HomeMy WebLinkAboutCC_2022_06_28_AgendaPacket CITY OF ATASCADERO CITY COUNCIL AGENDA
HYBRID MEETING INFORMATION:
In accordance with City Council Resolution No. 2022-044 and the requirements of
AB 361, the City Council Meeting will be available via teleconference for those who
wish to participate remotely. The City Council meeting will also be held in the City
Council Chambers and in-person attendance will be available at that location.
HOW TO OBSERVE THE MEETING REMOTELY:
To participate remotely, residents can livestream the meeting on Zoom, SLO-SPAN.org,
on Spectrum cable Channel 20 in Atascadero, and listen live on KPRL Radio 1230AM
and 99.3FM. The video recording of the meeting will repeat daily on Channel 20 at 1:00
am, 9:00 am, and 6:00 pm and will be available through the City’s website and on the
City’s YouTube Channel. To participate remotely using the Zoom platform please visit
https://us02web.zoom.us/webinar/register/WN_ZwJ7a031S3KXauEym9ehaA.
HOW TO SUBMIT PUBLIC COMMENT:
Individuals who wish to provide public comment in-person may attend the meeting in
the City Council Chambers. Individuals who wish to participate remotely may call
(669) 900-6833 (Meeting ID: 889 2347 9018) to listen and provide public comment via
phone or via the Zoom platform using the link above.
If you wish to comment but not via a live platform, please email public comments to
cityclerk@atascadero.org. Such email comments must identify the Agenda Item Number
in the subject line of the email. The comments will be forwarded to the City Council and
made a part of the administrative record. To ensure distribution to the City Council prior
to consideration of the agenda, the public is encouraged to submit comments no later
than 12:00 p.m. the day of the meeting. Those comments, as well as any comments
received after that time, but before the close of the item, will be distributed to the City Council,
posted on the City’s website, and will be made part of the official public record of the meeting.
Please note, email comments will not be read into the record.
AMERICAN DISABILITY ACT ACCOMMODATIONS:
Any member of the public who needs accommodations should contact the City
Clerk’s Office at cityclerk@atascadero.org or by calling 805-470-3400 at least 48
hours prior to the meeting or time when services are needed. The City will use their
best efforts to provide reasonable accommodations to afford as much accessibility
as possible while also maintaining public safety in accordance with the City procedure
for resolving reasonable accommodation requests.
City Council agendas and minutes may be viewed on the City's website:
www.atascadero.org/agendas.
Copies of the staff reports or other documentation relating to each item of business referred to on
the Agenda are on file in the office of the City Clerk and are available for public inspection on our
website, www.atascadero.org. Contracts, Resolutions and Ordinances will be allocated a number
once they are approved by the City Council. The Minutes of this meeting will reflect these numbers.
All documents submitted by the public during Council meetings that are made a part of the record or
referred to in their statement will be noted in the Minutes and available for review by contacting the
City Clerk's office. All documents will be available for public inspection by appointment during City
Hall business hours.
Page 1 of 220
This
Page
Intentionally
Left Blank
Page 2 of 220
CITY OF ATASCADERO
CITY COUNCIL
AGENDA
Tuesday, June 28, 2022
City Hall Council Chambers, 4th floor
6500 Palma Avenue, Atascadero, California
REGULAR SESSION – CALL TO ORDER: 6:00 P.M.
PLEDGE OF ALLEGIANCE: Council Member Bourbeau
ROLL CALL: Mayor Moreno
Mayor Pro Tem Newsom
Council Member Bourbeau
Council Member Dariz
Council Member Funk
APPROVAL OF AGENDA: Roll Call
Recommendation: Council:
1. Approve this agenda; and
2. Waive the reading in full of all ordinances appearing on this agenda, and the titles
of the ordinances will be read aloud by the City Clerk at the first reading, after the
motion and before the City Council votes.
CLOSED SESSION – REPORT (IF ANY)
1. June 14, 2022
A. CONSENT CALENDAR: (All items on the consent calendar are considered to be routine
and non-controversial by City staff and will be approved by one motion if no member of
the Council or public wishes to comment or ask questions. If comment or discussion is
desired by anyone, the item will be removed from the Consent Calendar and will be
considered in the listed sequence with an opportunity for any member of the public to
address the Council concerning the item before action is taken.)
1. City Council Draft Action Minutes – June 14, 2022
▪ Recommendation: Council approve the June 14, 2022 Draft City Council Regular
Meeting Minutes. [City Clerk]
City Council Regular Session: 6:00 P.M.
Page 3 of 220
2. May 2022 Accounts Payable and Payroll
▪ Fiscal Impact: $2,292,110.85.
▪ Recommendation: Council approve certified City accounts payable, payroll and payroll
vendor checks for May 2022. [Administrative Services]
UPDATES FROM THE CITY MANAGER: (The City Manager will give an oral report on any
current issues of concern to the City Council.)
COMMUNITY FORUM: (This portion of the meeting is reserved for persons wanting to
address the Council on any matter not on this agenda and over which the Council has
jurisdiction. Speakers are limited to three minutes. Please state your name for the record
before making your presentation. Comments made during Community Forum will not be a
subject of discussion. A maximum of 30 minutes will be allowed for Community Forum,
unless changed by the Council. Comments will be allowed for the entire 30-minute period
so if the final speaker has finished before the 30 minute period has ended and a member of
the public wishes to make a comment after the Council has commenced another item, the
member should alert the Clerk within the 30 minute period of their desire to make a comment
and the Council will take up that comment upon completion of the item which was
commenced. Any members of the public who have questions or need information may
contact the City Clerk’s Office, between the hours of 8:30 a.m. and 5:00 p.m. at
(805) 470-3400, or cityclerk@atascadero.org.)
B. PUBLIC HEARINGS:
1. Adopting Sewer Service Charges to be Added to the 2022-2023 Property Tax Rolls
▪ Fiscal Impact: The City estimates it will collect $3,925,563 in sewer service
charges for Fiscal Year 2022-2023.
▪ Recommendations: Council:
1. Conduct a public hearing to receive verbal testimony regarding the
proposed sewer service charges to be levied onto property tax rolls.
2. Adopt Draft Resolution approving sewer charges to be added to the 2022-
2023 property tax rolls. [Public Works]
2. Del Rio Marketplace (AMND19-0063)
▪ Fiscal Impact: The commercial portion of the project will have a positive impact on
City revenues and will provide synergy for increased development throughout the
area. Additionally, the development is required to annex into the Citywide CFD.
With annexation into the CFD, overall, the project will be fiscally positive.
▪ Recommendations: Council adopt Draft Resolution approving a Conditional Use
Permit Amendment, Tentative Parcel Map (AT22-0011), and Environmental Impact
Report (EIR) Addendum for the Del Rio Marketplace, subject to findings and
conditions of approval. [Community Development]
C. MANAGEMENT REPORTS
1. Integrated Waste Management Authority – Amended and Restated Joint
Powers Agreement
▪ Fiscal Impact: None.
▪ Recommendations: Authorize the Mayor to execute the San Luis Obispo
Integrated Waste Management Authority Second Amended and Restated
Joint Powers Agreement. [City Manager]
Page 4 of 220
D. COUNCIL ANNOUNCEMENTS AND COMMITTEE REPORTS: (On their own
initiative, Council Members may make a brief announcement or a brief report on their own
activities. The following represent standing committees. Informative status reports will
be given, as felt necessary):
Mayor Moreno
1. City Selection Committee
2. County Mayors Round Table
3. Regional Economic Action Coalition (REACH)
4. SLO Council of Governments (SLOCOG)
5. SLO Regional Transit Authority (RTA)
Mayor Pro Tem Newsom
1. City / Schools Committee
2. Design Review Committee
3. League of California Cities – Council Liaison
4. Visit SLO CAL Advisory Committee
Council Member Bourbeau
1. City of Atascadero Finance Committee
2. City / Schools Committee
3. Integrated Waste Management Authority (IWMA)
4. SLO County Water Resources Advisory Committee (WRAC)
Council Member Dariz
1. Air Pollution Control District
2. California Joint Powers Insurance Authority (CJPIA) Board
3. City of Atascadero Finance Committee
4. Community Action Partnership of San Luis Obispo (CAPSLO)
Council Member Funk
1. Atascadero Basin Ground Water Sustainability Agency (GSA)
2. Design Review Committee
3. Homeless Services Oversight Council
E. INDIVIDUAL DETERMINATION AND / OR ACTION: (Council Members may ask a
question for clarification, make a referral to staff or take action to have staff place a matter of
business on a future agenda. The Council may take action on items listed on the Agenda.)
1. City Council
2. City Clerk
3. City Treasurer
4. City Attorney
5. City Manager
F. ADJOURNMENT
Please note: Should anyone challenge any proposed development entitlement listed on this Agenda in court, that person
may be limited to raising those issues addressed at the public hearing described in this notice, or in written correspondence
delivered to the City Council at or prior to this public hearing. Correspondence submitted at this public hearing will be
distributed to the Council and available for review in the City Clerk's office.
Page 5 of 220
This
Page
Intentionally
Left Blank
Page 6 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
CITY OF ATASCADERO
CITY COUNCIL
DRAFT MINUTES
Tuesday, June 14, 2022
City Hall Council Chambers, 4th floor
6500 Palma Avenue, Atascadero, California
REGULAR SESSION – CALL TO ORDER: 6:00 P.M.
Mayor Moreno called the meeting to order at 6:01 p.m. and Mayor Pro Tem Newsom led the
Pledge of Allegiance.
ROLL CALL:
Present: Council Members Bourbeau, Dariz, and Funk (by teleconference), Mayor
Pro Tem Newsom and Mayor Moreno
Absent: None
Others Present: None
Staff Present: City Manager Rachelle Rickard, Administrative Services Director Jeri
Rangel, Fire Chief Casey Bryson, Public Works Director Nick DeBar, City
Attorney Brian Pierik, Deputy City Manager/City Clerk Lara Christensen,
Deputy City Manager Terrie Banish, Senior Planner Kelly Gleason and
IT Systems Administrator III David Anastasia
APPROVAL OF AGENDA:
MOTION: By Council Member Bourbeau and seconded by Mayor Pro Tem Newsom
to:
1. Approve this agenda; and,
2. Waive the reading in full of all ordinances appearing on this
agenda, and the titles of the ordinances will be read aloud by
City Council Regular Session: 6:00 P.M.
City Council Closed Session: Immediately
following conclusion of
the City Council Regular
Session
City Council Regular Session: 6:00 P.M.
City Council Closed Session: Immediately following
the conclusion of the City
Council Regular Session
Page 7 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
the City Clerk at the first reading, after the motion and before
the City Council votes.
Motion passed 5:0 by a roll-call vote.
CLOSED SESSION – REPORT (IF ANY)
1. May 24, 2022
City Attorney Pierik noted that there was no reportable action.
A. CONSENT CALENDAR:
1. City Council Draft Action Minutes – May 24, 2022
▪ Recommendation: Council approve the May 24, 2022 Draft City Council Regular
Meeting Minutes. [City Clerk]
2. March 2022 Investment Report
▪ Fiscal Impact: None.
▪ Recommendation: Council receive and file the City Treasurer’s report for quarter ending
March 31, 2022. [City Treasurer]
3. 2022-2023 Annual Spending Limit
▪ Fiscal Impact: None.
▪ Recommendation: Council adopt the attached Draft Resolution establishing the
annual spending limit for fiscal year 2022-2023. [Administrative Services]
4. Authorizing Temporary Road Closures for 2022 Hot El Camino Cruise Nite
and Colony Days Parade Route
▪ Fiscal Impact: Cruise Nite incurs no net fiscal impact. The City cost of conducting
the event is approximately $15,000 and is included in the adopted budget. It is
anticipated that these costs will be fully recovered through budgeted sponsorships
and entry fees.
▪ Recommendation: Council:
1. Adopt Draft Resolution A authorizing temporary road closures and restrictions on
August 19, 2022 for the Hot El Camino Cruise Nite.
2. Adopt Draft Resolution B authorizing temporary road closures and restrictions on
October 1, 2022 for the Colony Days Parade Route. [Public Works]
6. General Municipal Election – November 8, 2022
▪ Fiscal Impact: $40,000.
▪ Recommendations: Council adopt the following Resolutions for the purpose of
electing a Mayor, two members to the City Council, and a City Treasurer:
1. Draft Resolution A, calling and giving notice of the holding of a General
Municipal Election to be held on Tuesday, November 8, 2022 for the
election of a Mayor, two Council Members, and a City Treasurer
2. Draft Resolution B, requesting the Board of Supervisors of the County of
San Luis Obispo to consolidate a General Municipal Election to be held on
November 8, 2022. [City Clerk]
Page 8 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
7. AB 481 – Military Equipment Policy
▪ Fiscal Impact: None.
▪ Recommendation: Council adopt on second reading, by title only, a Draft
Ordinance adopting a Military Equipment Policy in accordance with Assembly
Bill 481. [Police Department]
8. Virtual Meetings – AB 361 Requirements
▪ Fiscal Impact: None.
▪ Recommendation: Council adopt Draft Resolution making findings consistent with the
requirements of AB 361 to continue to allow for the conduct of virtual meetings.
[City Manager]
9. Centennial Plaza Surplus Land Declaration Zone Change (ZCH) 22-0022
5901 West Mall
▪ Fiscal Impact: None.
▪ Recommendation: Council adopt a Resolution declaring the vacant parcels of land
surrounding Centennial Plaza location in Downtown and owned by the City of
Atascadero as surplus land. [Community Development]
10. Priority Legislative Budget Project – Delegation of Authority
Downtown Infrastructure Enhancement Plan Project
▪ Fiscal Impact: None.
▪ Recommendation: Council adopt Draft Resolution approving delegation of authority to
the City Manager or her designee for executing Priority Legislative Budget Project
documents associated with the Downtown Infrastructure Enhancement Plan Project.
[Public Works]
11. Legal Services Budget
▪ Fiscal Impact: $100,000 in FY 21-22 and $135,000 in FY 22-23.
▪ Recommendation: Council authorize the Director of Administrative Services to
appropriate an additional $100,000 in General Fund Reserves for legal services in FY
21-22 and $135,000 in FY 22-23. [City Attorney]
Deputy City Manager/City Clerk Christensen reported that staff would be pulling Consent Item #A-2
and bringing it back for Council review at a later date.
Council Member Funk asked a brief question on Item #A-11 regarding the additional budget request,
which was answered by City Manager Rickard.
Council Member Bourbeau removed Item #A-5 for separate vote and noted that this item covers a
project on his street and while there is no conflict, he will abstain from voting on the item.
MOTION: By Council Member Bourbeau and seconded by Council Member
Funk to approve Consent Calendar Items Nos. A-1, A-3, A-4, and
A-6 through A-11. (#A-3: Resolution No. 2022-039) (#A-4: Resolution
Nos. 2022-040 and 2022-041) (#A-6: Resolution Nos. 2022-042 and
2022-043) (#A-7: Ordinance No. 656) (#A-8: Resolution No. 2022-044)
(#A-9: Resolution No. 2022-045) (#A-10: Resolution No. 2022-046)
Motion passed 5:0 by a roll-call vote.
Page 9 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
5. 2022 Measure F-14 Pavement Rehabilitation Construction Award
▪ Fiscal Impact: $2,761,237.
▪ Recommendations: Council:
1. Award a construction contract for $2,761,237 to Souza Construction for the
2022 Measure F-14 Pavement Rehabilitation Project (Project No.
C2021R01).
2. Authorize the Director of Administrative Services to allocate an additional
$600,000 in Measure F-14 fund balance to the 2022 Measure F-14
Pavement Rehabilitation Project. [Public Works]
MOTION: By Council Member Funk and seconded by Mayor Pro Tem Newsom
to:
1. Award construction Contract No. 2022-007 for $2,761,237 to
Souza Construction for the 2022 Measure F-14 Pavement
Rehabilitation Project (Project No. C2021R01).
2. Authorize the Director of Administrative Services to allocate an
additional $600,000 in Measure F-14 fund balance to the 2022
Measure F-14 Pavement Rehabilitation Project.
Motion passed 4:0 by a roll-call vote. Bourbeau abstain.
UPDATES FROM THE CITY MANAGER:
City Manager Rickard presented the following employees with Service Awards:
• 5 Years: Justin Kamp, Wastewater Treatment Plant Operator II
Andrew Hawkins, Fire Engineer
Jackson Light, Fire Engineer
Craig Martineau, Police Officer
• 20 Years: Jennifer Fanning, Recreation Supervisor
Mayor Moreno presented the following employee with a Service Award:
• 25 Years: Rachelle Rickard, City Manager
Following Employee Recognition, City Manager Rickard gave an update on projects and
events within the City.
COMMUNITY FORUM:
The following persons spoke in-person, by telephone or through the webinar: Zach Jackson,
Audrey Taub, Kevin Campion, and Chris Farris
B. PUBLIC HEARINGS:
1. Apple Valley Assessment Districts
▪ Fiscal Impact: Annual assessments for 2022/2023 will total $38,500 for
road/drainage system maintenance and $63,000 for landscape and lighting
maintenance. These amounts will be assessed to the owners of parcels in
Page 10 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
Apple Valley. Contributions of $11,000 for half the cost of the park will be
made from the City’s General Fund, and an equal revenue source will be
recognized from contributions made by the developer.
▪ Recommendations: Council:
1. Adopt Draft Resolution A approving the final Engineer’s Report regarding
the Street and Storm Drain Maintenance District No. 01 (Apple Valley), and
the levy and collection of annual assessments related thereto for fiscal year
2022/2023.
2. Adopt Draft Resolution B ordering the levy and collection of assessments
for fiscal year 2022/2023 for Street and Storm Drain Maintenance District
No. 01 (Apple Valley).
3. Adopt Draft Resolution C approving the final Engineer’s Report regarding
the Landscaping and Lighting District No. 01 (Apple Valley), and the levy
and collection of annual assessments related thereto in fiscal year
2022/2023.
4. Adopt Draft Resolution D ordering the levy and collection of assessments
for fiscal year 2022/2023 for Landscaping and Lighting District No. 01
(Apple Valley). [Administrative Services]
Ex Parte Communications
Administrative Services Director Rangel gave the report and answered questions from the
Council.
PUBLIC COMMENT:
The following persons spoke in-person, by telephone or through the webinar: None
Mayor Moreno closed the Public Comment period.
MOTION: By Council Member Bourbeau and seconded by Mayor Pro Tem
Newsom to:
1. Adopt Resolution No. 2022-047 approving the final Engineer’s
Report regarding the Street and Storm Drain Maintenance District
No. 01 (Apple Valley), and the levy and collection of annual
assessments related thereto for fiscal year 2022/2023.
2. Adopt Resolution No. 2022-048 ordering the levy and collection of
assessments for fiscal year 2022/2023 for Street and Storm Drain
Maintenance District No. 01 (Apple Valley).
3. Adopt Resolution No. 2022-049 approving the final Engineer’s
Report regarding the Landscaping and Lighting District No. 01
(Apple Valley), and the levy and collection of annual assessments
related thereto in fiscal year 2022/2023.
4. Adopt Resolution No. 2022-050 ordering the levy and collection of
assessments for fiscal year 2022/2023 for Landscaping and
Lighting District No. 01 (Apple Valley).
Motion passed 5:0 by a roll-call vote.
2. De Anza Estates Assessment Districts
▪ Fiscal Impact: Annual assessments for 2022/2023 will total $30,562 for
road/drainage system maintenance and $15,875 for landscape and lighting
maintenance. These amounts will be assessed to the owners of parcels in De
Page 11 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
Anza Estates. The City General Fund will contribute $1,400 for the fiscal year
2022/2023 for half of the maintenance costs of the trails and open space.
