Loading...
HomeMy WebLinkAboutPC Resolution 2024-0009PC RESOLUTION 2024-0009 RESOLUTION OF THE PLANNING COMMISSION OF THECITY OF ATASCADERO, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL APPROVE AN AMENDMENT TO THE DOVE CREEK MASTER PLAN OF DEVELOPMENT (CUP 2003-0099), VESTING TENTATIVE TRACT MAP (TR 3229), AND AMENDMENTS TO PLANNED DEVELOPMENT OVERLAY #12 TO ALLOW FOR A MIXED RESIDENTIAL AND COMMERCIAL PROJECT ON THE DOVE CREEK COMMERCIAL PROPERTY (APN 045-331-014) AND FINI) THE AMENDMENTS CONSISTENT WITH THE PREVIOUSLY CERTIFIED MITIGATED NEGATIVE DECLARATION (EDN 2004-0026). DOVE CREEK MIXED-USE MONTAGE DEVELOPMENT, INC. (DEV23-0079) WHEREAS, an application has been received from Montage Development, Inc. (23945 Calabasas Road, Suite 116, Calabasas, CA 91302), Applicant and Seuong M Moon (6130 Via Huerto Court, Atascadero, CA 93422) Owner, to consider a Zoning Text Change to Planned Development Overlay Zone No. 12, Vesting Tentative Tract Map, and Master Plan ofDevelopment (Conditional Use Permit); and WHEREAS, the site's current General Plan Land Use Designation is Mixed -Use Planned Development (MU -PD); and WHEREAS, the site's current Zoning Designation is Commercial Retail (CR) with a Planned Development No. 12 (PD 12) overlay; and WHEREAS, PD12 was established in 2004 with the approval of the Dove Creek Development and modifications to the zoning overlay district are necessary for consistency with the revised Master Plan of Development; and WHEREAS, the Planning Commission has determined that it is in the bestinterest of the City to enact amendments to Planned Development Overlay #12 for consistency with the revised Master Plan of Development, including incorporation of land use definitions updated between overlay zone adoption in 2004 and today; and WHEREAS, the site has previously been identified by the City Council as a key development opportunity site for future mixed-use/residential development (in commercial zoning districts) with a maximum allowable density of 24 units per acre; and WHEREAS, the minimum lot size in the CR zoning district is 2 acres; and WHEREAS, smaller lot sizes are allowed for commercial projects that provide shared access and parking and are designed as an integrated commercial center; and WHEREAS, the proposed subdivision will result in seven parcels ranging from 0.33 to 2.74 acres with allowances for residential and/or commercial condominium airspace units on each parcel to accommodate individual sale of residential units and commercial tenant spaces; and WHEREAS, the Atascadero Municipal Code allows for the establishment of custom Planned Development Overlay Zones to create custom zoning for unique projects and allow for a mix of commercial and residential uses that would otherwise not be permitted by underlying zoning; and WHEREAS, shared parking and access easements are required to be recorded to ensure that all parcels have legal access from the adjacent rights-of-way; and WHEREAS, the project was reviewed by the Design Review Committee at their regularly scheduled meeting on September 14, 2023; and WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and WHEREAS, a timely and properly noticed Public Hearing upon the subject application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said application; and NOW, THEREFORE BE IT RESOLVED by the Planning Commission of the City of Atascadero: SECTION 1. Recitals: The above recitals are true and correct. SECTION 2. Public Hearings. The Planning Commission held duly noticed public hearings to consider the project on May 21, 2024, where the Commission considered testimony and reports from staff, the applicants, and the public. SECTION 3. Facts and Findings. The Planning Commission makes the following findings and determinations: A. Findings for Zoning Text Amendment 1. FINDING; The proposed projector use is consistent with the General Plan, and FACT: The General Plan has designated the project site as Mixed -Use Planned Development which allows a mixture of commercial, office, and residential uses with a focus on pedestrian orientation and connections between different uses throughout the project area. The General plan allows for a horizontal or vertical mixture of uses with the approval of a Planned Development Overlay Zone and an accompanying Master Plan of Development. Planned Development #12 and a Master Plan of Development were previously approved for the project site. The proposed text amendment establishes a maximum residential density of 71 residential units for the project site, which is consistent with the 24 du/ac maximum residential density that is allowed for mixed-use developments in commercial zoning districts. 2. FINDING: The establishment and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and FACT: The proposed development will be located at the intersection of Santa Barbara Road and El Camino Real. As proposed, the commercial uses will be adjacent to El Camino Real and the residential uses will front Santa Barbara Road, Bliss Street, and Cashin Street. Adequate access to the site is provided off Cashin Street and Bliss Street per the originally approved Dove Creek master plan. The site design has been reviewed by all City departments for consistency with code requirements. Impacts have been analyzed through the previously certified Initial Study/Mitigated Negative Declaration (MND) No. 2004-0026. As conditioned, the project will not be detrimental or unsafe to those working, visiting, or living on the project site or those within the surrounding neighborhoods. 3. FINDING: The proposed projector use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and FACT: The proposed project is within the existing Dove Creek neighborhood, comprised of small -lot single-family residences fronting Bliss Street and Cashin Street. The project has been designed to focus residential uses adjacent to existing residential units with the proposed 2 -story residential buildings fronting Bliss and Cashin Streets, and the 3 -story residential building fronting Santa Barbara Road. The development pattern of the proposed project is similar to the conceptual site plan that was originally approved to be the commercial component of the Dove Creek Master Plan. Commercial uses have been internal to the project site or adjacentto El Camino Real to provide a visual buffer between existing residences and the higher -intensity commercial and multi -family uses. 4. FINDING: The proposed zone change will not create any new significant and unavoidable impacts to traffic, infrastructure, or public service impacts; and FACT: A Mitigated Negative Declaration (MND) No.2004-0026 was certified by the City Council on September 14, 2004. The MND evaluated the entire Dove Creek Master Plan and specifically analyzed the potential impacts of a commercial development on the project site that included 60,000 SF of future commercial retail space, including a 26,500 SF anchor tenant. While the residential villages identified in the analyzed project have been built and occupied as planned, the commercial center never developed and is now the location of the proposed mixed-use project. To supplement the analysis of the previously certified MND for the project site, the applicant prepared a series of comparative analyses to evaluate whether the project would result in a greater impact to resources that previously identified. The applicant team provided analyses related to traffic and sewer capacity. The traffic analysis showed a reduction in anticipated peak hour trips based on the proposed mix of land - uses. The sewer capacity analysis showed that, while there will likely be an increase in peak flows, the sewer lines as designed are sized appropriately to accommodate the proposed development. 