HomeMy WebLinkAboutPC Resolution 2023-0005PC RESOLUTION 2023-0005
RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ATASCADERO RECOMMENDING THAT THE CITY
COUNCIL APPROVE A CONDITIONAL USE PERMIT TO ESTABLISH A
MASTER PLAN OF DEVELOPMENT AND APPROVE A MASTER SIGN
PROGRAM, TREE REMOVAL, AND HEIGHT EXCEPTION, AND
APPROVE VESTING TENTATIVE TRACT MAP (TR 3177) FOR THE
BARREL CREEK PROJECT
BARREL CREEK
LEGACY REALTY AND DEVELOPMENT, LLC
(DEV21-0066)
WHEREAS, an application has been received from Legacy Realty and Development, LLC
(5390 E. Pine Avenue, Fresno, CA 93727), Applicant and First Assembly of God Church (5545
Ardilla Ave, Atascadero, CA 93422) Owner, to consider a General Plan Amendment, Zone
Change, Vesting Tentative Tract Map, Tree Removal Permit, and Master Plan of Development
(Conditional Use Permit) including a Commercial Sign Program and height exception; and
WHEREAS, the site's current General Plan Land Use Designation is Suburban Estates
(SE); and
WHEREAS, the site's current Zoning Designation is Residential Suburban (RS); and
WHEREAS, the site has previously been identified by the City Council as a key
development opportunity site based on the site's adjacency to Highway 101 and proximity to the
key commercial node at El Camino Real and Del Rio Road; and
WHEREAS, the City Council reviewed the request at their regularly scheduled meeting
on April 28, 2020 at which time the Council authorized the applicants to submit a formal
application; and
WHEREAS, the project held a neighborhood meeting to gather input from surrounding
residents and interested persons on September 23, 2020; and
WHEREAS, the minimum lot size in the CPK zoning district is 2 acres; and
WHEREAS, the proposed commercial subdivision includes parcels ranging from 0.34
acres to 0.86 acres; and
WHEREAS, the minimum lot size in the RMF -10 zoning district is 0.5 acres; and
WHEREAS, the proposed residential subdivision includes parcels ranging from 0.09 acres
to 0.19 acres; and
WHEREAS, The Atascadero Municipal Code allows for establishment of custom Planned
Development Overlay Zones to create custom zoning for unique projects and allow for smaller -lot
sizes that would otherwise be allowed by underlying zoning; and
WHEREAS, shared parking and access easements are required to be recorded to ensure
that all parcels have legal access from the adjacent rights-of-way; and
WHEREAS, the project was reviewed by the Design Review Committee at their regularly
scheduled meeting on March 10, 2022; and
WHEREAS, The Planning Commission, at the February 7, 2023 meeting, recommended
the City Council approve a General Plan Designation and Zoning Map Amendment and establish
a custom PD Overlay Zone on the project site; and
WHEREAS, the project was reviewed by the Design Review Committee at their regularly
scheduled meeting on August 10, 2021; and
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and
WHEREAS, a timely and properly noticed Public Hearing upon the subject application
was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral
and documentary, was admitted on behalf of said application; and
NOW, THEREFORE BE IT RESOLVED by the Planning Commission of the City of
Atascadero:
SECTION 1. Recitals: The above recitals are true and correct.
SECTION 2. Public Hearings. The Planning Commission held duly noticed public
hearings to consider the project on January 17, 2023 and February 7, 2023 where the Commission
considered testimony and reports from staff, the applicants, and the public.
SECTION 3. Facts and Findings. The Planning Commission makes the following
findings and determinations:
1. Findings for Approval of a Conditional Use Permit
A. FINDING: The proposed project or use is consistent with the General Plan
FACT: The proposed project includes a General plan Amendment and Zone Change to
modify the development potential of the project site and intensify uses from what is
allowed today. The project site is located adjacent to Highway 101 and a key
commercial node at Del Rio Road and El Camino Real. The site is adjacent to services
and a majority of the site is within the City's identified Urban Services Line. The
project is consistent with the Land Use, Open Space and Circulation (LOC) Policies
and Programs 1. 1.7 for infill development; 1.4.1 for screening exterior lights; 2.1.3 and
7.2.3 for providing street trees; and, 8.5.3 for providing on-site stormwater
management. In addition, the project is consistent with Circulation Element (CIR)
Policies and Programs 1.4 for requiring a tree lined street; 1.5.1 for requiring adequate
off-street parking; and 2.3.1 for providing adequate sidewalks as required for all new
commercial development in the City.
The General Plan also includes policies and programs aimed at enhancing the City's
visual character and promoting economic viability. The City Council has previously
identified this site as a key opportunity for increased economic development and
expanded housing. In addition, LOC13 provides policies and programs aimed at
establishing a range of employment and business opportunities to provide a sound
economic base and ensure that new development generates sufficient revenue to
support public service needs and quality environmental, social, and educational
opportunities. LOC14 also encourages land uses that provide jobs and services for
residents that fit within the City's character.
The project, as proposed, will provide additional services to surrounding residents and
provide increased property taxes once the site has been developed. The project provides
rental and for -sale units that are "affordable -by -design" and will contribute to
affordable housing through compliance with the City's interim affordable housing
policy.
B. FINDING: The proposed projector use satisfies all applicable provisions of the Zoning
Ordinance
FACT: The proposed mixed commercial and residential development includes a
request for a General Plan Amendment and Zone Change to modify the development
potential of the project site. With those approvals, the project is consistent with the
Atascadero Municipal Code and the established Planned Development Overlay Zone.
The proposed structures and site plan are consistent with the applicable provisions of
the Atascadero Municipal Code as conditioned.
C. FINDING: The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety or welfare of the general public or persons residing or
working in the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use
FACT: The proposed development will be located at the intersection ofHighway 101,
Del Rio Road, and San Ramon Road. Adequate access to the site is provided off Del
Rio Road and San Ramon Road. The site design has been reviewed by all City
departments for consistency with code requirements. Impacts have been analyzed
through the Initial Study and a proposed Mitigated Negative Declaration has been
prepared identifying mitigation measures to reduce any impacts to a level of
insignificance. The project is conditioned to construct frontage improvements along
Del Rio Rd and San Ramon Road that will ensure safe traffic patterns in and out of the
site. The intersection of Del Rio Road and San Ramon Road is also conditioned to be
improved with a pedestrian crosswalk and pedestrian safety features to ensure safe
pedestrian traffic to and from the project site. As conditioned, the project will not be
detrimental or unsafe to those working, visiting, or living on the project site nor those
within the surrounding neighborhoods.
D. FINDING: The proposed project or use will not be inconsistent with the character of
the immediate neighborhood or contrary to its orderly development
FACT: The proposed project is adjacent to Highway 101, the Apple Valley
neighborhood, comprised of small -lot single-family residences, and rural residential
parcels fronting San Ramon Road. The project has been designed to focus residential
uses adjacent po existing neighborhoods. The lot pattern of the proposed small -lot
single-family subdivision is similar to the Apple Valley development. Commercial uses
have been located adjacent to Highway 101 and the drainage which runs adjacent to
the project site to the west provides a natural visual buffer between existing residences
and the higher intensity commercial and multi -family uses.
E. FINDING: The proposed use or project will not generate a volume of traffic beyond
the safe capacity of all roads providing access to the project, either existing or to be
improved in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance with
the land use element
FACT: The proposed project has been reviewed by Central Coast Transportation
Consultants and an analysis was preformed to determine appropriate mitigation
measures to accommodate the proposed development. The project will create
additional traffic, both from new residents to the project and visitors and employees to
the commercial portion of the project. The analysis concluded that traffic volumes and
patterns will be safe and within the capacity of adjacent roadways with mitigation
incorporated.
F. FINDING: The proposed project is in compliance with any pertinent City policy or
criteria adopted by ordinance or resolution of the City Council.
FACT: The Design Review Committee has reviewed the proposed project and found
the site plan and elevations to be consistent with the criteria in the City's Design
Review Manual. The project site has been previously identified as an opportunity site
for increased development and an opportunity for economic development. The City
Council has an existing policy governing requests for general plan amendments and all
processes outlined in that policy have been. completed. The Council also has a policy
related to the approval pf Planned Development Overlay Zones outlining community
benefits associated with the request for modified zoning standards. The project, as
analyzed and conditions, s in compliance with this policy.