▪ Recommendations: Council:
1. Adopt Draft Resolution A approving the final Engineer’s Report regarding
the Street and Storm Drain Maintenance District No. 03 (De Anza Estates),
and the levy and collection of annual assessments related thereto for fiscal
year 2022/2023.
2. Adopt Draft Resolution B ordering the levy and collection of assessments
for fiscal year 2022/2023 for Street and Storm Drain Maintenance District
No. 03 (De Anza Estates).
3. Adopt Draft Resolution C approving the final Engineer’s Report regarding
the Landscaping and Lighting District No. 03 (De Anza Estates), and the
levy and collection of annual assessments related thereto in fiscal year
2022/2023.
4. Adopt Draft Resolution D ordering the levy and collection of assessments
for fiscal year 2022/2023 for Landscaping and Lighting District No. 03 (De
Anza Estates). [Administrative Services]
Ex Parte Communications: None.
Administrative Services Director Rangel gave the staff report.
PUBLIC COMMENT:
The following citizens spoke on this item: None.
Mayor Moreno closed the Public Comment period.
MOTION: By Council Member Bourbeau and seconded by Council Member
Funk to:
1. Adopt Resolution No. 2022-051 approving the final Engineer’s
Report regarding the Street and Storm Drain Maintenance District
No. 03 (De Anza Estates), and the levy and collection of annual
assessments related thereto for fiscal year 2022/2023.
2. Adopt Resolution No. 2022-052 ordering the levy and collection of
assessments for fiscal year 2022/2023 for Street and Storm Drain
Maintenance District No. 03 (De Anza Estates).
3. Adopt Resolution No. 2022-053 approving the final Engineer’s
Report regarding the Landscaping and Lighting District No. 03 (De
Anza Estates), and the levy and collection of annual assessments
related thereto in fiscal year 2022/2023.
4. Adopt Resolution No. 2022-054 ordering the levy and collection of
assessments for fiscal year 2022/2023 for Landscaping and
Lighting District No. 03 (De Anza Estates).
Motion passed 5:0 by a roll-call vote.
3. Woodridge (Las Lomas) Assessment Districts
▪ Fiscal Impact: Annual assessments for 2022/2023 will total $99,189 for
road/drainage system maintenance and $70,452 for landscape and lighting
maintenance. These amounts will be assessed to the owners of parcels in Las
Lomas (Woodridge). The City General Fund will contribute $2,600 for the
Page 12 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
fiscal year 2022/2023 for 25% of the maintenance costs of the trails and open
space.
▪ Recommendations: Council:
1. Adopt Draft Resolution A approving the final Engineer’s Report regarding
the Street and Storm Drain Maintenance District No. 02 – Woodridge (Las
Lomas), and the levy and collection of annual assessments related thereto
for Fiscal Year 2022/2023.
2. Adopt Draft Resolution B ordering the levy and collection of assessments
for Fiscal Year 2022/2023 for Street and Storm Drain Maintenance District
No. 02 – Woodridge (Las Lomas).
3. Adopt Draft Resolution C approving the final Engineer’s Report regarding
the Landscaping and Lighting District No. 02 – Woodridge (Las Lomas),
and the levy and collection of annual assessments related thereto in Fiscal
Year 2022/2023.
4. Adopt Draft Resolution D ordering the levy and collection of assessments
for Fiscal Year 2022/2023 for Landscaping and Lighting District No. 02 –
Woodridge (Las Lomas). [Administrative Services]
Ex Parte Communications: None. Mayor Moreno did note that all Council Members received
a copy of an email from a Las Lomas resident in opposition to the assessment.
Administrative Services Director Rangel gave the staff report.
PUBLIC COMMENT:
The following citizens spoke on this item: Vy Pierce
Mayor Moreno closed the Public Comment period.
MOTION: By Council Member Bourbeau and seconded by Council Member
Funk to:
1. Adopt Resolution No. 2022-055 approving the final Engineer’s
Report regarding the Street and Storm Drain Maintenance District
No. 02 – Woodridge (Las Lomas), and the levy and collection of
annual assessments related thereto for fiscal year 2022/2023.
2. Adopt Resolution No. 2022-056 ordering the levy and collection of
assessments for fiscal year 2022/2023 for Street and Storm Drain
Maintenance District No. 02 – Woodridge (Las Lomas).
3. Adopt Resolution No. 2022-057 approving the final Engineer’s
Report regarding the Landscaping and Lighting District No. 02 –
Woodridge (Las Lomas), and the levy and collection of annual
assessments related thereto in fiscal year 2022/2023.
4. Adopt Resolution No. 2022-058 ordering the levy and collection of
assessments for fiscal year 2022/2023 for Landscaping and
Lighting District No. 02 – Woodridge (Las Lomas).
Motion passed 5:0 by a roll-call vote.
4. Downtown Parking & Business Improvement Area (DPBIA) Confirmation of
Annual Assessment (FY 2022-2023)
Page 13 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
▪ Fiscal Impact: Adopting the staff recommendation will result in the collection of
approximately $12,800 and expenditure of $12,820 in budgeted DPBIA funds.
▪ Recommendation: Council adopt Draft Resolution confirming the annual
assessment for the Downtown Parking and Business Improvement Area (Fiscal
Year 2022-2023). [City Manager]
Ex Parte Communications: None
Deputy City Manager Banish gave the staff report.
PUBLIC COMMENT:
The following citizens spoke on this item: None.
Mayor Moreno closed the Public Comment period.
MOTION: By Council Member Bourbeau and seconded by Council Member
Dariz to adopt Resolution No. 2022-059 confirming the annual
assessment for the Downtown Parking and Business Improvement
Area (Fiscal Year 2022-2023).
Motion passed 5:0 by a roll-call vote.
5. Atascadero Tourism Business Improvement District (ATBID) Confirmation
of Annual Assessment (Fiscal Year 2022-2023)
▪ Fiscal Impact: Annual assessments for 2022-2023 are expected to be approximately
$298,170 (or higher based on the current trend) and will be assessed as 2% of the
rent charged on the occupied rooms and spaces for transient services.
▪ Recommendation: Council adopt Draft Resolution confirming the annual
assessment for the Atascadero Tourism Business Improvement District (Fiscal Year
2022-2023). [City Manager]
Ex Parte Communications: None
Deputy City Manager Banish gave the staff report.
PUBLIC COMMENT:
The following citizens spoke on this item: None.
Mayor Moreno closed the Public Comment period.
MOTION: By Council Member Bourbeau and seconded by Council Member
Funk to adopt Resolution No. 2022-060 confirming the annual
assessment for the Atascadero Tourism Business Improvement
District (Fiscal Year 2022-2023).
Motion passed 5:0 by a roll-call vote.
6. Amendments and Additions to Fee Schedule
▪ Fiscal Impact: The fiscal impact of the fee update is unknown; however, revenues
are expected to increase with adoption of the draft fee schedule and fees will be more
fairly allocated based changes that have occurred in the economy, City staffing, City
procedures, and regulations since the last Cost Study was completed.
Page 14 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
▪ Recommendation: Council adopt Draft Resolution A establishing a schedule of Fees
and Charges for City Services. [Administrative Services]
Ex Parte Communications: None
Administrative Services Director Rangel gave the presentation and answered questions
from the Council. Eric Johnson, with Cost Revenue Specialists, and Senior Planner Gleason
also answered questions from the Council.
PUBLIC COMMENT:
The following citizens spoke on this item: None.
Mayor Moreno closed the Public Comment period.
MOTION: By Council Member Funk and seconded by Mayor Pro Tem Newsom
to adopt Resolution No. 2022-061 establishing a schedule of Fees and
Charges for City Services with the following changes to Exhibit A (Draft Fee
Schedule):
• Fee 22-091B (Day Care/Group Home Inspection/Schools):
Inspection - $50 per permit for Day Care
• Fee 22-018 (Zoo Admissions): $12 General and $10 Senior
Motion passed 5:0 by a roll-call vote.
C. COUNCIL ANNOUNCEMENTS AND COMMITTEE REPORTS:
The following Council Members gave brief update reports on their committees since their
last Council meeting:
Mayor Moreno
1. Regional Economic Action Coalition (REACH)
Mayor Pro Tem Newsom
1. Design Review Committee
Council Member Bourbeau
1. Integrated Waste Management Authority (IWMA)
2. SLO Council of Governments (SLOCOG)
Council Member Dariz
1. Air Pollution Control District
2. Community Action Partnership of San Luis Obispo (CAPSLO)
Council Member Funk
1. Homeless Services Oversight Council
D. INDIVIDUAL DETERMINATION AND / OR ACTION: (Council Members may ask a
question for clarification, make a referral to staff or take action to have staff place a matter of
business on a future agenda. The Council may take action on items listed on the Agenda.)
Page 15 of 220
ITEM NUMBER: A-1
DATE: 06/28/22
1. City Council – Mayor Moreno reported that the City of Paso Robles has requested
Atascadero send a letter in support of the State Route 46 Multi-modal Corridor
Improvement Project to further the City of Paso Robles Spaceport efforts.
E. RECESS TO CLOSED SESSION FOLLOWING CONCLUSION OF CITY COUNCIL
REGULAR SESSION
Mayor Moreno recessed the Regular Meeting at 8:01 p.m. and called the Closed Session
Meeting to order at 8:09 p.m.
COUNCIL CLOSED SESSION:
1. CLOSED SESSION -- PUBLIC COMMENT
2. COUNCIL LEAVES TO BEGIN CLOSED SESSION
3. CLOSED SESSION -- CALL TO ORDER
a. Conference with Real Property Negotiators
(Govt. Code 54956.8)
Real Property: 5970 El Camino Real (APN 030181031)
Agency Negotiator: Rachelle Rickard, City Manager
Negotiating Parties: Fred C. Pflum Revocable Trust
Subject of Negotiations: Purchase price and/or terms of payment
4. CLOSED SESSION – ADJOURNMENT
F. ADJOURN
Following Closed Session, the meeting was adjourned at 8:32 pm; no reportable action.
MINUTES PREPARED BY:
______________________________________
Lara K. Christensen
City Clerk
APPROVED:
Page 16 of 220
ITEM NUMBER: A-2 DATE: 06/28/22Page 17 of 220
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of May 2022
4394 05/03/2022 RABOBANK, N.A. 57,250.08Payroll Vendor Payment
4395 05/03/2022 EMPLOYMENT DEV DEPARTMENT 17,950.22Payroll Vendor Payment
4396 05/03/2022 EMPLOYMENT DEV. DEPARTMENT 2,817.09Payroll Vendor Payment
170903 05/04/2022 ANTHEM BLUE CROSS HEALTH 215,207.05Payroll Vendor Payment
170904 05/04/2022 BENEFIT COORDINATORS CORP 9,190.20Payroll Vendor Payment
170905 05/04/2022 LINCOLN NATIONAL LIFE INS CO 2,067.87Payroll Vendor Payment
170906 05/04/2022 MEDICAL EYE SERVICES 1,803.10Payroll Vendor Payment
170907 05/06/2022 13 STARS MEDIA 668.12Accounts Payable Check
170908 05/06/2022 2 MEXICANS, LLC 5,834.25Accounts Payable Check
170909 05/06/2022 ALLIANT INSURANCE SERVICES INC 182.00Accounts Payable Check
170910 05/06/2022 AMERICAN WEST TIRE & AUTO INC 379.01Accounts Payable Check
170911 05/06/2022 AT&T 24.30Accounts Payable Check
170912 05/06/2022 AT&T 784.68Accounts Payable Check
170913 05/06/2022 ATASCADERO HAY & FEED 372.49Accounts Payable Check
170914 05/06/2022 ATASCADERO YOUTH FOOTBALL 150.00Accounts Payable Check
170915 05/06/2022 ATM ADVANTAGE PLUS 175.00Accounts Payable Check
170916 05/06/2022 BASSETT'S CRICKET RANCH,INC. 348.49Accounts Payable Check
170917 05/06/2022 KEITH R. BERGHER 956.25Accounts Payable Check
170918 05/06/2022 BERRY MAN, INC. 503.85Accounts Payable Check
170919 05/06/2022 BREZDEN PEST CONTROL, INC. 161.00Accounts Payable Check
170920 05/06/2022 MAREN E. BROWN 100.00Accounts Payable Check
170921 05/06/2022 BURKE,WILLIAMS, & SORENSON LLP 19,349.78Accounts Payable Check
170922 05/06/2022 CARQUEST OF ATASCADERO 78.86Accounts Payable Check
170923 05/06/2022 CENTRAL COAST BREWING, INC. 537.08Accounts Payable Check
170924 05/06/2022 CHARTER COMMUNICATIONS 4,405.19Accounts Payable Check
170925 05/06/2022 CITY OF ATASCADERO 347.00Accounts Payable Check
170926 05/06/2022 KAREN A. CLANIN 266.00Accounts Payable Check
170927 05/06/2022 CLEVER CONCEPTS, INC. 47.95Accounts Payable Check
170928 05/06/2022 CRYSTAL CREAMERY, INC. 1,002.99Accounts Payable Check
170929 05/06/2022 CRYSTAL SPRINGS WATER 20.00Accounts Payable Check
170930 05/06/2022 DESTINY CUELLAR 600.00Accounts Payable Check
170931 05/06/2022 CULLIGAN/CENTRAL COAST WTR TRT 35.00Accounts Payable Check
170932 05/06/2022 SHARON J. DAVIS 273.00Accounts Payable Check
170933 05/06/2022 NICHOLAS DEBAR 300.00Accounts Payable Check
170934 05/06/2022 JOE DEBRUIN, PH.D. 180.00Accounts Payable Check
170935 05/06/2022 HYRUM C. DEL CASTILLO 97.20Accounts Payable Check
170936 05/06/2022 DEPENDABLE FIRE PROTECTION 360.00Accounts Payable Check
170937 05/06/2022 DESTINATION TRAVEL NETWORK 100.00Accounts Payable Check
170938 05/06/2022 DISTINCTIVE GLASSWARE BRANDING 205.86Accounts Payable Check
170939 05/06/2022 PHILIP DUNSMORE 300.00Accounts Payable Check
170940 05/06/2022 ALI ELMASRI 100.00Accounts Payable Check
170941 05/06/2022 FAILSAFE TESTING, LLC 933.25Accounts Payable Check
170942 05/06/2022 AMANDA FERRELL 104.00Accounts Payable Check
ITEM NUMBER: A-2
DATE: 06/28/22
ATTACHMENT: 1
Page 18 of 220
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of May 2022
170943 05/06/2022 FERRELL'S AUTO REPAIR 430.83Accounts Payable Check
170944 05/06/2022 ANNE E. GALLAGHER 157.50Accounts Payable Check
170945 05/06/2022 GAS COMPANY 1,521.77Accounts Payable Check
170946 05/06/2022 GIERLICH-MITCHELL, INC. 3,639.86Accounts Payable Check
170947 05/06/2022 DANIEL J. GRASSESCHI 300.00Accounts Payable Check
170948 05/06/2022 ROCHELLE O. HANSON-TORRES 299.50Accounts Payable Check
170949 05/06/2022 HIGH COUNTRY OUTDOOR, INC. 850.00Accounts Payable Check
170950 05/06/2022 RYAN HOFSTETTER 248.99Accounts Payable Check
170952 05/06/2022 HOME DEPOT CREDIT SERVICES 2,935.81Accounts Payable Check
170953 05/06/2022 RACHEL HUNTER 81.90Accounts Payable Check
170954 05/06/2022 INFORMATION TECHNOLOGY 1,628.95Accounts Payable Check
170955 05/06/2022 JOANN HEAD LAND SURVEYING 11,719.78Accounts Payable Check
170956 05/06/2022 K & M INTERNATIONAL 4,033.21Accounts Payable Check
170957 05/06/2022 LAYNE LABORATORIES, INC. 1,413.75Accounts Payable Check
170958 05/06/2022 LEE WILSON ELECTRIC CO. INC 1,668.03Accounts Payable Check
170959 05/06/2022 LIFE ASSIST, INC. 1,043.24Accounts Payable Check
170960 05/06/2022 REBECCA N. LILLEY 243.00Accounts Payable Check
170961 05/06/2022 LINDE GAS & EQUIPMENT INC. 185.33Accounts Payable Check
170962 05/06/2022 LONE MADRONE, BRISTOLS CIDER 608.00Accounts Payable Check
170963 05/06/2022 CRAIG C. LOWRIE 75.00Accounts Payable Check
170964 05/06/2022 MADRONE LANDSCAPES, INC. 406.00Accounts Payable Check
170965 05/06/2022 MARBORG INDUSTRIES 73.05Accounts Payable Check
170966 05/06/2022 SAMUEL HENRY MCMILLAN, JR. 125.00Accounts Payable Check
170967 05/06/2022 MEA WINE, LLC 316.50Accounts Payable Check
170968 05/06/2022 MICHAEL K. NUNLEY & ASSC, INC. 5,855.33Accounts Payable Check
170969 05/06/2022 MID-COAST MOWER & SAW, INC. 73.73Accounts Payable Check
170970 05/06/2022 MIG 3,611.25Accounts Payable Check
170971 05/06/2022 MINER'S ACE HARDWARE 463.57Accounts Payable Check
170972 05/06/2022 MISSION UNIFORM SERVICE 336.03Accounts Payable Check
170973 05/06/2022 MOBILE SMALL ENGINE REPAIR 400.00Accounts Payable Check
170974 05/06/2022 MORRO BAY BUG COMPANY 273.82Accounts Payable Check
170975 05/06/2022 KELLYE R. NETZ 49.50Accounts Payable Check
170976 05/06/2022 OASIS EQUIPMENT RENTAL 599.60Accounts Payable Check
170977 05/06/2022 OFFICE DEPOT INC. 87.29Accounts Payable Check
170979 05/06/2022 PACIFIC GAS AND ELECTRIC 32,596.60Accounts Payable Check
170980 05/06/2022 PASO ROBLES FORD LINCOLN MERC 76.50Accounts Payable Check
170981 05/06/2022 RICARDO PAZ 375.00Accounts Payable Check
170982 05/06/2022 PEAKWIFI, LLC 650.00Accounts Payable Check
170983 05/06/2022 PORTER CONSTRUCTION, INC. 4,860.00Accounts Payable Check
170984 05/06/2022 PROCARE JANITORIAL SUPPLY,INC. 762.05Accounts Payable Check
170985 05/06/2022 GERALD D. PURIFY JR. 200.00Accounts Payable Check
170986 05/06/2022 RAINSCAPE, A LANDSCAPE SVC CO. 350.00Accounts Payable Check
170987 05/06/2022 JERI RANGEL 300.00Accounts Payable Check
ITEM NUMBER: A-2
DATE: 06/28/22
ATTACHMENT: 1
Page 19 of 220
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of May 2022
170988 05/06/2022 READYREFRESH BY NESTLE 82.63Accounts Payable Check