5. FINDING: The proposed zone change is consistent with the CEQA Findings. FACT: The proposed text amendment is minor and will not result in an environmental impact. A mix of commercial and residential uses is allowable in the Commercial Retail zoning district and PD 12. B. C. Findings for Approval of a Conditional Use Permit Amendment to modify the Master Plan of Development 1. FINDING: The proposed project or use is consistent with the General Plan FACT: The proposed project includes a Zone Text Change to modify the Planned Development Overlay Zone No. 12 (PD 12) to allow the proposed mix of residential and commercial uses on the project site and intensify uses from what is allowed today. The project site is located in the northwest corner of the Santa Barbara Road and El Camino Real intersection, the southern entrance to the city. The site is adjacent to services and is within the City's identified Urban Services Line. The project is consistent with the Land Use, Open Space and Circulation (LOC) Policies and Programs 1.1.7 for infill development; 1.4.1 for screening exterior lights; 2.1.3 and 7.2.3 for providing street trees; and 8.5.3 for providing on-site stormwater management. In addition, the project is consistent with Circulation Element (CIR) Policies and Programs 1.4 for requiring a tree -lined street; 1.5.1 for requiring adequate off-street parking; and 2.3.1 for providing adequate sidewalks as required for all new commercial development in the City. The General Plan also includes policies and programs aimed at enhancing the City's visual character and promoting economic viability. The City Council has previously identified this site as a key opportunity for increased economic development and expanded housing. In addition, LOC 3 provides policies and programs aimed at transforming the existing El Camino Real "strip" into a distinctive, attractive, and efficient commercial, office, and industrial park area that can provide for the long-term economic viability of the community. LOC 13 provides policies and programs aimed at establishing a range of employment and business opportunities to provide a sound economic base and ensure that new development generates sufficient revenue to support public service needs and quality environmental, social, and educational opportunities. The project, as proposed, will provide commercial uses that are distinctive, attractive, and can contribute to the long-term economic viability of the community.The proposed project includes commercial uses that generate sales and transient occupancy tax revenue that the City can use to further support public services. The proposed short- term rental hotel units will provide a service that doesn't exist near the City's south gateway and is in growing demand. The mix of residential and commercial uses on the project site will contribute to the viability of the commercial tenants. The proposed site plan and conceptual landscape plan include pedestrian walkways that connect to existing pedestrian walkways within the broader neighborhood. All proposed uses will utilize a singular looped driveway access and parking will be shared. The project site was previously identified and approved for commercial development within the existing Planned development overlay zoning designation and the Master Plan for The Villages of Dove Creek. The project will maintain and enhance the existing street trees and landscaping that pedestrians in this neighborhood are accustomed to. 2. FINDING: The proposed projector use satisfies all applicable provisionsof the Zoning Ordinance FACT: The proposed mixed commercial and residential development includes a request for a Zone Text Change to modify the development potential of the project site. With those approvals, the project is consistent with the Atascadero Municipal Code and the established Planned Development Overlay Zone No. 12. The proposed structures and site plan are consistent with the applicable provisions of the Atascadero Municipal Code as conditioned. 3. FINDING: The establishment and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injuriousto property or improvements in the vicinity of the use FACT: The proposed development will be located at the intersection ofSanta Barbara Road and El Camino Real. As proposed, the commercial uses will be adjacent to El Camino Real and the residential uses will front Santa Barbara Road, Bliss Street, and Cashin Street. Adequate access to the site is provided off Cashin Street and Bliss Street per the originally approved Dove Creek master plan. The site design has been reviewed by all City departments for consistency with code requirements. Impacts have been analyzed through the previously certified Initial Study/Mitigated Negative Declaration (MND) No. 2004-0026. As conditioned, the project will not be detrimental or unsafe to those working, visiting, or living on the project site or those within the surrounding neighborhoods. 4. FINDING: The proposed project or use will not be inconsistent with the character of the immediate neighborhood or contrary to its orderly development FACT: The proposed project is within the existing Dove Creek neighborhood, comprised of small -lot single-family residences fronting Bliss Street and Cashin Street. The project has been designed to focus residential uses adjacent to existing residential units with the proposed 2 -story residential buildings fronting Bliss and Cashin Streets, and the 3 -story residential building fronting Santa Barbara Road. The development pattern of the proposed project is similar to the conceptual site plan that was originally approved to be the commercial component of the Dove Creek Master Plan. Commercial uses are internal to the project site or adjacent to El Camino Real to provide a visual buffer between existing residences and the higher -intensity commercial and multi -family uses. 5. FINDING: The proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the land use element FACT: A Trip Generation Comparison, prepared by Central Coast Transportation Consultants estimated the vehicle trips for the project as proposed and compared the trip levels to the previously approved project. The proposed project will generate 1,546 trips per weekday, including 91 AM peak hour trips and 166 PM peak hour trips. The trip generation would be lower than the 2,475 trips per weekday generated by the previously approved project, Therefore, the previously identified mitigation measures are adequate to accommodate the proposed development. The project will create additional traffic, both from new residents to the project and visitors and employees to the commercial portion of the project but will generate 929 fewer AM and PM peak hour trips daily. The analysis concluded that traffic volumes and patterns will be safe and within the capacity of adjacent roadways. D. Findings for Parking Modification 1. FINDING: The project qualifies for a parking reduction based on the nature of the uses on site and the differing peak -hour demands of parking for the distinct planned uses. FACT: The project proposes a mix of residential and commercial uses in additional to a short-term stay hotel. The Atascadero Municipal Code recognizes that uses that have different peak -hour parking demands can qualify for a parking reduction as the provided spaces can be shared between all uses on-site. The Code also recognizes that separate commercial uses that share the same site often have patrons that visit more than one commercial tenant at a time, allowing for a reduction in total parking demand. This is generally the case for residential and retail/restaurant uses and residents and hotel patrons generally park overnight whereas retail and restaurant uses have greater daytime demand. In addition, the site is designed with uses that are complimentary and visitors will likely visit more than one commercial tenant during their visit to the site. E. Findings for Hotels with kitchens in more than 50% of the rooms/units 1. FINDING: The project is designed consistent with the standards of the Atascadero Municipal Code and provides amenities consistent with a tourist serving use. FACT: Staff has reviewed the project and confirmed that the project, as conditioned, will be consistent with the standards of the Atascadero Municipal Code. The project will provide fitness areas, a lounge, and is adjacent to residents and visitor -serving commercial and recreation uses. 2. FINDING: The project is in an area that supports tourist -serving activities. FACT: The project site is in the commercial retail zone and is part of the Dove Creek neighborhood. The Dove Creek commercial development proposal includes resident and tourist -serving uses and amenities will be provided on-site. The site is near Paloma Park which is a draw for many larger sports tournaments. Deed covenants will be recorded against the property detailing the nature of the use in compliance with local regulations. F. Findings for Approval of a Vesting Tentative Tract Map 1. FINDING: The proposed subdivision, together with the provisions for its design and improvement, is consistent with the General Plan (Government Code §§ 66474(a) and (b)) FACT: The proposed project includes a Zone Text Change to modify the Planned