2. Findings for Approval of a Tentative Tract Map
A. FINDING: The proposed subdivision, together with the provisions for its design and
improvement, is consistent with the General Plan (Government Code §§ 66474(a) and
(b)), and
FACT: The proposed project includes a General plan Amendment and Zone Change to
modify the development potential of the project site and intensify uses from what is
allowed today. The project site is located adjacent to Highway 101 and a key
commercial node at Del Rio Road and El Camino Real. The site is adjacent to services
and a majority of the site is within the City's identified Urban Services Line. The
project is consistent with the Land Use, Open Space and Circulation (LOC) Policies
and Programs 1. 1.7 for infill development; 1.4.1 for screening exterior lights; 2.1.3 and
7.2.3 for providing street trees; and, 8.5.3 for providing on-site stormwater
management. In addition, the project is consistent with Circulation Element (CIR)
Policies and Programs 1.4 for requiring a tree lined street; 1.5.1 for requiring adequate
off-street parking; and 2.3.1 for providing adequate sidewalks as required for all new
commercial development in the City.
The General Plan also includes policies and programs aimed at enhancing the City's
visual character and promoting economic viability. The City Council has previously
identified this site as a key opportunity for increased economic development and
expanded housing. In addition, LOC 13 provides policies and programs aimed at
establishing a range of employment and business opportunities to provide a sound
economic base and ensure that new development generates sufficient revenue to
support public service needs and quality environmental, social, and educational
opportunities. LOC14 also encourages land uses that provide jobs and services for
residents that fit within the City's character.
The project, as proposed, will provide additional services to surrounding residents and
provide increased property taxes once the site has been developed. The pmject provides
rental and for -sale units that are "affordable -by -design" and will contribute to
affordable housing through compliance with the City's interim affordable housing
policy.
B. FINDING: The site is physically suitable for the type of development (Government
Code§ 66474(c)), and
FACT: The property, after approval, will be zoned Commercial Park and Residential
Multi -Family. The site is located adjacent o Del Rio Road and San Ramon Road and
adjacent to the Del Rio Road / Highway 101 interchange. The Del Rio Road right-of-
way is wide enough to accommodate all proposed improvements. The project site is
relatively flat with an existing drainage bisecting the site. The site has been designed
to accommodate all stormwater generated from the project.
C. FINDING: The site is physically suitable for the proposed density of development
(Government Code § 66474(d)), and
FACT: The property, after approval, will be zoned Commercial Park and Residential
Multi -Family. The site is located adjacent o Del Rio Road and San Ramon Road and
adjacent to the Del Rio Road / Highway 101 interchange. The Residential Multi -Family
zoning allows for a maximum base density of 10 dwelling units per acre. The project
site zoned for residential uses will be 6 acres, resulting is a proposed density of 10
units/acre.
D. FINDING: The design of the subdivision or the proposed improvements will not cause
substantial environmental damage or substantially and avoidably injure fish or wildlife
or their habitat. (Government Code § 66474(e)), and
FACT: The proposed project is on a site with an existing drainage 'that bisects the
property originating from a culvert under Highway 101 and continuing north-west to
Graves Creek. The existing drainage has minimal vegetation and was determined by
the biologist to not contain sensitive species or be under the jurisdiction of any State or
federal agency. The project is designed to enhance this feature.
E. FINDING; The design of the subdivision or the type of improvements will not cause
serious health problems. (Government Code § 66474(f)), and
FACT: The project is designed in accordance with all local and State regulations. The
project proposes a mixed commercial and residential development at a key opportunity
site in the City and will not create any impacts to public health.
F. FINDING; The design of the subdivision will not conflict with easements for access
through or use of property within the proposed subdivision. (Government Code §
66474(g)).
FACT: The proposed project includes conditions to provide shared access and parking
easements throughout the site for the benefit of all applicable parcels ensuring access
to all proposed parcels and uses.
3. Findings for Approval of. a Tree Removal Permit
FINDING; The tree is obstructing proposed improvements that cannot be reasonably
designed to avoid the need for tree removal, as certified by a report from the site planner
and determined by the Community Development Department based on the following
factors:
a. Early consultation with the City,
b. Consideration of practical design alternatives,
c. Provision of cost comparisons (from applicant) for practical design alternatives,
d. If saving tree eliminates all reasonable use of the property, or
e. Saving the tree requires the removal of more desirable trees.
FACT: The project proposes the removal of 4 native oak trees totaling 99 inches dbh. The
trees proposed for removal are within the residential development area and would conflict
with grading and drainage improvements.
4. Findings for Approval of a Height Exception
FINDING: The project will not result in substantial detrimental effects on the enjoyment
and use of adjoining properties and that the modified height will not exceed the lifesaving
equipment capabilities of the Fire Department.
FACT: The height is exceeded by architectural and roof features for the hotel building
buildings located along the norther portion of the site. The modified height will provide
visual interest and has been reviewed by the Fire Department. The modified height will not
exceed the lifesaving equipment capabilities of the Fire Department and is intended to
enhance the appearance of the project and provide variation in building form and massing.
The building is setback approximately 75 -feet from the northern property line where an
adjacent residential property and outbuilding currently exist. The project has been
conditioned to provide screening landscaping along this property line to minimize impacts
to the adjacent residential rear yard area.
SECTION 4. CEQA. An Initial Study was prepared to determine if the proposed project would
have a significant adverse effect on the environment. The Initial Study found that the proj ect results
in no significant impacts with mitigation measures incorporated. Consequently, a Mitigated
Negative Declaration was prepared and circulated for public review on December 28, 2022. Based
on public testimony, the document was revised and re -circulated for public review on February 2,
2023. The Planning Commission has recommended that the City Council certify the environmental
determination for the Barrel Creek project.
SECTION 5. Recommendation for Approval. The Planning Commission of the City of
Atascadero, California, in a regular session assembled on February 7, 2023, resolved to
recommend that the City Council approve a Conditional Use Permit and Vesting Tentative Tract
Map for the Barrel Creek project (DEV21-0066) subject to the following:
1. EXHIBIT A: Conditions of Approval
2. EXHIBIT B: Project Entitlement Package
On motion by Commissioner Schmidt and seconded by Commissioner Hughes, the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Anderson, Carranza, Heath, Hughes, Schmidt, Keen (6)
NOES: None
ABSTAIN: None
ABSENT: van den Eikhof
ADOPTED: February 7, 2023
CITY OF ATASCADERO, CA
Jeff uaf4Wn Eikhof _
Planning Commission Chairpemon�
Attest:
Phil Dunsmore
Planning Commission Secretary
Attachment 1: Conditions of Approval
DEV21-0066: Barrel Creek
Conditions of Approval
DEV21-0066
Vesting Tentative Tract Map 3177
Barrel Creek
APNs 049-131-043, 044, 052, 058, and 066
Planning Department
1. This approval includes the following entitlements:
a) Vesting Tentative Tract Map (TR3177) is for the creation of
42 legal lots of record (as conditioned) described on the
attached exhibits and shall apply to APN 049-131-043, 044,
052, 058, and 066 regardless of owner.
b) Master Plan of Development / Conditional Use Permit for
approximately 53,500 sf of commercial / light industrial
space, a 120 -room hotel, 40 multi -family apartment units, 16
short-term stay cottages, and a 20 single family parcels.
Approval also includes a height exception and Master Sign
Program.
2. All commercial buildings (excluding the hotels) shall be required to
receive final occupancy prior to any residential unit receiving final
occupancy. Improvements must be completed as follows, and as
detailed in subsequent conditions:
Phase I (commercial):
• Road A in its entirety to _ the satisfaction of the Fire
Marshal
• All associated drainage facilities
• All frontage improvements on Del Rio Road and at the
intersection of Del Rio Road and San Ramon
• All landscaping within the commercial portion of the
project including north edge landscaping
• All associated public utilities including extension of the
sanitary sewer main in Del Rio Road
• Upgrades to Lift Station 14
Phase 2 (multi -family)
• Street B and adjacent parking
• All associated drainage facilities
• All associated landscaping
• All associated public utilities
• Any needed additional upgrades to Lift Station 14
Phase 2 (single-family):
• Streets C and D
• All frontage improvements along San Ramon Road
• All associated drainage facilities
• All associated landscaping
• All associated public utilities
• Any needed additional upgrades to Lift Station 14
Timing Responsibility
!Monitoring
FM: Final Map PS:
BL: Business License BS:
PR: Pem-dReuiew FD:
FI: Final Inspedon PD:
TO: Temp CE:
Occupancy
F0: Final Occupancy
Planning Services
Building srces
Fire Depalment
Police DePaitnent
City Engineer
PS
Conditions of Approval
riming
Responsibility
DEV21-0066
/Monitoring
Vesting Tentative Tract Map 3177
FM: Final Map
BL: Business License
Ps: Planning Services
BS: Building Services
Barrel Creek
PR: Permit Review
FD: Fn; Department
FI: Finallnspecton
PD: Police Department
T0: Temporary
CE: City Engineer
049-131-043s 044s 052! 058f and 066
Occupancy
F0: Final
The Hotel and short term stay cottages can be constructed at
any time. Upgrades to Lift Station 13 may be required if flows
exceed estimates.