170989 05/06/2022 SHANENE M. REEVES 120.00Accounts Payable Check
170990 05/06/2022 RICK ENGINEERING COMPANY 9,360.70Accounts Payable Check
170991 05/06/2022 RACHELLE RICKARD 300.00Accounts Payable Check
170992 05/06/2022 FRANK ROCHA 42.00Accounts Payable Check
170993 05/06/2022 SUSAN ROJAS 59.00Accounts Payable Check
170994 05/06/2022 EVAN RUSSELL 227.29Accounts Payable Check
170995 05/06/2022 SCHINDLER ELEVATOR CORP 458.43Accounts Payable Check
170996 05/06/2022 SCOTT O'BRIEN FIRE & SAFETY CO 411.08Accounts Payable Check
170997 05/06/2022 THE SHERWIN-WILLIAMS COMPANY 137.01Accounts Payable Check
170998 05/06/2022 SITEONE LANDSCAPE SUPPLY, LLC 135.72Accounts Payable Check
170999 05/06/2022 SLO COUNTY SHERIFF'S OFFICE 285.00Accounts Payable Check
171000 05/06/2022 MARY P. SMITH 1,081.80Accounts Payable Check
171001 05/06/2022 SOUTH COAST EMERGENCY VEH SVC 1,041.19Accounts Payable Check
171002 05/06/2022 SOUZA CONSTRUCTION, INC. 201,974.29Accounts Payable Check
171003 05/06/2022 SPEAKWRITE, LLC. 164.42Accounts Payable Check
171004 05/06/2022 CONNER M. SPEARS 3,360.00Accounts Payable Check
171005 05/06/2022 SPECIALIZED EQUIPMENT REPAIR 2,566.86Accounts Payable Check
171006 05/06/2022 STANLEY CONVERGENT SECURITY 467.00Accounts Payable Check
171007 05/06/2022 SUN TEES NORTH 489.38Accounts Payable Check
171008 05/06/2022 SUNLIGHT JANITORIAL, INC. 4,850.00Accounts Payable Check
171009 05/06/2022 RONALD R. TARICA 88.19Accounts Payable Check
171010 05/06/2022 TEMPLETON UNIFORMS, LLC 796.34Accounts Payable Check
171011 05/06/2022 KARL O. TOERGE 144.00Accounts Payable Check
171012 05/06/2022 TURF STAR, INC. 31.14Accounts Payable Check
171013 05/06/2022 U.S. POSTMASTER 2,200.00Accounts Payable Check
171014 05/06/2022 ULTREX LEASING 263.18Accounts Payable Check
171015 05/06/2022 MEGAN L. VAN ALLEN 120.00Accounts Payable Check
171016 05/06/2022 RENE VASQUEZ 205.00Accounts Payable Check
171017 05/06/2022 THOMAS F. VELASQUEZ 50.00Accounts Payable Check
171018 05/06/2022 VERIZON WIRELESS 2,466.53Accounts Payable Check
171019 05/06/2022 VINO VICE, INC. 1,535.50Accounts Payable Check
171020 05/06/2022 WEST COAST AUTO & TOWING, INC. 150.00Accounts Payable Check
171021 05/06/2022 WEX BANK - 76 UNIVERSL 15,973.48Accounts Payable Check
171022 05/06/2022 WEX BANK - WEX FLEET UNIVERSAL 9,790.44Accounts Payable Check
171023 05/06/2022 WORKBENCH 12,730.00Accounts Payable Check
171024 05/06/2022 KAREN B. WYKE 396.00Accounts Payable Check
171025 05/06/2022 YOUTH EVOLUTION SOCCER 3,384.00Accounts Payable Check
4397 05/12/2022 ANTHEM BLUE CROSS HSA 8,839.92Payroll Vendor Payment
171026 05/12/2022 ATASCADERO MID MGRS ORG UNION 60.00Payroll Vendor Payment
171027 05/12/2022 ATASCADERO POLICE OFFICERS 1,950.00Payroll Vendor Payment
171028 05/12/2022 ATASCADERO PROF. FIREFIGHTERS 1,151.80Payroll Vendor Payment
171029 05/12/2022 CA FIREFIGHTERS BENEFIT TRUST 1,800.00Payroll Vendor Payment
ITEM NUMBER: A-2
DATE: 06/28/22
ATTACHMENT: 1
Page 20 of 220
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of May 2022
171030 05/12/2022 EMPLOYMENT DEV. DEPARTMENT 16,522.00Accounts Payable Check
171031 05/12/2022 MASS MUTUAL WORKPLACE SOLUTION 7,036.96Payroll Vendor Payment
171032 05/12/2022 MISSIONSQUARE RETIREMENT 125.00Payroll Vendor Payment
171033 05/12/2022 NATIONWIDE RETIREMENT SOLUTION 693.51Payroll Vendor Payment
171034 05/12/2022 NAVIA BENEFIT SOLUTIONS 1,674.10Payroll Vendor Payment
171035 05/12/2022 SEIU LOCAL 620 810.61Payroll Vendor Payment
171036 05/12/2022 VANTAGEPOINT TRNSFR AGT 106099 416.88Payroll Vendor Payment
171037 05/12/2022 VANTAGEPOINT TRNSFR AGT 304633 8,081.75Payroll Vendor Payment
171038 05/12/2022 VANTAGEPOINT TRNSFR AGT 706276 285.00Payroll Vendor Payment
4398 05/13/2022 STATE DISBURSEMENT UNIT 536.99Payroll Vendor Payment
4399 05/16/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 21,932.50Payroll Vendor Payment
4400 05/16/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 33,514.55Payroll Vendor Payment
4401 05/16/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 2,255.31Payroll Vendor Payment
4402 05/16/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 2,650.48Payroll Vendor Payment
4403 05/16/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 6,709.33Payroll Vendor Payment
4404 05/16/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 8,577.31Payroll Vendor Payment
4405 05/16/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 10,931.71Payroll Vendor Payment
4406 05/16/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 17,804.57Payroll Vendor Payment
4407 05/17/2022 RABOBANK, N.A. 60,380.38Payroll Vendor Payment
4408 05/17/2022 EMPLOYMENT DEV DEPARTMENT 18,881.44Payroll Vendor Payment
4409 05/17/2022 EMPLOYMENT DEV. DEPARTMENT 2,891.57Payroll Vendor Payment
171039 05/20/2022 13 STARS MEDIA 606.27Accounts Payable Check
171040 05/20/2022 2 MEXICANS, LLC 1,507.00Accounts Payable Check
171041 05/20/2022 ADAMSKI,MOROSKI,MADDEN, 1,316.00Accounts Payable Check
171042 05/20/2022 AGM CALIFORNIA, INC. 1,950.00Accounts Payable Check
171043 05/20/2022 ALAMEDA ELECTRICAL DISTRIBUTOR 317.20Accounts Payable Check
171044 05/20/2022 ALPHA ELECTRIC SERVICE 312.50Accounts Payable Check
171045 05/20/2022 ALTHOUSE & MEADE, INC. 300.00Accounts Payable Check
171046 05/20/2022 AMERICAN WEST TIRE & AUTO INC 1,654.50Accounts Payable Check
171047 05/20/2022 ANTECH DIAGNOSTICS 231.21Accounts Payable Check
171049 05/20/2022 AT&T 1,080.64Accounts Payable Check
171050 05/20/2022 AT&T 34.24Accounts Payable Check
171051 05/20/2022 ATASCADERO HAY & FEED 1,172.80Accounts Payable Check
171053 05/20/2022 ATASCADERO MUTUAL WATER CO. 19,911.00Accounts Payable Check
171054 05/20/2022 AVILA TRAFFIC SAFETY 300.75Accounts Payable Check
171055 05/20/2022 BASSETT'S CRICKET RANCH,INC. 348.49Accounts Payable Check
171056 05/20/2022 BERRY MAN, INC. 784.05Accounts Payable Check
171057 05/20/2022 BOUND TREE MEDICAL, LLC 103.32Accounts Payable Check
171058 05/20/2022 CASEY BRYSON 66.00Accounts Payable Check
171059 05/20/2022 BUREAU VERITAS NORTH AMERICA 77,156.23Accounts Payable Check
171060 05/20/2022 BURKE,WILLIAMS, & SORENSON LLP 16,188.00Accounts Payable Check
171061 05/20/2022 CARQUEST OF ATASCADERO 330.64Accounts Payable Check
171062 05/20/2022 CASEY PRINTING, INC. 1,732.39Accounts Payable Check
ITEM NUMBER: A-2
DATE: 06/28/22
ATTACHMENT: 1
Page 21 of 220
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of May 2022
171063 05/20/2022 CG VISUAL SOLUTIONS CORP. 686.64Accounts Payable Check
171064 05/20/2022 CHARTER COMMUNICATIONS 73.90Accounts Payable Check
171065 05/20/2022 TIMOTHY CLEAVER 173.99Accounts Payable Check
171066 05/20/2022 CMC 2,148.90Accounts Payable Check
171067 05/20/2022 COASTAL COPY, INC. 304.05Accounts Payable Check
171068 05/20/2022 COBAN TECHNOLOGIES, INC. 123.75Accounts Payable Check
171069 05/20/2022 CRYSTAL CREAMERY, INC. 363.28Accounts Payable Check
171070 05/20/2022 CULLIGAN/CENTRAL COAST WTR TRT 70.00Accounts Payable Check
171071 05/20/2022 DAN BIDDLE PEST CONTROL SERVIC 135.00Accounts Payable Check
171072 05/20/2022 NICHOLAS DEBAR 450.00Accounts Payable Check
171073 05/20/2022 DEPARTMENT OF JUSTICE 1,000.00Accounts Payable Check
171074 05/20/2022 DEPARTMENT OF TRANSPORTATION 4,453.57Accounts Payable Check
171075 05/20/2022 DEPENDABLE FIRE PROTECTION 318.43Accounts Payable Check
171076 05/20/2022 ECONOMIC & PLANNING SYSTEM INC 4,987.50Accounts Payable Check
171077 05/20/2022 EIKHOF DESIGN GROUP, INC. 1,650.58Accounts Payable Check
171078 05/20/2022 ELECTRICRAFT, INC. 121.50Accounts Payable Check
171079 05/20/2022 ALI ELMASRI 100.00Accounts Payable Check
171080 05/20/2022 ESCUELA DEL RIO 660.00Accounts Payable Check
171081 05/20/2022 JENNIFER FANNING 97.11Accounts Payable Check
171082 05/20/2022 FARM SUPPLY COMPANY 1,075.16Accounts Payable Check
171083 05/20/2022 FENCE FACTORY ATASCADERO 675.00Accounts Payable Check
171084 05/20/2022 FGL ENVIRONMENTAL 921.00Accounts Payable Check
171085 05/20/2022 FILIPPIN ENGINEERING, INC. 43,566.00Accounts Payable Check
171086 05/20/2022 GAS COMPANY 327.17Accounts Payable Check
171087 05/20/2022 GOVERNMENT FINANCE OFFICERS AS 225.00Accounts Payable Check
171088 05/20/2022 HAMANN FAMILY TRUST 3,883.93Accounts Payable Check
171089 05/20/2022 HAMNER, JEWELL & ASSOCIATES 659.72Accounts Payable Check
171090 05/20/2022 HART IMPRESSIONS PRINTING 1,633.07Accounts Payable Check
171091 05/20/2022 ALAN HURST 600.00Accounts Payable Check
171092 05/20/2022 INMAN CONSTRUCTION 29.00Accounts Payable Check
171093 05/20/2022 EMILY F. JENNINGS 180.00Accounts Payable Check
171094 05/20/2022 K & M INTERNATIONAL 1,919.67Accounts Payable Check
171095 05/20/2022 KPRL 1230 AM 1,070.00Accounts Payable Check
171096 05/20/2022 L.N. CURTIS & SONS 3,258.38Accounts Payable Check
171097 05/20/2022 LIFE ASSIST, INC. 520.56Accounts Payable Check
171098 05/20/2022 REBECCA N. LILLEY 216.00Accounts Payable Check
171099 05/20/2022 MARBORG INDUSTRIES 1,178.05Accounts Payable Check
171100 05/20/2022 MCCLATCHY SHARED SERVICES, LLC 482.96Accounts Payable Check
171101 05/20/2022 SAMUEL HENRY MCMILLAN, JR. 100.00Accounts Payable Check
171102 05/20/2022 RILEY A. METE 75.00Accounts Payable Check
171103 05/20/2022 MICHAEL K. NUNLEY & ASSC, INC. 992.73Accounts Payable Check
171104 05/20/2022 MIG 663.75Accounts Payable Check
171105 05/20/2022 KATE MILES 102.00Accounts Payable Check
ITEM NUMBER: A-2
DATE: 06/28/22
ATTACHMENT: 1
Page 22 of 220
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of May 2022
171106 05/20/2022 MINER'S ACE HARDWARE 805.52Accounts Payable Check
171107 05/20/2022 MISSION UNIFORM SERVICE 414.52Accounts Payable Check
171108 05/20/2022 MNS ENGINEERS, INC. 455.00Accounts Payable Check
171109 05/20/2022 MORRO BAY BUG COMPANY 136.91Accounts Payable Check
171110 05/20/2022 NIELSEN,MERKSAMER,PARRINELLO, 4,795.50Accounts Payable Check
171111 05/20/2022 NORTH COAST ENGINEERING INC. 247.50Accounts Payable Check
171112 05/20/2022 ANDRES J. NUNO 250.00Accounts Payable Check
171113 05/20/2022 ODP BUSINESS SOLUTIONS, LLC 602.76Accounts Payable Check
171114 05/20/2022 PACIFIC GAS AND ELECTRIC 27,908.27Accounts Payable Check
171115 05/20/2022 VOID 0.00Accounts Payable Check
171116 05/20/2022 RICARDO PAZ 75.00Accounts Payable Check
171117 05/20/2022 DEAN PERICIC 275.00Accounts Payable Check
171118 05/20/2022 PERRY'S PARCEL & GIFT 75.00Accounts Payable Check
171119 05/20/2022 PETERSON U-CART 324.80Accounts Payable Check
171120 05/20/2022 POTRATZ RESIDENTIAL PROPERTIES 25.00Accounts Payable Check
171121 05/20/2022 PROCARE JANITORIAL SUPPLY,INC. 417.28Accounts Payable Check
171122 05/20/2022 PRW STEEL SUPPLY, INC. 353.96Accounts Payable Check
171123 05/20/2022 LAUREN-ASHLEY PURIFY 287.82Accounts Payable Check
171124 05/20/2022 RAIN FOR RENT 4,922.99Accounts Payable Check
171125 05/20/2022 RAINSCAPE, A LANDSCAPE SVC CO. 7,085.48Accounts Payable Check
171126 05/20/2022 READYREFRESH BY NESTLE 843.44Accounts Payable Check
171127 05/20/2022 BRIAN S. RICKS 125.00Accounts Payable Check
171128 05/20/2022 GREG ROACH 326.81Accounts Payable Check
171129 05/20/2022 ROYAL RESORTWEAR, LLC 768.50Accounts Payable Check
171130 05/20/2022 SCHNEIDER ELECTRIC SYS USA INC 2,633.30Accounts Payable Check
171131 05/20/2022 SCOTT O'BRIEN FIRE & SAFETY CO 269.97Accounts Payable Check
171132 05/20/2022 CASEY SEARS 186.18Accounts Payable Check
171133 05/20/2022 SERVICE SYSTEMS ASSC, INC. 2,500.00Accounts Payable Check
171134 05/20/2022 TRINITY J. SILVA 180.00Accounts Payable Check
171135 05/20/2022 SLO COUNTY SHERIFF'S OFFICE 3,890.00Accounts Payable Check
171136 05/20/2022 SO. BAY REG. PUBLIC SAFETY 3,580.00Accounts Payable Check
171137 05/20/2022 SOUTH COAST EMERGENCY VEH SVC 2,013.42Accounts Payable Check
171138 05/20/2022 SOUZA CONSTRUCTION, INC. 3,081.56Accounts Payable Check
171139 05/20/2022 JENNIFER L. SPOTTEN 176.40Accounts Payable Check
171140 05/20/2022 STANLEY CONVERGENT SECURITY 304.71Accounts Payable Check
171141 05/20/2022 STAPLES CREDIT PLAN 409.21Accounts Payable Check
171142 05/20/2022 STATEWIDE TRAFFIC SAFETY&SIGNS 5,369.81Accounts Payable Check
171143 05/20/2022 MICHAEL STORNETTA 240.00Accounts Payable Check
171144 05/20/2022 TENT CITY BEER COMPANY 595.00Accounts Payable Check
171145 05/20/2022 TERRA VERDE ENVIRONMENTAL CONS 1,316.06Accounts Payable Check
171146 05/20/2022 TESLA ENERGY OPERATIONS, INC. 66.79Accounts Payable Check
171147 05/20/2022 THOMSON REUTERS - WEST 180.35Accounts Payable Check
171148 05/20/2022 KARL O. TOERGE 81.00Accounts Payable Check
ITEM NUMBER: A-2
DATE: 06/28/22
ATTACHMENT: 1
Page 23 of 220
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of May 2022
171153 05/20/2022 U.S. BANK 29,017.98Accounts Payable Check
171154 05/20/2022 U.S. BANK 3,019.00Accounts Payable Check
171155 05/20/2022 ULTREX BUSINESS PRODUCTS 27.43Accounts Payable Check
171156 05/20/2022 VAN BEURDEN INSURANCE SVC, INC 10,388.63Accounts Payable Check
171157 05/20/2022 DAVID VAN SON 66.00Accounts Payable Check
171158 05/20/2022 RENE VASQUEZ 133.00Accounts Payable Check
171159 05/20/2022 THOMAS F. VELASQUEZ 50.00Accounts Payable Check
171160 05/20/2022 VICTORIA R. VENABLE 120.00Accounts Payable Check
171161 05/20/2022 VERDIN 14,572.23Accounts Payable Check
171162 05/20/2022 VERIZON WIRELESS 278.22Accounts Payable Check
171163 05/20/2022 VISIT SLO CAL 52,515.18Accounts Payable Check
171164 05/20/2022 WALLACE GROUP 35,862.50Accounts Payable Check
171165 05/20/2022 WCJ PROPERTY SERVICES 2,431.50Accounts Payable Check
171166 05/20/2022 WILD FIELDS BREWHOUSE, LLC 150.00Accounts Payable Check
171167 05/20/2022 WINE COUNTRY BALANCE 590.00Accounts Payable Check
171168 05/20/2022 HARRY YASUMOTO 1,396.57Accounts Payable Check
171169 05/20/2022 ZOOM IMAGING SOLUTIONS, INC. 986.91Accounts Payable Check
4410 05/26/2022 ANTHEM BLUE CROSS HSA 9,839.92Payroll Vendor Payment
171170 05/26/2022 ATASCADERO MID MGRS ORG UNION 60.00Payroll Vendor Payment
171171 05/26/2022 ATASCADERO POLICE OFFICERS 1,950.00Payroll Vendor Payment
171172 05/26/2022 ATASCADERO PROF. FIREFIGHTERS 1,151.80Payroll Vendor Payment
171173 05/26/2022 CA FIREFIGHTERS BENEFIT TRUST 1,800.00Payroll Vendor Payment
171174 05/26/2022 MASS MUTUAL WORKPLACE SOLUTION 7,032.70Payroll Vendor Payment
171175 05/26/2022 NATIONWIDE RETIREMENT SOLUTION 537.83Payroll Vendor Payment
171176 05/26/2022 NAVIA BENEFIT SOLUTIONS 1,674.10Payroll Vendor Payment
171177 05/26/2022 SEIU LOCAL 620 810.61Payroll Vendor Payment
171178 05/26/2022 VANTAGEPOINT TRNSFR AGT 106099 416.88Payroll Vendor Payment
171179 05/26/2022 VANTAGEPOINT TRNSFR AGT 304633 8,076.35Payroll Vendor Payment
171180 05/26/2022 VANTAGEPOINT TRNSFR AGT 706276 285.00Payroll Vendor Payment
4411 05/27/2022 STATE DISBURSEMENT UNIT 536.99Payroll Vendor Payment
4412 05/27/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 21,909.04Payroll Vendor Payment
4413 05/27/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 32,868.98Payroll Vendor Payment
4414 05/27/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 2,145.94Payroll Vendor Payment
4415 05/27/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 2,655.62Payroll Vendor Payment
4416 05/27/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 6,709.33Payroll Vendor Payment
4417 05/27/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 8,432.97Payroll Vendor Payment
4418 05/27/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 11,295.58Payroll Vendor Payment
4419 05/27/2022 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 17,167.49Payroll Vendor Payment
4420 05/31/2022 RABOBANK, N.A. 58,584.55Payroll Vendor Payment
4421 05/31/2022 EMPLOYMENT DEV DEPARTMENT 18,279.22Payroll Vendor Payment
4422 05/31/2022 EMPLOYMENT DEV. DEPARTMENT 2,886.89Payroll Vendor Payment
ITEM NUMBER: A-2
DATE: 06/28/22
ATTACHMENT: 1
Page 24 of 220
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of May 2022
$1,603,929.09
ITEM NUMBER: A-2
DATE: 06/28/22
ATTACHMENT: 1
Page 25 of 220
This
Page
Intentionally
Left Blank
Page 26 of 220
ITEM NUMBER: B-1
DATE: 06/28/22
Atascadero City Council
Staff Report – Public Works Department
Adopting Sewer Service Charges to be Added to the
2022-2023 Property Tax Rolls
RECOMMENDATIONS:
Council:
1. Conduct a public hearing to receive verbal testimony regarding the proposed
sewer service charges to be levied onto property tax rolls.