Development Overlay Zone No. 12 (PD 12) to allow the proposed mix of residential and commercial uses on the project site and intensify uses from what is allowed today. The project site is located in the northwest corner of the Santa Barbara Road and El Camino Real intersection, the southern entrance to the city. The site is adjacent to services and is within the City's identified Urban Services Line. The project is consistent with the Land Use, Open Space and Circulation (LOC) Policies and Programs 1.1.7 for infill development; 1.4.1 for screening exterior lights; 2.1.3 and 7.2.3 for providing street trees; and 8.5.3 for providing on -sit stormwater management. In addition, the project is consistent with Circulation Bement (CIR) Policies and Programs 1.4 for requiring a tree -lined street; 1.5.1 for reginring adequate off-street parking; and 2.3.1 for providing adequate sidewalks as required for all new commercial development in the City. The General Plan also includes policies and programs aimed at enhancing the City's visual character and promoting economic viability. The City Council has previously identified this site as a key opportunity for increased economic development and expanded housing. In addition, LOC 3 provides policies and programs aimed at transforming the existing El Camino Real "strip" into a distinctive, attractive, and efficient commercial, office, and industrial park area that can provide forthe long-term economic viability of the community. LOC 13 provides policies and programs aimed at establishing a range of employment and business opportunities to provide a sound economic base and ensure that new development generates sufficient revenue to support public service needs and quality environmental, social, and educational opportunities. The project, as proposed, will provide commercial uses that are distinctive, attractive, and can contribute to the long-term economic viability of the community. The proposed project includes commercial uses that generate sales and transient occupancy tax revenue that the city can use to further support public services. The proposed short- term rental hotel units will provide a service that doesn't exist near tlT City's south gateway and is in growing demand. The mix of residential and commercial uses on the project site will contribute to the viability of the commercial tenants. The proposed site plan and conceptual landscape plan include pedestrian walkways that connect to existing pedestrian walkways within the broader neighborhood. All proposed uses will utilize a singular looped driveway access and parking will be shared. The project site was previously identified and approved for commercial development within the existing Planned development overlay zoning designation and the Mater Plan for The Villages of Dove Creek. The project will maintain and enhance the existing street trees and landscaping that pedestrians in this neighborhood are accustomed to. 2. FINDING: The site is physically suitable for the type of development (Government Code§ 66474(c)) FACT: The property, after approval, will be zoned Commercial retail with Planned Development Overlay Zone No. 12. The site is located adjacent to SantaBarbara Road and El Camino Real, within the existing Master Plan of Development for Dove Creek. All required right-of-way improvements along Santa Barbara Road, Bliss Street, Cashin Street, and El Camino Real have been constructed to City standards and will be maintained in perpetuity. The project site was previously graded to accommodate drainage at the lowest point of the site adjacent to the intersection of Bliss and Cashin Streets. The site has been designed to accommodate all stormwater generated from the project. 3. FINDING: The site is physically suitable for the proposed density of development (Government Code § 66474(d)) FACT: The property is zoned Commercial Retail with Planned Development Overlay Zone No. 12. The site is located adjacent to Santa Barbara Road and El Camino Real, within the existing Master Plan of Development for Dove Creek. The site has previously been identified by the City Council as a key development opportunity site for future mixed-use/residential development (in commercial zoning districts) with a maximum allowable density of 24 units per acre The project site as proposed will have 71 residential units on 5.19 -acres, resulting in a proposed density of 13.7 units/acre. 4. FINDING: The design of the subdivision or the proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. (Government Code § 66474(e)) FACT: The proposed project site is outside of the 100 -year flood plain and the site is designed to be integrated into the Dove Creek neighborhood which includes creek and wetland restoration areas. The drainage from the site will be engineered to provide on- site post -construction water treatment before outflow into the neighborhood -wide storm drain system. The site was previously graded as part of the original tract improvements and no environmental concerns exist on site. 5. FINDING; The design of the subdivision or the type of improvements will not cause serious health problems. (Government Code § 66474(f)) FACT: The project is designed in accordance with all applicable local and State regulations. The project proposes a mixed commercial and residential development at a key opportunity site in the city and will not create any impacts to public health. 6. FINDING; The design of the subdivision will not conflict with easements for access through or use of property within the proposed subdivision. (Government Code § 66474(g)) FACT: The proposed project includes conditions to provide shared access and parking easements throughout the site for the benefit of all applicable parcels, ensuring access to all proposed parcels and uses. G. Findings for Planned Development Overlay Zone 1. FINDING; The modification of development standards or processing requirements is warranted to promote orderly and harmonious development FACT: The proposed project includes commercial uses that are distinctive, attractive, and can contribute to the long-term economic viability of the community. The mix of residential and commercial uses on the project site will contribute to the viability of the commercial tenants. The proposed site plan and conceptual landscape plan include pedestrian walkways that connect to existing pedestrian walkways within the broader_ neighborhood. All proposed uses will utilize a singular looped driveway access and parking will be shared. The project site was previously identified and approved for commercial development within the existing Planned Development zoning designation and the Master Plan for The Villages of Dove Creek. The project will maintain and enhance the existing street trees and landscaping that pedestrians in this neighborhood are accustomed to. 2. FINDING; The modification of development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area. FACT: The proposed project includes a mix of commercial uses that generate sales and transient occupancy tax revenue that the city can use to further support public services. The proposed short-term rental hotel units will provide a service that doesn't exist near the City's south gateway and is in growing demand. 3. FINDING; The benefits derived from the overlay zone cannot be reasonably achieved through existing development standards for processing requirements FACT: The Commercial Retail zone allows for mixed-use development with up to 24 units per acre. Generally, residential units must be located above ground -floor commercial space. Residential uses may only be located on the groundfloor with the approval of a planned development overlay zone. As the project site is located within PD 12, an amendment to the Master Plan of Development and overlay zone allows for the proposed configuration. The addition of ground floor residential uses within the proposed mixed-use development will serve as a transition between the existing residential use along Bliss and Cashin Streets and the commercial uses within the project site core and along El Camino Real. The addition of residential uses on the ground floor of the proposed mixed-use development will also help the city achieve its Regional Housing Needs Allocation (RHNA) objectives. 