR WHITE F.G. 12'-0" PLATE 6'-8" HEADER 15-9" OVERALL BUILDING HEIGHT F.G. 12'-0" PLATE 6'-8" HEADER 15-9" OVERALL BUILDING HEIGHT F.G. 12'-0" PLATE 6'-8" HEADER 15-9" OVERALL BUILDING HEIGHT F.G. 12'-0" PLATE 6'-8" HEADER 15-9" OVERALL BUILDING HEIGHT 12 3.5 12 2.5 12 2.5 P L A N P R E P A R E D F O R : SHEET NUMBER: SHEET TITLE: PROJECT NO. DRAWN BY FILE NAME DATE C: \ U s e r s \ d j h 1 1 \ D r o p b o x \ p r o j e c t s 2 0 2 5 \ h o l z e r J a s o n \ 0 0 0 0 0 0 \ p r o j e c t T e m p l a t e \ S h e e t s \ A - 2 . 1 E L E V A T I O N S . d w g Da n a H u m p h r e y 1/ 1 6 / 2 0 2 5 9 : 5 8 : 4 2 A M D J H D R A F T & D E S I G N 610 10TH ST. SUITE A PASO ROBLES CA 93446 DJH1132@GMAIL.COM 805.975.3071 AT A S C A D E R O , C A 9 3 4 2 2 24 5 5 M O N T E R E Y R O A D JA S O N H O L Z E R 1/27/2025 6:29 PM ---- A-2.1 ELEVATIONS.DWG DJH ELEVATIONS A-2.1 12 P L A N P R E P A R E D F O R : SHEET NUMBER: SHEET TITLE: PROJECT NO. DRAWN BY FILE NAME DATE C: \ U s e r s \ d j h 1 1 \ D r o p b o x \ p r o j e c t s 2 0 2 5 \ h o l z e r J a s o n \ 0 0 0 0 0 0 \ p r o j e c t T e m p l a t e \ S h e e t s \ A - 3 . 1 E L E C T R I C A L P L A N . d w g D a n a H u m p h r e y 8 / 3 0 / 2 0 2 4 9 : 4 8 : 0 7 A M D J H D R A F T & D E S I G N 610 10TH ST. SUITE A PASO ROBLES CA 93446 DJH1132@GMAIL.COM 805.975.3071 AT A S C A D E R O , C A 9 3 4 2 2 24 5 5 M O N T E R E Y R O A D JA S O N H O L Z E R 1/27/2025 6:29 PM ---- A-3.1 ELECTRICAL PLAN.DWG DJH PERSPECTIVE VIEW A-3.1 BACK ELEVATION FRONT ELEVATION RIGHT ELEVATION 13 04/21/2025 | Item 1 | Staff Report Attachment 4: Photos of As-Built Structure Page 9 of 10 14 04/21/2025 | Item 1 | Staff Report Attachment 4: Photos of As-Built Structure Page 10 of 10 15