2. Adopt Draft Resolution approving sewer service charges to be added to the
2022-2023 property tax rolls.
DISCUSSION:
The Atascadero Municipal Code provides for the collection of sewer service charges on
the general County property tax bills. Charges have been collected in this manner since
the City took ownership of the Atascadero County Sanitation District in 1984. Sewer
service charges are fixed rates based upon strength factors and Equivalent Dwelling
Units (EDU). One EDU is the equivalent of the average sewer discharge of a single-
family residential dwelling (240 gallons per day).
The City Council approved increases to sewer service charges at their May 10, 2022
regular meeting in accordance with Proposition 218 requirements. This was the fourth
time rates have been increased since 1994 and is estimated to increase FY22/23
revenue by over $630,000 in sewer service charges. Monthly sewer service charges
will increase $6.46 from $34.00 per single-family dwelling (one EDU) to $40.46
beginning July 1, 2022. An additional two dollars are added to each property on the tax
roll to cover the County fee to administer the levy process.
The public hearing for levying sewer service charges was publicly noticed on June 16,
2022. A list of properties by Assessor Property Numbers (APNs) and levy amount (which
does not include the two-dollar County fee) are itemized on Exhibit A of the Draft Resolution
available in the City Clerk’s Office. Sewer service charges will appear as a line item entitled
“ATAS SEWER CHARGE” on property tax statements. Any questions or concerns received
during the public hearing should be referred to staff for resolution prior to submitting the
charges to the County Auditor by the July 15, 2022 deadline.
Page 27 of 220
ITEM NUMBER: B-1
DATE: 06/28/22
FISCAL IMPACT:
The City estimates it will collect $3,925,563 in sewer service charges for Fiscal Year
2022-2023 if Council adopts the attached resolution.
ATTACHMENTS:
1. Draft Resolution
2. Exhibit A - Annual Sanitary Sewer Charges 2022-2023 (Available in the City Clerk’s Office
and as part of the online agenda packet.)
Page 28 of 220
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1
DRAFT RESOLUTION
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ATASCADERO, CALIFORNIA, ADOPTING SEWER SERVICE
CHARGES TO BE ADDED TO THE 2022-2023 PROPERTY TAX ROLLS
WHEREAS, the City Council of the City of Atascadero (hereafter referred to as City
Council) has duly held a public hearing on June 28, 2022 concerning the addition of the
2022-2023 sewer service charges to the 2022-2023 property tax bills; and
WHEREAS, due notice was given to the public in accordance with Section 5470 et seq
of the Health and Safety Code; and
WHEREAS, the City Council of the City of Atascadero approved increases in sewer
service rates on May 10, 2022 that become effective on July 1, 2022; and
WHEREAS, at said hearing the report marked “Exhibit A”, on file with the City Clerk
and incorporated herein by reference, containing such charges reflecting said increases in sewer
service rates was duly received by said Council; and
WHEREAS, at said public hearing opportunity was given for filing objections and
protests and for presentation of testimony of other evidence concerning same; and
WHEREAS, it is in the public interest that this body adopt the charges and determine
and confirm the report presented at the hearing.
NOW, THEREFORE BE IT RESOLVED, by the City Council of the City of
Atascadero:
SECTION 1. That the recitals set forth hereinabove are true, correct and valid.
SECTION 2. That the City Council hereby adopts the service charges set forth on the
report marked “Exhibit A” which is on file in the City Clerk’s Office and hereby expressly
incorporated herein by reference as though here fully set forth; and the City Council hereby
determines and confirms the report containing such charges as set forth in said “Exhibit A” and
hereby further determines and confirms that each and every service charge set forth in said report
is true and accurate and is in fact owed.
SECTION 3. That the charges as so confirmed and determined and adopted shall appear
as separate items on the tax bill of each parcel listed in said report, and such charges shall be
collected at the same time and in the same manner as ordinary County ad valorem taxes are
collected, and are subject to the same penalties in the same procedure and sale in case the
delinquency is provided for such taxes.
Page 29 of 220
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1
SECTION 4. The City Clerk shall file a certified copy of this Resolution and said Exhibit
A with the County Auditor upon its adoption.
SECTION 5. This Resolution is approved by at least a two-thirds vote of said Council.
PASSED AND ADOPTED at a regular meeting of the City Council held on the ___ day of
____, 2022.
On motion by Council Member ______ and seconded by Council Member _______, the
foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
CITY OF ATASCADERO
________________________________
Heather Moreno, Mayor
ATTEST:
Lara K. Christensen, City Clerk
APPROVED AS TO FORM:
Brian A. Pierik, City Attorney
Page 30 of 220
City of Atascadero
Annual Sanitary
Sewer Charges
2022/2023
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 31 of 220
Atascadero Sewer Charges 2022/2023
APN TaxAmount
028-051-013 $485.52
028-051-030 $485.52
028-051-031 $485.52
028-051-042 $485.52
028-051-043 $485.52
028-051-045 $485.52
028-051-049 $485.52
028-051-050 $485.52
028-051-051 $485.52
028-051-052 $485.52
028-051-057 $485.52
028-051-058 $485.52
028-051-059 $485.52
028-052-001 $485.52
028-052-006 $485.52
028-052-009 $485.52
028-052-011 $485.52
028-052-012 $485.52
028-052-013 $485.52
028-052-014 $485.52
028-052-017 $485.52
028-052-018 $485.52
028-052-019 $485.52
028-052-020 $485.52
028-052-021 $485.52
028-052-031 $485.52
028-052-032 $485.52
028-052-033 $485.52
028-052-034 $485.52
028-052-035 $485.52
028-052-036 $485.52
028-052-037 $485.52
028-052-038 $485.52
028-061-007 $485.52
028-061-009 $485.52
028-061-012 $485.52
028-061-016 $485.52
028-061-017 $485.52
028-061-018 $485.52
028-061-019 $485.52
028-061-020 $485.52
028-061-021 $485.52
028-061-022 $485.52
028-061-023 $485.52
028-061-028 $485.52
028-061-032 $485.52
028-061-033 $485.52
028-061-036 $485.52
028-061-037 $485.52
028-061-040 $485.52
028-061-041 $485.52
028-061-042 $485.52
028-061-043 $485.52
028-061-044 $485.52
028-061-048 $485.52
028-061-050 $485.52
028-061-051 $485.52
028-061-052 $485.52
028-061-053 $485.52
028-061-054 $485.52
028-062-001 $485.52
028-062-002 $485.52
028-062-006 $485.52
028-062-011 $485.52
028-062-012 $485.52
028-062-014 $485.52
028-062-015 $485.52
028-062-016 $485.52
028-062-017 $485.52
028-062-018 $485.52
028-062-020 $485.52
028-062-024 $485.52
028-062-025 $485.52
028-062-026 $485.52
028-062-027 $485.52
028-062-028 $485.52
028-062-029 $485.52
028-062-030 $485.52
028-062-031 $485.52
028-062-032 $485.52
028-062-033 $485.52
028-062-036 $485.52
028-062-038 $485.52
028-062-039 $485.52
028-062-040 $485.52
028-062-041 $485.52
028-062-042 $485.52
028-062-043 $485.52
028-071-001 $485.52
028-071-002 $485.52
028-071-006 $485.52
028-071-012 $485.52
028-071-033 $485.52
028-071-037 $485.52
028-071-041 $485.52
028-071-042 $485.52
028-071-043 $485.52
028-071-044 $485.52
028-071-047 $485.52
028-071-048 $485.52
028-071-050 $485.52
028-071-051 $485.52
028-071-052 $485.52
028-071-054 $485.52
028-072-001 $485.52
028-072-002 $485.52
028-073-001 $485.52
028-082-001 $485.52
028-082-008 $971.04
028-082-009 $485.52
028-082-010 $485.52
028-082-011 $485.52
028-082-013 $485.52
028-082-014 $485.52
028-082-015 $485.52
028-082-016 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 32 of 220
Atascadero Sewer Charges 2022/2023
028-082-018 $485.52
028-082-020 $485.52
028-084-003 $485.52
028-084-004 $485.52
028-084-005 $485.52
028-084-006 $485.52
028-084-007 $485.52
028-084-008 $485.52
028-084-009 $485.52
028-084-010 $485.52
028-084-011 $485.52
028-084-012 $485.52
028-084-013 $485.52
028-084-014 $485.52
028-084-015 $485.52
028-084-016 $485.52
028-084-017 $485.52
028-084-018 $485.52
028-084-019 $485.52
028-084-020 $485.52
028-084-021 $485.52
028-141-003 $485.52
028-141-005 $485.52
028-141-009 $485.52
028-141-010 $485.52
028-141-011 $485.52
028-141-020 $485.52
028-141-021 $485.52
028-141-029 $485.52
028-141-032 $485.52
028-141-033 $485.52
028-151-003 $485.52
028-151-004 $485.52
028-151-005 $485.52
028-151-006 $485.52
028-151-009 $485.52
028-151-010 $485.52
028-151-011 $485.52
028-151-012 $485.52
028-151-013 $485.52
028-151-016 $485.52
028-151-017 $485.52
028-151-018 $485.52
028-151-019 $485.52
028-151-020 $485.52
028-151-022 $485.52
028-151-023 $485.52
028-151-024 $485.52
028-151-025 $485.52
028-151-026 $485.52
028-151-027 $485.52
028-151-028 $485.52
028-151-029 $485.52
028-151-030 $485.52
028-151-031 $485.52
028-151-032 $485.52
028-151-033 $485.52
028-151-034 $485.52
028-151-035 $485.52
028-151-037 $485.52
028-151-038 $485.52
028-151-039 $485.52
028-151-042 $485.52
028-151-043 $485.52
028-151-045 $485.52
028-151-046 $485.52
028-151-048 $485.52
028-151-050 $485.52
028-151-051 $485.52
028-151-052 $485.52
028-151-053 $485.52
028-151-054 $485.52
028-151-055 $485.52
028-151-056 $485.52
028-151-057 $485.52
028-151-058 $485.52
028-151-059 $485.52
028-151-060 $485.52
028-151-061 $485.52
028-151-062 $485.52
028-151-063 $485.52
028-152-006 $485.52
028-152-007 $485.52
028-152-008 $485.52
028-152-009 $485.52
028-152-010 $485.52
028-152-011 $485.52
028-152-013 $485.52
028-152-015 $485.52
028-152-016 $485.52
028-152-019 $485.52
028-152-020 $485.52
028-152-023 $485.52
028-152-024 $485.52
028-152-029 $485.52
028-152-030 $485.52
028-152-040 $485.52
028-152-042 $485.52
028-152-043 $485.52
028-152-044 $485.52
028-152-045 $485.52
028-152-046 $485.52
028-152-048 $485.52
028-152-049 $485.52
028-152-050 $485.52
028-152-051 $485.52
028-152-052 $485.52
028-152-055 $485.52
028-152-056 $485.52
028-152-058 $485.52
028-152-059 $485.52
028-152-060 $485.52
028-152-061 $485.52
028-152-065 $485.52
028-152-066 $485.52
028-152-067 $485.52
028-152-068 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 33 of 220
Atascadero Sewer Charges 2022/2023
028-152-069 $485.52
028-152-070 $485.52
028-152-072 $485.52
028-152-073 $485.52
028-161-001 $485.52
028-161-003 $485.52
028-161-006 $485.52
028-161-007 $485.52
028-161-014 $485.52
028-161-015 $485.52
028-161-021 $971.04
028-161-022 $485.52
028-161-024 $485.52
028-161-026 $485.52
028-161-027 $485.52
028-171-005 $485.52
028-172-001 $485.52
028-172-005 $485.52
028-172-013 $485.52
028-172-028 $485.52
028-181-020 $485.52
028-181-021 $485.52
028-181-025 $485.52
028-181-026 $485.52
028-191-017 $485.52
028-191-018 $485.52
028-191-019 $485.52
028-191-020 $485.52
028-191-021 $485.52
028-192-001 $1,359.48
028-192-002 $485.52
028-192-005 $485.52
028-192-006 $485.52
028-192-007 $485.52
028-192-014 $485.52
028-192-015 $485.52
028-192-024 $485.52
028-192-035 $3,398.64
028-192-039 $1,456.56
028-192-040 $485.52
028-192-042 $1,456.56
028-192-043 $485.52
028-192-047 $485.52
028-192-048 $485.52
028-192-049 $1,092.48
028-192-050 $485.52
028-192-053 $485.52
028-192-054 $485.52
028-192-055 $485.52
028-192-056 $485.52
028-192-057 $485.52
028-192-058 $485.52
028-192-059 $485.52
028-201-011 $485.52
028-261-004 $485.52
028-261-026 $485.52
028-261-027 $485.52
028-261-028 $485.52
028-261-029 $485.52
028-261-030 $485.52
028-261-031 $485.52
028-261-032 $485.52
028-261-034 $485.52
028-291-007 $485.52
028-292-001 $485.52
028-292-005 $485.52
028-292-014 $485.52
028-292-015 $485.52
028-292-017 $485.52
028-292-018 $485.52
028-311-019 $485.52
028-331-015 $971.04
028-331-016 $485.52
028-331-017 $485.52
028-331-020 $971.04
028-332-010 $485.52
028-332-017 $485.52
028-332-019 $485.52
028-332-020 $485.52
028-332-021 $485.52
028-332-025 $485.52
028-332-030 $485.52
028-332-035 $485.52
028-332-036 $485.52
028-332-038 $485.52
028-332-039 $485.52
028-332-040 $485.52
028-341-002 $971.04
028-341-018 $485.52
028-341-024 $485.52
028-341-025 $485.52
028-361-002 $485.52
028-361-017 $2,427.60
028-361-032 $485.52
029-012-003 $485.52
029-012-010 $485.52
029-012-011 $485.52
029-012-012 $485.52
029-012-013 $485.52
029-012-015 $485.52
029-012-020 $485.52
029-012-021 $485.52
029-021-001 $485.52
029-021-002 $485.52
029-021-003 $485.52
029-021-004 $485.52
029-021-005 $485.52
029-021-006 $485.52
029-021-007 $485.52
029-021-008 $485.52
029-021-011 $485.52
029-021-012 $485.52
029-021-014 $485.52
029-021-015 $485.52
029-021-016 $485.52
029-022-001 $485.52
029-022-002 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 34 of 220
Atascadero Sewer Charges 2022/2023
029-022-003 $485.52
029-022-004 $485.52
029-022-005 $485.52
029-022-006 $485.52
029-022-010 $485.52
029-022-011 $485.52
029-022-017 $485.52
029-022-019 $485.52
029-022-023 $485.52
029-022-024 $485.52
029-022-025 $485.52
029-022-026 $485.52
029-022-027 $485.52
029-022-028 $485.52
029-022-029 $485.52
029-023-001 $485.52
029-023-007 $485.52
029-023-009 $485.52
029-023-010 $485.52
029-023-011 $485.52
029-023-012 $485.52
029-024-014 $485.52
029-024-017 $485.52
029-024-018 $485.52
029-024-019 $485.52
029-031-011 $485.52
029-031-012 $485.52
029-051-006 $485.52
029-051-007 $485.52
029-051-008 $485.52
029-051-009 $485.52
029-051-014 $485.52
029-051-022 $485.52
029-051-031 $485.52
029-051-032 $485.52
029-051-033 $485.52
029-051-034 $679.68
029-051-035 $485.52
029-051-036 $485.52
029-061-002 $485.52
029-061-003 $485.52
029-061-013 $485.52
029-061-015 $1,820.76
029-061-016 $485.52
029-061-018 $485.52
029-061-019 $485.52
029-061-023 $485.52
029-061-025 $485.52
029-061-029 $1,456.56
029-061-030 $485.52
029-061-033 $485.52
029-061-034 $485.52
029-061-037 $485.52
029-061-038 $485.52
029-061-040 $485.52
029-061-041 $485.52
029-061-042 $485.52
029-061-043 $485.52
029-061-044 $485.52
029-061-045 $485.52
029-061-046 $485.52
029-061-047 $485.52
029-061-048 $485.52
029-061-049 $485.52
029-061-050 $485.52
029-061-051 $485.52
029-061-052 $485.52
029-061-053 $485.52
029-062-001 $485.52
029-062-002 $485.52
029-062-009 $485.52
029-062-011 $728.28
029-062-012 $728.28
029-062-014 $1,456.56
029-062-015 $728.28
029-062-017 $485.52
029-062-018 $485.52
029-062-020 $485.52
029-062-021 $485.52
029-062-022 $485.52
029-062-023 $485.52
029-062-024 $971.04
029-062-025 $485.52
029-062-026 $485.52
029-062-028 $485.52
029-062-030 $485.52
029-062-037 $485.52
029-062-038 $485.52
029-062-039 $485.52
029-062-040 $485.52
029-062-041 $485.52
029-062-042 $485.52
029-062-043 $485.52
029-062-044 $485.52
029-062-045 $485.52
029-062-046 $485.52
029-062-047 $485.52
029-062-048 $485.52
029-071-001 $485.52
029-071-002 $485.52
029-071-003 $485.52
029-071-004 $485.52
029-071-005 $485.52
029-071-009 $485.52
029-071-010 $485.52
029-071-011 $485.52
029-071-015 $485.52
029-071-016 $485.52
029-071-021 $485.52
029-071-022 $485.52
029-071-023 $485.52
029-071-024 $485.52
029-071-026 $485.52
029-071-027 $728.28
029-071-028 $485.52
029-071-030 $485.52
029-071-031 $971.04
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 35 of 220
