HomeMy WebLinkAboutPC Resolution 2003-0013FEB - 4 2003
ORIGINAL RESOLUTION NO. PC 2003-0013 CITY OF ATASCAD
A RESOLUTION OF THE PLANNING COMMISSION PLANNING
OF THE CITY OF ATASCADERO APPROVING
CONDITIONAL USE PERMIT 2002-0075 FOR A 2,592 SQUARE FOOT COMMERCIAL
BUILDING, 1872 SQUARE FOOT FUTURE COMMERCIAL BUILDING EXPANSION,
AND 1,800 SQUARE FOOT RESIDENTIAL DUPLEX BUILDING ON A 0.65 -ACRE
SITE AT APN 029-302-047 & 029-312-036.
(5245, 5265 El Camino Real / Stan Sherwin)
WHEREAS, an application has been received from Stan Sherwin (5265 El Camino Real,
Atascadero, CA 93422) Applicant and Property Owner for a Conditional Use Permit (CUP 2002-
0075) to construct a 2,592 square foot commercial building, 1,872 future commercial expansion,
1,800 square foot residential duplex building, parking lot and landscaping on one parcel in a
commercial retail zoning district; and,
WHEREAS, the site's General Plan Designation is GC (General Commercial); and,
WHEREAS, the site's zoning district is CR (Commercial Retail); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone
Change application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said Conditional Use Permit;
and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on February 4, 2003, studied and considered Conditional Use Permit (CUP
2002-0075), after first studying and considering the Draft Mitigated Negative Declaration
prepared for the project, and
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Findings for Certification of the Proposed Mitigated Nep-ative
Declaration. The Planning Commission finds as follows:
1. The project does not have the potential to degrade the environment when mitigation
measures are incorporated into the project's mitigation monitoring program as
conditions of approval; and,
2. The project will not achieve short-term to the disadvantage of long term
environmental goals; and,
3. The project does not have impacts which are individually limited, but cumulatively
considerable; and,
4. The project will not cause substantial adverse effects on human beings either directly
or indirectly; and,
SECTION 2. Findings for Approval of the Conditional Use Permit. The Planning
Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element; and,
SECTION 3. Approval. The Planning Commission of the City of Atascadero, in a
regular session assembled on February 4, 2003, resolved to Conditional Use Permit 2002-0075
subject to the following conditions and exhibits:
EXHIBIT A: Conditions of Approval/Mitigation Monitoring Program
EXHIBIT B: Exterior Elevations
EXHIBIT C: Site Plan & Preliminary Landscape Plan
EXHIBIT D: Floor Plan
EXHIBIT E: Preliminary Grading, Drainage & Utility Plan
EXHIBIT F: Color and Material Sample Board
EXHIBIT G: Sign Program
EXHIBIT H: Master Plan of Development (Site Plan & Commercial Building
Elevations)
On motion by Commissioner Kelley, and seconded by Commissioner Porter the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Commissioners Kelley, Porter, Jones, Bentz, and Fonzi (5 )
NOES: None (0 )
ABSENT: Commissioner Eddings ( 1 )
ABSTAIN: None (0 )
ADOPTED: February 4, 2003
CITY OF ATASCADERO, CA
Roberta Fonzi, Chairpers
Atascadero Planning Commission
Attest:
arren M. Frace
Planning Commission Secretary
EXHIBIT A: Conditions of Approval
Conditional Use Permit 2002-0075: Stan Sherwin/ K -Jon's Mixed -Use
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2002-0075: K -Jon's / Stan Sherwin
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Pemut
BS: Building Services
T0: Temporary Occupancy
FD: Fire Depatnent
FI: Final inspection
PD: Police Department
FO: Final Occupancy
CE: City Engineer
WW: Wastewater
CA City Attorney
AMWC: Water Comp.
Planning Services
1. This conditional use permit shall be for a 2,592 square
On going
PS
foot commercial building, 1,872 future commercial
expansion, 1,800 square foot residential duplex
building, parking lot and landscaping on two adjacent
parcels totaling 0.65 -acres as described on the
attached exhibits and located on parcels 029-302-047,
029-312-036 (5245, 5265 EI Camino Real) regardless
of owner.
2. The approval of this use permit shall become final and
On going
PS
effective for the purposes of issuing building permits
fourteen (14) days following the Planning Commission
approval unless prior to the time, an appeal to the
decision is filed as set forth in Section 9-1.111(b) of the
Zoning Ordinance.
On going
PS
3. Approval of this Conditional Use Permit shall be valid
for twelve (12) months after its effective date. At the
end of the period, the approval shall expire and become
null and void unless the project has received a building
permit.