Construction of the residential portion of the project may not
commence until building permits for commercial buildings have
been issued and construction has begun on the commercial /
light industrial portion of the project.
A deed covenant shall be recorded concurrently with the final
map to notify residential parcels of the requirement for the
commercial portion of the project to be completed prior to any
residential units, per the phasing listed above.
3. Final design of each phase and project component must be in
Ongoing
PS
substantial conformance with provided Exhibit(s) adopted with this
Resolution, and any conditions of approval related to such.
4. The approval of these entitlements shall become final and effective for
Ongoing
PS
the purposes of issuing building permits the day after the City Council
hearing, unless an appeal is made in accordance with the Atascadero
Municipal Code.
5. In accordance with the Atascadero Municipal Code section 9-8.105, Ongoing
PS
any violation of any of the conditions of approval may be cause for
revocation of this entitlement and subject the applicant and/or future
property owners to the penalties set for in the Atascadero Municipal
Code, as well as any other available legal remedies.
1
6. The Community Development Director and/or City Engineer shall FM
PS/CE
have the authority to make modifications to the final map that remain
in substantial conformance with the approved Tentative Map.
7. The Community Development Director and/or City Engineer shall PR
PS/CE
have the authority to make minor modifications to the Master Plan of
development that are necessary to address code requirements or
result in superior design.
8. Approval of these entitlements shall be valid for twenty-four (24)
PIR/FM
PS
months after its effective date. At the end of the period, the approval
shall expire and become null and void unless the project has received
a final map (Tentative Map entitlement) or building permit (Master Plan
of Development), or a time extension has been granted, consistent
with the Atascadero Municipal Code.
9. Vesting Tentative Subdivision Map was deemed complete on
Ongoing
PS/CE
1212112022, for the purposes of vested development rights and fees
consistent with the Subdivision Map Act of the State of California.
10. A final map drawn in substantial conformance with the approved
FM
PSICE
vesting tentative map, and in compliance with all conditions set forth
Conditions of Approval
Timing
Responsibility
DEV21-0066
[Monitoring
Vesting Tentative Tract Map 3177
FM: Final Map
PS: Planning sv*es
Barrel Creek
BL Business License
PR: Pen dtReweN
BS: Building Services
FD: Fre Dq-trneent
FI: Final Inspection
PD: Police Depaftent
TO: Tenporary
CE: City Engineer
APNs 049-131-043,044,052,058 and 066
f
occupancy
F0: R4 Occupancy
herein, shall be submitted for review and approval in accordance with
the Subdivision Map Act and the City's Subdivision Ordinance
Ongoing
11. The applicant shall defend, indemnify, and hold harmless the City of
Atascadero or its agents, officers, and employees against any claim
or action brought to challenge an approval by the City, or any of its
entities, concerning the subdivision.
12. All subsequent Tentative Map and construction permits shall be PR / FM
PS/CE
consistent with the Master Plan of Development approved for the
project.
13. The subdivision shall be subject to additional fees for park or
PR PS
recreation purposes (QUIMBY Act) as required by City Ordinance
14. All maintenance costs listed below shall be 100% funded by the Ongoing
PS/CE
project in perpetuity, except for public facilities that are accepted
for maintenance by the City of Atascadero. The service and
maintenance cost shall be funded through an entity or mechanism
established by the developer, subject to City Staff approval. This
entity or mechanism must be in place prior to, or concurrently with
acceptance of any final map(s) or the issuance of any building
permits. The entity or mechanism shall be approved by the City
Attorney, City Engineer and Administrative Services Director prior
to acceptance of any Final Map(s) or issuance of any building
permits. The administration of the above-mentioned funds, and
the coordination and performance of maintenance activities, shall
be the responsibility of the entity or mechanism.
a) All roads, sidewalks, pathways, parking, and access areas.
b) All landscaping and lighting within the proposed project area.
c) Common area fencing and/or features.
d) Open areas on private property within the proposed project area
including detention facilities, bio-swales, and other low -impact -
development features.
e) All drainage facilities within the project area.
f) Landscaped frontages within the right-of-way of all public streets
within the defined project boundary, including irrigation.
g) On-site sanitary sewer system(s) and storm drains located within
the project area.
15. The emergency services and facility maintenance costs listed
FM
PS
below shall be 100% funded by the project in perpetuity. The
service and maintenance costs shall be funded through a
community facilities district established by the City at the
developer's cost. The funding mechanism must be in place prior to
or concurrently with acceptance of the final maps. The funding
mechanism shall be approved, by the City Attome , City Engineer
Conditions of Approval Timing
DEV21-0066
Vesting Tentative Tract Map 3177 FM: Final Map
BL: Business License
Barrel Creek PR: PerrrkReview
FI: Finallnspecton
TO: Temporary
APNs 049-131-043, 044, 052, 058, and 066 FO: Final Occupancy
and Administrative Services Director prior to acceptance of any final
Responsibility
/Monitoring
BS Building Services
9
FD: Fire Depar4nent
PD: Ponce Department
CE: City Engineer
map. The administration of the above-mentioned funds shall be by
the City. Developer agrees to participate in the community facilities
district and to take all steps reasonably required by the City with
regard to the establishment of the district and assessment of the
property.
• All Atascadero Police Department service costs to the
project.
■ All Atascadero Fire Department service costs to the
project.
■ Off-site common City of Atascadero park facilities
maintenance service costs related to the project
Annexation into the Community Facilities District shall be required
prior to, or concurrently with, recordation of the final map, or prior
to occupancy of any residential unit if the tract map is abandoned.
16. Affordable Housing: The applicant shall deed restrict 4 units at the FM
PS
moderate-income level within the single -family subdivision.
The applicant shall deed restrict the following units within the
multi -family area:
• 3 moderate units (3.44 rounded down)
2 low income units (2.16 rounded down)
2 very -low income units (1.6 rounded up)
• In -lieu fees collected for the missing fraction
17. Shared parking and access easements shall be recorded over all FM PS/CE
parcels as applicable. Easements shall also be recorded for shared
drainage facilities. Parking shall not be designated for each use except
for short-term pick-up spaces and multi -family residential uses as
needed. A maximum of one space per residential unit shall be
designated as reserved.
18. Prior to final map, the applicant shall submit CC&Rs for review by the . FM PS
Community Development Department. CC&Rs for the commercial
and residential portions of the project may be separate, combined, or
tiered.
19. The central commercial plaza space shall be designed with main PR PS
entrances to any abutting space from the Plaza. This does not prohibit
entrances from also being located facing the surrounding
access/parking areas.
20. Agreements shall be required to be recorded against each residential FM, PR PS/CE
parcel notifying any residential tenant of the commercial nature of the
site to ensure that commercial activities are prioritized.
Conditions of Approval
Timing
Responsibility
DEV21-0066
/Monitoring
Vesting Tentative Tract Map 3177
FM: Final Map
PS: Planning Services
Barrel Creek
BL: Business License
PR: Permit Review
BS: Building Services
FD: Fre Depaninent
FI: Finallnspecdon
PD: Police Department
T0: Temporary
CE: co Engineer
049-131-043 044 052 058 and 066
f � � f
OccAPNs
Fa. a
Fin
Fa. Fnal Occupancy
21. All landscape on-site or planted along the street frontage shall be
Ongoing
PS
maintained in a manner that allows the tree to grow to its full natural
height and natural canopy. No growth suppressants shall be permitted
that result.in stunting or modifying the natural growth pattern of the
tree.
22. A tree protection plan shall be submitted as part of each building
PR
PS
permit package. The plan shall identify the size and species of all
trees, all trees proposed for removal, the location of any required tree
protection fencing, and construction related mitigation measures
dictated by the project arborist and/or City Native Tree Guidelines. All
tree removals shall be mitigated consistent with the requirements of
the Atascadero Municipal Code. Any required mitigation fees shall be
paid prior to permit issuance.