Atascadero Sewer Charges 2022/2023
029-071-032 $485.52
029-071-033 $485.52
029-071-034 $485.52
029-071-035 $485.52
029-071-038 $485.52
029-071-039 $485.52
029-081-002 $728.28
029-081-005 $728.28
029-081-006 $485.52
029-081-007 $485.52
029-081-009 $2,184.84
029-081-011 $485.52
029-081-012 $485.52
029-081-015 $485.52
029-081-016 $485.52
029-081-017 $485.52
029-081-018 $485.52
029-081-019 $485.52
029-081-020 $485.52
029-081-023 $485.52
029-081-024 $485.52
029-081-025 $485.52
029-081-026 $485.52
029-082-002 $485.52
029-082-008 $485.52
029-082-011 $971.04
029-082-015 $485.52
029-082-016 $485.52
029-082-021 $1,942.08
029-082-022 $485.52
029-082-023 $485.52
029-082-024 $485.52
029-082-025 $971.04
029-082-029 $485.52
029-082-030 $485.52
029-082-032 $971.04
029-082-033 $971.04
029-082-037 $971.04
029-082-039 $971.04
029-082-040 $971.04
029-082-041 $485.52
029-082-042 $849.72
029-082-044 $485.52
029-082-045 $485.52
029-082-046 $485.52
029-082-048 $485.52
029-082-049 $485.52
029-082-050 $485.52
029-082-051 $485.52
029-082-052 $485.52
029-091-014 $485.52
029-091-015 $485.52
029-091-016 $485.52
029-091-017 $485.52
029-091-018 $485.52
029-091-019 $485.52
029-091-020 $485.52
029-091-021 $485.52
029-091-022 $485.52
029-091-023 $485.52
029-091-024 $485.52
029-091-025 $485.52
029-091-026 $485.52
029-091-027 $485.52
029-091-028 $485.52
029-091-029 $485.52
029-091-041 $1,942.08
029-101-021 $485.52
029-101-022 $485.52
029-101-023 $485.52
029-101-024 $485.52
029-101-025 $485.52
029-101-026 $485.52
029-101-027 $485.52
029-101-028 $485.52
029-101-029 $485.52
029-101-030 $485.52
029-101-031 $485.52
029-101-032 $485.52
029-101-033 $485.52
029-101-034 $485.52
029-101-035 $485.52
029-101-036 $485.52
029-101-037 $485.52
029-101-038 $485.52
029-101-039 $485.52
029-101-040 $485.52
029-101-041 $485.52
029-101-042 $485.52
029-101-043 $485.52
029-101-044 $485.52
029-101-045 $485.52
029-101-046 $485.52
029-101-047 $485.52
029-101-048 $485.52
029-101-049 $485.52
029-101-050 $485.52
029-101-051 $485.52
029-101-052 $485.52
029-101-053 $485.52
029-101-054 $485.52
029-101-055 $485.52
029-101-056 $485.52
029-101-057 $485.52
029-101-058 $485.52
029-101-059 $485.52
029-101-060 $485.52
029-101-061 $485.52
029-101-062 $485.52
029-101-063 $485.52
029-101-064 $485.52
029-104-007 $485.52
029-104-008 $485.52
029-104-009 $485.52
029-104-010 $485.52
029-104-011 $485.52
029-104-012 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 36 of 220
Atascadero Sewer Charges 2022/2023
029-104-013 $485.52
029-104-014 $485.52
029-104-015 $485.52
029-104-016 $485.52
029-104-017 $485.52
029-104-018 $485.52
029-104-019 $485.52
029-104-020 $485.52
029-104-021 $485.52
029-104-022 $485.52
029-105-027 $485.52
029-105-037 $485.52
029-105-040 $485.52
029-105-045 $485.52
029-106-004 $485.52
029-106-006 $485.52
029-106-007 $485.52
029-211-001 $485.52
029-211-002 $485.52
029-211-004 $485.52
029-211-007 $485.52
029-211-009 $485.52
029-211-013 $485.52
029-211-014 $485.52
029-211-015 $485.52
029-211-016 $485.52
029-211-017 $485.52
029-211-018 $485.52
029-211-019 $485.52
029-211-020 $485.52
029-211-025 $485.52
029-211-028 $485.52
029-211-029 $485.52
029-211-030 $485.52
029-211-031 $485.52
029-211-032 $485.52
029-211-033 $485.52
029-211-034 $485.52
029-211-035 $485.52
029-211-036 $485.52
029-212-002 $485.52
029-212-003 $485.52
029-212-007 $485.52
029-212-008 $485.52
029-212-009 $485.52
029-212-010 $485.52
029-212-011 $485.52
029-212-012 $485.52
029-212-013 $485.52
029-212-014 $485.52
029-212-015 $485.52
029-212-016 $485.52
029-212-019 $485.52
029-212-020 $485.52
029-212-021 $485.52
029-212-022 $485.52
029-212-023 $485.52
029-212-024 $485.52
029-212-025 $485.52
029-212-026 $485.52
029-212-027 $485.52
029-221-001 $485.52
029-221-002 $485.52
029-221-003 $485.52
029-221-004 $485.52
029-221-005 $485.52
029-221-006 $485.52
029-221-007 $485.52
029-221-008 $485.52
029-221-009 $485.52
029-221-010 $485.52
029-221-011 $485.52
029-221-012 $485.52
029-221-013 $485.52
029-222-002 $485.52
029-222-003 $485.52
029-222-005 $485.52
029-222-006 $485.52
029-222-009 $485.52
029-222-010 $485.52
029-222-011 $485.52
029-222-012 $485.52
029-222-013 $485.52
029-222-014 $485.52
029-222-015 $485.52
029-222-016 $485.52
029-222-019 $485.52
029-222-020 $485.52
029-222-021 $485.52
029-222-022 $485.52
029-222-026 $485.52
029-222-027 $485.52
029-222-031 $485.52
029-222-032 $485.52
029-222-033 $485.52
029-222-034 $485.52
029-222-036 $485.52
029-222-037 $485.52
029-222-038 $485.52
029-222-039 $485.52
029-222-040 $485.52
029-223-001 $485.52
029-223-002 $485.52
029-223-003 $485.52
029-223-004 $485.52
029-223-009 $485.52
029-223-010 $485.52
029-223-011 $485.52
029-223-018 $485.52
029-223-020 $485.52
029-223-021 $485.52
029-231-001 $485.52
029-231-002 $485.52
029-231-006 $485.52
029-231-007 $485.52
029-231-008 $485.52
029-231-009 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 37 of 220
Atascadero Sewer Charges 2022/2023
029-231-010 $485.52
029-231-012 $485.52
029-231-013 $485.52
029-231-014 $485.52
029-231-015 $485.52
029-231-016 $485.52
029-233-004 $485.52
029-233-007 $485.52
029-233-015 $485.52
029-233-016 $485.52
029-233-017 $485.52
029-233-018 $485.52
029-233-019 $485.52
029-233-020 $485.52
029-233-021 $485.52
029-233-023 $485.52
029-233-024 $485.52
029-233-025 $485.52
029-241-002 $485.52
029-241-011 $485.52
029-241-015 $485.52
029-241-017 $485.52
029-241-022 $485.52
029-241-023 $485.52
029-241-024 $485.52
029-241-025 $485.52
029-241-027 $485.52
029-241-028 $485.52
029-241-029 $971.04
029-241-032 $485.52
029-241-033 $485.52
029-241-034 $485.52
029-241-035 $485.52
029-241-037 $485.52
029-241-038 $485.52
029-241-039 $485.52
029-241-040 $485.52
029-251-004 $485.52
029-251-005 $485.52
029-252-001 $2,306.28
029-252-003 $11,069.88
029-252-005 $1,942.08
029-252-008 $485.52
029-252-009 $485.52
029-252-010 $485.52
029-252-013 $485.52
029-252-014 $971.04
029-252-018 $971.04
029-252-023 $971.04
029-252-024 $971.04
029-252-025 $1,456.56
029-252-026 $485.52
029-252-028 $485.52
029-252-029 $485.52
029-253-003 $679.68
029-253-004 $485.52
029-253-005 $485.52
029-253-007 $1,456.56
029-253-008 $485.52
029-253-014 $485.52
029-253-015 $485.52
029-253-016 $1,456.56
029-253-017 $1,592.16
029-253-023 $1,092.48
029-253-024 $485.52
029-253-025 $971.04
029-253-026 $485.52
029-253-030 $485.52
029-253-031 $1,456.56
029-254-003 $485.52
029-254-004 $485.52
029-254-005 $485.52
029-254-009 $485.52
029-254-013 $485.52
029-254-014 $1,092.48
029-254-015 $485.52
029-254-016 $485.52
029-255-001 $485.52
029-255-002 $485.52
029-255-003 $485.52
029-255-004 $485.52
029-255-005 $485.52
029-255-006 $485.52
029-255-007 $485.52
029-255-008 $485.52
029-255-009 $485.52
029-255-010 $485.52
029-255-011 $485.52
029-256-001 $485.52
029-256-002 $485.52
029-256-003 $485.52
029-256-004 $485.52
029-256-005 $485.52
029-256-006 $485.52
029-256-007 $485.52
029-256-008 $485.52
029-256-009 $485.52
029-256-010 $485.52
029-256-011 $485.52
029-256-012 $485.52
029-256-013 $485.52
029-256-014 $485.52
029-256-015 $485.52
029-256-016 $485.52
029-256-017 $485.52
029-256-018 $485.52
029-256-019 $485.52
029-256-020 $485.52
029-256-021 $485.52
029-256-022 $485.52
029-256-023 $485.52
029-256-024 $485.52
029-256-025 $485.52
029-256-026 $485.52
029-256-027 $485.52
029-256-028 $485.52
029-256-029 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 38 of 220
Atascadero Sewer Charges 2022/2023
029-256-030 $485.52
029-256-031 $485.52
029-256-032 $485.52
029-261-001 $485.52
029-261-002 $485.52
029-261-007 $485.52
029-261-008 $485.52
029-261-009 $485.52
029-261-012 $485.52
029-261-017 $485.52
029-261-021 $485.52
029-261-022 $485.52
029-261-023 $485.52
029-262-001 $485.52
029-262-002 $485.52
029-262-003 $485.52
029-262-004 $485.52
029-262-006 $1,456.56
029-262-014 $485.52
029-262-017 $485.52
029-262-019 $485.52
029-262-023 $485.52
029-262-026 $485.52
029-262-028 $485.52
029-262-032 $485.52
029-262-034 $485.52
029-262-035 $2,427.60
029-262-036 $971.04
029-262-037 $485.52
029-262-038 $485.52
029-262-039 $485.52
029-262-040 $485.52
029-262-041 $485.52
029-262-042 $971.04
029-262-043 $485.52
029-262-046 $485.52
029-262-047 $485.52
029-262-048 $485.52
029-262-049 $485.52
029-262-050 $485.52
029-262-051 $485.52
029-262-052 $485.52
029-262-053 $485.52
029-262-054 $485.52
029-262-055 $485.52
029-262-056 $485.52
029-262-064 $485.52
029-262-065 $485.52
029-271-007 $645.72
029-271-013 $485.52
029-271-014 $485.52
029-271-016 $485.52
029-271-017 $485.52
029-271-018 $485.52
029-271-021 $485.52
029-271-022 $485.52
029-271-023 $485.52
029-271-024 $485.52
029-272-004 $485.52
029-272-005 $485.52
029-272-006 $485.52
029-272-007 $485.52
029-272-012 $485.52
029-272-013 $485.52
029-272-016 $485.52
029-272-017 $485.52
029-272-021 $485.52
029-272-022 $485.52
029-272-023 $485.52
029-272-024 $485.52
029-272-025 $485.52
029-272-026 $485.52
029-272-027 $485.52
029-273-001 $485.52
029-273-002 $485.52
029-273-003 $485.52
029-273-004 $485.52
029-273-005 $971.04
029-273-006 $485.52
029-273-007 $485.52
029-273-008 $485.52
029-273-009 $485.52
029-273-010 $485.52
029-273-011 $485.52
029-273-012 $485.52
029-274-001 $485.52
029-274-002 $485.52
029-274-003 $485.52
029-274-004 $485.52
029-274-005 $485.52
029-274-006 $485.52
029-274-007 $485.52
029-274-011 $485.52
029-274-013 $485.52
029-274-015 $485.52
029-274-021 $485.52
029-281-005 $971.04
029-281-006 $485.52
029-281-013 $485.52
029-281-017 $485.52
029-281-018 $485.52
029-281-019 $485.52
029-281-020 $485.52
029-281-021 $485.52
029-281-023 $485.52
029-281-028 $485.52
029-281-029 $485.52
029-281-030 $485.52
029-281-031 $485.52
029-281-032 $485.52
029-281-033 $485.52
029-281-034 $485.52
029-281-035 $485.52
029-281-036 $485.52
029-281-038 $485.52
029-281-040 $485.52
029-281-041 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 39 of 220
Atascadero Sewer Charges 2022/2023
029-281-042 $485.52
029-281-043 $485.52
029-281-044 $485.52
029-281-045 $485.52
029-281-046 $485.52
029-281-047 $485.52
029-281-048 $485.52
029-281-049 $485.52
029-291-003 $485.52
029-291-007 $485.52
029-291-009 $485.52
029-291-011 $485.52
029-291-013 $485.52
029-291-014 $485.52
029-291-018 $485.52
029-291-023 $485.52
029-291-024 $485.52
029-291-025 $485.52
029-291-026 $485.52
029-291-027 $485.52
029-291-028 $485.52
029-291-029 $485.52
029-291-030 $485.52
029-291-031 $971.04
029-291-032 $1,092.48
029-291-033 $776.88
029-291-034 $971.04
029-291-035 $485.52
029-292-002 $485.52
029-292-003 $485.52
029-292-004 $971.04
029-292-007 $485.52
029-292-013 $485.52
029-292-014 $485.52
029-292-015 $485.52
029-292-016 $485.52
029-292-018 $485.52
029-292-019 $485.52
029-292-020 $485.52
029-292-022 $485.52
029-292-023 $485.52
029-292-025 $2,427.60
029-292-030 $1,092.48
029-292-032 $485.52
029-292-033 $2,184.84
029-292-034 $2,184.84
029-292-035 $1,092.48
029-292-036 $1,456.56
029-292-037 $1,456.56
029-292-038 $485.52
029-292-039 $485.52
029-292-040 $485.52
029-292-041 $485.52
029-292-043 $485.52
029-292-045 $485.52
029-292-046 $485.52
029-292-047 $485.52
029-292-048 $485.52
029-292-050 $485.52
029-292-051 $485.52
029-292-052 $485.52
029-292-053 $485.52
029-292-054 $485.52
029-301-004 $485.52
029-301-005 $485.52
029-301-006 $485.52
029-301-007 $485.52
029-301-009 $485.52
029-301-010 $485.52
029-301-011 $485.52
029-301-013 $971.04
029-301-014 $485.52
029-301-015 $485.52
029-301-016 $485.52
029-301-018 $485.52
029-301-020 $485.52
029-301-021 $485.52
029-301-029 $485.52
029-301-030 $485.52
029-301-031 $485.52
029-301-032 $485.52
029-301-033 $485.52
029-301-034 $485.52
029-301-035 $645.72
029-301-036 $1,942.08
029-301-037 $485.52
029-301-038 $971.04
029-301-042 $485.52
029-301-043 $485.52
029-301-044 $485.52
029-301-045 $485.52
029-301-048 $485.52
029-301-049 $485.52
029-301-050 $485.52
029-301-051 $485.52
029-301-052 $485.52
029-301-053 $485.52
029-301-054 $485.52
029-301-055 $485.52
029-302-002 $485.52
029-302-003 $485.52
029-302-014 $485.52
029-302-016 $485.52
029-302-017 $485.52
029-302-018 $485.52
029-302-019 $1,942.08
029-302-020 $971.04
029-302-027 $485.52
029-302-028 $485.52
029-302-033 $485.52
029-302-034 $1,092.48
029-302-035 $485.52
029-302-038 $971.04
029-302-039 $485.52
029-302-040 $485.52
029-302-041 $485.52
029-302-042 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 40 of 220
Atascadero Sewer Charges 2022/2023
029-302-043 $485.52
029-302-045 $971.04
029-302-046 $485.52
029-302-047 $1,592.16
029-302-048 $971.04
029-302-049 $1,820.76
029-302-052 $485.52
029-302-053 $485.52
029-302-054 $485.52
029-302-055 $485.52
029-302-056 $485.52
029-302-058 $485.52
029-302-059 $485.52
029-302-060 $485.52
029-302-061 $485.52
029-302-062 $485.52
029-302-063 $485.52
029-302-064 $485.52
029-302-065 $485.52
029-302-066 $485.52
029-302-067 $485.52
029-302-068 $485.52
029-311-001 $485.52
029-311-009 $485.52
029-311-011 $485.52
029-311-012 $485.52
029-311-015 $485.52
029-311-016 $485.52
029-311-017 $485.52
029-311-018 $1,456.56
029-311-019 $485.52
029-311-022 $485.52
029-311-023 $485.52
029-311-024 $485.52
029-311-025 $485.52
029-311-028 $485.52
029-311-031 $485.52
029-311-032 $1,213.80
029-311-036 $485.52
029-311-037 $1,456.56
029-311-038 $485.52
029-311-040 $1,456.56
029-311-041 $1,456.56
029-311-044 $1,456.56
029-311-047 $645.72
029-311-048 $485.52
029-311-049 $485.52
029-311-050 $485.52
029-312-005 $1,092.48
029-312-011 $485.52
029-312-015 $485.52
029-312-018 $485.52
029-312-021 $971.04
029-312-023 $485.52
029-312-024 $728.28
029-312-025 $485.52
029-312-026 $1,456.56
029-312-027 $4,733.88
029-312-028 $1,291.44
029-312-031 $728.28
029-312-032 $645.72
029-312-033 $2,184.84
029-312-034 $1,456.56
029-312-035 $485.52
029-312-036 $971.04
029-312-037 $485.52
029-312-038 $485.52
029-312-039 $485.52
029-312-040 $485.52
029-312-043 $4,005.60
029-321-002 $485.52
029-321-003 $485.52
029-321-011 $485.52
029-321-016 $1,291.44
029-321-017 $485.52
029-321-018 $485.52
029-321-020 $485.52
029-321-021 $485.52
029-321-022 $485.52
029-321-024 $485.52
029-321-025 $485.52
029-321-026 $485.52
029-322-001 $485.52
029-322-006 $485.52
029-322-009 $2,913.12
029-322-010 $485.52
029-322-012 $4,126.92
029-322-014 $485.52
029-322-016 $485.52
029-322-017 $485.52
029-322-019 $485.52
029-322-020 $1,456.56
029-322-021 $1,456.56
029-322-022 $485.52
029-323-017 $6,797.28
029-323-018 $485.52
029-323-019 $485.52
029-323-020 $485.52
029-323-021 $9,710.40
029-323-023 $485.52
029-323-025 $485.52
029-341-001 $971.04
029-341-006 $849.72
029-341-009 $728.28
029-341-014 $728.28
029-341-015 $728.28
029-341-016 $728.28
029-341-017 $728.28
029-341-018 $728.28
029-341-019 $485.52
029-342-004 $485.52
029-342-005 $2,427.60
029-342-007 $1,456.56
029-342-009 $3,884.16
029-342-012 $485.52
029-342-013 $485.52
029-342-014 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 41 of 220
Atascadero Sewer Charges 2022/2023
029-342-015 $971.04
029-342-016 $1,456.56
029-342-017 $1,456.56
029-342-020 $485.52
029-342-021 $485.52
029-342-022 $485.52
029-342-023 $14,342.28
029-342-024 $4,612.44
029-343-007 $485.52
029-343-008 $1,092.48
029-343-009 $485.52
029-343-011 $485.52
029-343-013 $485.52
029-343-014 $485.52