4. The Community Development Department shall have
BP
PS
the authority to approve minor changes to the project
that (1) result in a superior site design or appearance,
and/or (2) address a construction design issue that is
not substantive to the Conditional Use Permit, (3) Adjust
project intensity <10%).
5. All site improvements, lighting, landscaping, and
BP
PS
building elevations including colors, material and
FI
finishes shall be consistent or superior to those shown
in attached Exhibits B through H.
6. The Architectural Elevations as shown in Exhibit B and
BP
PS
H shall include the following:
a) All exterior finishes, materials and construction
techniques shall be consistent with, or superior to those
shown on the attached exhibits or conditioned.
7. There shall be no roof -mounted equipment on the
BP
PS
residential duplex building.
I FI
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
` CUP 2002-0075: K- Jon's / Stan Sherwin
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
FI: Final inspection
PD: Police Department
F0: Final Occupancy
CE: City Engineer
WW: Wastewater
CA CityMomey
AMWC: Water Comp.
residential duplex building.
FI
8. All ducts, meters, air conditioning equipment, and all
BP
PS
other mechanical equipment shall be located within the
building or, if required on the rooftop, be designed to be
below the building parapet. Any ground -mounted
equipment shall be screened from public view with
materials architecturally compatible with the main
structure. Ground -mounted gas and electric meters,
electric transformers, and large water piping systems
shall be completely screened from public view with
approved architectural features and/or landscape
plantings.
9. The Community Development Department shall
BP
PS, BS
approve a final landscape and irrigation plan consistent
with Exhibits C and H, prior to the issuance of any
building permit. Landscape plans and specification shall
be prepared by a professional landscape architect and
indicate the location, size, quantity and planting
requirements of all plant materials. The plans shall
include details for an automatic underground irrigation
system. The landscape construction plan shall be
consistent with the incorporation of the following
features at a minimum:
a) The species, size, quantity, and location of all proposed
plant material will be indicated on the plans.
b) All slopes in excess of 3:1 shall be planted with slope
stabilizing plant materials and installed with jute mesh.
c) Add irrigated vine pockets along the northerly retaining
where the sidewalk abuts.
d) All trees are to be 15 -gallon minimum size (except item
i) and double -staked.
e) Plant the parking lot edges along EI Camino Real with a
low hedgerow planting along the backside of the
parking lot curb.
f) Specify 24 -inch box sized street trees adjacent to EL
Camino Real.
g) Landscape returns located in the front parking bank
may be reduced to allow for one additional space.
10. Prior to the issuance of any future Phase II building
GP
PS
permits, all off-site access and parking easements
BP
CA
required from adjacent properties shall be approved
by the City Attorney and recorded in favor of the
project and it perpetuity. The required easements
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2002-0075: K -Jon's / Stan Sherwin
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Balding Permit
BS: Building Services
T0: Temporary Occupancy
FD: Fire Department
FI: Final inspection
PD: Police Depar6nent
F0: Final Occupancy
CE City Engineer
WW: Wastewater
CA City Aamey
AMWC: Water Comp.
shall include one (1) reciprocal shared access drive
aisle between adjacent southerly property at the
location identified in Exhibits C and H.
11. Trash/recycle enclosure shall be constructed of tan
BP
PS
split -face block material, with solid metal gates
(painted to match building color) and sized to
accommodate dumpster and recycle containers. The
adjacent compact parking space may be deleted to
accommodate this condition.
12. Signs shall be designed and located as identified on
BP
PS
Exhibit C and G. No permanent or temporary signs
are to be located upon the side or rear (north, south,
east) elevations of the commercial building. Signs
shall not be permitted on the residential duplex
building.
13. The commercial and residential building arcade/porch
BP
PS
columns shall be square symmetrical plaster
columns. The carport shall be square symmetrical
taster or wood columns.
14. The stucco siding shall not be machine or sprayed
BP
PS
finished.
15. The roof pitch of the rectangular hipped tower over
BP
PS
the main entrance shall match the 6:12 arcade roof
itch, as viewed in side north, south elevation.
16. The future commercial building expansion front porch
BP
PS
and staircase railing shall be decorative metal or
heavy wrought iron, subject to staff approval
17. The storefront doors, and window glass shall be clear
BP
PS
or only slightly tinted.
18. Special paving treatment shall be added at the two EI
BP
PS
Camino Real driveway entrances, as identified on
Exhibits C and H.
19. An arborist report is required to recommend any tree
GP, BP
PS
protection requirements for an off-site native oak tree
located adjacent to the northeast corner of the project
site. Preservation recommendations shall include
relocating the proposed retaining wall away from the
property corner.
