HomeMy WebLinkAboutResolution 2023-071
EXHIBIT A: Conditions of Approval
USE21-0107
Conditions of Approval
Conditional Use Permit
Outdoor Recreational Vehicle Storage
6805 Sycamore Road
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary
Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
1. This Conditional Use Permit shall be for an outdoor recreational vehicle storage
yard as described in attached Exhibits, located at 6805 Sycamore Road (APN
028-121-001), regardless of owner.
Ongoing PS
2. The approval of this use permit shall become final and effective the date of the
hearing. Issuance of building permits may not occur prior to the appeal period of
fourteen (14) days following the Planning Commission approval.
Ongoing PS
3. The Community Development Department shall have the authority to approve the
following minor changes to the project that (1) modify the site plan project by less
than 10%, (2) result in a superior site design or appearance, and/or (3) address a
construction design issue that is not substantive to the Conditional Use Permit.
Ongoing PS, CE
4. Approval of this Conditional Use Permit shall be valid for twenty-four (24) months
after its effective date. At the end of this time period, the approval shall expire
and become null and void unless the project has received a building permit or a
time extension.
BP PS
5. This use permit shall be valid for this site regardless of owner. If the storage land
use ceases for more than 6 months following initial occupancy or if the City
verifies that the use is not in compliance with Use Permit conditions, the use
permit shall be revoked and shall be subject to the review and approval of a new
use permit, subject to zoning and General Plan compliance at the time of
revocation.
Ongoing PS
6. The owner and applicant shall defend, indemnify, and hold harmless the City of
Atascadero or its agents, officers, and employees against any claim or action
brought to challenge an approval by the City, or any of its entities, concerning this
conditional use permit.
Ongoing CA
Planning Services
7. The Conditional Use Permit shall allow an outdoor recreational vehicle storage
yard as shown in Exhibit B.
Ongoing PS
8. All landscaping, fencing and site improvements shall be maintained in good order.
Any dead or non-performing landscape items shall be replaced within 30 days.
Any damaged fencing, lighting, or site improvements shall be replaced
immediately.
Ongoing PS
9. No changes to fencing, landscaping, or site improvements may be installed
without prior approval by the City.
Ongoing PS
10. No cargo containers, inoperable vehicles, inoperable boats or inoperable RV’s
shall be stored on-site. Only currently registered, operable vehicles or RV’s may
be stored on-site. All vehicles will be inspected upon initial storage to ensure
vehicle is operable and all stored vehicles shall maintain insurance and provide
copy of current insurance to City upon request.
Ongoing PS
Resolution No. 2023-071
Exhibit A
Conditions of Approval
Conditional Use Permit
Outdoor Recreational Vehicle Storage
6805 Sycamore Road
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary
Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
11. No storage of vehicles in any location other than in the designated on-site parking
areas as identified in the site plan approved by Planning Commission may be
stored on any portion of the site.
Ongoing PS
12. No other land use shall be allowed in conjunction with the RV storage unless
specifically approved by the City.
Ongoing PS
13. No washing or servicing of vehicles, RV’s or Boats or other equipment may occur
on-site.
Ongoing PS
14. No dumping of RV waste or water tanks may occur on site at any time. Ongoing PS
15. No storage, paving, stockpiling, grading, or use of the site shall be allowed within
30 feet of the top of the bank of the Salinas River.
Ongoing PS / BS
16. The realignment of the Anza Trail shall be consistent with what is shown in Exhibit
B. The trail shall be completed and fully landscaped per the approved landscape
plan. Any modifications must be approved by the Community Development
Director. Generally, taller vegetation shall be focused between the RV storage lot
and the realigned Anza Trail. Shorter species shall be planted between the Anza
Trail and Sycamore Road to avoid the trail from becoming a hidden corridor
BP/ FI PS
17. The existing chain link fence adjacent to Sycamore Road and the realigned Anza
Trail shall be replaced with a split rail or pipe rail fence with a maximum height of
4 feet tall. Fence shall be installed prior to requesting a Planning Final.
FI PS
18. All new fencing chain link fencing, other than fencing along the Salina River, shall
be vinyl coated with a dark neutral color. The maximum fence height shall not
exceed 6 feet. However, the addition of barbed wire (NOT Constantine wire) may
be added to the top of interior fences along the RV storage lot. Fencing shall be
installed prior to requesting a Final Planning Inspection.
FI PS
19. Existing chain link fencing along Sycamore Road may be repurposed to be used
as fencing adjacent to the Salinas River.