029-343-016 $728.28
029-343-017 $728.28
029-343-018 $728.28
029-344-004 $485.52
029-344-005 $971.04
029-344-006 $485.52
029-344-009 $485.52
029-344-019 $971.04
029-344-022 $485.52
029-344-025 $485.52
029-344-027 $485.52
029-344-028 $485.52
029-344-029 $485.52
029-344-032 $485.52
029-344-033 $1,942.08
029-344-034 $1,213.80
029-344-036 $971.04
029-344-037 $485.52
029-344-038 $485.52
029-344-039 $971.04
029-344-040 $971.04
029-347-017 $971.04
029-347-022 $645.72
029-347-023 $485.52
029-351-001 $485.52
029-352-003 $485.52
029-361-007 $5,583.48
029-361-013 $485.52
029-361-021 $485.52
029-361-022 $4,126.92
029-361-023 $485.52
029-361-048 $7,768.32
029-361-049 $1,942.08
029-363-001 $485.52
029-363-002 $485.52
029-363-003 $485.52
029-363-004 $485.52
029-363-005 $485.52
029-363-006 $485.52
029-363-007 $485.52
029-363-008 $485.52
029-363-009 $485.52
029-363-010 $485.52
029-363-011 $485.52
029-363-012 $485.52
029-363-013 $485.52
029-363-014 $485.52
029-363-015 $485.52
029-363-016 $485.52
029-363-017 $485.52
029-363-018 $485.52
029-363-019 $485.52
029-363-020 $485.52
029-363-021 $485.52
029-363-022 $485.52
029-363-023 $485.52
029-363-024 $485.52
029-363-025 $485.52
029-363-026 $485.52
029-363-027 $485.52
029-363-028 $485.52
029-363-029 $485.52
029-363-030 $485.52
029-363-031 $485.52
029-363-032 $485.52
029-363-033 $485.52
029-363-034 $485.52
029-363-035 $485.52
029-363-036 $485.52
029-363-037 $485.52
029-363-038 $485.52
029-363-039 $485.52
029-363-040 $485.52
029-371-010 $485.52
029-371-014 $485.52
029-371-016 $485.52
029-371-017 $485.52
029-371-018 $485.52
029-371-019 $485.52
029-371-020 $485.52
029-371-021 $485.52
029-371-022 $485.52
029-371-023 $485.52
029-371-027 $485.52
029-371-028 $485.52
029-371-029 $485.52
029-382-032 $485.52
029-382-033 $485.52
029-391-001 $364.20
029-391-002 $364.20
029-391-003 $364.20
029-391-004 $364.20
029-391-005 $364.20
029-391-006 $364.20
029-391-007 $364.20
029-391-008 $364.20
029-391-009 $364.20
029-391-010 $364.20
029-391-011 $364.20
029-391-012 $364.20
029-391-013 $364.20
029-391-014 $364.20
029-391-015 $364.20
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 42 of 220
Atascadero Sewer Charges 2022/2023
029-391-016 $364.20
029-391-017 $364.20
029-391-018 $364.20
029-391-019 $364.20
029-391-020 $364.20
029-391-021 $364.20
029-391-022 $364.20
029-391-023 $364.20
029-391-024 $364.20
029-391-025 $364.20
029-391-026 $364.20
029-391-027 $364.20
029-391-028 $364.20
029-391-029 $364.20
029-391-030 $364.20
029-391-031 $364.20
029-391-032 $364.20
029-391-033 $364.20
029-391-034 $364.20
029-391-035 $364.20
029-391-036 $364.20
029-391-037 $364.20
029-391-038 $364.20
029-391-039 $364.20
029-391-040 $364.20
029-391-041 $364.20
029-391-042 $364.20
029-391-043 $364.20
029-391-044 $364.20
029-391-045 $364.20
029-391-046 $364.20
029-391-047 $364.20
029-391-048 $364.20
029-391-049 $364.20
029-391-050 $364.20
029-391-051 $364.20
029-391-052 $364.20
029-391-053 $364.20
029-391-054 $364.20
029-391-058 $485.52
030-011-004 $485.52
030-011-005 $6,190.44
030-011-006 $485.52
030-011-007 $1,942.08
030-011-009 $485.52
030-011-010 $2,427.60
030-011-013 $485.52
030-011-014 $1,213.80
030-011-016 $485.52
030-011-020 $1,456.56
030-011-021 $1,456.56
030-011-024 $485.52
030-011-027 $2,184.84
030-011-028 $1,820.76
030-011-029 $485.52
030-011-030 $485.52
030-011-031 $1,942.08
030-011-032 $485.52
030-011-033 $485.52
030-011-034 $485.52
030-011-036 $485.52
030-011-038 $2,184.84
030-011-039 $1,820.76
030-011-040 $2,184.84
030-011-041 $485.52
030-011-042 $485.52
030-011-043 $485.52
030-011-044 $485.52
030-011-045 $485.52
030-011-046 $485.52
030-011-047 $485.52
030-011-048 $485.52
030-011-050 $364.20
030-011-051 $364.20
030-011-052 $364.20
030-021-002 $485.52
030-021-005 $971.04
030-021-006 $485.52
030-021-007 $485.52
030-021-011 $485.52
030-021-012 $485.52
030-021-013 $485.52
030-021-015 $971.04
030-021-017 $485.52
030-021-019 $971.04
030-021-021 $485.52
030-031-017 $485.52
030-041-004 $485.52
030-041-005 $485.52
030-041-007 $485.52
030-041-008 $485.52
030-041-009 $485.52
030-041-014 $485.52
030-041-016 $485.52
030-041-017 $485.52
030-041-018 $485.52
030-041-019 $485.52
030-041-020 $485.52
030-041-021 $485.52
030-041-022 $485.52
030-051-011 $485.52
030-061-002 $485.52
030-061-003 $485.52
030-061-004 $485.52
030-061-005 $485.52
030-061-008 $485.52
030-061-017 $485.52
030-061-018 $485.52
030-061-019 $485.52
030-061-020 $485.52
030-061-030 $485.52
030-061-031 $485.52
030-061-032 $485.52
030-061-033 $485.52
030-061-038 $485.52
030-061-041 $485.52
030-061-042 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 43 of 220
Atascadero Sewer Charges 2022/2023
030-061-052 $485.52
030-061-053 $485.52
030-061-054 $485.52
030-061-057 $485.52
030-071-001 $485.52
030-071-006 $485.52
030-071-040 $485.52
030-071-044 $485.52
030-071-057 $485.52
030-071-058 $485.52
030-071-059 $485.52
030-071-060 $485.52
030-071-061 $485.52
030-071-062 $485.52
030-081-017 $971.04
030-081-022 $6,797.28
030-081-025 $3,884.16
030-081-026 $485.52
030-081-028 $485.52
030-081-029 $485.52
030-081-030 $485.52
030-081-031 $485.52
030-081-032 $485.52
030-081-034 $485.52
030-081-035 $485.52
030-081-036 $485.52
030-081-039 $485.52
030-081-040 $485.52
030-081-041 $4,855.20
030-081-042 $1,456.56
030-081-044 $4,369.68
030-081-047 $3,884.16
030-081-048 $4,126.92
030-091-002 $2,184.84
030-091-003 $485.52
030-091-004 $485.52
030-091-005 $1,456.56
030-091-010 $1,456.56
030-091-011 $1,820.76
030-091-014 $2,184.84
030-091-015 $485.52
030-091-016 $485.52
030-091-017 $971.04
030-091-018 $1,820.76
030-091-019 $2,184.84
030-091-021 $3,325.80
030-091-022 $2,184.84
030-091-023 $2,549.04
030-091-026 $485.52
030-091-032 $2,184.84
030-091-033 $485.52
030-091-034 $485.52
030-091-035 $485.52
030-091-036 $485.52
030-091-037 $485.52
030-091-038 $485.52
030-091-039 $485.52
030-091-040 $485.52
030-091-042 $1,092.48
030-091-043 $485.52
030-091-045 $1,456.56
030-091-046 $1,092.48
030-091-048 $485.52
030-091-049 $485.52
030-091-052 $2,184.84
030-091-053 $1,820.76
030-091-054 $485.52
030-091-055 $485.52
030-091-056 $485.52
030-091-057 $485.52
030-091-059 $485.52
030-091-060 $485.52
030-091-061 $485.52
030-091-062 $485.52
030-091-063 $2,184.84
030-091-065 $485.52
030-091-066 $485.52
030-091-067 $485.52
030-101-003 $485.52
030-101-004 $485.52
030-101-005 $485.52
030-101-006 $971.04
030-101-010 $485.52
030-101-011 $5,219.40
030-101-020 $728.28
030-101-025 $364.20
030-101-026 $485.52
030-101-027 $485.52
030-101-028 $971.04
030-101-030 $5,219.40
030-101-036 $2,379.00
030-101-037 $2,184.84
030-101-038 $971.04
030-101-039 $728.28
030-101-040 $485.52
030-101-041 $485.52
030-101-042 $485.52
030-101-045 $485.52
030-101-046 $485.52
030-101-047 $485.52
030-101-048 $485.52
030-101-049 $485.52
030-101-050 $485.52
030-101-051 $485.52
030-101-052 $485.52
030-101-054 $485.52
030-101-055 $485.52
030-101-057 $1,456.56
030-101-058 $485.52
030-101-059 $485.52
030-101-060 $485.52
030-111-001 $485.52
030-111-002 $485.52
030-111-005 $485.52
030-111-009 $485.52
030-111-010 $485.52
030-111-012 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 44 of 220
Atascadero Sewer Charges 2022/2023
030-111-013 $485.52
030-111-014 $485.52
030-111-015 $485.52
030-111-016 $485.52
030-111-017 $485.52
030-111-018 $485.52
030-111-031 $485.52
030-111-032 $485.52
030-111-033 $485.52
030-111-034 $485.52
030-111-035 $485.52
030-111-040 $485.52
030-111-041 $485.52
030-111-043 $485.52
030-111-044 $485.52
030-111-045 $485.52
030-111-046 $485.52
030-111-047 $485.52
030-111-048 $485.52
030-121-001 $2,913.12
030-121-002 $1,456.56
030-121-003 $485.52
030-121-004 $485.52
030-121-006 $485.52
030-121-024 $971.04
030-121-028 $485.52
030-121-029 $1,213.80
030-121-037 $485.52
030-121-038 $485.52
030-121-039 $4,855.20
030-121-040 $485.52
030-121-041 $6,190.44
030-121-043 $1,942.08
030-121-044 $5,860.20
030-121-045 $2,427.60
030-121-046 $4,855.20
030-122-001 $364.20
030-122-002 $364.20
030-122-003 $364.20
030-122-004 $364.20
030-122-005 $364.20
030-122-006 $364.20
030-123-001 $485.52
030-123-002 $485.52
030-123-003 $485.52
030-123-004 $485.52
030-123-005 $485.52
030-123-006 $485.52
030-123-007 $485.52
030-123-008 $485.52
030-123-009 $485.52
030-123-010 $485.52
030-123-011 $485.52
030-123-012 $485.52
030-123-013 $485.52
030-123-014 $485.52
030-123-015 $485.52
030-123-016 $485.52
030-123-017 $485.52
030-123-018 $485.52
030-123-019 $485.52
030-123-020 $485.52
030-123-021 $485.52
030-123-022 $485.52
030-123-023 $485.52
030-123-024 $485.52
030-123-025 $485.52
030-123-026 $485.52
030-123-027 $485.52
030-123-028 $485.52
030-123-030 $485.52
030-123-031 $485.52
030-123-032 $485.52
030-123-033 $485.52
030-123-034 $485.52
030-123-035 $485.52
030-123-036 $485.52
030-123-037 $485.52
030-124-001 $4,855.20
030-124-002 $485.52
030-124-003 $485.52
030-124-004 $485.52
030-124-005 $485.52
030-124-006 $485.52
030-124-007 $485.52
030-124-008 $485.52
030-124-009 $485.52
030-124-010 $485.52
030-124-011 $485.52
030-124-012 $485.52
030-124-013 $485.52
030-124-014 $485.52
030-124-015 $485.52
030-131-001 $485.52
030-131-006 $485.52
030-131-008 $1,456.56
030-131-009 $728.28
030-131-010 $1,942.08
030-131-011 $1,456.56
030-131-012 $1,456.56
030-131-015 $485.52
030-131-016 $485.52
030-131-017 $485.52
030-131-018 $485.52
030-131-019 $485.52
030-131-023 $485.52
030-131-024 $485.52
030-131-027 $1,592.16
030-131-028 $485.52
030-131-034 $485.52
030-131-035 $728.28
030-131-038 $485.52
030-131-039 $485.52
030-131-041 $485.52
030-131-042 $1,456.56
030-131-044 $1,092.48
030-131-046 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 45 of 220
Atascadero Sewer Charges 2022/2023
030-131-048 $1,456.56
030-131-049 $728.28
030-131-050 $728.28
030-131-051 $485.52
030-131-052 $485.52
030-131-053 $485.52
030-131-054 $485.52
030-131-056 $485.52
030-131-057 $485.52
030-131-058 $485.52
030-132-002 $485.52
030-132-003 $485.52
030-132-004 $485.52
030-132-005 $485.52
030-132-006 $1,092.48
030-132-007 $1,092.48
030-132-008 $1,456.56
030-132-011 $1,456.56
030-132-012 $485.52
030-132-013 $485.52
030-132-014 $485.52
030-132-019 $485.52
030-132-024 $971.04
030-132-025 $485.52
030-132-028 $485.52
030-132-029 $971.04
030-132-030 $485.52
030-132-032 $971.04
030-132-038 $485.52
030-132-040 $485.52
030-132-043 $1,456.56
030-132-044 $485.52
030-132-045 $2,913.12
030-132-046 $485.52
030-132-051 $485.52
030-132-052 $485.52
030-132-053 $485.52
030-133-001 $364.20
030-133-002 $364.20
030-133-003 $364.20
030-133-004 $364.20
030-133-005 $364.20
030-133-006 $364.20
030-133-007 $364.20
030-134-001 $364.20
030-134-002 $364.20
030-134-003 $364.20
030-134-004 $485.52
030-134-005 $485.52
030-134-006 $485.52
030-134-008 $485.52
030-134-009 $485.52
030-134-010 $485.52
030-141-004 $485.52
030-141-010 $485.52
030-141-013 $485.52
030-141-016 $485.52
030-141-017 $485.52
030-141-018 $485.52
030-141-020 $485.52
030-141-021 $485.52
030-141-022 $776.88
030-141-023 $971.04
030-141-029 $485.52
030-141-030 $485.52
030-141-037 $485.52
030-141-038 $485.52
030-141-043 $485.52
030-141-044 $485.52
030-141-049 $485.52
030-141-051 $485.52
030-141-052 $485.52
030-141-053 $485.52
030-141-058 $485.52
030-141-059 $485.52
030-141-060 $485.52
030-141-061 $485.52
030-141-062 $485.52
030-141-067 $485.52
030-141-068 $485.52
030-141-069 $485.52
030-141-070 $485.52
030-141-071 $485.52
030-141-072 $485.52
030-141-073 $485.52
030-141-074 $1,942.08
030-141-077 $485.52
030-141-078 $971.04
030-141-079 $485.52
030-141-080 $485.52
030-151-004 $485.52
030-151-005 $485.52
030-151-006 $485.52
030-151-007 $485.52
030-151-008 $485.52
030-151-009 $485.52
030-151-010 $485.52
030-151-011 $485.52
030-151-015 $971.04
030-151-019 $485.52
030-151-020 $485.52
030-151-021 $485.52
030-151-022 $485.52
030-151-023 $485.52
030-151-024 $485.52
030-151-025 $485.52
030-151-026 $485.52
030-151-027 $485.52
030-151-028 $485.52
030-151-029 $485.52
030-151-034 $485.52
030-151-036 $2,913.12
030-151-037 $485.52
030-152-004 $4,126.92
030-152-006 $485.52
030-152-007 $2,427.60
030-152-008 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 46 of 220
Atascadero Sewer Charges 2022/2023
030-152-016 $485.52
030-152-023 $485.52
030-152-024 $485.52
030-152-025 $485.52
030-152-026 $485.52
030-152-032 $485.52
030-152-033 $485.52
030-152-034 $485.52
030-152-036 $485.52
030-152-037 $485.52
030-152-038 $1,942.08
030-181-013 $485.52
030-181-015 $825.36
030-181-030 $485.52
030-181-031 $485.52
030-181-033 $485.52
030-181-035 $485.52
030-181-040 $485.52
030-181-043 $485.52
030-181-044 $485.52
030-181-047 $485.52
030-181-052 $1,699.32
030-181-061 $485.52
030-182-004 $1,456.56
030-191-001 $1,942.08
030-191-008 $728.28
030-191-011 $2,913.12
030-191-021 $1,699.32
030-191-032 $485.52
030-191-035 $2,427.60
030-191-038 $2,913.12
030-191-039 $1,456.56
030-191-040 $728.28
030-191-041 $728.28
030-192-018 $1,456.56
030-192-019 $1,456.56
030-192-020 $971.04
030-193-003 $13,837.32
030-201-003 $485.52
030-201-004 $1,942.08
030-201-005 $1,942.08
030-201-006 $2,913.12
030-201-007 $2,670.36
030-201-008 $485.52
030-201-015 $645.72
030-201-026 $4,855.20
030-201-027 $4,855.20
030-201-028 $485.52
030-202-001 $485.52
030-202-002 $485.52
030-202-003 $485.52
030-202-004 $485.52
030-202-005 $485.52
030-202-006 $485.52
030-202-007 $485.52
030-211-032 $3,641.40
030-211-033 $971.04
030-211-037 $971.04
030-212-026 $4,612.44
030-213-016 $485.52
030-213-017 $485.52
030-213-018 $485.52
030-213-019 $485.52
030-213-020 $485.52
030-213-021 $485.52
030-213-022 $485.52
030-213-023 $485.52
030-213-025 $485.52
030-213-026 $485.52
030-213-027 $485.52
030-213-028 $485.52
030-213-029 $485.52
030-213-030 $485.52
030-213-031 $485.52
030-213-032 $485.52
030-213-033 $485.52
030-213-034 $485.52
030-213-035 $485.52
030-213-036 $485.52
030-221-009 $485.52
030-221-022 $485.52
030-221-023 $485.52
030-221-024 $485.52
030-221-025 $485.52
030-221-026 $485.52
030-221-027 $485.52
030-221-028 $485.52
030-221-031 $485.52
030-221-032 $485.52
030-221-033 $971.04
030-222-032 $485.52
030-222-034 $485.52
030-222-037 $2,427.60
030-222-043 $2,427.60
030-222-044 $3,641.40
030-222-045 $2,913.12
030-222-049 $2,549.04
030-223-001 $485.52
030-223-002 $485.52
030-223-003 $485.52
030-223-004 $485.52
030-223-005 $485.52
030-223-006 $485.52
030-223-007 $485.52
030-223-008 $485.52
030-231-023 $1,456.56
030-231-024 $485.52
030-231-025 $971.04
030-231-026 $485.52
030-231-027 $485.52
030-231-028 $485.52
030-231-029 $485.52
030-231-031 $485.52
030-231-032 $485.52
030-231-033 $485.52
030-231-034 $485.52
030-232-018 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 47 of 220
Atascadero Sewer Charges 2022/2023
030-232-021 $485.52
030-232-026 $485.52
030-232-027 $485.52
030-232-029 $485.52
030-232-030 $485.52
030-232-031 $485.52
030-233-004 $485.52
030-233-009 $485.52
030-241-005 $645.72
030-241-009 $485.52
030-241-010 $485.52
030-241-011 $485.52
030-241-012 $1,456.56
030-241-013 $485.52
030-241-020 $485.52
030-241-033 $1,456.56
030-241-036 $485.52
030-241-045 $971.04
030-241-051 $2,427.60
030-241-052 $485.52
030-241-053 $485.52
030-241-054 $971.04
030-241-056 $485.52
030-241-058 $485.52
030-241-063 $485.52
030-241-064 $485.52