4. FINDING; The proposed plans, if any, offer certain redeeming features to compensate for requested modifications FACT: The City Council has adopted a policy listing potential benefits for consideration when approving a Planned Development overlay zone. The Dove Creek Project was found to provide community benefit during the original approval of the project in 2004. Per City Council policy, benefits include high-quality architectural and landscape design, buffering between uses, higher density to meet Housing Element goals, pocket parks, and walkways for pedestrian connectivity. Modification of the Master Plan of Development for the 5 -acre commercial site will not significantly change the nature and community benefit of the project, however, the added community-based commercial uses and increased housing opportunities will enhance the community benefit provided in the Dove Creek development. As designed and conditioned, the proposed amended project meets the findings for approval. SECTION 4. CE A. A Mitigated Negative Declaration (MND) No.2004-0026 was certified by the City Council on September 14, 2004. The MND evaluated the entire Dove Creek Master Plan and specifically analyzed the potential impacts of a commercial development on the project site that included 60,000 SF of future commercial retail space, including a 26,500 SF anchor tenant. While the residential villages identified in the analyzed project have been built and occupied as planned, the commercial center never developed and is now the location of the proposed mixed-use project. To supplement the analysis of the previously certified MND for the project site, the applicant prepared a series of comparative analyses to evaluate whether the project would result in a greater impact to resources than previously identified. The applicant team provided analyses related to traffic and sewer capacity. The traffic analysis showed a reduction in anticipated peak -hour trips based on the proposed mix of land uses. The sewer capacity analysis showed that, while there will likely be an increase in peak flows, the sewer lines as designed are sized appropriately to accommodate the proposed development. SECTION 5. Recommendation for Approval. The Planning Commission of the City of Atascadero, California, in a regular session assembled on May 21, 2024, resolved to recommend that the City Council approve an Amendment (DEV23-0079) to the Dove Creek Master Plan of Development (CUP 2003-0099), approving the Dove Creek Commercial Parcel Mixed -Use project, Vesting Tentative Tract Map (TR3229) for parcel subdivision and condomiruam purposes, and an associated Amendment to Planned Development Overlay Zone #12, subject to the following: 1. EXHIBIT A: Conditions of Approval 2. EXHIBIT B: Project Entitlement Package 3. EXHIBIT C: Vesting Tentative Tract Map (TR 3229) 4. EXHIBIT D: Planned Development #12 Zone Text Amendment BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by Commissioner Schmidt and seconded by Chairperson Keen, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: Anderson, Heath, Hughes, Schmidt, van den Eikhof, Keen (6) NOES: Carranza (1) ABSTAIN: None (0) ABSENT: None (0) ADOPTED: May 21, 2024 CITY OF ATASCADERO, CA Tori leen Planning Commission Chairperson Attest: Phil Dunsmore Planning Commission Secretary Conditions of Approval Timing Responsibility DEV23-0079 /Monitoring Vesting Tentative Tract Map 3229 BL: Business License PS: Planning Services BS: Building Services Master Plan of Development/Conditional Use Permit GP: Grading Permit FD: Fire Department Dove Creek Commercial Development BP: Building Permit FI: Final Inspecton PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney APN 045-331-014 PLANNING DEPARTMENT 1. This approval includes the following entitlements: Ongoing PS a) Vesting Tentative Tract Map (TR 3229) is for the creation of 7 legal lots of record (as conditioned) described on the attached exhibits and shall apply to APN 045-331-014, regardless of owner. b) Master Plan of Development / Conditional Use Permit for approximately 14,840 SF of commercial tenant space, 71 residential condominium units, and 20 short-term rental hotel units. 2. The approval of these entitlements shall become final and Ongoing PS effective for the purposes of issuing building permits the day after the City Council hearing unless an appeal is made in accordance with the Atascadero Municipal Code. 3. In accordance with the Atascadero Municipal Code Section 9- Ongoing PS 8.105, any violation of any of the conditions of approval may be cause for revocation of this entitlement and subject the applicant and/or future property owners to the penalties set for in the Atascadero Municipal Code, as well as any other available legal remedies. 4. The Community Development Director and/or City Engineer FM PS / CE shall have the authority to make modifications to the final map that remain in substantial conformance with the approved Tentative Tract Map. 5. The Community Development Director and/or City Engineer BP / FM PS / CE shall have the authority to make minor modifications to the Master Plan of Development that are necessary to address code requirements or result in superior design. 6. Approval of these entitlements shall be valid for twenty-four (24) BP / FM PS months after its effective date. At the end of the period, the approval shall expire and become null and void unless a final map (Tract Map entitlement) has been recorded, or a construction permit (Master Plan of Development) has been issued and substantial construction has commenced, or a time extension has been granted, consistent with the Atascadero Municipal Code. 7. Vesting Tentative Subdivision Map was deemed complete on On-going PS, CE May 13, 2024, for the purposes of vested development rights and fees consistent with the Subdivision Map Act of the State of California. Conditions of Approval Timing Responsibility DEV23-0079 /Monitoring Vesting Tentative Tract Map 3229 PS: Planning Services BL: Business License BS: Building Services Master Plan of Development/Conditional Use Permit GP: Grading Permit FD: Fire Department BP: Building Permit PD: Police Department Dove Creek Commercial Development FI: Final Inspection CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA City Attorney APN 045-331-014 8. The applicant shall defend, indemnify, and hold harmless the Ongoing City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, for any claims arising from the approvals of these or subsequent project entitlements. 9. All subsequent Tentative Tract Map and construction permits BP/FM PS/CE shall be consistent with the Master Plan of Development approved for the project, or as further specified by the conditions herein. 10. The subdivision shall be subject to additional fees for park or BP PS recreation purposes (QUIMBY Act) as required by the City Ordinance. 11. The commercial portion of the project (commercial courtyard FI PS and hotel/market) shall be finaled prior to the issuance of certificates of occupancy for the remaining 20% of residential units on-site. 12. All maintenance costs listed below shall be 100% funded by FM/BP PS the project in perpetuity, except for public facilities that are accepted for maintenance by the City of Atascadero. The service and maintenance cost shall be funded through an entity or mechanism established by the developer, subject to City Staff approval. This entity or mechanism must be in place prior to, or concurrently with acceptance of any final map(s) or the issuance of any residential building permits, whichever comes first. The entity or mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any Final Map(s) or issuance of any building permits. The administration of the above-mentioned funds, and the coordination and performance of maintenance activities, shall be the responsibility of the entity or mechanism. a) All roads, sidewalks, pathways, parking, and access areas. b) All landscaping and lighting within the proposed project area. c) Common area fencing and/or features. d) Open areas on private property within the proposed project area including detention facilities, bio-swales, and other low -impact -development features. e) All drainage facilities within the project area. f) Landscaped frontages within the right-of-way of all public .streets within the defined project boundary, including irrigation. Conditions of Approval Timing Responsibility DEV23-0079 /Monitoring Vesting Tentative Tract Map 3229 PS: Planning Services BL: Business License BS: Building Services Master Plan of Development/Conditional Use Permit GP: Grading Permit FD: Fire Department Dove Creek Commercial Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater FO: Final Occupancy CA: City