23. Taller landscaping shall be included at the rear of the proposed
Ongoing
PS
multi-family buildings. Landscaping shall include taller trees and
shrubs designed to enhance visual screening. Landscaping shall
be placed to avoid conflicts with retaining walls and footings.
24. All perimeter / retaining walls facing San Ramon Road, Del Rio Road,
PR
PS
and walls at the rear of the multi-family buildings shall include
decorative veneer or natural stone texture. All other walls shall be a
dark color split face block or shall match decorative walls. All walls and
veneers shall be approved by the Community Development Director
and shall be included in the permit application.
25. A fencing plan shall be included with each development phase /
PR
PSlCE
permit. Fencing for the commercial and multi-family portion of the
project shall be limited to safety fencing as deemed necessary by the
Community Development Director and/or the City Engineer or as
required for outdoor restaurant areas. No chain-link fencing shall be
permitted. Solid fencing may be used to screen mechanical
equipment or provide small privacy areas where appropriate. Single -
family properties shall be fenced per the guidelines of the Planned
Development Overlay Zone. Wood fencing shall be high quality and
shall include a top rail. No dog-eared fencing will be permitted.
26. Evergreen landscaping shall be included along the northern project
PR
PS
edge adjacent to existing residentially zoned parcels to the greatest
extent feasible. Landscape materials shall include trees and shrubs
that provide visual screening above the fence/wall line and visual
screening of the hotel and lighted freeway sign.
27. London Plane street trees shall be planted along the Del Rio Road
PR PS/CE
frontage at a spacing of 30-feet on-center or as approved by the City
Engineer. Street trees along the San Ramon frontage may be grouped
for a more natural rural appearance. Additional frontage landscaping
shall include accent trees and native grasses.
In addition to the London Plane Sycamores, medium sized native
grasses, such as deer grass and California oat grass, and small
Conditions of Approval
Timing Responsibility
!Monitoring
vwc1 -wov
VestingTentative Tract Ma 3177
enve p
FM: Final Map
BL: Business License
PS: Planning Services
BS: Building Services
Barrel Creek
PR: Permit Review
FI: Final Inspection
FD: Fre Depatnent
PD: Police Department
T0: Temporary
CE: City Engineer
049-131-043,044,052,058,and 066
OccupanAPNs
FO: FinY
F0: Final Occupancy
shrubs, such as manzanita and ceanothus, shall be included along
the Del Rio frontage to provide visual softening of the retaining wall.
28. Entry sign concept 2B shall be utilized for the Del Rio Road and
PR
PS
commercial area entrances. Stone veneer shall be compatible with the
decorative treatment conditioned for the retaining / perimeter walls.
29. Water tower signage lighting shall be externally illuminated and shall
PR
PS
be dark sky compliant and directional.
30. Future buildings shall be approved by planning staff prior to permit
PR
PS
issuance and shall incorporate design elements consistent with a
contemporary agrarian design theme, consistent with this Master Plan
of Development. Building footprints and elevations may vary provided
the overall design theme and square -footage analyzed for traffic and
sewer capacity are maintained.
31. All trash enclosures shall be constructed of dark color split face block
PR
PS
or similar and shall include high quality solid metal doors. Enclosures
shall be designed in accordance with Cal Green requirements.
32. Any second floor greater than 50% of the first -floor area of a
PR
PS
commercial building shall have a finished floor elevation of a minimum
of 16 -feet from finished floor elevation of the ground floor.
33. All stormwater basins shall be unfenced. Low level decorative split rail
PR
PS/CE
fencing may be approved by the Community Development Director.
34. Lot 40 shall be eliminated from the final map.
FM
PS/CE
35. Easements for common access, parking, drainage, and amenity
FM
PS
areas shall be recorded on the face of the map. Separate covenants
shall be recorded governing use and maintenance responsibilities.
An additional covenant shall be recorded notifying all future
property owners that the project is governed by a Planned
Development Overlay zone and any modifications or changes to the
appearance, fencing, or amenity areas requires approval by the
City.
36. All site lighting shall be shielded, directional, and dark sky
PR
PS
compliant. Up lighting and festoon lighting shall be permitted within
the commercial plaza area, hotel courtyard, amphitheater, and
along the hotel entry facade only. Bollard and/or low level in -ground
safety lighting shall be permitted along pedestrian pathways.
37. Tenant signage shall compliant with the project exhibits and PD38
PR
PS
standards.
38. Rear yard fencing of lots adjacent to the Del Rio Road Frontage
PR
PS
shall be setback a minimum of 3 -feet from any retaining wall in
excess of 2 -feet.
Conditions of Approval
Timing
PS
Responsibility
DEV21-0066
approved construction permit. All finishes shall be repaired or
/Monitoring
Vesting Tentative Tract Map 3177
FM: Final Map
PS:
Planning Services
development. Any dead or non -thriving landscaping shall be
BL: Business License
BS:
Building Services
Barrel Creek
PR: permit Review
FD:
Fre Departrnent
FI: Finallnspecton
PD:
Police Department
while appearing groomed and orderly.
TD: Temporary
CE:
City Engineer
APNs 049-131-043 044 052 058 and 066
� � � f
Finn
FO: FD: FinalOauparxy
accessway within the project area.
39. Drainage crossings shall be designed to enhance the natural
PR
PR
PS/CE
drainage feature. Grading shall be minimized and shall be blended
1
conditioning condensers, electrical transformers, backflow devices
into the natural terrain to reduce impacts. Riparian vegetation shall
etc., shall be screened from public view through the use of
be included in the landscape plan to enhance the drainage
decorative landscaping subject to approval by the Community
feature. Headwalls shall include decorative veneer or texture.
connections and/or back flow prevention devices for commercial
Arched culvert or similar natural bottom culverts are required
and multi -family buildings shall be incorporated into the served
unless waived by the Community Development Director and City
buildings, unless waived by Community Development Director. If
Engineer.
landscape planter and shall be fully screened by appropriately
40. es eshall be maintained in and kept clear of any debris or
Ongoing
PS
storage including construction debris, unless part of an active,
approved construction permit. All finishes shall be repaired or
replaced as needed to maintain a high quality commercial / resort
development. Any dead or non -thriving landscaping shall be
immediately replaced. All landscaping required for screening of
any use, structure, or utility /mechanical equipment shall be
maintained at a height and density to achieve maximum screening
while appearing groomed and orderly.
41. No gates shall be permitted on any public or private roadway or
Ongoing
PS
accessway within the project area.
42. For commercial, industrial, office or multi -family projects, all
PR
PSIFD
existing and/or new ground -mounted appurtenances such as air-
conditioning condensers, electrical transformers, backflow devices
etc., shall be screened from public view through the use of
decorative landscaping subject to approval by the Community
Development Director or his designee. All fire department
connections and/or back flow prevention devices for commercial
and multi -family buildings shall be incorporated into the served
buildings, unless waived by Community Development Director. If
building integration is infeasible, all equipment shall be placed in a
landscape planter and shall be fully screened by appropriately
sized landscape species.
43. All existing and/or new roof appurtenances such as air-
Ongoing
PS
conditioning units, grease hoods, etc. shall be screened from
public view. The screening shall be architecturally integrated with
the building design and constructed of compatible materials to the
satisfaction of the Community Development Director or his
designee.
44. All mitigation measures included in the Mitigation Monitoring
Ongoing
PS/CE/FD
Program are hereby incorporated by reference and shall be
implemented as listed or as conditioned.
Conditions of Approval
DEV21-0066
Vesting Tentative Tract Map 3177
Barrel Creek
APNs 049-131-043, 044, 052, 058, and 066
Timing Responsibility
/Monitoring
FM: Final Map PS: Planning Services
BL: Business License BS: Building Seances
PR: PemitReview FD: Fire Department
FI: Finallnspecton PD: Police Depalment
TO: Temporary CE: City Engineer
Occupancy
F0: Final Occupancy
45. Cottage hotel units shall not include units over which the State has PR
permitting jurisdiction. A maximum of 25% of the unit can have a
full kitchen, unless otherwise approved by the subsequent Master
Plan of Development.
46. A deed notification shall be required to be recorded on all
residential parcels notifying future buyers of the rural nature of the
surrounding neighborhood and the possibility for animals and farm
equipment that may produce added noise and odors.
Public Works Department
Public Works - Grading, Drainage, and Stormwater
47. A final Stormwater Control Plan (SWCP) and supporting hydrology
report shall be approved by the City Engineer prior to issuance of
any building permit, in accordance with the State regulations
(Regional Water Quality Control Board Res. No. R3-2013-0032).