Public Works — Drainage
20. The project may tie into the existing storm drain inlet
BP
BS, CE
on EI Camino Real. The preliminary plans show a
schematic layout of a drainage system. This system
conveys most of the site storm water runoff directly to
the existing storm drain inlet on EI Camino Real.
Storm water flow, except from the immediate
driveway, will not be conveyed across the sidewalk.
21. All drainage improvements shall be designed to City
BP
BS, CE
of Atascadero Engineering Standards. A Registered
Civil Engineer shall design the plans and submit
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2002-0075: K -Jon's / Stan Sherwin
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
FI: Final inspection
PD: Police Deparlinent
F0: Final Occupancy
CE: City Engineer
WAN: Wastewater
CA. City Attomey
AMC: Water Comp.
drainage calculations for the system. The
calculations shall support the design of any structures
or pipes. Closed conduits shall be designed to
convey the 10 -year flow with gravity flow; the 25 -year
flow with head, and provide safe conveyance for the
1 00 - ear overflow.
Public Improvements (Project Frontage)
22. All public improvements shall be constructed in
BP
BS, CE
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings or
as directed by the City Engineer.
Wastewater
23. This project shall connect to City sewer. The design
BP
BS, WW
and construction of the connection shall follow all City
standards. All fees shall be paid at the time of permit
issuance.
On -Site Improvements
24. The applicant will obtain approval by the City
BP
BS, CE
Engineer of the grading & drainage plan and the
storm drain design & facilities.
25. The preliminary plans show retaining walls along the
BP
BS, CE
property lines. The walls shall be designed by a
registered civil or structural engineer. A soils report
shall be submitted specifying design parameters and
drainage recommendations for the walls. The walls
shall be designed to these parameters. Easements
shall be obtained from the offsite property owners
where access or grading is required to construct the
walls. Wall material shall be subject to Planning
Department approval.
26. Prior to issuance of any building permit related to
BP
CE, CA
future Phase II improvements (Shown on the Master
Plan of Development Exhibit H), the applicant shall
provide an agreement with the adjacent southerly
property owner, indicating acceptance of proposed
future Phase II improvements including reciprocal
access, parking, driveway and landscape. The
agreement shall be subject to review and approval of
the City Engineer and City Attorney.
Standard Conditions
27. The applicant shall enter into a Plan Check &
BP
BS
Inspection agreement with the City.
28. An encroachment permit shall be obtained prior to
BP
BS
any work within City rights of way.
29. The applicant shall be responsible for the protection,
BP
BS
relocation and/or alteration of existing utilities.
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2002-0075: K -Jon's /Stan Sherwin
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Pemit
BS: Building Services
TO. Temporary Occupancy
FD: Fire Department
FI: Final inspection
PD: Police Department
FO: Final Occupancy
CE: City Engineer
WW: Wastewater
CA: City Attomey
AMC: Water Comp.
30. The applicant shall install all new utilities (water, gas,
BP
BS
electric, cable TV and telephone) underground.
31. The applicant shall monument all property corners for
BP
BS
construction control and shall promptly replace them
if disturbed.
32. Prior to issuance of building permits, the applicant
BP
BS
shall submit a grading and drainage plan with a
separate sheet(s) devoted to sedimentation and
erosion control, prepared by a registered civil
engineer for review and approval by the City
Engineer.
33. Prior to the final inspection, all outstanding plan check
BP
BS
and inspection fees shall be paid.
34. All construction activities shall comply with the City of
BP
BS
Atascadero Noise Ordinance for hours of operation.
Construction activities shall be limited to the following
hours of operation:
• 7 a.m. to 7 p.m. Monday through Friday
• 9 a.m. to 6 p.m. Saturday
• No construction on Sunday
The hours of construction may be modified by the
Community Development Director upon a
determination that unusually loud construction
activities are having a significant impact on the
neighbors.
Failure to comply with the above-described hours of
operation may result in withholding of inspections and
possible construction prohibitions, subject to the
review and approval of the Planning Commission.
35. Prior to the final inspection, the applicant shall submit
BP
BS
a written statement from a registered civil engineer
that all work has been completed and is in full
compliance with the approved plans and the Uniform
Building Code (UBC).
Mitigation Measures
BP
PS
1.c.1
Mitigation Measure 1.c.1: All lighting shall be designed to
eliminate any off site glare. All exterior site lights shall utilize
full cut-off, "hooded" lighting fixtures to prevent offsite light
spillage and glare. Any luminaire pole height shall not exceed
30 -feet in height, limit intensity to 2.0 foot candles at ingress
/egress, and otherwise 0.6 foot candle minimum to 1.0
maximum in parking areas. Fixtures shall be shield cut-off
type.