Attorney APN 045-331-014 g) On-site sanitary sewer system(s) and storm drains located within the project area. 13. The emergency services and facility maintenance costs listed FM/BP PS below shall be 100% funded by the project in perpetuity. The service and maintenance costs shall be funded through a community facilities district established by the City at the developer's cost. The funding mechanism must be in place prior to or concurrently with acceptance of the final maps or issuance of any residential building permit, whichever comes first. The funding mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above-mentioned funds shall be by the City. The developer agrees to participate in the community facilities district and to take all steps reasonably required by the City with regard to the establishment of the district and assessment of the property. ■ All Atascadero Police Department service costs to the project. ■ All Atascadero Fire Department service costs to the project. • Off-site common City of Atascadero park facilities maintenance service costs related to the project 14. Shared parking and access easements shall be recorded over all FM PS/CE parcels as applicable. Easements shall also be recorded for shared drainage facilities. Parking shall not be designated for each use except for tandem spaces, short-term pick-up spaces, and private residential garage spaces. 15. Separate covenants shall be recorded governing use and FM/BP PS / CE maintenance responsibilities of shared facilities including, but not limited to, parking, access, drainage, landscaping, common use areas, and fencing. An additional covenant shall be recorded notifying all future property owners that the project is governed by a Planned Development Overlay Zone / Master Plan of Development and any modifications or changes to the appearance, fencing, or amenity areas require approval by the City. 16. The applicant shall make a good-faith effort to negotiate a shared FM / BP PS maintenance agreement with the Dove Creek HOA for fair share costs associated with the maintenance of Cashin and Bliss Streets including frontage landscaping. 17. Prior to final map, the applicant shall submit CC&Rs for review by FM PS / CE the Community Development Department. CC&Rs for the Conditions of Approval Timing Responsibility DEV23-0079 /Monitoring Vesting Tentative Tract Map 3229 PS: Planning Services BL: Business License BS: Building Services Master Plan of Development/Conditional Use Permit GP: Grading Permit FD: Fire Department BP: Building Permit PD: Police Department Dove Creek Commercial Development FI: Final Inspection CE: CO Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney APN 045-331-014 commercial and residential portions of the project may be separate, combined, or tiered. 18. Agreements shall be required to be recorded against each FM / BP PS residential parcel notifying any residential owner of the commercial nature of the site to ensure that commercial activities are prioritized. 19. The applicant shall work with the City staff regarding the final FM/BP PS selection of landscaping. Trees selected to be adjacent to the public right-of-way shall be compatible with the Dove Creek Master Plan of Development. 20. All landscape on-site or planted along the street frontage shall be Ongoing PS maintained in a manner that allows the tree to grow to its full natural height and natural canopy. No growth suppressants shall be permitted that result in stunting or modifying the natural growth pattern of the tree. Should such trees be maintained contrary to this condition, the owner shall be responsible for replacement. 21. The project site shall be fenced and secured during construction. Ongoing PS Any existing street trees or landscaping that is damaged during construction shall be replaced prior to final of any adjacent building or tract improvements. 22. All perimeter/ retaining walls adjacent to Santa Barbara Road, EI BP PS Camino Real, Bliss Street, and Cashin Street shall be in substantial conformance with the attached exhibits. Retaining wall material shall be constructed of dark color split face block or decorative stone veneer consistent with the proposed architecture of the 3 -story residential building. Material specifications shall be included in the permit application. 23. All landscape and retaining walls shall have an anti -graffiti coating BP PS applied. 24. Signage shall be consistent with project exhibits. All signage shall BP PS/CE consist of individual letters and shall include external or halo -style lighting. No internally illuminated signage shall be permitted unless sign lighting is turned off between the hours of 10 pm and 7 am. 25. The gateway/entry monument sign shall be maintained in BP PS perpetuity by the common lot owner or owner's association in accordance with City standards. City signage and logo(s) shall be approved by the City Engineer prior to installation. An easement shall be recorded in the area of the sign in favor of the city to allow the city access as needed to modify signage at the city's discretion. Conditions of Approval Timing Responsibility DEV23-0079 /Monitoring Vesting Tentative Tract Map 3229 PS: Planning Services BL: Business License BS: Building Services Master Plan of Development/Conditional Use Permit GP: Grading Permit FD: Fire Department BP: Building Permit PD: Police Department Dove Creek Commercial Development Fl: Final Inspection CE: City Engineer TO: Temporary Occupancy WW: Wastewater FO: Final Occupancy CA: City Attorney APN 045-331-014 26. All stormwater basins shall be unfenced. Low level decorative BP PS split rail fencing may be approved by the Community Development Director. 27. Plaza spaces shall include decorative pavement such as BP PS stamped and/or colored concrete, or similar. 28. Future buildings shall be approved by planning staff prior to BP PS permit issuance and shall incorporate design elements consistent to attached exhibits. 29. All trash enclosures shall be constructed of dark color split face BP PS block or similar and shall include high quality solid metal doors. Enclosures shall be designed in accordance with City and State requirements. 30. All site lighting shall be shielded, directional, and dark sky BP PS compliant. Up lighting and festoon lighting shall be permitted within the commercial areas and along the pedestrian paseo. Bollard and/or low level in -ground safety lighting shall be permitted along pedestrian pathways. Parking lot lighting shall include a minimum 2 -inch lens shield or the lens shall be recessed a minimum of 2 -inches into the light housing. Parking lot lighting shall be dimmable and shall be on motion sensors with lighting dimmed except when activated between the hours of 10 pm and 7 am, and shall have a maximum pole height of 14 -feet. All lighting shall be consistent and between 2700K and 3000K. 31. Landscaping along Cashin and Bliss Streets shall include BP PS material that has a variety of height and scale and shall include trees and shrubs for layering. 32. The site shall be maintained and kept clear of any debris or Ongoing PS storage including construction debris, unless part of an active, approved construction permit. All finishes shall be repaired or replaced as needed to maintain a high-quality commercial/residential development. Any dead or non - thriving landscaping shall be immediately replaced. All landscaping required for screening of any use, structure, or utility /mechanical equipment shall be maintained at a height and density to achieve maximum screening while appearing groomed and orderly. 33. No gates shall be permitted on any public or private roadway Ongoing PS or accessway within the project area. 34. For commercial, industrial, office or multi -family projects, all BP PS / FD existing and/or new ground -mounted appurtenances such as air-conditioning condensers, electrical transformers, backflow Conditions of Approval Timing Responsibility DEV23-0079 /Monitoring Vesting Tentative Tract Map 3229 PS: Planning Services BL: Business License BS: Building Services Master Plan of Development/Conditional Use Permit GP: Grading Permit FD: Fire Department BP: Building Permit PD: Police Department Dove Creek Commercial Development FI: Final Inspection CE: City Engineer TO: Temporary Occupancy WW: Wastewater FO: Final Occupancy CA: City Attomey APN 045-331-014 devices etc., shall be screened from public view through the use of decorative landscaping subject to approval by the Community Development Director or his designee. All fire department connections and/or backflow prevention devices for commercial and multi -family buildings shall be incorporated into the served buildings unless waived by the Community Development Director. If building integration is infeasible, all equipment shall be placed in a landscape planter and shall be fully screened by appropriately sized landscape species. 