48. Prior to a final inspection of any permit the following City
Stormwater documents shall be completed and approved by the
City Engineer:
• ATAS - SWP-1001_Engineer Certification Form
• ATAS - SWP-1003_OwnerAgentlnfo
• ATAS - SWP-1007_ Exhibit_ B_ Instructions_ SCM FORM
• ATAS - SWP-1008 Stormwater System Plans and Manuals
• ATAS - SWP-2002 Stormwater O&M Process and Form
Instructions
• ATAS - SWP-3001_Stormwater System O&M _Agreement
• ATAS - SWP-3002_Private Stormwater System Recorded
Notice
• Any other stormwater documents required by the Water Board
or State of California.
Email publicworks@atascadero.org for copies of the above City
templates.
49. A Storm Water Pollution Prevention Plan (SWPPP) is required
prior to any ground disturbing activities greater than 1 acre. The
Waste Discharger Identification (WDID) number provided upon
acceptance of the SWPPP into the State's SMARTS system
registration shall be noted on the Title Sheet of the relevant project
plans. A project Qualified Stormwater Professional (QSP) shall
coordinate with the City Inspector for State mandated storm water
inspections and shall provide verification of QSP inspections,
monitoring, SWPPP modifications and actions throughout project.
PR
PR
PR
PS
CE
CE
CE
Conditions of Approval
DEV21-0066
Vesting Tentative Tract Map 3177
Barrel Creek
APNs 049-131-043,044,052, 058, and 066
Timing
Responsibility
!Monitoring
FM: Final Map
PS:
Planning Services
BL: Business License
BS:
Building services
PR: PennA Review
FD:
Fre Depar6nent
FI: Final Inspection
PD:
Porice Department
Ta. Temporary
CE:
City Enoneer
Occupancy
F0: Final Occupancy
50. All stormwater management improvements to be owned or PR/F CE 1
managed by the funding mechanism referenced in Condition #14
and shall be identified in an Operation and Maintenance
Plan/Agreement (OMP) and shall be recorded concurrently with
the Final Map. The OMP shall include a financial plan addressing
annual and long-term maintenance as well as replacement.
Specific requirements for stormwater management may be
required to be identified on an additional Final Map information
sheet.
51. All culverts conveying creek stormwater shall not exceed velocity PR CE
that results in detrimental environmental impacts such as
downstream flooding, erosion, minimization of vegetation.
52. Flood control basins are utilized in the City of Atascadero, as
determined appropriate depending upon site conditions: Retention
basins, Detention basins, and Subsurface Infiltration Basins. In all
cases, the Project Engineer shall provide evidence that the basin
will completely drain within seven (7) days to the satisfaction of the
City Engineer.
Retention Basin. Any drainage basin which is used as a terminal disposal
facility shall be classified as a retention basin. If included in the project,
any retention basin shall comply with all applicable State and local
regulations including the following:
a. Percolation Test Required. A minimum of 3 percolation tests
per basin shall be submitted to the City Engineer for review and
approval prior to approval of the plans. The project engineer
shall submit calculations and a report demonstrating the basin
will drain within seven -days of a single storm event as noted
above. Deep soil borings may be required in areas where there
is concern of shallow depth to groundwater or bedrock.
Percolation tests shall be performed at depths below the basin
bottom.
Detention Basin. Any drainage basin which has a downstream outlet
designed to meter the outflow shall be classified as a detention basin. If
included in the project, any detention basin shall comply with all
applicable State and local regulations.
Subsurface Infiltration Basins. Subsurface basins may be used for either
retention or detention of site runoff, where their application is suitable for
project conditions. If included in the project, any subsurface basins shall
comply with all applicable State and local regulations. Subsurface basins
shall be limited to locations where the depth to seasonally high
groundwater is greater than 10 -feet below the deepest portion of the
basin.
Drain Rock. Drain rock shall be clean, crushed granite (or
clean, angular rock of similar approved hardness) with rock size
PR
CE
Conditions of Approval
PR
CE
Timing
Responsibility
of fiber optic cable or conduit for such as appropriate.
54. Prior to recording the Final Map, the Applicant shall have the map
FM
/Monitoring
DEV21-0066
cable TV, and the Atascadero Mutual Water Company. The
Vesting Tentative Tract Map 3177
FM:
Final Map
PS:
Planning Services
utility purposes are acceptable.
BL:
Business License
W.
Building Services
Barrel Creek
CE
PR:
Permit Review
FD:
Fire Department
FI,
Final Inspection
PD:
Police Department
T0:
Temporary
CE:
City Engineer
APNs 049-131-043 044 052 058 and 066
� s s s
Occupancy
F0: Final Occupancy
ranging from 1 -1/2 -inch to 3/4 -inch. Rock gradation shall
conform to the Specification of ASTM C-33 #4.
Operational Requirements.
• Water quality of inflow (both sediment and chemical
loading) may require pretreatment or separation
• Maintenance plan, including provisions for vehicular
access and confined -space entry safety
requirements, where applicable
• A safe overflow path shall be identified on the plan
and may require easements
Overflow Path Required. The design of all drainage basins shall identify
the designated route for overflow. The Project Engineer shall design the
overflow path so that the flow in a 100- year storm is non-erosive and will
not damage downstream improvements, including other basins.
Easements may be required for concentrated flows across multiple
properties.
Public Works - Utilities
53. Public utilities shall be installed in all public rights-of-way to the
PR
CE
satisfaction of the City Engineer. This shall include the installation
of fiber optic cable or conduit for such as appropriate.
54. Prior to recording the Final Map, the Applicant shall have the map
FM
CE
reviewed by the public utility providers for power, telephone, gas,
cable TV, and the Atascadero Mutual Water Company. The
Applicant shall obtain a letter from each utility company stating
that the easements and rights-of-way shown on the map for public
utility purposes are acceptable.
55. Each building shall be served with separate services for water,
PR
CE
sewer, gas, power, telephone, fiber/communication, and cable TV.
Utility laterals shall be located and constructed to each building in
accordance with City Engineering Standards and Standard
Specifications and other applicable codes.
56. New and replacement utility distribution systems and services,
PR
CE
including all existing utilities along all project frontages, shall be
constructed underground, to the satisfaction of the City Engineer.
57. The Applicant shall extend the water distribution system to the
PR
CE
satisfaction of the Atascadero Mutual Water Company (AMWC)
and City Engineer.
PR
CE
58. The water system shall include easements outside of the road
rights-of-way for water system facilities as required by the AMWC
and to the satisfaction of the City Engineer.
Conditions of Approval
Timing
Responsibility
DEV21-0066
/Monitoring
Vesting Tentative Tract Map 3177
FM: Final Map
PS: Planning serves
BL: Business License
BS: Building Services
Barrel Creek
PR: PematReview
FD: Fin: Depatmnt
Fl: Fined Inspeclon
PD: Police Department
T0: Temporary
CE: City Engineer
APNs 049-131-043 044 052 058 and 066
� f s �
r
FO: F0: FiFealOccupancy
59. Separate water meters shall be installed for irrigation of common
PR
CE
open space areas.
60. Above ground facilities required for the water distribution system,
PR
CE
such as backflow prevention device assemblies, pressure
reducing units, and pressure booster stations, shall be located
outside the public right-of-way and shall include visual screening
to the satisfaction of AMWC and the City. Fire connections and
backflow devices for the commercial and multifamily buildings
shall be installed per Condition #42.
61. The wastewater collection system shall be designed and
PR
CE
constructed in accordance with City Engineering Standards and
Specifications to the satisfaction of the City Engineer. Gravity
sanitary sewer (SS) mains shall terminate in manholes. The
development's private sanitary sewer main shall tie in to City
sewer on Del Rio Road and/or San Ramon Road in a manhole.
62. All non-residential uses/buildings must demonstrate that
PR
CE
wastewater effluent composition meets City requirements, or pre-
treatment may be required. For uses that require pre-treatment, a
sampling location shall be provided to sample effluent prior to
discharge to sewer main line.
PR
CE
63. Sewer capacity charges/fees will be applied to building permit at
issuance. The applicant shall pay sewer fees in effect at the.time
the Vesting Parcel Map was deemed complete. If any unique uses
are proposed, specific wastewater information may be required to
be submitted, subject to the request and approval of the City
Engineer.