030-241-065 $971.04
030-241-066 $5,583.48
030-242-013 $485.52
030-242-025 $485.52
030-242-037 $485.52
030-242-038 $485.52
030-242-039 $485.52
030-271-003 $485.52
030-271-012 $485.52
030-271-013 $1,942.08
030-271-018 $485.52
030-271-019 $6,311.76
030-271-023 $1,942.08
030-271-026 $485.52
030-281-003 $485.52
030-281-006 $971.04
030-281-011 $971.04
030-281-012 $1,213.80
030-281-019 $485.52
030-281-020 $485.52
030-281-021 $728.28
030-281-022 $485.52
030-281-023 $728.28
030-281-024 $485.52
030-281-025 $485.52
030-281-028 $485.52
030-281-029 $485.52
030-281-030 $485.52
030-281-031 $485.52
030-281-032 $728.28
030-281-033 $485.52
030-281-034 $485.52
030-281-036 $971.04
030-281-037 $485.52
030-281-038 $485.52
030-281-039 $485.52
030-281-040 $485.52
030-281-041 $485.52
030-281-042 $485.52
030-281-043 $485.52
030-281-044 $485.52
030-281-045 $485.52
030-281-046 $485.52
030-281-047 $485.52
030-281-048 $485.52
030-282-014 $485.52
030-282-015 $485.52
030-282-018 $485.52
030-282-021 $485.52
030-282-022 $485.52
030-282-029 $485.52
030-282-032 $485.52
030-282-037 $485.52
030-282-038 $485.52
030-282-039 $485.52
030-282-040 $485.52
030-282-041 $485.52
030-282-042 $485.52
030-282-043 $485.52
030-283-009 $485.52
030-283-010 $485.52
030-283-011 $485.52
030-283-012 $485.52
030-283-013 $485.52
030-283-014 $485.52
030-283-015 $485.52
030-283-016 $485.52
030-283-017 $485.52
030-283-018 $485.52
030-283-019 $485.52
030-285-001 $485.52
030-285-002 $485.52
030-285-003 $485.52
030-285-004 $485.52
030-286-001 $485.52
030-286-002 $485.52
030-286-003 $485.52
030-286-004 $485.52
030-291-013 $485.52
030-291-014 $485.52
030-291-015 $1,213.80
030-291-017 $485.52
030-291-020 $485.52
030-291-028 $485.52
030-291-029 $971.04
030-291-030 $485.52
030-291-031 $485.52
030-292-007 $485.52
030-292-009 $1,592.16
030-292-010 $1,092.48
030-292-011 $4,126.92
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 48 of 220
Atascadero Sewer Charges 2022/2023
030-292-013 $971.04
030-292-015 $485.52
030-292-016 $485.52
030-292-017 $485.52
030-292-021 $485.52
030-292-022 $485.52
030-292-023 $485.52
030-292-024 $2,913.12
030-292-027 $1,092.48
030-292-029 $485.52
030-292-033 $1,592.16
030-292-038 $485.52
030-292-041 $485.52
030-292-047 $485.52
030-292-048 $485.52
030-292-049 $485.52
030-292-051 $485.52
030-292-052 $485.52
030-292-053 $485.52
030-292-055 $485.52
030-292-056 $485.52
030-292-057 $485.52
030-292-058 $485.52
030-292-059 $485.52
030-292-060 $485.52
030-292-061 $485.52
030-292-062 $485.52
030-292-063 $485.52
030-292-067 $485.52
030-292-068 $485.52
030-292-070 $485.52
030-292-071 $485.52
030-292-072 $485.52
030-292-073 $485.52
030-292-079 $485.52
030-292-080 $485.52
030-301-009 $485.52
030-301-017 $485.52
030-301-018 $485.52
030-301-022 $485.52
030-301-023 $1,456.56
030-301-029 $485.52
030-301-032 $485.52
030-301-033 $485.52
030-301-034 $485.52
030-301-035 $485.52
030-301-037 $485.52
030-301-040 $485.52
030-301-043 $485.52
030-301-044 $485.52
030-301-045 $1,456.56
030-301-046 $485.52
030-301-048 $485.52
030-301-053 $485.52
030-301-054 $485.52
030-301-055 $485.52
030-311-011 $485.52
030-332-005 $485.52
030-332-011 $485.52
030-332-012 $485.52
030-332-014 $485.52
030-332-015 $485.52
030-332-018 $485.52
030-332-021 $485.52
030-341-003 $364.20
030-341-004 $485.52
030-341-005 $485.52
030-341-006 $485.52
030-341-009 $485.52
030-341-013 $1,456.56
030-341-015 $485.52
030-341-017 $485.52
030-341-018 $485.52
030-341-019 $485.52
030-341-020 $1,456.56
030-341-021 $1,456.56
030-341-022 $1,820.76
030-341-023 $1,456.56
030-341-024 $2,913.12
030-341-025 $1,213.80
030-341-026 $728.28
030-341-027 $485.52
030-341-028 $485.52
030-341-029 $485.52
030-341-030 $485.52
030-341-031 $485.52
030-341-032 $485.52
030-341-033 $485.52
030-341-034 $485.52
030-341-035 $485.52
030-343-004 $5,583.48
030-343-005 $1,456.56
030-351-001 $485.52
030-351-003 $485.52
030-351-004 $485.52
030-351-005 $485.52
030-351-011 $485.52
030-351-015 $485.52
030-351-016 $485.52
030-351-017 $485.52
030-351-018 $485.52
030-351-019 $485.52
030-351-024 $485.52
030-351-027 $485.52
030-351-028 $485.52
030-351-029 $485.52
030-351-031 $971.04
030-351-033 $485.52
030-351-034 $485.52
030-351-035 $485.52
030-351-036 $485.52
030-351-037 $485.52
030-352-002 $485.52
030-352-003 $485.52
030-352-006 $485.52
030-352-008 $485.52
030-352-012 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 49 of 220
Atascadero Sewer Charges 2022/2023
030-352-015 $485.52
030-352-022 $485.52
030-352-023 $485.52
030-352-025 $485.52
030-352-026 $485.52
030-352-027 $485.52
030-352-030 $485.52
030-352-031 $485.52
030-352-032 $485.52
030-371-001 $485.52
030-371-002 $485.52
030-371-003 $485.52
030-371-008 $485.52
030-371-009 $485.52
030-371-010 $971.04
030-371-011 $485.52
030-371-017 $485.52
030-371-018 $485.52
030-371-021 $485.52
030-371-022 $485.52
030-371-023 $485.52
030-371-024 $485.52
030-371-025 $485.52
030-371-028 $485.52
030-372-001 $485.52
030-372-002 $485.52
030-372-003 $485.52
030-372-004 $485.52
030-372-006 $485.52
030-372-007 $485.52
030-372-008 $485.52
030-372-011 $485.52
030-372-013 $485.52
030-372-018 $485.52
030-372-019 $485.52
030-372-020 $485.52
030-372-021 $485.52
030-372-022 $485.52
030-372-023 $485.52
030-372-024 $485.52
030-372-025 $485.52
030-372-026 $728.28
030-372-027 $485.52
030-372-028 $485.52
030-373-001 $485.52
030-373-007 $485.52
030-373-008 $485.52
030-373-009 $485.52
030-373-016 $485.52
030-373-017 $485.52
030-373-018 $485.52
030-373-019 $1,820.76
030-373-021 $971.04
030-373-022 $485.52
030-373-023 $485.52
030-373-025 $485.52
030-373-027 $485.52
030-373-028 $485.52
030-373-029 $485.52
030-373-030 $679.68
030-373-031 $485.52
030-373-032 $485.52
030-373-033 $485.52
030-373-034 $485.52
030-391-001 $485.52
030-400-001 $485.52
030-400-005 $485.52
030-400-006 $485.52
030-400-007 $485.52
030-400-008 $485.52
030-400-009 $485.52
030-400-016 $485.52
030-400-017 $485.52
030-400-018 $485.52
030-400-019 $485.52
030-400-020 $485.52
030-400-021 $485.52
030-400-022 $485.52
030-400-023 $485.52
030-400-024 $485.52
030-400-025 $485.52
030-400-026 $485.52
030-400-027 $485.52
030-400-028 $485.52
030-400-029 $485.52
030-400-030 $485.52
030-400-031 $485.52
030-400-032 $485.52
030-400-033 $485.52
030-400-034 $485.52
030-400-035 $485.52
030-400-036 $485.52
030-400-037 $485.52
030-400-038 $485.52
030-400-039 $485.52
030-400-040 $485.52
030-400-041 $485.52
030-400-042 $485.52
030-400-043 $485.52
030-400-044 $485.52
030-400-045 $485.52
030-400-046 $485.52
030-400-049 $485.52
030-400-050 $485.52
030-400-051 $485.52
030-400-052 $485.52
030-400-053 $485.52
030-400-054 $485.52
030-400-055 $485.52
030-400-056 $485.52
030-400-057 $485.52
030-401-008 $485.52
030-401-009 $485.52
030-401-010 $485.52
030-401-011 $485.52
030-401-012 $485.52
030-401-013 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 50 of 220
Atascadero Sewer Charges 2022/2023
030-401-014 $485.52
030-401-015 $485.52
030-401-017 $485.52
030-401-018 $485.52
030-401-020 $485.52
030-401-021 $485.52
030-401-023 $485.52
030-401-024 $485.52
030-401-025 $485.52
030-401-026 $485.52
030-401-027 $485.52
030-401-028 $485.52
030-401-030 $485.52
030-401-031 $485.52
030-401-032 $485.52
030-401-037 $485.52
030-401-038 $485.52
030-411-001 $485.52
030-411-002 $485.52
030-411-003 $485.52
030-411-004 $485.52
030-411-005 $485.52
030-411-006 $485.52
030-411-008 $485.52
030-411-009 $485.52
030-411-010 $485.52
030-411-011 $485.52
030-412-001 $971.04
030-412-002 $485.52
030-412-006 $485.52
030-412-007 $485.52
030-412-008 $485.52
030-412-009 $485.52
030-412-010 $485.52
030-412-011 $485.52
030-412-012 $485.52
030-412-013 $485.52
030-412-014 $485.52
030-412-015 $485.52
030-412-016 $485.52
030-412-022 $485.52
030-412-023 $485.52
030-412-024 $485.52
030-412-025 $485.52
030-412-026 $485.52
030-412-027 $485.52
030-412-029 $485.52
030-413-001 $485.52
030-413-002 $485.52
030-413-003 $485.52
030-413-004 $485.52
030-413-006 $485.52
030-413-010 $485.52
030-413-012 $485.52
030-413-016 $485.52
030-413-018 $485.52
030-413-020 $485.52
030-413-029 $485.52
030-413-031 $485.52
030-421-003 $485.52
030-421-004 $485.52
030-421-006 $485.52
030-421-007 $485.52
030-421-008 $485.52
030-421-009 $485.52
030-421-010 $485.52
030-421-011 $485.52
030-421-012 $485.52
030-421-013 $485.52
030-422-002 $485.52
030-422-003 $485.52
030-422-004 $485.52
030-422-005 $485.52
030-422-006 $485.52
030-422-007 $485.52
030-422-008 $485.52
030-422-009 $485.52
030-422-010 $485.52
030-422-011 $485.52
030-431-001 $485.52
030-431-002 $485.52
030-431-003 $485.52
030-431-004 $485.52
030-431-005 $485.52
030-431-006 $485.52
030-431-007 $485.52
030-431-009 $485.52
030-431-010 $485.52
030-431-011 $485.52
030-431-012 $485.52
030-431-013 $485.52
030-431-014 $485.52
030-431-015 $485.52
030-431-016 $485.52
030-431-017 $485.52
030-431-018 $485.52
030-442-009 $485.52
030-442-010 $485.52
030-442-011 $485.52
030-451-001 $485.52
030-451-002 $485.52
030-451-003 $485.52
030-451-006 $485.52
030-461-012 $6,918.72
030-461-023 $16,022.16
030-461-026 $485.52
030-461-029 $37,385.04
030-461-042 $13,109.04
030-461-044 $16,143.60
030-461-055 $2,549.04
030-461-056 $485.52
030-462-001 $364.20
030-462-002 $364.20
030-462-003 $364.20
030-462-004 $364.20
030-462-005 $364.20
030-462-006 $364.20
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 51 of 220
Atascadero Sewer Charges 2022/2023
030-462-007 $364.20
030-462-008 $364.20
030-462-009 $364.20
030-462-010 $364.20
030-462-012 $364.20
030-462-013 $364.20
030-462-014 $364.20
030-462-015 $364.20
030-462-016 $364.20
030-462-017 $364.20
030-462-019 $485.52
030-462-020 $485.52
030-462-021 $485.52
030-462-022 $485.52
030-462-023 $485.52
030-462-024 $485.52
030-462-025 $485.52
030-462-026 $485.52
030-463-001 $364.20
030-463-002 $364.20
030-463-003 $364.20
030-463-004 $364.20
030-463-005 $364.20
030-463-006 $364.20
030-463-007 $364.20
030-463-008 $364.20
030-463-010 $364.20
030-463-011 $364.20
030-463-012 $364.20
030-463-013 $364.20
030-463-014 $364.20
030-463-015 $364.20
030-463-016 $364.20
030-463-017 $364.20
030-463-018 $364.20
030-464-001 $485.52
030-464-002 $485.52
030-464-003 $485.52
030-464-004 $485.52
030-464-005 $485.52
030-464-006 $485.52
030-464-007 $485.52
030-464-008 $485.52
030-464-009 $485.52
030-464-010 $485.52
030-466-002 $364.20
030-466-003 $364.20
030-466-004 $364.20
030-466-005 $364.20
030-466-006 $364.20
030-466-007 $364.20
030-466-008 $364.20
030-466-009 $364.20
030-466-010 $364.20
030-466-011 $364.20
030-466-012 $485.52
030-466-013 $485.52
030-466-014 $4,369.68
030-466-015 $485.52
030-466-016 $582.60
030-466-017 $485.52
030-466-018 $485.52
030-466-019 $485.52
030-466-021 $2,913.12
030-466-023 $364.20
030-466-024 $364.20
030-466-025 $364.20
030-466-026 $364.20
030-466-027 $364.20
030-471-005 $485.52
030-471-006 $485.52
030-471-007 $485.52
030-471-008 $485.52
030-471-010 $1,942.08
030-472-001 $485.52
030-472-007 $8,011.08
030-472-009 $3,228.72
030-472-010 $485.52
030-472-011 $485.52
030-472-012 $485.52
030-472-013 $485.52
030-472-014 $485.52
030-472-015 $485.52
030-472-016 $485.52
030-472-017 $485.52
030-473-001 $485.52
030-473-002 $485.52
030-473-003 $485.52
030-473-004 $485.52
030-473-005 $485.52
030-473-006 $485.52
030-473-007 $485.52
030-473-008 $485.52
030-473-009 $485.52
030-473-010 $485.52
030-473-011 $485.52
030-473-012 $485.52
030-473-013 $485.52
030-473-014 $485.52
030-473-015 $485.52
030-473-016 $485.52
030-473-017 $485.52
030-473-018 $485.52
030-473-020 $485.52
030-473-021 $485.52
030-473-022 $485.52
030-473-023 $485.52
030-473-024 $485.52
030-473-025 $485.52
030-473-026 $485.52
030-473-027 $485.52
030-473-028 $485.52
030-473-029 $485.52
030-473-030 $485.52
030-473-031 $485.52
030-473-032 $485.52
030-473-034 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 52 of 220
Atascadero Sewer Charges 2022/2023
030-473-035 $485.52
030-473-036 $485.52
030-473-037 $485.52
030-473-038 $485.52
030-473-039 $485.52
030-473-040 $485.52
030-481-003 $1,456.56
030-481-007 $1,335.24
030-481-009 $485.52
030-481-014 $485.52
030-481-015 $485.52
030-481-019 $485.52
030-481-020 $485.52
030-481-021 $485.52
030-481-022 $485.52
030-481-024 $485.52
030-481-025 $485.52
030-481-026 $485.52
030-481-027 $485.52
030-481-028 $485.52
030-481-029 $485.52
030-481-030 $485.52
030-481-031 $485.52
030-481-032 $485.52
030-481-033 $485.52
030-481-034 $485.52
030-481-035 $485.52
030-481-036 $485.52
030-481-037 $485.52
030-481-039 $485.52
030-481-041 $485.52
030-481-042 $485.52
030-481-043 $485.52
030-482-001 $485.52
030-482-003 $3,325.80
030-482-004 $485.52
030-482-005 $485.52
030-482-006 $364.20
030-482-007 $364.20
030-482-008 $364.20
030-482-009 $364.20
030-482-010 $364.20
030-482-011 $364.20
030-483-001 $485.52
030-483-002 $485.52
030-483-003 $485.52
030-483-004 $485.52
030-483-005 $485.52
030-483-006 $485.52
030-483-008 $485.52
030-491-004 $485.52
030-491-005 $485.52
030-491-007 $485.52
030-491-008 $485.52
030-491-009 $485.52
030-491-014 $485.52
030-491-023 $3,641.40
030-492-003 $971.04
030-501-004 $485.52
030-501-006 $485.52
030-502-007 $3,884.16
030-502-011 $1,456.56
030-502-012 $1,942.08
030-502-015 $485.52
030-502-016 $485.52
030-502-017 $485.52
030-502-018 $485.52
030-502-022 $485.52
030-502-032 $485.52
030-502-033 $485.52
030-502-035 $485.52
030-502-037 $485.52
030-502-038 $971.04
030-502-042 $485.52
030-511-003 $1,942.08
030-512-003 $485.52
030-512-004 $971.04
030-512-005 $645.72
030-512-006 $2,913.12
030-512-007 $485.52
030-512-010 $971.04
030-513-001 $485.52
030-513-002 $485.52
030-513-003 $485.52
030-513-004 $485.52
030-513-011 $6,311.76
030-513-012 $5,340.72
030-513-013 $4,855.20
030-513-014 $485.52
030-513-015 $6,311.76
030-513-016 $1,942.08
030-521-001 $485.52
030-521-002 $485.52
030-521-003 $485.52
030-521-004 $485.52
030-521-006 $485.52
030-521-009 $485.52
030-521-010 $485.52
030-521-011 $485.52
030-521-012 $485.52
030-521-013 $485.52
030-521-014 $485.52
030-522-001 $485.52
030-522-002 $485.52
030-522-003 $485.52
030-522-004 $485.52
030-522-005 $485.52
030-522-006 $485.52
030-522-010 $485.52
030-522-011 $485.52
030-522-012 $971.04
030-522-014 $485.52
030-522-015 $485.52
030-522-016 $485.52
030-522-017 $485.52
030-522-018 $485.52
030-522-019 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 53 of 220
Atascadero Sewer Charges 2022/2023
030-522-020 $485.52
030-522-021 $485.52
030-522-022 $485.52
030-522-023 $485.52
030-522-024 $485.52
030-522-025 $485.52
030-522-026 $485.52
030-522-027 $485.52
030-522-028 $485.52
030-522-029 $485.52
030-522-031 $485.52
030-522-032 $485.52
030-522-033 $485.52
030-522-034 $485.52
030-522-035 $485.52
030-522-036 $485.52
030-522-037 $485.52
030-522-038 $485.52
030-522-039 $485.52
030-522-040 $485.52
030-522-041 $485.52
030-522-042 $485.52
030-522-043 $485.52
030-522-044 $485.52
030-522-045 $485.52
030-523-002 $485.52
030-523-007 $485.52
030-523-008 $485.52
030-523-009 $485.52
030-523-010 $485.52
031-012-012 $485.52
031-012-023 $485.52
031-012-024 $485.52
031-012-025 $485.52
031-013-006 $485.52
031-013-027 $485.52
031-013-028 $485.52
031-013-029 $485.52
031-021-001 $971.04
031-021-007 $485.52
031-022-001 $485.52
031-023-010 $485.52