35. All existing and/or new roof appurtenances such as air- Ongoing PS conditioning units, grease hoods, etc. shall be screened from public view. The screening shall be architecturally integrated with the building design and constructed of compatible materials to the satisfaction of the Community Development Director or his designee. 36. All mitigation measures identified in the previously certified Ongoing PS/CE/FD Mitigated Negative Declaration No. 2004-0026, and the mitigation monitoring program for the Master Plan of Development, as amended, are hereby incorporated by reference and shall be implemented as listed or as conditioned. 37. Venting shafts for a potential kitchen in the market/deli space BP PS / BS shall be incorporated into the building design with initial construction permits. CITY ENGINEER PROJECT CONDITIONS 38. An encroachment permit is required for any work or temporary BP/GP CE use in the City rights-of-way. 39. The owner shall enter into an agreement for ongoing FI CE maintenance responsibilities for all on-site post -construction stormwater treatment facilities. 40. Applicant shall pay sewer capacity charges in effect at the time BP CE of building permit application or date of vested tentative map approval. If any unique uses are proposed, specific wastewater information may be required to be submitted, subject to the request and approval of the City Engineer. Conditions of Approval Timing Responsibility DEV23-0079 /Monitoring Vesting Tentative Tract Map 3229 PS: Planning Services BL: Business License BS: Building Services Master Plan of Development/Conditional Use Permit GP: Grading Permit FD: Fire Department Dove Creek Commercial Development BP: Building Permit FI: Final Inspection PD: Police Deparhnent CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney APN 045-331-014 41. Applicant shall have the map reviewed by the public utility FM CE providers for power, telephone, gas, cable TV, and the Atascadero Mutual Water Company. The Applicant shall obtain a letter from each utility company stating that the easements and rights-of-way shown on the map for public utility purposes are acceptable 42. Documents that the City of Atascadero requires to be recorded FM CE concurrently with the final map shall be listed on the certificate sheet of the final map. 43. The applicant shall be responsible for the relocation and/or BP/GP CE alteration of existing utilities as required by utility company or that conflict with proposed work. 44. The applicant shall install all new utilities (water, gas, electric, BP / GP CE cable TV and telephone) underground. Utilities shall be extended to the property line frontage of each lot or its public utility easement. 45. A final map drawn in substantial conformance with the approved FM CE tentative tract map, and in compliance with all conditions set forth herein, shall be submitted for review and approval in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. 46. Prior to recording the vesting final map, the applicant shall either FM CE bond for or set monuments at all new property corners. A registered civil engineer licensed to perform land surveying or licensed land surveyor shall submit written certification to City Engineer that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. FIRE DEPARTMENT PROJECT CONDITIONS 47. A minimum of 2 fire hydrants will be required to meet the fire flow BP FD requirement for building #5. 48. Fire hydrants are to be located within 100 feet of each fire BP FD department connection for each building. Conditions of Approval Timing Responsibility DEV23-0079 /Monitoring Vesting Tentative Tract Map 3229 PS : Planning Se" es BL: Business License BS: Building Services Master Plan of Development/Conditional Use Permit GP: Grading Permit FD: Fire Department BP: Building Permit PD: Police Department Dove Creek Commercial Development FI: Final Inspection CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney APM 045-331-014 49. Fire hydrants shall be located on the same side of the street as BP FD the fire department connections for each building. 50. A turning performance analysis as per Standard F-7 is required. BP FD 51. Provide fire flow calculations as per the 2022 CA Fire Code for BP FD each building. C� 0 Rc. 'Y {'+PV^a►N �� ,-y'S+•�`}a a 0 0 "j O a 0 LL .0.w w OZ Q ZUZ Z UZ 0 25 U 6 rc O wwww¢"pwwww �o U w�R o 0000 00000O o a <` - z zzzz zzzzzz z w'.;�.it`� by s� o° S o 5 S 50 o S o o z z "3' W r aw Y��"- mC 5555 UU 'm�mm'm 'm 0 UUP j U 'HWY 101 a O -r a Ci _ li w z a f� Lu 2 Vf 0drugWoga�wog�drog_Woo�W�oow�0sm0W.r0am- �W.r0sm- :01 Ww0romW�0omww'0omW�0am w�0om�w0e60 0 o oeoo0000+oz u oodoZoooZoU p w pwwO 0 Z ^ a0 � W dw w w W W Z- 3 NNN > >>>>>�wa 0 w�a?B pwUWO'0gH V UzZZzzzZZzzzzzZZZdsw0Z ° �� uH2s --p0faOaw�aooU......mow�am d ,uQ opo dF�wiW'ao aw�d�o aw Ga U a?o°� G°¢� a ap0n¢�y O N O c a4 -4i a u a z o Q, r m X0 = Q U 0 a a a za > zzzzz �- Q u r a e� ¢ ddddd Q Q C 0 V _ ¢ NO �f igi Q 0 ~ wU ZxE d Q< i2„ o°°°° C d C9 g �vXNPSa�0 Q z x R ra�4N°v�hM �¢¢N 4 ~Z V d UZ YQFO CL a CL o �9 wN V a Z\v 0- °a m O N Vw U w i J w F d 2 d d d a K 1N•�F 30 0000000 O � z0 Ozz UTI �� iTZZZZZ O O w -aUna W l�_ Qd U.UO�00� i w0 Omm 'c Q'pUPh t� ZZwmmmm w `� Z Uoom w 06 wz ui w - zz a¢ �� ..� O as 'mm H o 00 � � � o o zo 0w0 rc7= .5 wQ¢O zWfw_z� N wmOp�V w�"' <o Ua �� oNWoa ¢�c�i�ooWp LLw> ao0�0°Q W3� �ZzrO -a ���� z �uWo o ¢oa ao x� owmo� WU00 zf�w O zz��5 oyZc� Z�<m�w ?U.- _ ��x ow�z ¢^xU�x z�Zo>u'�¢O� Op z¢�zz =�Owa Axa aoaw� o� o z 3W Z OAU �N zw�?w��wwU'S �� pp Ua�3 O O dodo 6oZU-O, uzo,o-w-<> olamm 002z --a adz I- Wu,�LL o��w x� woo$o=m23¢ x=f�� ZO wZ <<- 0 =N3jo BzaoO �O pOx> Zw0aa ¢i- 0;� 2 Ooww.. z¢x w0 mQiwaou o?°�.pO¢W� o�Zwo �¢�gww M.o W W4§wW w�p��wo ¢3�p=UjV00 ziph< za¢„z„��w wmz E�od� O 6w ou w3� Qoz �wx3 �Z �waw� �w3�gw f¢� oou F' 000�� w�Oi>o y-()ZZ2ZLLa O`'x,x womUw� zz�w Ozz a U W n ad V� wp a <F yUw � i3aoZ p�QaZ�� 0�0>��d��¢ w0waV dOLL�c9z 1o�� o� »� o Wo �Z �qo "OW�zdpx°u �¢�a o�m z toQo- oo�LL� oLL>�� 9Z�u�� ow�ua oa uoi�wu >< X2_8 ���w -Mo IL zor—< Zmx�Zpo oHUnu-�w0E ZNmzoW Uap¢=o w� p �i z¢ xo 0. �Za < pU �����za i^O�Uim ox 5 xp,"ui pw�¢C�t� wp>i O� wF�_m zZ >O Lwow Od LLxNOad =<U �� �Orz3p Oza= o') Z< U uuw o �aa�V o0 vohz � 3 o') Z< < a xcj�m E •Oo a�_pw(�Ur., pOw-',ax ¢ k'� a gNzw 0=0�w"a �7U.�.. Itw ��„z„zi,"� OUFOwmvo �U¢o Oz�wpU a paw a� U a-- DOp� aiwdww(� N�Vw aS Do z�0 9H 3g�o�ww�z� w�-- - ow H w¢o �xzz �L)— ��>-. y�w�- Oma a�'maLL U.,. . ����� � � �m LL L)— dH u was za u u uu��¢w H oda -3 www w= O 0 o e -4. uiX 00 OOON O 000M 00 00 O O w Y G X o o X K o o x o < o W z< _ Q 0_ N w O x N M w a w U a w O N w 0 N w U¢ m Z Z Z Z Z Z Z Z Z Z U Z Z Z Z Z Z 0 0 0 0 o a o o p o a o o S 8 0 a m UI m m 6iD z w w w 0 Z< H oy Z z z Z w w y z z H U Ua f Nm z .. ., ¢m1 z H ti p 0 O N O t� O X N M O M 1� R R X N N N X N N �- N N C n ♦1� U U U v U v O Om o, a Zsd Q Y U Hi w 0 a ¢ ¢ d W voo m�3Y ~ w z U dos J�w3 Z m z z 3ua O p zw w,' z w m __ O (� ^'x Yx Yo a hw¢G r z a --~ o f r p Q O Z Q - O U< w U Z Z Z z Z Z U 0w0�p YOU' p p p Q O Q O w w Z m m N m m m m z o m o m >O X a x¢ w �> E> �d p p Y(~'ld� Ow'Oww o d m o a U< N -p a N N m h N OZw ° O z us U U "� UUUU UUUU u C9p0w�z �wU' w � � a C7 dada 6¢¢� Q�u+t��V++Uw � i U m z �nw HyHti U<Zi.. x¢ u a It u2y(2 w� W ww W p p < S Q F> p p ¢ d _ U_ 'fi t n V p mU > H w ¢¢ p d ? � �V H J O wwUah�Ud eyH�o —muO¢i NUQW UZ O p+3UU H17 1 j ti-4moUIU ad >W W< a�3•1o >«U¢xpyo wsi2 pn 5 O ¢w� dvu >>U W 3 < Q1m a�-- "C o � o Y w=_z w m ad Z-2 _R �� r 1 O UUUQ y UhUhU�UH "ta 2 U2 x @1 (D)@ 22 = " 0 O ZZZ Z dto O jw� LLi<< iiYi� u�Jw� N w o s 2@Mou <05 N� H yH�N Nati y� d y W 6j o m = N H V h N m U C z h & ar Q p min¢ O 000.-d v n a NNNI�— - C90 N o o w tj dwwU>w wmN..hUU¢UYa¢r�p¢M pHU UU¢dw<Y�¢m< HaAd �S6z�5:Zpws z0� aw2�Uaw U`iwUZZS� > awUw U Q�O�ap 0pUp umoZZ ZZ za U �E 15 - _Qsm¢ p ¢H -00a sN0 y� ' off � oa; > woz V��O= <9e p <z0w GQ w>O jww>pu�OoowwozGw �z d wee vy O�i O O ZN rc� u z 7'1 f �i i ,f, dy4Au1 � Y�x tr� i 4 ;r �tia .t V I Imm C, U' Q x Q 1p W m H �\ 01LA 91S�$1C \ 69• , ��.� �Q'' Q� 6%/$' ppP�..922 1N375423 1�N N W Z W Z H G H W W y W C� X V) Q \ W N 0 1S D`\ N ` 927. . 