64. Per Mitigation Measure USS-01, prior to occupancy for any use, PR CE
the developer shall upgrade City Lift Station 14 with the following:
a. Install new 30 HP submersible pumps and associated
piping improvements
b. Install new wet well roof and hatch
c. Install new Motor Control Center (MCC), Variable
Frequency Drives (VFDs), and upgrade controls
d. Install stationary emergency generator, propane tank, and
associated piping
e. Bypass pumping during construction
Concurrent with the submittal of the first building permit, submit
a public improvement plan set for the upgrading of the Lift
Station 14 outlined above to the Public Works Department for
review and approval.
65. Per Mitigation Measure USS-02, prior to occupancy of any use
PR
CE
that exceeds 196 gallons per minute at peak hour (GPM) flow at
Lift Station 14, the developer shall upgrade City Lift Station 14 with
the following:
Conditions of Approval
DEV21-0066
Vesting Tentative Tract Map 3177
Barrel Creek
APNs 049-131-043, 044, 052, 058, and 066
a. Replacement of existing pumps with minimum 40 -Hp
pumps and associated piping upgrades, or as approved by
the City Engineer based on an updated analysis.
b. Remove and replace existing wet well with minimum 8'
diameter wet well.
c. Pipeline connection improvements.
d. Install new MCC, VFDs, and upgrade controls.
e. Upsize the emergency generator as needed.
f. Bypass pumping during construction.
Concurrent with the submittal of the any building permit application
which would trigger the exceedance of 196 GPM, submit a public
improvement plan set for the upgrade of Lift Station 14 as outlined
above to the Public Works Department for review and approval.
Public Works — Subdivision / Public Improvements
66. If any conditioned improvements are installed by another project,
this project shall pay their fair share toward any installed
improvement or facility. Fair Share payments shall be determined
by the City Engineer.
67 Prior to the issuance of building permits, the applicant shall
provide the fair share payment for the Ramona Rd realignment
and planned improvements for the Del Rio Road corridor in the
vicinity of US 101 and any associated improvements and signal
timing modifications as listed in the mitigation monitoring program,
including:
• Ramona Road realignment and associated widening of
Del Rio Road including pedestrian facilities.
• Reconfiguration and signal modifications of US101
southbound / Del Rio Road intersection, including
pedestrian crosswalks.
• Addition of dedicated right turn lane on Del Rio Road to
US101 northbound ramp and associated signal
modifications.
• Intersection improvements at Del Rio Road / EI Camino
Real.
All fair share percentages and fees shall be reviewed and
approved by the City Engineer. Fair share percentages shall be
based on an updated traffic analysis, paid for by the developer an
approved by the City Engineer. Fair share fees shall be based on
an updated project cost estimate at the time of permit issuance, as
determined by the City Engineer. Fair share fees shall be paid
prior to issuance of each building permit for any traffic generating
use.
It is anticipated that the City will complete the Ramona Road
realignment prior to commencement of the project. If these
Timing
Responsibility
Nonitoring
FM: Final Map
Ps:
Planning Services
BL Business License
BS:
Building Services
PR: Permit Review
FD:
Fire Departrnent
FI: Final Inspection
PD:
Police Departrnent
TO: Temporary
CE:
City Engineer
Occupancy
F0: Final Occupancy
PR
PR
CE
CE
Conditions of Approval
DEV21-0066
Vesting Tentative Tract Map 3177
Barrel Creek
APNs 049-131-043,044,052,058, and 066
improvements are not completed, "Do Not Block" Intersection
Markings per the California Manual on Uniform Traffic Control
Devices (CAMUTCD) Section 36.17 shall be completed at the
Ramona Road intersection prior to occupancy of any commercial
or residential use.
Should the improvements outlined in MM TRANS -04 (Del
Rio/US101/EI Camino Real) not be complete at the time of
occupancy for any use in the project, the developer shall be
responsible for constructing those improvements. An updated
traffic analysis may be provided to determine the trigger for
improvement completion. If improvements are not constructed
prior to permit submittal for this project, the applicant will
coordinate with the City and Caltrans on construction of the
required lane widening.
68. Should a developer construct oversized improvements, any costs
of the installed improvements in excess of the project's
proportional share, may be eligible for a TIF fee credit. Any
potential TIF fee credit will be calculated by the City and will
comply with any City resolution guiding TIF Fee credits in place at
the time of construction of the improvements. The developer
constructing the improvements may also be eligible for
reimbursement from other developments conditioned to
participate.
69. The project shall construct all improvements needed to
accommodate each phase of the development.
Phase 1 (Commercial): Prior to or concurrently with the issuance
of permits to commence the project, a public improvement plan
shall be reviewed and approved by the City Engineer and an
encroachment permit shall be issued for improvements on Del Rio
Road and any improvements at the intersection of San Ramon
Road and Del Rio Road including:
a. Curb, gutter, and a 6 -foot sidewalk along Del Rio Road
b. Associated road widening
c. Striping and signage
d. Improvements on project corner.
e. Installation of a ladder striped crosswalk on the eastern
leg of the Del Rio Road / San Ramon intersection
f. The crosswalk shall be supplemented with pedestrian
warning signage and rectangular rapid flashing beacon
(RRFB) on both sides of the road, The crosswalk across
the northern side San Ramon Road shall not be included.
g. Lighting at the intersection of Del Rio Road and San
Ramon Road sufficient for pedestrian and vehicular
safety. Light shall be provided both on the north and
south side of the intersection
Phase 2 (single-family): Prior to issuance of any permit for the
single-family neighborhood, a public improvement plans shall be
reviewed and approved by the City Engineer and an
Ongoing
FM I PS/CE
Timing
Responsibility
(Monitoring
FM:
Final Map
PS:
Planning services
BL
Business License
Bs:
Building services
PR:
PemtitReAaw
FD:
Fre DepartneM
FI:
Final Inspection
PD:
Police Depaitnent
TO:
Temporary
CE:
City Engineer
Occupancy
F0:
Final Occupancy
improvements are not completed, "Do Not Block" Intersection
Markings per the California Manual on Uniform Traffic Control
Devices (CAMUTCD) Section 36.17 shall be completed at the
Ramona Road intersection prior to occupancy of any commercial
or residential use.
Should the improvements outlined in MM TRANS -04 (Del
Rio/US101/EI Camino Real) not be complete at the time of
occupancy for any use in the project, the developer shall be
responsible for constructing those improvements. An updated
traffic analysis may be provided to determine the trigger for
improvement completion. If improvements are not constructed
prior to permit submittal for this project, the applicant will
coordinate with the City and Caltrans on construction of the
required lane widening.
68. Should a developer construct oversized improvements, any costs
of the installed improvements in excess of the project's
proportional share, may be eligible for a TIF fee credit. Any
potential TIF fee credit will be calculated by the City and will
comply with any City resolution guiding TIF Fee credits in place at
the time of construction of the improvements. The developer
constructing the improvements may also be eligible for
reimbursement from other developments conditioned to
participate.
69. The project shall construct all improvements needed to
accommodate each phase of the development.
Phase 1 (Commercial): Prior to or concurrently with the issuance
of permits to commence the project, a public improvement plan
shall be reviewed and approved by the City Engineer and an
encroachment permit shall be issued for improvements on Del Rio
Road and any improvements at the intersection of San Ramon
Road and Del Rio Road including:
a. Curb, gutter, and a 6 -foot sidewalk along Del Rio Road
b. Associated road widening
c. Striping and signage
d. Improvements on project corner.
e. Installation of a ladder striped crosswalk on the eastern
leg of the Del Rio Road / San Ramon intersection
f. The crosswalk shall be supplemented with pedestrian
warning signage and rectangular rapid flashing beacon
(RRFB) on both sides of the road, The crosswalk across
the northern side San Ramon Road shall not be included.
g. Lighting at the intersection of Del Rio Road and San
Ramon Road sufficient for pedestrian and vehicular
safety. Light shall be provided both on the north and
south side of the intersection
Phase 2 (single-family): Prior to issuance of any permit for the
single-family neighborhood, a public improvement plans shall be
reviewed and approved by the City Engineer and an
Ongoing
FM I PS/CE
Conditions of Approval
DEV21-0066
Vesting Tentative Tract Map 3177
Barrel Creek
APNs 049-131-043, 044, 052, 058, and 066
encroachment permit shall be issued for improvements as detailed
below:
a. Curb, gutter, and a 6 -foot sidewalk along San Ramon
Road. Sidewalk shall terminate to a point North of Street
D as determined by the City Engineer.
b. A contiguous pedestrian path of travel shall be provided
along Del Rio Road to the existing sidewalk on the south
side of the freeway overpass.
