HomeMy WebLinkAboutResidential Remodel Intake Checklist
City of Atascadero
Community Development Department
PUBLIC INFORMATION - BUILDING SERVICES
Community Development Department 6500 Palma Avenue Atascadero, CA 93422 (805) 461-5035 fax (805) 461-7612
Page 1 of 1
T:\FORMS\BUILDING\2023 HANDOUTS\Residential Remodel Intake Checklist.doc REV Jul-23
RESIDENTIAL REMODEL INTAKE CHECKLIST
SEISMIC DESIGN CATEGORY C, D or E - CLIMATE ZONE 4 - WIND ZONES 85 M.P.H - EXPOSURE ZONE “B” OR “C”
ZONING ORDINANCE - NATIVE TREE ORDINANCE - ATASCADERO MUNICIPAL CODE - 2022 CBC - 2022 CRC - 2022 CEC
2022 CPC - 2022 CMC - 2022 CGBC - ENGINEERING STANDARDS - CALIFORNIA STATE ENERGY COMPLIANCE (TITLE 24)
PERMIT INTAKE MEETINGS ARE REQUIRED BY APPOINTMENT ONLY
MONDAY – FRIDAY BETWEEN 8:30 A.M – 4:00 P.M.
Incomplete submittals will not be accepted at the permit counter
I. Application and Forms:
Residential Intake Request Form – Email permitcenter@atascadero.org prior to schedule intake meeting.
Complete Application - Signed by Property Owner, Authorized Agent, or Licensed General Contractor.
Grant Deed / Title Report – Required if applicant name is different than County Assessor’s records or deferring impact fee
payment until Final on 2nd unit conversions.
Construction Waste Management Plan
Encroachment Permit (Separate Application) – Required for all work within the City’s Right-of-Way.
II. Fees: Express: Minor: Major:
Current Express Fee Fee $ Valuation** Fee $ Valuation**
Non-Structural Non-Structural Structural changes
Valuation < $16,000 Valuation > $16,001
Min. Plan Check
** Building Permit Valuations – Definition:
Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing
equipment and other permanent systems, including materials and labor. (Fee schedules are often based on a valuation of the work to be
performed. This concept is based on the proposition that the valuation of a project is related to the amount of work to be expended in plan
reviews, inspections and administering the permit, plus an excess to cover the department overhead.)
Advance Plan Check Fee – Determined prior to intake meeting. Additional fees applicable at permit issuance.
I. Site Plan (3 sets; if applicable): see elements of a site plan handout
Septic Systems – If your residence is connected to a private sewage disposal system (septic system) AND if your remodel
includes adding a bedroom, the existing septic tank, length and number of leach fields must be verified by a licensed
professional septic contractor or engineer. If public sewer is available, a sewer connection may be required.
III. Construction Drawings and Support Docs (3 complete drawing sets with 2 sets support docs):
Existing Floor Plan Layout and Proposed Floor Plan Layout
Title 24 State Energy Analysis – if applicable
Additional Information / Required Prior to Issuance:
One (1) Additional Floor Plan For County Assessor – Min. 11”x17”