9p?LU LU J � V ' ad CZ Z C7�Q° P P1�1. HW W 0 ZQoe TQC w Lu CK i( H 0 929 92 Q 0 W NI rry,�Q��`�1' \1\ D iny' Q Z a 4ry2cP�615`��� J aW[ 979 F j i01'x! i �yo�°�0\e 420 i o !l) I^ry S� 919 02 1 cP �VQ\033101 ti ati CO.. 916 C\ 916 _ J�'AI 91, LANE 11 m y76 t 1 } gy5 VQ��O 1 oryR� 1. N 1 p &'J� o$ L 974 O . 4 II 0 11 $S6 r As '(6 .'5.Y Aj'1'i1 D O'Rc 972 SJR aF9 ' W N4T2952 0 C3 Q W V°3 BLISS STREET f 9 0 8921 J L' 111141211 J � V ' j. As '(6 .'5.Y Aj'1'i1 D O'Rc 972 SJR aF9 ' W N4T2952 0 C3 Q W V°3 BLISS STREET 111141211 0613 10 ZQoe cy oC TQC U Z AP\0 0 4 Q 0 \1\ D iny' Q Z 425 aW[ Q�ciOC P Q r e'S ;z zbzo naO�z 0 w z0 w p a0, O Oa J Sb ?ou �o��„�o zu �uW- z 0 cy z - J w Sz �U >->Z-- W O` O a s X: 03 (D 3 i Op Sz u.- ze•"Moxdz ffiHl,gg?a�a�wz 22 a w w ww 3 U. iapY aUp�wpaz r Z a �z z M 0-0 mw ww Qaw X61 g6jtg� zgo�� z zos�toa LL�oLLu'zpdod�arLLa� -O<H Qin uY aw 3 z f U' Z w J W p3 wXI�YO>U�> O? Z X :E m U' a �e6 :7( O woz aad g>a,-`o jN ZZ -�w� �a o� aoLYZz 3g =2 Z�= oa125 H x w �� wp ° �< �u ��� =wo d m ti o pU h o_U0w moa U� ampUwO w d O— v> .n2 U O- O �♦la m v1 vl� Vs N �nO N (J N Z N pm J ,a ¢mz z�x �?a h z U 0 OZZz v 00 n U W 0 � 0 r 0 a�<3m U U U w 0 ~? as :2 a Mm na> y U w U j n z a Z n OPMT=: � pm rO>z °Ypa=) ozdo m u (D Z Y Fy m 2 fl CC4 O ux Z U' ? � � W n x Q W pp Y Y Z o e W Y F Y 8 y y W w < Z0m v^i N�O o't Ur g y w� =O zW� HZ �a z LU N O x ti X 3 (� ? w .. Z a Z W Q w �YCK Z QzUoo¢� J Z o W W w ra Oz - o N Q U z w '..; � ``\ �wb'wed J7, ZJ'i _Wf�,/ 13 0 or, i.' f u *Z2 x 9y. r a V o= Q Q I \` W I. rl cy- U eco ' O Oly- Z co 0 (, co Q Z W Y ` ------------ _N 133?J1S SSIl9 � d U Z O U W a �+ � 5 U CK G � CO i 0 D .,0-.99 I J fI O .1 L H WWC p � G N C N co O U o 11111: I I i I j I C b C a m Q Y K O ry L� a W p j III e U^ U 4 a vii E p Z 0 o O=0. 0 1 W w Q m O \� i I O h I I O � I I � I II I ------------ I 1 I I II Z I I I h Q ..0-,Z9 .0 2 � Q � O N W CL H Z J m 3 O OW w m Z w0 N CSO Z d Z O M 0 Z ;5 Qw OLL 0 O 3 O hp <z U zoOe �Q m o� wwO w n� of m -7 J: O O O 0 N o � O F y U Cp C s O 4% V s 30V21`J'1VN'J�V WOM3 O OO ONOT �1N P ..M O O O 0_ N ^ 34VNE)'1VN *OAV WONA w 0 31 zl I xvw „o ,s£ 0 0 N o�o� �^ O� a I I I I dV3 O a 31 0l I „a.al I I O Q I I Z o O o I 1 V3H y i I �o i I I o o x tir, a U IN a I I , � W I r �'•„ 20 N acs m Us I :-. I� m sy I a a LU zf o ! m �� - O Z 4 ClV3H w I Z ` O,IZ Q C6 Z Z J a Z L) 3: I a I W l i I Z Z U LLQ q I Z Q � I F OV3H N Z O z p J 1 p=.,o .a I O 0 i U� i ; J W I I I 1 Q > J :20 Z a — I N LL I y W H000 I I W UO Zo - Z I W I W Z s CG 44 a j 4 O x< w d Y o 0 34VSO*IVN'OAV VVO1H 'XVW..O-S£ y ,.6-.81 0 90^ O^ pR N 000N pa pig o 3OV21J'1VN'JnV W0M3 O ? OI o I Uf w .,6-.81 " S-,8 ,0-,£ ..1-,L „0-,1 1 0 9 07 0 7 O 4 Tn N CIV3H QV3H I p coi p N p °' O `� ,.0-,8 N .,0-.01 O w wl p h 2 d Z Z � ( I I I (� Q z Y QV3 S 0 - I „0.8 OO uz - LLJ i 00 Oz ag < O o 1 j I wQ o w _ I r a i °m Ko IND y- 41 m .f ?K I i - y LU z e W Z� Z< ..0-.6 N y F w z z a S- O W O 3 I o,ol F z o (9 z > `vl Qz I < o z O z — w_'I I i — O_ h 00 Z ce °w ® LU W I.I, K w aZ w — oY w C N G N IZ U0=0 a.l Z 3 I I I I I � � I, II , LU 0- o c9 , a � T 0z on I 4 i T ,- � OV3H H i (� .,0-.41 z G J_ J_ LC m _ 4G wAamM K< W i° N v Q U' 0 0 va = k. ,.7-61 �,6-,9Z O O� o 0o ON O�O O O O_ O� 0 0 LLP LL' P 0Z1 O — w O w ,.0-.Z 1 p U O 0- oO c 00 Op 1 ~ Z z0 w o Om p Oz_ > � wz Op 3h __ w0 �U m _ CW C LU W Q LU 3 LU O OOp U _..,__. .. of m Z Z U U QZ -_ Z �0 Z O Z0 O > o > J �w J Q Z W W 0 13 OO Z CG Q ag Q OQ w ad O O U U W CL. W a Z Z O J_ O J_ M 7 44 m � bb CO ¢�=6M _e a X � W d W u m 0 0 N= „9-,0£ 0 b 0 -.0c O �1 'T Oco Ci LL P Q 3i ZI Lo_ 0 O 0 i 0���' O w U f w ° O 31 0l N 31V1d'O'1 ° ~� O O w 31V1d'O'l LU J O10 a lU ^ Q i W o o U I � 31V1d'O'l a 7,61 5W N Q O U x C7 3 Om w III, 0 a O z � o z _ -- O � W J � N W W d 1 H H Z Z _ 0 � J J c no is 41 m Q O7m N a of � o I I Z/ l L-.06 co Q m U o C `o y o ,Z/t L-,06 X o c z J -D, ,Z/ 10-.81ad o W d t W tz m z s o D \ \a O 3 \ o Z O' o w w _ O ma �9 N N ^ 6 - I N I r N Illll 111 O LU Irv ^ Q � N - wo I I mi 1 0 I V r LOU? o m N _ Lu I m N N r � N N I �RflT N 11111111 a I C I � M WN I LU m ON c7 m ON N N Z I Q J d J N N W Q 7.. O W N ..Z/ t Z-.8£ Z/ 1 Z-.8£ w a U N Q Z J m 411 ..Z/! Z-,£ I ,S -,9L I Z -.RC T „Z/ 1 7,-,8C !]D � unli � lb 3 0 Z ZO W Qm U 030 O = V�LL N a J O W N U . Z W O S m Z Qwd W m Z K Q z W Q W X U O wZ 00 �O vdi0 d:s5 s v-5-0 N H Y U a z 0 d O I I 'I � I � e i v I a I I i I I f f 1 I I I I I I � zt/ I I I zt ----J �.„7 dAl r-- I 6' I IN Oo �m I I go I I ,Q I I I ,zt/„v I I 'I I I „z—I I I I I I I I ►I ZI /,.4 .I„zr l /„4 I N I. I I a 0 0 N LLJa Y a Z_ D J 44 0 4) N 34 V NO 'lYN '`JhV Vd0213 o x8 Oc On Yo W 0� 0� 0°' Glu Y z O O O O a z U s 251 ZI LLI i O - U > O „L-,S „1-.6 1 .,Z-.Ol Z-Al J 1 OV3H I I av3H OO LLw 0,8 „0 A! ui U Uw Q Zw A Ux OJ Um 3 >�O O y N -- -� f 30VN!D'1HN'OAV WONJ a O (, O w 0 °u, S ,Zn OOO oIN LL� LLI �a U U Z w N .,1-,6 I „Z-,OI I „Z-,OI oz dV3H OV3H I I ..o .a „o ,0 i DC7 Z Qz ^' z a i O (L > x a H w 0 di N Q U = Q O W _ m w Z y W C D a - <- Q '�' C) O i m Q U 0 Z_ Z od<4n U a w z w Z Q 0U z O U �++ (� O u. — O z A O Lu J - w O W a.w and I N Zw Z > N -4 - / !��yy LuN _ d Z O O oma- Z Oz p � 44 m g ae �O o � N O 30VMJ'1VN'0nV W0NA X `u W Y a W W u i 0 LO O'(p'V Op O U a z O 0 o D LLP > _ I �I 2: O - p w N t/T I„L-S J-16 .Z -.OL OV3H I OV3H I GV3H I �' C N 0 I 0 7-1 - zT: z o j, d > oa I `° L P P 0 U U D _ - -� I 3OVMJ'1VN -OAV WOMB j OoLL n �v 0i� o i 0 g�a o�o 0oo 0 w w OZ -- 0 OI Clq � -t �IP w a �> �I = o - g- - W z O �� w U 3 I OV3H aV3H'Iy'`OV3H _ , p--�I 0 0 o Ed 04 oa L. >0 z0 > 5 _Z � Z Q h H w 0 Z W Z- < �(� O(J o ie p� m m 02 z 00 ti w e 0 0 4n y � y wZ ��`- - z _ (� w oz �Q O z Q ('w oz zY a O o O U5 - N Q 3umH J O ` W U f LL /w 0 7 u W N W _ Z Z _ 00 CV j a w W—�'�—J W CL 9L < !'\ (j z >- C7 z !- d 0 z w w Z Q z Q< P z 0w a O .9-.0Zj w Q m � � 44 I 0 � r fLU M d" ON OO of of QOM �la O .4 of a x z O IlJppI1Y m o m o iG D N I i I ""Id IL31b1d I l-:6 .,£ .61 I I I I I I � I J c o c W LU LU Q mMR{ j _Q N I� N Ili I O W ki W ( WIC v mo moI m� N I' N I .. N N �I W " �l z 0 U N a z 0 Z 0 N CL W } V Z J M In � r fLU IlJppI1Y m o m o iG D p W N Ili I O W ki W ( WIC v mo moI m� N I' N I .. N N �I W " �l z 0 U N a z 0 Z 0 N CL W } V Z J M In � r � iG D p W h W I I c o c LU LU LU N Ili I O W ki W ( WIC v mo moI m� N I' N I .. N N �I W " �l z 0 U N a z 0 Z 0 N CL W } V Z J M In M D m �'J O 1 O OD wIP 0 P OI dl Q RV1d 00 W Oz Q W 0 LL r OZ Op 3V3 m � C P Q c dl F O RV1d ,Z/t 6-,E „I -St y M N d h W Q d MI m m00 m� P <IP OI r O � 0 J OV3H m .0 -,OI Z U z Z ZO w I �O W NO O W3 ® — 1 Z Q M O W � 1 P H NJIS O'1 Z O ,A-9 I J 34VNO'1VN'OAV WO?A pp „9 -,OZ m N m O Ql Ola N Q Z J O � ~ m `aV3H Z z z *r4 0OzQW0 I a O I o y P M 00 CL 3 O NOIS'O'1 Z 0 36VMO-IVN'OAVWO?J � .19-11Z 1m J m „9-,0Z �o �o a % .Lim OIP K Q a H W LL O Z W N GV3H I Z ? y .0-,01 I O Q H J m ---r I z Q I I � W J W W H V I Z I � 34V210'1VN'`JnV WONJ �o �o aIP OIG W 0 LUI.- � � � N ~I �z => Z � Z _ N dV3H O Q VII U Pit:; a ¢ m it :; 6-.S9 o y z .,Z/ l L-.£ .,£-,9Z „0-9 ..Z/ l Ol-.6Z N �O X u o I I Y o s a � U a C - N I � e c W W � Q C9 _ W W I� w Q N Z 0 � O W O 1 J O W � I Q p 0 Z I I I - I F p ih o Q p Q O M Q � LU � N Q a N Q b LIJ I V 1 rLU o �I H W� _.r. o 0 I a� H,LUo ut N ,W,^ a® o r - J N LUQ 'a W W_ Z a Q m � Q � IIIII I;II 0 I - o J , 517 I � W z L L-,£ ..£-.9Z ,0-.9 Z/10 1-.6Z r Z_ a m � � J N Q � m ' N IQ� „6-.59 S Z/t Ol ,6Z .0-,9 ,Z/t OL -6Z G o c� �o X ON y o W °o d! v N U u d > 0 W O I Z m N �. � t 4 W o O m � N I — I W O O I' m N O I I t I W Q m r N O I Wp do O O N � N N � I O LU O V � N O D Lau? M O mo N � i � Q N O v � O O YJ p NCL Q J do?, N 1� N ' O Z J Q � 0 0 z � I Z O U N - - -7 H M W ,.Z/t of -,6Z 0,9 „Z/10h6Z „6-,99 Z N Q � m E=a o 2, -0 w a I w=yw d v w ° 5 K U O 1 �0 a0 0 0 O LL ¢ - - ---- I I D r. i I `I - i — „ZZ,.4 I I I L- I I I I II I I I I I I Z L ..t —I oo m JI •. -- r. I I I L_ I I I I I' „d L /J7 I dAl I I ` r'` I I ',I ,ZL I I I L I I I I i I I I � IT W Y ,H V Z J_ ca m 30VNO'1VN''JAV NONA =t O NQ N O Q O O n _ < Rg1a O O O OP KI E N J 0 0l of ol^ x O - w H a o O Is U > a h 4V3H OV3HOV3H 3 O U o Z N 3 O s > p z0 D 00 - u N z f 1 0 R W I Q W mm a II Z K 30vao '1vN 'onv woa� h I_Fl O, QIP Q�� O(V OP �M Oce O� O'^ O q� of of NI w z .. >... O Q a� „L ,S,.l 0- u_T w Q '� '' I % I- I I OV3H OV3H OV3H C a O ° U — co W Z o I Q C w Z O ti Q UZ !I Z a W Z W ^ Z U _ L) W -Q LLz d Q —Z Z O ' U LL o z Q >L LLIW > J W `` O Q K Lu o d H Z Q H O Z I P O m I 44 34V80'1VN'JAV WOId „0-S£ �o: =�a P M J N O-(pv Op O^ �Jl P ql U -0 o H XU < \ o W I -- , 4V3H�VgH OV3H a z_ o ; - O 3 iIn O ' oz w > � p L Z cN U Q Q OW U > N 0- K W W Z W W N i 34V80'1VN'!DAV woad 1g OC N OC p T Z�l >Q �Md 000 Qo �� ow ! 