Timing Responsibility
Monitoring
I FM: Final Map
I BL: Business License
PR: PennftReview
FI: Finallnspection
TO: Temporary
Occupancy
F0: Final Occupancy
PS:
Bs
FD:
PD:
CE:
Planning Services
Building services
Fre Department
Police Department
City Engineer
Both phase 1 and phase 2 public improvements must be
completed or bonded for prior to recordation of the final map.
Phase 2 multi -family Improvements are the same as listed for
Phase 1 and are to be complete prior to construction of any multi-
family building per conditions.
70. The connection between Street D and Street A shall be designed FM/PR CEPS/FD
as one-way with traffic flowing from the residential area to the
commercial area. The intersection shall be designed to discourage
through traffic and shall include signage to prohibit entry from
Street A to Street D (commercial to residential). This connection
will also serve as an emergency egress from Street D and shall
not be gated or designed in any way which hinders emergency
vehicle access.
71. All mitigation measures included in the mitigation monitoring Ongoing PS/CE
program shall be implemented as conditioned. Conditions listed
are intended to supplement and refine mitigation measures. Any
discrepancy shall be resolved by a determination of the City
Engineer and Community Development Director.
72. Public improvement plans (PIPs) shall be prepared by a licensed PR
civil engineer. PIPs shall be prepared on 24"x36" plan sheets, use
the City Standard border and signature block, and shall comply
with Section 2 of City Standard Specifications. All plans shall
contain the City of Atascadero "Standard Notes for Improvement
Plans" on file in the City Engineer's office.
CE
73. A 6 -foot wide Public Utility Easement (PUE) shall be dedicated FM CE
contiguous to the new road rights-of-way for the property frontages
along San Ramon Road and Del Rio Road.
74. Road slope easements shall be dedicated where the road prism FM
cut/fill slopes extend beyond the right-of-way. The easement shall
extend not less than five feet (horizontally) beyond any daylight or
catch line of the graded slope or other required road facility (such
as a brow ditch, retaining wall, drainage swale, etc.), to the
satisfaction of the City Engineer.
75. Prior to Encroachment permit issuance, the Developer shall PR
execute an "Engineer of Work Agreement" form designating who
will be providing engineering support for the design and
construction of the improvements for the project (Engineer of
Record). The City and Engineer of Record (EOW) inspectors are
CE
CE
Conditions of Approval
Timing
Responsibility
DEV21-0066
!Monitoring
Vesting Tentative Tract Map 3177
FM: Final Map
PS: Planning Services
BL: Business License
BS: Building SeMoes
Barrel Creek
PR: Permit Review
FD: Foe Depnnent
FI: Final inspection
PD: Police Department
TO: Temporary
CE: City Engineer
APNs 049-131-043, 044, 052, 058, and 066
Occupancy
FO: Final Occupancy
to work together in collection and record keeping necessary for the
inspection and approval of the improvements. The EOW inspector
shall be onsite when work requiring inspection occurs. City
inspections will occur based on the agreed upon schedule with
City Staff.
76. The horizontal and vertical design of roads shall be in compliance
PR
CE
with the City of Atascadero Engineering Standards and Caltrans
design requirements, if applicable, to the satisfaction of the City
Engineer. The City Engineer reserves the right to make
modifications to all submitted road designs, when in the opinion of
the City Engineer, the public's health and safety is benefitted.
77. The design of structural pavement sections for on-site roads shall
PR
CE
be based on minimum a Traffic Index (TI) = 6.0 and a 20 -year
design life. Off-site/public roads must match existing pavement
sections and/or City Standards Specifications to the satisfaction of
the City Engineer.
78. New roads with pavement placed prior to the construction of PR
CE
buildings will be subjected to additional construction traffic and
wear associated with the on-site construction not included in the
design life of the pavement section. Therefore, to off -set this, the
AC thickness shall be increased from that which is derived from
Caltrans method by either:
a. 1" if the pavement is placed prior to building
construction (not phased)
b. 1.5" if the pavement construction is phased (i.e. — a
portion of the ultimate pavement thickness is deferred
and a final pavement wearing course placed prior to
final inspection).
c. Final pavement wearing course shall not be less than
1.5"
d. Street centerline monuments shall be provided at
intersections and at the beginning and end of curves
along the street centerline
Public Works - General
79. All public improvements shall be constructed in conformance with the
PR
CE
City of Atascadero Engineering Department Standard Specifications
and Drawings, except as noted above or as approved by the City
Engineer.
80. In the event that the applicant is allowed to bond for the public FM
CE
improvements required as a condition of the map, the applicant shall
enter into a Subdivision Improvement Agreement with the City.
81. An engineer's estimate of probable cost for Subdivision Improvements FM
CE
shall be submitted for review and approval by the City Engineer to
determine the amount of the bond.
Conditions of Approval
Timing Responsibility
DEV21-0066
I /Monitoring
Vesting Tentative Tract Map 3177
FM: Final Map Ps: Planning SeNoes
BL: Business License BS: Building Services
Barrel Creek
PR:itRevew Par FD: Fire Depatrent
FI: Finallnspecton PD: PDlice Department
T0: Temporary CE: city Engineer
APNs 049-131-043 044 052 058 d 066
s , s � an
occupancy
F0: FinalOxupancy �
82. The Subdivision Improvement Agreement (SIA) shall record
FM
CE
concurrently with the Final Map. If it is the intent of the developer to
pursue a reimbursement agreement with the City for the installation of
any oversized improvements, reference to said agreement and terms
shall be included in the SIA.
83. The applicant shall be responsible for the relocation and/or alteration PR
CE
of existing utilities.
84. The applicant shall monument all property corners for construction
FM
CE
control and shall promptly replace them if disturbed.
85. Prior to recording the final map, the applicant shall either bond for or FM
CE
set monuments at all new property corners. A registered civil engineer
licensed to perform land surveying or licensed land surveyor shall
indicate by certificate on the parcel map, that comers have been set
or shall be set by a date specific and that they will be sufficient to
enable the survey to be retraced.
CE
86. The applicant shall acquire title interest in any off-site land that may be FM
required to allow for the construction of the improvements. The
applicant shall bear all costs associated with the necessary
acquisitions. The applicant shall also gain concurrence from all
adjacent property owners whose ingress and egress is affected by
these improvements.
CE
87. Drainage easements shall be provided as needed to accommodate FM
both public and private drainage facilities.
88. Prior to recording the tract map, the applicant shall pay all outstanding FM
CE
plan check/inspection fees.
CE
89. Prior to recording the map, the applicant shall bond for or complete all FM
improvements required by these conditions of approval.
CE
90. Prior to the final inspection of any public improvements, the applicant FM
shall submit a written statement from a registered civil engineer that all
work has been completed and is in full compliance with the approved
plans.
91 Prior to the final inspection, the applicant shall submit a written
FOTO
CE
certification from a registered civil engineer or land surveyor that all
survey monuments have been set as shown on the final map.
92. An encroachment permit shall be obtained prior to any work within City
PR
CE
rights of way.
CE
93. Prior to the issuance of building permits, the applicant shall submit a
PR
grading and drainage plan prepared by a registered civil engineer for
review and approval by the City Engineer.
Conditions of Approval
Timing
Responslblilty
DEV21-0066
/Monitoring
Vesting Tentative Tract Map 3177
FM: Final Map
BL: Business License
Ps: Planning Services
BS: Building Services
Barrel Creek
PR: Permit Review
FD: Rre Department
Fl: Final Inspection
PD: Police Departnent
TD: Temporary
CE: City Engineer
APNs 049-131-043,044,052,068,and 066
Occupancy FU. Final Occupancy
Fire Department
94. Fire hydrants shall be located within 100 -feet of the fire department
PR
FD
connection for each building.
95. A 26 -foot wide fire lane shall be provided no closer than 15 -feet and
PR
FD/CE
no farther than 30 -feet from any building exceeding 30 -feet in height,
subject to the approval of the Fire Marshal and City Engineer. This may
be accommodated within the parking lot drive aisles.
96. An Atascadero Construction Site Safety Plan is required to be
PR
FD
submitted and approved prior issuance of building permits.
97. The turn -around area at the terminus of street "C within the residential
PR
FD/CE
subdivision shall include red curb and no parking signage.
98. A fire flow calculation for each commercial and multi -family structure
PR
FD
shall be provided during building permit review to determine required
hydrant spacing.