Mitigation Measure Il.c.2: The project landscape shall include
BP
PS
1.c.2
requiring 24 -inch box sized street trees adjacent to EI Camino
Real.
Mitigation Measure 3.b: The project shall be conditioned to
BP
BS
3.b
comply with all applicable District regulations pertaining to the
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2002-0075: K -Jon's / Stan Sherwin
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fre Department
FI: Final inspection
PD: Police Depart hent
F0: Fina Occupancy
CE: City Engineer
WW: Wastewater
CA City Attorney
AMWC: Water Comp.
control of fugitive dust (PM -10) as contained in section 6.4 of
the Air Quality Handbook. All site grading and demolition
plans notes shall list the following regulations:
A. All material excavated or graded shall be sufficiently
watered to prevent excessive amounts of dust. Watering
shall occur at least twice daily with complete coverage,
preferably in the late morning and after work is finished for
the day.
B. All clearing, grading, earth moving, or excavation
activities shall cease during periods of high winds (i.e.
greater than 20 mph averaged over one hour) so as to
prevent excessive amounts of dust.
All material transported off-site shall be either
sufficiently watered or securely covered to prevent
excessive amounts of dust.
The area disturbed by clearing, grading, earth
moving, or excavation operations shall be minimized so as
to prevent excessive amounts of dust.
Permanent dust control measured identified in
the approved project revegetation and landscape plans
shall be implemented as soon as possible following
completion of any soil disturbing activities.
Exposed ground areas that are planned to be
reworked at dates greater than one month after initial
grading shall be sown with fast -germinating native grass
seed and watered until vegetation becomes established.
All disturbed areas not subject to revegetation
shall be stabilized using approved chemical soil binders,
jute netting, or other methods in advance by the APCD.
All roadways, driveways, sidewalks, etc. to be
paved shall be completed as soon as possible. In
addition, structural foundations shall be completed as
soon as possible following building pad construction.
On-site vehicle speed shall be limited to 15 mph
for any unpaved surface.
All unpaved areas with vehicle traffic shall be
watered at least twice per day, using non -potable water.
Streets adjacent to the project site shall be swept
daily to remove silt which may have accumulated from
construction activities so as to prevent excessive amounts
of dust from leaving the site.
Wheel washers may be required when significant
offsite import or export of fill is involved.
M. Large canopy shade trees shall be provided along street
frontages and within parking areas to shade paved areas
and minimize urban heat build-up.
Mitigation Measure4.ef: An arborist report and tree
GP, BP
PS, BS, CE
4.ef
preservation recommendations is required for any proposed
construction or earthwork within or adjacent to the drip line of
the existing off-site oak tree located at the northeast corner of
the site, prior to grading or building permit issuance.
Mitigation Measure 5.e: Should any cultural resources be
GP
BS
5.e
unearthed during site development work, the provisions of
CEQA -Section 15064.5, will be followed to reduce impacts to
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2002-0075: Ktilon's / Stan Sherwin
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
Fl: Final inspection
PD: Police Department
F0: Final Occupancy
CE: City Engineer
WW: Wastewater
CA City Attomey
AMWC: Water Comp.
a non-significant level.
Mitigation Measure 6.b.1: The Building Permit Application
GP
PS, BS, CE
6.b.2
plans shall include erosion control measures to prevent soil,
dirt, and debris from entering the storm drain system during
and after construction. A separate plan shall be submitted for
this purpose and shall be subject to review and approval of the
City Engineer at the time of Building Permit application.
Mitigation Measure 6.b.2: All cut and fill slopes shall be
GP
PS, BS, CE
6.b.4
hydroseeded with an appropriate erosion control method
(erosion control blanket, hydro -mulch, or straw mulch
appropriately anchored) immediately after completion of
earthwork between the months of October 15 through April 15.
All disturbed slopes shall have appropriate erosion control
methods in place. Duration of the project: The contractor will
be responsible for the clean-up of any mud or debris that is
tracked onto public streets by construction vehicles.
Mitigation Measure 6.c.d: A soils report shall be required to be
GP
BS
6.c.d
submitted with a future building permit by the building
department. The building plans will be required to follow the
recommendations of the soils report to assure safety for
occupants and buildings.
Mitigation Measure 8.e.f.1: A Stormwater Pollution Prevention
GP
PS, BS, CE
6.b.1
Plan (SWPPP)/Erosion Control Plan shall be submitted and
approved by the City Engineer prior to the issuance of the
building permit. The plan shall include storm water measures
for the operation and maintenance of the project for the review
and approval of the City Engineer. The Building Permit
application plans shall identify Best Management Practices
(BMPs) appropriate to the uses conducted on site that
effectively prohibit the entry of pollutants into storm water
runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for
GP
PS, BS, CE
6.b.3
ensuring that all contractors are aware of all storm water
quality measures and that such measures are implemented.
Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction
notices, citations, or stop orders.
Mitigation Measure 11.d: All construction activities shall
BP, GP
PS, BS
11.d
comply with the City of Atascadero Noise Ordinance for hours
of operation.
Construction activities shall be limited to the following hours of
operation:
• 7 a.m. to 7 p.m. Monday through Friday
• 9 a.m. to 6 p.m. Saturday
• No construction on Sunday
Further, particularly loud noises shall not occur before 8 a.m.
on weekdays and not at all on weekends.
The hours of construction may be modified by the Community
Development Director upon a determination that unusually
loud construction activities are having a significant impact on
the neighbors.
Conditions of Approval 1 Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2002-0075: K -Jon's / Stan Sherwin
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Pemrt
BS: Building Services
TO: Temporary Occupancy
FD: Fre Department
Fl: Final inspection
PD: Police Department
F0: Final Occupancy
CE: City Engineer
WW: Wastewater
CA Cily Attorney
AMWC: Water Comp.
Failure to comply with the above-described hours of operation
may result in withholding of inspections and possible
construction prohibitions, subject to the review and approval of
the Planning Commission.
A sign shall be posted on-site with the hours of operation and
a telephone number of the person to be contacted in the event
of any violations. The details of such a sign shall be approved
by staff during the Grading Plan/Building Permit review
process.
Mitigation Measure 15.g: The applicant shall provide
BP
BS
15.g
reciprocal access easements to the northerly, central, and
southerly adjoining properties per the proposed site plan.
EXHIBIT B: Exterior Elevations
CUP 2002-0075
OCXI M.. • MON
pWlMlw gOOOOCT.O.
EXHIBIT B: Exterior Elevations
CUP 2002-0075
4
qui�rua�
EXHIBIT C: Site Plan & Preliminary Landscape Plan
CUP 2002-0075
�norntq ca�,su,tr�, a,��• ,
�-- u cuuNo RF+1L —•- -
„w.... f�
Muti 611� 11vi, K.rorEw� ws rrs
JM4
c't JE1 ELKS 52artW rw+,in�tc � � r
o•rwwmax A7�°aCAi�W�Cd� Gh 9°v4 -Z2 "0
..a.•�, $ G9 L LAM@lo KCAL rONIt 466 •T24,6
EXHIBIT D: Floor Pian
CUP 2002-0075
EXHIBIT E: Preliminary Grading, Drainage & Utility Plan
CUP 2002-0075
a. "j----' ..
.��� \ i ♦ n -1 yn � �,-.—�--. _tea �,
/At --------
b _arrY
19,00'-•�S�JO�� ' l9.00•'
gl, Ari1lID j{L Gi1�SS1CLLt�i'. N44R7' xW 201.00
,�.x,w....�•wR _f�1rLIM �1»AbIN4 PLAN„ �
A• inarllnerunr. oruox y� \
•7- uxxixo•reoeuniox
°" � x. w.nRrur •p
EXHIBIT F: Color & Material Sample Board
CUP 2002-0075
EXHIBIT G: Sign Program
CUP 2002-0075
Tenant Sign Locations
WL
je
VorY �t141�k WM ixl't�r'•
MajffYK� t�K
,i.r
60wr HWL04L TSMO I —
f1o'
liK hlt✓. T
P.om#K'.
3'
- JDA -
ep 6-rr-w-r
EXHIBIT H: Master Plan of Development (Site Plan)
CUP 2002-0075
r o
Note: Prior to issuance of any
building permit related to future
Phase II improvements, the {
'+ applicant shall provide an
agreement with the adjacent Q
f ti southerly property owner, -1®8�" --4
indicating acceptance of v
xw _ proposed future Phase II �
F_
improvements including tc a
reciprocal access, parking,
driveway and landscape. The u N W 3
agreement shall be subject to 43 _
review and approval of the City
Engineer and City Attorney.
Ni
—� aHe vExY�- F, , — ��► —> ��
2g' a
v t c
4 Milt
Aa S
s
2e'
s'tt�ua�
1Gibrttl4
ren e�ew�x�
t
oy26aS �1. Cd•MIFtO tC9rSl—
V't
,�.,�^...����"�
K•JvNS JEVE�L1rK5
ATA^aC�.,Gi
,r
984Y2
a amu„
S2WA 61• GAMIMo KWA
t ONOL 444 TZ4
r