0 0 0 0^ NIP w z — �I �I I of LLI N 1- �T` I A -d b .Ol Z.,01 z I dV3H OV3H LL aV3H O Oz o — /- z �- 00 � W Oo I, z g pp r xH YB Z y. W rca 0 0 Q ~ N Z O (� U z a W _ z Z O z a? _ W oz <a H O w U z O J m¢ F 1� Q 1 N W ZI _ I W c � _ W Q 1 d z _ z H J J � 4e v a N 2 z? W Q h O O Q O Q 1 X U u O1 dl 2 OI H U d 3 31V1d 31VId LL31Vld C ., t-.6 ., t-.6 ..1-.6 I 0 an I i� w Q a a LUW i 1 Q m N m O M3 C? N Nj._ -.. . _ 4 Q� _ _ 4 Toe Uo OU�a ovP P � p a - W O 31Vld LL 31V1d L 31V1d m� m o Q N C� N N O JI LU a i W / m- C-? o m E O a NN N a W � O h W W v `n :-- i WW C Q O O N N �I W O W N -- Z N N aN f- I 0 a❑ H wo� Z LU U' ov'lu O O J��f Q ~ N N Z O O w Q 0 U W W d a C7 (9 m m fr 44 Ar d � g °of Ji � Q d Q N Y so o LL 4% Uo d `a d o U g �� ..4-.£9 y o O I ° n Q a W m N N oo m M `o co M NW TLT r�tww O Q m m 4 N 4 N 0 0 com o m m I ?FPFd il11111111 (V O d' a II �o y m� W� I I N N —_ m D Z uj U LLJ N � tn Z o. Q a 0, 0 0 J N n a W F H 8.tE 8 t£ H b .£9 W d Y H � � Z Q D J to LC W O Z W N m _ Lni� H o � 4) O x� W d Y o C! v 3(1V2O'1VN'OAV wOdJ U a i 'xvw..I a) - o ,ss > 0 0 o Bch 0,0 «� M a�P 02 0 5 0I �I F. e ZI O — U w N „6 -,ll „l-.6 .z-,Ot 4V3H L `4V3H 3 I ao >_- zz0 I I z °oI z -- 0 oI x 01 3aVaO'1VN'OAV woad W Q ¢ I 0 Ed d iii o w O N O:- -- O Z z UI WI w Q f O z- -1. I .,6-.t l A. 6 .,L-.Ol ¢ K O¢I., OV3H 4V3H I i I I U u - ti I >fL n U ,I u I M — W unII. W I z .< v I ` r �� Ia U_ z I I �- z I j z II O O s I I � -- I_ a �>, q 5 I w Lu W O i W F z I � x I O 1¢ (7 I m W ti0 �z -_ i ? h z! a a 01 W W 'ol oZI ¢�I I ¢GI z � ��� z I m m 3aVNO'1VN'OAV WONA 1 „6,LL 1 „L-,6 1 „Z -.O[ I wih �2v GV3H LOV3H �- �- O- O I I � � 0 p I - 1 �I of LLI 3OVS0 *IVN *OAV Woad 1 „6,LL 1 „L-,6 1 „Z -.O[ I W GV3H LOV3H CV �- II I , I I I ti II o � I d°' I 1 O -_..• _._. _ JI j z0 I I o Qa I oQW 0� _ I I �y Q W Ei E13 OQ m m LU N w /-- H Q - Z 00 S H o _ _s I I m MT Ia z m Q O I Ixl a w j LUI T _� I h a0 I Ly Ly J to to 3OVS0 *IVN *OAV Woad „6-, l l ' ., l-.6 ' „Z-,0 L ' W - Q'- CV �- , 7 0 0 d°' Oo 1 O „6-, l l ' ., l-.6 ' „Z-,0 L ' I OV3H L OV3H a KN W oQ I 1 _ Z o z O J m W LZ z d0 o 0 Q- OCN W W c 0 ¢ WaO� zg �Z p Q Z�= g mZ� N v< �¢ Y C oe �'OQ w U Y —m zI0'z�~ r O p N e w o K Z W U.=_ ._ - h H w_ H v; C p C o Y `1 ¢ O O=pO -- -. ---- UNOU pO G7 > — �z�71 - -- - _--- x - z 03 0O O G �— -- Z — ZOZv —._ — 2.o- C. dhm`� - - 1 F W -e`F'gyi a 'j Q Q ZZb£6 VO '0213OVOSVIV a �Z r lVgU ONIINVO l3 OOLII s $ Z Of g fl'+§o 8 p uF� sw II��Ae�'ONI'ONI``N33NION3 VYV�r n� `_ 3sn-43XIW X133210 3n04 d o' R " � 1 � � __ �� i• o 8 B`z $ 8w � NOLLon'diSNOO tl0=l ION 3 3 0 0 0 0 0 0 0 0 0 0 „ - - 1 Eg a p uF� sw � � __ �� i• 8 B`z $ 8w � 0 0 0 0 0 0 0 0 0 0 „ 0 0 0 0 0 0 0 � w to '''� Wyk. � 1 -� � � 7 a• ' } > O a 1 IN z x A1C' 4` •.` .r_ � ` �.- ?�, � - H x1 �. 0`fli, z r ' ° '"' Wo W�z_z 3 �"' �W» Ho t 'o 11H MR0 Rafl u Ngg,- m -i - ~ zs�d7r �iq 3p69 EVQIF M-H �W oo� c a W u°_ ° E s 3osos HH, 0 _ n 9" ��►�T. 9 m E O� _ W= II L •x E 4 N 1 \ Q16 U a O: ro f �W JX VW v� 9" ��►�T. �5 7i�7 aS iel F ,a� E O� _ W= II L •x E 4 N 1 \ Q16 U a O: F �W �5 7i�7 aS iel F ,a� E O� D. II N� N �5 7i�7 aS iel F II 1 \ F `t VW v� ®� E osz � o o F= wo - z W ww�ow�m�° C wUW�S6F - H Y .-clw<.n a.mc Z mV< -0�� oa>Ao2z 5019 w bEg y9 zz �a y' yQ v0� 2FV 2 O SpQ��^� iz, Z`w0 020`5 sF� QS -<2p o Quo <<M oj3zu5 5� 1033 i- Ego a ma>o W�l oggIN28 MM ousow` ��W 5 - >5ppS°omu�z s n6s $io pp 1010 pzp O z >iY 0Z� O _. '^�i fo o�u EEI 0 og;Q a� Z 30 O 4 aLL i_c_ - u �a �,o Ws. Zw i �2 N p 6 i~u�6' '0R- O ll 1. =Soo Nga EFaF--' 5F --- F--- ----- °do a as m�R 7 O -_ Z 5 3a o W f - 5p �s g � wSou Q Sow °p o �z W- =°o <O 13 �Zo-� z <� < 0p- m3 ap o� e. a 3 ro8g u w oma$ o� 300Es m O Vsmo 63 w. �� O ow �z o��p 3 rr i n mai> �Q Um-ao mV< -0�� oa>Ao2z 5019 w bEg y9 zz �a y' yQ v0� 2FV 2 O SpQ��^� iz, Z`w0 020`5 sF� QS -<2p o Quo <<M oj3zu5 5� 1033 i- Ego a ma>o W�l oggIN28 MM ousow` ��W 5 - >5ppS°omu�z s n6s $io pp 1010 pzp O i O o '^�i fo o�u 3 �u 0 og;Q a� o°o" �3 LLio �o wuo=�po 4 aLL i_c_ - u �a �,o Ws. ��lLL O��cx Sao 03 _ r w qSac c�Wfa � d i~u�6' '0R- _ Nga EFaF--' 5F --- F--- ----- °do a as m�R 3 a 3 ro8g :o 300Es WZ O ow �z o��p sOW O �Q Um-ao mV< -0�� oa>Ao2z 5019 w bEg y9 zz �a y' yQ v0� 2FV 2 O SpQ��^� iz, Z`w0 020`5 sF� QS -<2p o Quo <<M oj3zu5 5� 1033 i- Ego a ma>o W�l oggIN28 MM ousow` ��W 5 - >5ppS°omu�z s n6s $io pp _ ss cE= N cEEii ED in `E < W 0 o rb�a LU CL o2a6 N - oE£� _ 5.0 Z Z m16.e �Em E $-O c g B mgE o3L-_Q0 dgti_-�a Z °®avd -E.O.EO N Lu Ea`y�o� _ V n�rn c_ W J t _E v _ O Q Lv°m � Z oa0 cacu IL .E. mE =i a@a3ao t Z �u O®3 'Ez° 3�EliEot U W -Mi I t.i�3r l N la� ,Z V _m-m env Efo°me N ,jalCl V moLLo c d/ £mp°o£o U V sor o =oo IA- £n 3Emc Oo°d= - U3o°c nwo gl 3EEtc_°° J � - g _ a -2 E»E,t, 1 E°c3e�o E c - O mN�#g N J eE yk; z i f wfW€ar ORa Q� ZOLUN g= n ea u n $ is�'s`s� 40' § 9-3.657 Establishment of Planned Development Overlay Zone No. 12 (PD12). Planned Development Overlay Zone No. 12 is established as shown on the official zoning maps (Section 9-1.102 of this title). A Planned Development Overlay Zone No. 12 is established on ail parcels , k .UUZI, .., U11 5 56± UU , 4, :331998, 945.991 991,045_342 995,04-5 _R42 994 045.342.013 045_342_09 045_242_004 0-45 R42— Q Q 2, @4;-V;2! O IFIWithin Tract ?(;?F inrhirlinp �­v f itura hrli. it ^n thereof with a tota' gross acreage of 63.3 acres. The maximum residential density within the planned development shall not exceed 2-7-9 350 residential units.-, including a maximum base residential density for the vacant commercial site at 71 residential units, consistent with the previous environmental analysis for the project sitF A minimum of &31 19 acre 4 -commercial retail u&e- ro ertN, and 27.7 acres of common and natural open space on the 63.3 -acre project site shall be provided. The development standards contained within the master plan of development document (CUP 2003-0099) ana Utvt3-00, , as conditioned shall be applied to all future development within the project area, and as follows: (a) The Vesting Tentative Tract Map (TTM 2003-0033) --ir1 Tantativa Tr;art neap (Trart ���9� and any subsequent amendments for the site shall be consistent with CUP 2003-0099 DEV23-007 . All construction and development shall conform to the approved master plan of development, as conditioned. (b) No subsequent tentative parcel or tract map shall be approved unless found to be consistent with the approved master plan of development. (c) The commercial area, residential dwelling units, landscaping, walls and fencing shall be subject to review under the City's Appearance Review requirements consistent with the approved master plan of development. (d) Building setbacks lot sizes, landscape area, and lot coverage shall be as identified within the approved master plan of development. (e) Alterations or additions to established dwelling units shall be subject to the density and development standards of the master plan of development. (f) Subsequent amendments to the master plan of development shall be approved by Planning Commission Resolution. (g) The commercial center will retain the Commercial Retail zoning district designation. The following allowable uses are proposed for this district within the PD12 overlay zone: 1) tirnsan rooa ana Proau(_L. 2) Bar / Tavern; 3) Farmer's Market; (1) BFeadeast studies; 441 -Food and beverage retail sales; 5) General Retail, (4) FuFnitwFe, hemefumishings and equipment; Irl !_.,..eFal retia di -s , steges; 6 Indoor Recreation Services; 7) Mircobrewery / Brewpub; 8) Tasting Room; 9) Winery– Boutique; {x}10 Temporary or seasonal sales; kg}Llj Financial services; (9) Wea4R o 49412) Offices; { 144--S4 +`fig; 42}13 Temporary offices; 4-3}14L Personal services; (14) Light 4-5}15 Eating and drinking places; 46�16 Membership organizations; (- 17) Schools—business and vocational; (29) Fa FF a n+ anal PI*eS• (21) Fuel and wee .deale FS; (x4L81 Hotels and motels; (23) Skilled n i — f"i", i 04419 Bed and breakfast; (25) PuReFal r r2cT (2:7) I blit , seFyiese nteF, {x$ZC' Libraries and museums; (- Z] Temporary events., (h) The conditionally allowed uses within the Commercail Retail zone shall be limited to the following: 1) Amusement Services; 2) Indoor Recreation Services 3) Multi -Family Dwelling (i) residential and open space use shall be consistent with the requirements of the underlying zoning district except as allowed by the master plan of development.