MITIGATION MEASURE
Timing
Aesthetics
AES -1
Landscaping shall be included along the San Ramon and Del Rio frontages Prior to Building
to buffer higher density residential lots from surrounding existing rural Permit Issuance /
residences. Landscaping shall include small shrubs and grasses along with Project Final
street trees. Street trees along San Ramon shall be installed in a natural
grouped pattern and shall include native species. Landscaping along Del
Rio shall include shrubs and grasses as well as London plan trees at a
spacing of 30 -feet on -center consistent with the adjacent Apple Valley
development. A minimum of 8 feet of landscaped area shall be provided
along each frontage.
Columnar landscaping and canopy shade trees shall be provided along the Prior to Building
AES -2
norther property line to provide visual screening of the 4 -story hotel from Permit Issuance /
the adjacent residential parcel. Landscaping shall include evergreen Project Final
species and shall be designed to block visual impacts to the greatest extent
possible.
AES -03
Site lighting shall be low-level safety lighting for the parking lot areas.
Prior to Building
Lighting shall be on motion sensors to minimize lighting when areas are not
Permit Issuance /
in use. All pole lighting shall be a maximum of 14 -feet in height and shall
Project Final
be shielded and directional.
AES -04
Low level lighting shall be placed at the intersection of San Ramon and Del
Prior to Building
Rio Road for safety. Additional lighting at the Apple Valley frontage shall be
Permit Issuance /
installed as needed to facilitate safe lighting levels at the intersection.
Project Final
AES-05
All site walls visible from the exterior of the site shall be decorative walls
Prior to Building
and shall include decorative veneer.
Permit Issuance /
Project Final
AES-06
Lighting at the north hotel facade and west facing portion of the fagade
Prior to Building
closest to the proposed multi-family units shall include pedestrian scale
Permit Issuance /
bollard lighting only. No architectural feature lighting is permitted. Fully
Project Final
shielded directional lighting shall be permitted where needed for egress
safety.
Air Quality
AQ-01
Water exposed soil during active construction at a specific frequency to
Ongoing during
achieve dust suppression.
Construction
AQ-02
Apply water at a specific frequency during active demolition to achieve
Ongoing during
dust suppression.
Construction
AQ-03
Water construction roads a minimum of twice daily.
Ongoing during
Construction
AQ-04
Maintain a 25 mile per hour speed limit for all vehicles during construction
Ongoing during
Construction
AQ-05
Zero or low-VOC paints shall be used throughout the project.
Priorto Building
Permit Issuance /
Project Final
AQ-06
Limit heavy equipment idling to no greater than 5 minutes at a single
Ongoing during
location
Construction
Cultural Resources
CUL-01
Prior to the issuance of any permits on-site, an Archeological Monitoring
Prior to Building
Plan shall be prepared by a qualified archeologist and shall be approved
Permit Issuance
by the City of Atascadero. All recommendations of the plan shall be
implemented as directed.
CUL-02
All grading and site disturbance activities shall be monitored by a qualified
Ongoing during
archeologist and a monitor from a local tribal representative.
Construction
CUL-03
Prior to demolition of the Quonset hut, the applicant shall provide
Prior to Building
documentation that includes floor plans, elevations, photographs and
Permit Issuance
historical facts related to the structure. The report shall be approved and
filed by the City prior to permit issuance for demolition.
Greenhouse Gas Emissions
GHG-01
Provide a pedestrian-friendly and interconnected streetscape with good
Prior to Building
access to/from the development for pedestrians, bicyclists, and transit
Permit Issuance
users to make alternative transportation more convenient, comfortable and
safe.
GHG-02
Provide large canopy shade trees throughout the parking areas to reduce
Priorto Building
evaporative emissions from parked vehicles.
Permit Issuance
GHG-03
The multi-family portion of the development shall meet or exceed
I Priorto Building
CALGreen Tier 2 standards.
Permit Issuance
GHG-04
See AQ mitigation measures
Noise
NOI-01
Construction activities shall be limited to gam to 7pm on Saturdays and
Ongoing during
shall not occur on Sundays.
construction
Transportation
TRANS -01 I The Crosswalk at Del Rio Road shall include ladder striping for the
Prior to Building
crosswalk at the eastern leg of the intersection. The crosswalk shall be
Permit Issuance /
supplemented with pedestrian warning signage and rectangular rapid
Project Final
flashing beacon (RRFB) on both sides of the road. The crosswalk across
the northern side San Ramon Road shall not be included.
TRANS -02
The intersection of San Ramon Road and Del Rio Road shall be illuminated
Prior to Building
with down lighting sufficient for pedestrian and vehicular safety. Light shall
Permit Issuance /
be provided both on the north and south side of the intersection.
Project Final
TRANS -03
A contiguous pedestrian path of travel shall be provided along Del Rio Road
Prior to Building
to the existing sidewalk on the south side of the freeway overpass prior to
Permit Issuance/
occupancy of any residential units.
Project Final
TRANS -04
Prior to occupancy of any use on the project, the following improvements Prior to Occupancy
shall be completed at the Del Rio and El Camino Real intersection:
• Restripe the eastbound approach to a left, through, and
right turn lane and modify the left turn to protected -
permissive phasing,
• Add a westbound left turn lane (required for eastbound
through lane transition) with. permissive phasing,
• Modify the southbound and northbound left turns to
protected -permissive phasing,
• Add overlap phasing to the southbound right turn pocket
currently under construction,
• Replace eight -inch traffic signal heads with 12 -inch
heads,
• Install yellow reflective tape on all backplates,
• Install new signage and replace non -reflective signs, and
• Optimize signal timings for all coordinated signals
including updating pedestrian and yellow clearance
times at Del Rio and EI Camino Real.
I
It is anticipated that these improvements will be completed by the
Marketplace Project prior to commencement of the Barrel Creek
Project. This project shall pay their fair share toward these
improvements. Fair share shall be based on current cost
estimates. Should the developer construct the improvements, any
costs of the installed improvements in excess of the project's
proportional share may be eligible for a TIF fee credit. Any
potential TIF fee credit will be calculated by the City and will
comply with any City resolution guiding TIF Fee credits in place at
the time of construction of the improvements. The developer
constructing the improvements may also be eligible for
reimbursement from other development conditioned to construct
specified improvements.
TRANS -05
The applicant/developer shall pay their fair share towards improvements at Prior to Building
the US101/Del Rio interchange as specified in the Del Rio Road Permit Issuance
Commercial Area Specific Plan including the addition of a westbound right -
turn lane to the intersection of Del Rio Road/US 101, such that there would
be two westbound lanes on Del Rio Road from EI Camino Real to the US
101 North ramp with a dedicated right turn lane onto US 101 northbound.
TRANS -06 The applicant/developer shall pay their fair share toward the realignment of Prior to Building
Ramona Road and associated frontage improvements along Del Rio Road Permit Issuance
between San Ramon and US 101. Cost estimates for the fair share
payment shall be based on a current cost estimate or the actual costs if the
project is completed prior to permit issuance. It is anticipated that the City
will complete these improvements prior to commencement of the project. If
these improvements are not completed, Do Not Block Intersection
Markings per the California Manual on Uniform Traffic Control Devices
(CAMUTCD) Section 36.17 shall be completed at the Ramona Road
intersection prior to occupancy of any commercial or residential use.
TRANS -07 A striped crosswalk shall be provided across "Street A" (project entry street Prior to Building
at Del Rio Road) to connect the pedestrians from the commercial portion Permit Issuance /
of the project to the Del Rio Road sidewalk and crossing at San Ramon. Project Final
Tribal and Cultural Resources
TCR -01 See mitigation measure CUL -01.
Utility and Service Systems
USS -01
USS -02
Prior to occupancy for any use, the developer shall upgrade Lift Station 14 Building Permit
with the following:
• Install new 30 HP submersible pumps and associated piping
improvements
• Install new wet well roof and hatch
Install new Motor Control Center (MCC), Variable Frequency
Drives (VFDs), and upgrade controls
• Install emergency generator, propane tank and associated piping
Bypass pumping during construction
Prior to occupancy of any use that exceeds 196 gallons per minute at peak Building Permit
hour flow at Lift Station 14, the developer shall upgrade Lift Station 14 with
the following:
• Replacement of 30 -Hp submersible pumps with 40 -Hp pumps and
associated piping upgrades
• Remove and replaced existing wet well with minimum 8' diameter
wet well
• Pipeline connection improvements
• Install new MCC, VFDs, and upgrade controls
• Upsize the emergency generator
• Bypass pumping during construction
Attachment 2: Project Design Package
DEV21-0066
See following