FI PS
20. The applicant shall submit a landscape and irrigation plan, completed by a
qualified professional, with their construction documents. The landscape plan
shall be consistent with what is shown inf Exhibit D with additional landscaping
focused on the following areas:
_Along the Anza Trail realignment to include landscaping that maintains safety
and visibility
_ In front of the existing construction yard, adjacent to Sycamore Road
Landscaping and irrigation shall be installed prior to requesting a Planning Final
Inspection.
BP/FI PS
21. Ensure that the Anza Trail realignment is built out to meet equestrian trail
standards.
FI PS
22. Maximum height of new light poles shall not be taller than 16 feet for each light
pole nor exceed the height of the levee to prevent light spillage into the riverbed.
The lights shall be set to dim low level light until motion is detected and shall
preclude activation by small animal movement.
BP/ FI PS
23. A photometric light study shall be submitted with the building permits for the
Phase 2 addition and shall consider all new lights proposed and all existing
lights proposed to be retained. The lighting plan shall not include any lights that
cause a light in excess of .01 footcandles on adjacent properties. Planning
Services staff shall conduct a night-time inspection of lights before the building
permits may be finaled.
BP/FI
24. The Use Permit shall be subject to additional review upon receipt of operational
complaints including a high number of police calls. Additional mitigation may be
warranted upon verification of recurring noise or operational disturbances that
Ongoing PS
Resolution No. 2023-071
Exhibit A
Conditions of Approval
Conditional Use Permit
Outdoor Recreational Vehicle Storage
6805 Sycamore Road
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary
Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
impact residential properties. Community Development Department review for
compliance with all conditions within 12 months of commencement of business
operation.
25. Archaeological monitoring is required with all ground disturbing activities. The
applicant will be required to provide a signed contract with a certified
archaeologist prior to building permit issuance. The archaeologist is required to
provide a letter to the City prior to Planning Department Final stating that all
recommended procedures were completed.
BP/ FI PS
26. The applicant shall hire a qualified biologist to provide a nesting bird survey and
survey for special status species within 3 months prior to construction
commencement. This survey shall include a survey for eagle nests within 1 mile
of the project site. The applicant shall follow all recommendations of the qualified
biologist and shall obtain all permits from the Department of Fish and Wildlife.
27. Trash receptacles shall be provided at or near the access gate, adequately
screened as determined by the Community Development Department, and of
sufficient size to serve the facility.
28. Overnight occupancy shall be strictly prohibited on site.
29. Private Security shall maintain security at site and shall be the first point of contact
for response to any security related issues.
Public Works
30. At Building permit submittal, provide updated Stormwater Control Plan (and
reflect on Grading Plans) indicating the areas outside of the drive aisles will not
be compacted >85% compaction to allow infiltration to meet Post Construction
requirement #1 to reduce impervious surface as far as practicable.
BP PW
31. Parking spaces are noted to be native material and are susceptible to pollutant
discharge from vehicles. At time of building permit submittal, on the plans and
with supplemental documents, provide drip pans and spill kits for leaks or other
spills under all vehicles at all times, similar to what would be found in a municipal
yard. (Reference industrial or municipal stormwater requirements for construction
or corporation yard spill prevention.)
A disposal station with spill kit supplies and covered cans for soiled materials shall
be located on the site for individuals using the facility and maintained by the
company who leases the land and runs the business.
A contact phone number shall be made available to call if a facility user/customer
has a spill. Provide copy of a Spill Response Plan to City for review and approval.
This plan must be in place to provide a procedure for cleaning up major spills,
including sewage or gray water leaks, in a timely manner with contact information
for those who would be responsible parties.
Any spills shall be reported to AMWC and the City of Atascadero immediately.
The site shall be inspected a minimum of twice weekly to ensure compliance.
BP/
Ongoing
PW
Resolution No. 2023-071
Exhibit A
EXHIBIT B: Site Plan USE21-0107 Light Pole Security Camera (N) 6’ vinyl coated chain link fence (E) Chain link fence Anza Trail (N) Split rail fence (as conditioned) (N) 6’ vinyl coated chain link fence Repurposed 6’ chain link fence Resolution No. 2023-071Exhibit B
ITEM | 11/15/2022 Sycamore RV Storage USE21-0107/ VSM Leasing and Rentals LLC EXHIBIT C: Preliminary Grading and Drainage Plan USE21-0107 Resolution No. 2023-071Exhibit C
ITEM | 11/15/2022 Sycamore RV Storage USE21-0107/ VSM Leasing and Rentals LLC EXHIBIT D: Landscape Plan (as modified) USE21-0107 Resolution No. 2023-071Exhibit D
X X X X Resolution No. 2023-071Exhibit D