Loading...
HomeMy WebLinkAboutMajor Commercial Intake ChecklistCity of Atascadero Community Development Department PUBLIC INFORMATION - BUILDING SERVICES 6500 Palma Avenue Atascadero, CA 93422 (805) 461-5035 fax (805) 461-7612 MAJOR COMMERCIAL SUBMITTAL INTAKE CHECKLIST PERMIT SUBMITTAL INTAKE MEETINGS ARE BY APPOINTMENT ONLY MONDAY – FRIDAY BETWEEN 8:30 A.M – 4:00 P.M. Incomplete submittals and walk-in submittals will not be accepted at the Permit Counter. PROJECTS INCLUDE: TIME FRAMES: New Commercial 1st Plan Check – 4 weeks New Industrial 2nd Plan Check – 2 weeks New Commercial Shell I. Application and Forms:  Commercial Intake Request Form – Email permitcenter@atascadero.org prior to schedule intake meeting.  Complete Application - Signed by Property Owner, Authorized Agent, or Licensed General Contractor.  Grant Deed / Title Report  Atascadero Mutual Water Company “Will Serve Letter” – Required for new water service.  Construction Waste Management Plan  County Health Department Approval – Required on any food establishment business prior to permit issuance.  OHSPD 3 Requirements – Declaration of request for plan review, inspection & certification form required to be signed at submittal for all new medical buildings.  Encroachment Permit (Separate Application) – Required for all work within the City’s Right-of-Way.  Public Improvement Plans – If required, applicant must apply separately from commercial structure. II. Fees:  Advance Plan Check Fee – Determined prior to intake meeting. Additional fees applicable at permit issuance.  Development Impact Fee – Payment may be deferred to Final with signed Impact Fee Agreement at permit issuance.  School Fees – Required prior to issuance with fees paid to the Atascadero Unified School District. City will provide form. III. Construction Drawings and Support Docs (4 complete sets): *Note: A commercial shell building is a “SHELL” building only. No mechanical equipment, interior plumbing (except fire sprinkler system), electrical (switches, light fixtures, and/or receptacles are permitted for security), or interior partition framing is included in a shell project. There is no occupancy approval upon completion of a commercial shell building project. A tenant improvement, complete with State Energy Title 24 compliance, all mechanical, electrical, plumbing (including accessibility compliance) and interior wall framing is required prior to issuance of a certificate of occupancy.  All items included in Civil and Planning Drawings (see IV. on page 2)  Cover Sheet – List all proposed occupancies and all deferred submittals. For commercial shell buildings provide a statement “THIS STRUCTURE IS A SHELL ONLY. NO OCCUPANCY IS PERMITTED UNTIL A TENANT IMPROVEMENT IS COMPLETED AND APPROVED, AND A CERTIFICATE OF OCCUPANCY IS ISSUED.”  Floor Plans  Site Plan – Shall show all property lines including bearings & distances, existing street improvements, basis of bearings, street right-of-way, topography, existing utility mains & services, proposed utility services, trenching, existing & proposed driveways, parking, landscaping, and any vegetation within 20-feet of construction activity  Architectural Elevations  Conventional Construction  Structural Calculations – If you are proposing non-conventional construction per CBC.  Truss Calculations  Methods / Materials / Detail Sheets – Methods and materials based on Fire Severity Zone (see handout).  Title 24 State Energy Analysis  Electrical Sheet – Must show lighting compliance with Title 24 State Energy Regulations.  Geotechnical Report / Soils Report  One (1) Additional Floor Plan For County Assessor – Min. 11”x17”  Fire Sprinkler Plans / Fire Alarm Plans / Hood Suppression System (2 complete sets) – This is a separate deferred addendum permit that must be submitted for prior to issuance of new structure permit. IV. Civil and Planning Drawings (2 sets required at submittal):.  Native Tree Protection Fencing – All native tree drip-lines (where the branches extend, not just the trunk) within 20-feet of proposed construction activity shall show tree protection fencing.  Arborist Report – Construction activity within native tree drip-lines (where the branches extend, not just the trunk) or native tree removal requires a report from a certified arborist. A separate planning application is required when removing native trees. To find an ISA certified arborist visit http://www.isa-arbor.com/findanarborist/arboristsearch.aspx.  Grading & Drainage Plan – Grading over 50 cubic yards requires a grading plan showing cut and fill, existing topography, proposed finished grades, finished floor elevation, elevation benchmark (location & elevation. If grading over average slops of 10% contact Planning Services (805) 461-5035.  Stormwater Run-Off Analysis or Hydrology Report – (as applicable)  Sediment and Erosion Control Plan – Separate plan sheet required. May be included on grading & drainage plan for minor projects.  Septic System Design and Percolations Test – Required if City Sewer is not available. SEISMIC DESIGN CATEGORY C. D OR E – CLIMATE ZONE 4 – WIND ZONES 85 M.P.H EXPOSURE ZONE “B” OR “C” ZONING ORDIANANCE – NATIVE TREE ORDINANCE – ATASCADERO MUNICIPAL CODE – 2022 CBC – 2022 CRC – 2022 CEC – 2022 CPC – 2022 CMC – 2022 CGBC – ENGINEERING STANDARDS – CALIFORNIA STATE ENERGY COMPLIANCE (TITLE 24)i T:\FORMS\BUILDING\2020 HANDOUTS\Major Commercial Intake Checklist.docx REV Jan-23