031-023-011 $485.52
031-023-012 $485.52
031-023-014 $485.52
031-023-015 $485.52
031-023-016 $485.52
031-023-017 $485.52
031-023-018 $485.52
031-023-026 $485.52
031-023-027 $485.52
031-041-015 $485.52
031-041-016 $485.52
031-041-019 $485.52
031-041-020 $485.52
031-041-021 $485.52
031-041-022 $485.52
031-041-023 $485.52
031-041-024 $485.52
031-041-025 $485.52
031-041-026 $485.52
031-041-027 $485.52
031-042-003 $485.52
031-042-004 $485.52
031-042-005 $485.52
031-042-012 $485.52
031-042-013 $485.52
031-042-014 $485.52
031-042-015 $485.52
031-042-016 $485.52
031-042-017 $485.52
031-042-018 $485.52
031-042-019 $485.52
031-043-010 $485.52
031-043-011 $485.52
031-043-013 $485.52
031-043-014 $485.52
031-043-015 $485.52
031-043-018 $971.04
031-043-019 $485.52
031-043-020 $485.52
031-043-021 $485.52
031-043-022 $485.52
031-043-023 $485.52
031-043-024 $485.52
031-043-025 $485.52
031-043-027 $485.52
031-043-028 $485.52
031-043-029 $485.52
031-043-030 $728.28
031-043-031 $485.52
031-051-001 $485.52
031-051-007 $485.52
031-051-018 $485.52
031-051-019 $485.52
031-051-021 $485.52
031-051-022 $485.52
031-051-023 $485.52
031-051-024 $485.52
031-051-032 $485.52
031-051-033 $485.52
031-051-034 $485.52
031-051-038 $485.52
031-051-042 $1,942.08
031-051-044 $485.52
031-051-047 $485.52
031-051-054 $485.52
031-051-057 $485.52
031-051-058 $1,456.56
031-051-059 $485.52
031-051-061 $485.52
031-051-062 $485.52
031-051-063 $485.52
031-051-064 $485.52
031-051-065 $485.52
031-051-066 $485.52
031-051-067 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 54 of 220
Atascadero Sewer Charges 2022/2023
031-051-068 $971.04
031-051-069 $485.52
031-051-070 $485.52
031-052-007 $485.52
031-052-021 $485.52
031-052-027 $485.52
031-052-028 $485.52
031-052-029 $485.52
031-052-030 $485.52
031-052-034 $485.52
031-052-035 $485.52
031-052-038 $485.52
031-052-039 $485.52
031-052-040 $485.52
031-052-041 $485.52
031-052-042 $485.52
031-052-043 $485.52
031-052-044 $971.04
031-052-045 $1,942.08
031-053-001 $485.52
031-053-002 $485.52
031-053-003 $485.52
031-053-004 $485.52
031-053-005 $485.52
031-053-006 $485.52
031-053-007 $485.52
031-053-008 $485.52
031-053-009 $485.52
031-053-010 $485.52
031-053-011 $485.52
031-053-012 $485.52
031-053-013 $485.52
031-054-002 $485.52
031-054-003 $485.52
031-061-001 $485.52
031-061-005 $485.52
031-061-006 $485.52
031-061-010 $485.52
031-061-023 $485.52
031-061-025 $485.52
031-061-030 $485.52
031-061-031 $485.52
031-061-032 $485.52
031-061-034 $485.52
031-061-036 $485.52
031-061-038 $485.52
031-061-039 $485.52
031-061-040 $485.52
031-061-042 $485.52
031-061-043 $485.52
031-062-001 $485.52
031-062-002 $485.52
031-062-003 $485.52
031-062-008 $485.52
031-062-009 $485.52
031-062-010 $485.52
031-062-013 $1,456.56
031-062-016 $485.52
031-062-019 $485.52
031-062-020 $485.52
031-062-021 $485.52
031-062-022 $485.52
031-071-013 $485.52
031-071-017 $485.52
031-071-018 $485.52
031-071-019 $485.52
031-071-021 $485.52
031-071-023 $485.52
031-071-024 $485.52
031-071-025 $485.52
031-071-029 $485.52
031-071-030 $485.52
031-071-031 $485.52
031-071-032 $485.52
031-071-033 $485.52
031-071-034 $485.52
031-071-035 $485.52
031-081-003 $485.52
031-081-004 $485.52
031-081-007 $485.52
031-081-013 $485.52
031-081-018 $485.52
031-081-019 $485.52
031-081-020 $485.52
031-081-021 $485.52
031-081-023 $485.52
031-081-026 $485.52
031-081-028 $485.52
031-081-029 $485.52
031-081-030 $485.52
031-082-020 $485.52
031-082-024 $485.52
031-082-025 $485.52
031-082-027 $485.52
031-082-028 $485.52
031-082-029 $485.52
031-082-030 $485.52
031-082-032 $485.52
031-082-034 $485.52
031-082-035 $485.52
031-082-036 $485.52
031-082-038 $485.52
031-082-039 $485.52
031-091-007 $485.52
031-091-011 $485.52
031-091-020 $485.52
031-091-023 $485.52
031-091-031 $485.52
031-101-008 $485.52
031-104-008 $485.52
031-104-009 $485.52
031-104-010 $485.52
031-104-025 $485.52
031-104-026 $485.52
031-112-004 $485.52
031-112-014 $485.52
031-115-003 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 55 of 220
Atascadero Sewer Charges 2022/2023
031-123-007 $485.52
031-123-009 $485.52
031-123-010 $485.52
031-124-011 $485.52
031-124-012 $485.52
031-124-013 $485.52
031-125-001 $485.52
031-125-002 $485.52
031-125-003 $485.52
031-131-006 $485.52
031-131-010 $485.52
031-132-002 $485.52
031-132-006 $485.52
031-132-008 $485.52
031-132-010 $485.52
031-132-011 $485.52
031-133-005 $485.52
031-133-012 $485.52
031-133-013 $485.52
031-133-014 $485.52
031-134-007 $485.52
031-134-008 $485.52
031-134-009 $485.52
031-134-010 $485.52
031-134-011 $485.52
031-134-023 $485.52
031-134-024 $485.52
031-141-003 $485.52
031-141-004 $485.52
031-141-005 $485.52
031-141-006 $485.52
031-141-007 $485.52
031-141-008 $485.52
031-141-010 $485.52
031-141-013 $485.52
031-141-014 $485.52
031-141-016 $485.52
031-141-019 $485.52
031-141-020 $485.52
031-141-021 $485.52
031-141-022 $485.52
031-141-023 $485.52
031-141-028 $485.52
031-141-033 $485.52
031-141-034 $485.52
031-141-038 $485.52
031-141-039 $485.52
031-141-041 $485.52
031-141-043 $485.52
031-141-044 $485.52
031-141-045 $485.52
031-141-046 $485.52
031-141-047 $485.52
031-141-048 $485.52
031-141-049 $485.52
031-141-050 $485.52
031-141-051 $485.52
031-142-003 $485.52
031-142-004 $485.52
031-142-011 $485.52
031-142-013 $485.52
031-142-014 $485.52
031-142-023 $485.52
031-142-024 $485.52
031-142-026 $971.04
031-142-027 $485.52
031-142-028 $485.52
031-142-033 $485.52
031-142-034 $485.52
031-151-007 $485.52
031-151-013 $485.52
031-151-014 $485.52
031-151-015 $485.52
031-151-016 $485.52
031-151-021 $485.52
031-151-022 $485.52
031-151-024 $971.04
031-151-027 $485.52
031-151-028 $485.52
031-151-029 $485.52
031-151-030 $485.52
031-151-031 $485.52
031-151-032 $485.52
031-151-033 $485.52
031-151-034 $485.52
031-152-012 $485.52
031-152-013 $485.52
031-152-014 $485.52
031-152-016 $485.52
031-152-017 $485.52
031-152-020 $485.52
031-152-021 $485.52
031-152-022 $485.52
031-152-023 $485.52
031-152-024 $485.52
031-152-025 $485.52
031-152-026 $849.72
031-152-027 $485.52
031-152-028 $485.52
031-152-029 $485.52
031-152-030 $485.52
031-152-031 $485.52
031-153-005 $1,942.08
031-153-010 $485.52
031-153-011 $485.52
031-153-013 $485.52
031-153-016 $485.52
031-153-017 $485.52
031-153-018 $485.52
031-153-019 $485.52
031-161-004 $776.88
031-161-007 $485.52
031-161-008 $485.52
031-161-019 $1,942.08
031-161-029 $485.52
031-161-030 $485.52
031-161-035 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 56 of 220
Atascadero Sewer Charges 2022/2023
031-161-037 $485.52
031-161-038 $485.52
031-161-039 $485.52
031-161-042 $485.52
031-161-043 $485.52
031-161-052 $13,109.04
031-162-001 $485.52
031-162-002 $485.52
031-162-003 $485.52
031-162-004 $485.52
031-162-005 $485.52
031-162-006 $485.52
031-171-001 $485.52
031-171-004 $485.52
031-171-005 $485.52
031-171-006 $485.52
031-171-007 $485.52
031-171-009 $485.52
031-171-010 $485.52
031-171-017 $485.52
031-171-018 $485.52
031-171-019 $485.52
031-171-020 $485.52
031-171-023 $485.52
031-171-028 $485.52
031-171-029 $485.52
031-171-030 $485.52
031-171-031 $971.04
031-181-001 $485.52
031-181-002 $485.52
031-181-004 $485.52
031-181-005 $485.52
031-181-008 $485.52
031-181-009 $485.52
031-181-022 $485.52
031-181-023 $485.52
031-181-024 $485.52
031-181-025 $485.52
031-181-026 $485.52
031-181-027 $485.52
031-181-028 $485.52
031-181-029 $485.52
031-181-030 $485.52
031-181-031 $971.04
031-182-005 $485.52
031-182-007 $485.52
031-182-008 $971.04
031-182-009 $485.52
031-182-013 $485.52
031-182-015 $485.52
031-182-018 $485.52
031-182-021 $485.52
031-182-025 $485.52
031-182-029 $485.52
031-182-030 $485.52
031-182-031 $485.52
031-182-032 $485.52
031-182-033 $485.52
031-182-034 $485.52
031-182-035 $485.52
031-182-036 $485.52
031-182-037 $485.52
031-182-038 $485.52
031-182-039 $485.52
031-183-004 $485.52
031-183-005 $485.52
031-183-018 $485.52
031-183-024 $485.52
031-183-025 $485.52
031-183-026 $485.52
031-183-027 $1,456.56
031-183-031 $485.52
031-183-032 $485.52
031-183-035 $485.52
031-183-036 $485.52
031-183-037 $485.52
031-183-038 $485.52
031-183-039 $485.52
031-183-040 $485.52
031-183-041 $485.52
031-184-001 $485.52
031-184-002 $485.52
031-184-003 $485.52
031-184-004 $485.52
031-184-005 $485.52
031-184-006 $485.52
031-184-007 $485.52
031-184-008 $485.52
031-184-009 $485.52
031-184-010 $485.52
031-184-011 $485.52
031-184-012 $485.52
031-184-013 $485.52
031-184-014 $485.52
031-184-015 $485.52
031-184-016 $485.52
031-184-017 $485.52
031-184-018 $485.52
031-202-006 $485.52
031-202-008 $485.52
031-202-017 $485.52
031-202-022 $485.52
031-202-026 $485.52
031-211-008 $485.52
031-211-011 $485.52
031-221-005 $485.52
031-221-009 $485.52
031-221-010 $485.52
031-221-011 $485.52
031-221-014 $485.52
031-221-015 $485.52
031-221-018 $485.52
031-221-019 $485.52
031-221-021 $485.52
031-221-022 $485.52
031-221-023 $485.52
031-221-024 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 57 of 220
Atascadero Sewer Charges 2022/2023
031-221-025 $485.52
031-221-026 $485.52
031-221-027 $485.52
031-222-001 $485.52
031-222-002 $485.52
031-222-003 $485.52
031-222-007 $485.52
031-222-008 $485.52
031-222-012 $485.52
031-222-013 $485.52
031-222-015 $485.52
031-222-016 $485.52
031-222-017 $485.52
031-222-018 $485.52
031-222-019 $485.52
031-222-021 $485.52
031-222-022 $485.52
031-222-023 $485.52
031-222-024 $485.52
031-222-027 $485.52
031-222-028 $485.52
031-222-029 $485.52
031-222-030 $485.52
031-231-004 $485.52
031-231-025 $1,456.56
031-231-034 $485.52
031-231-035 $485.52
031-231-037 $485.52
031-231-038 $485.52
031-231-039 $485.52
031-231-040 $485.52
031-231-042 $485.52
031-231-043 $485.52
031-231-044 $485.52
031-231-045 $485.52
031-231-046 $485.52
031-231-047 $485.52
031-231-048 $485.52
031-231-049 $485.52
031-231-050 $485.52
031-231-051 $485.52
031-231-052 $485.52
031-231-053 $485.52
031-231-054 $485.52
031-231-055 $485.52
031-231-056 $485.52
031-231-061 $485.52
031-231-066 $485.52
031-231-067 $485.52
031-231-068 $485.52
031-241-001 $485.52
031-241-002 $485.52
031-241-004 $485.52
031-241-005 $485.52
031-241-006 $485.52
031-241-007 $485.52
031-241-008 $485.52
031-241-009 $485.52
031-241-010 $485.52
031-241-014 $2,184.84
031-241-022 $2,549.04
031-241-023 $1,942.08
031-241-024 $485.52
031-242-011 $971.04
031-242-014 $485.52
031-242-016 $485.52
031-242-018 $5,826.24
031-243-001 $485.52
031-243-002 $485.52
031-243-003 $485.52
031-243-004 $485.52
031-243-005 $485.52
031-243-006 $485.52
031-243-008 $485.52
031-243-009 $485.52
031-243-010 $485.52
031-243-011 $485.52
031-243-014 $485.52
031-243-015 $485.52
031-243-016 $485.52
031-243-017 $485.52
031-243-018 $485.52
031-243-019 $485.52
031-243-020 $485.52
031-244-001 $485.52
031-244-002 $485.52
031-244-003 $485.52
031-244-004 $485.52
031-244-011 $485.52
031-244-012 $485.52
031-244-015 $485.52
031-244-017 $485.52
031-244-018 $485.52
031-244-020 $485.52
031-244-021 $485.52
031-251-003 $485.52
031-251-004 $485.52
031-251-005 $485.52
031-251-006 $485.52
031-251-008 $485.52
031-251-015 $485.52
031-251-016 $485.52
031-251-019 $485.52
031-251-020 $485.52
031-251-021 $485.52
031-251-022 $485.52
031-251-023 $485.52
031-251-025 $485.52
031-251-026 $485.52
031-251-027 $485.52
031-251-028 $485.52
031-251-029 $485.52
031-251-030 $485.52
031-251-031 $485.52
031-251-032 $485.52
031-251-038 $485.52
031-251-041 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 58 of 220
Atascadero Sewer Charges 2022/2023
031-251-042 $485.52
031-251-043 $485.52
031-251-045 $485.52
031-251-046 $485.52
031-251-047 $485.52
031-251-050 $485.52
031-251-051 $485.52
031-251-052 $485.52
031-251-053 $485.52
031-261-002 $485.52
031-261-003 $971.04
031-261-004 $485.52
031-261-005 $485.52
031-261-006 $485.52
031-261-010 $485.52
031-261-013 $485.52
031-261-015 $485.52
031-261-019 $485.52
031-261-026 $485.52
031-261-029 $485.52
031-261-030 $485.52
031-261-032 $485.52
031-261-033 $485.52
031-271-009 $485.52
031-271-010 $679.68
031-271-011 $485.52
031-271-013 $485.52
031-271-023 $485.52
031-271-024 $485.52
031-271-026 $485.52
031-271-027 $485.52
031-271-028 $485.52
031-271-029 $485.52
031-271-032 $485.52
031-271-033 $485.52
031-271-034 $485.52
031-271-037 $485.52
031-271-039 $485.52
031-271-040 $485.52
031-271-041 $485.52
031-271-042 $485.52
031-271-043 $485.52
031-271-044 $485.52
031-271-046 $485.52
031-271-047 $485.52
031-271-048 $485.52
031-281-011 $485.52
031-281-012 $485.52
031-281-013 $485.52
031-281-014 $485.52
031-281-016 $485.52
031-281-022 $485.52
031-281-029 $485.52
031-281-032 $485.52
031-281-033 $485.52
031-291-002 $485.52
031-291-010 $485.52
031-291-019 $485.52
031-291-020 $485.52
031-291-022 $971.04
031-291-023 $485.52
031-291-026 $485.52
031-291-028 $971.04
031-291-029 $4,733.88
031-291-030 $485.52
031-291-031 $485.52
031-291-032 $485.52
031-291-033 $485.52
031-291-034 $485.52
031-291-035 $485.52
031-291-036 $485.52
031-291-037 $485.52
031-291-038 $485.52
031-291-039 $971.04
031-291-040 $485.52
031-301-001 $485.52
031-301-003 $485.52
031-301-004 $485.52
031-301-006 $485.52
031-301-009 $485.52
031-301-011 $485.52
031-301-013 $1,456.56
031-301-020 $485.52
031-301-021 $485.52
031-301-023 $1,942.08
031-301-024 $485.52
031-301-025 $485.52
031-301-026 $485.52
031-301-027 $1,456.56
031-301-029 $485.52
031-301-030 $485.52
031-301-031 $1,456.56
031-301-032 $1,456.56
031-302-011 $485.52
031-302-013 $485.52
031-302-014 $485.52
031-302-033 $1,456.56
031-302-034 $485.52
031-302-035 $1,456.56
031-302-036 $485.52
031-303-001 $485.52
031-303-002 $485.52
031-303-003 $485.52
031-303-004 $485.52
031-303-006 $485.52
031-303-007 $485.52
031-303-008 $485.52
031-303-009 $485.52
031-303-010 $485.52
031-303-011 $485.52
031-303-013 $485.52
031-303-014 $485.52
031-303-015 $485.52
031-303-016 $485.52
031-311-001 $485.52
031-311-002 $485.52
031-311-003 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 59 of 220
Atascadero Sewer Charges 2022/2023
031-311-004 $485.52
031-311-005 $485.52
031-311-006 $485.52
031-311-007 $485.52
031-311-016 $485.52
031-311-017 $485.52
031-311-019 $485.52
031-311-021 $485.52
031-311-022 $485.52
031-311-023 $485.52
031-311-024 $485.52
031-311-025 $485.52
031-321-003 $971.04
031-321-004 $485.52
031-321-014 $485.52
031-321-015 $485.52
031-341-014 $485.52
031-341-015 $485.52
031-341-016 $485.52
031-341-017 $485.52
031-341-018 $485.52
031-341-026 $485.52
031-341-027 $485.52
031-351-006 $485.52
031-351-009 $2,913.12
031-371-009 $1,820.76
031-371-014 $364.20
031-371-016 $645.72
031-371-020 $485.52
031-371-021 $485.52
031-371-027 $485.52
031-371-028 $485.52
031-372-008 $645.72
031-373-001 $485.52
031-373-002 $485.52
031-373-003 $679.68
031-373-004 $485.52
031-373-005 $485.52
031-373-006 $485.52
031-373-007 $485.52
031-373-008 $485.52
031-373-009 $485.52
031-373-011 $485.52
031-381-001 $485.52
031-381-007 $485.52
031-381-009 $485.52
031-381-010 $485.52
031-381-020 $485.52
031-381-024 $485.52
031-381-027 $485.52
031-381-031 $485.52
031-381-032 $485.52
031-381-034 $485.52
031-381-035 $485.52
031-381-036 $485.52
031-381-041 $485.52
031-381-043 $485.52
031-381-044 $485.52
031-381-046 $485.52
031-381-051 $485.52
031-381-052 $485.52
031-381-053 $485.52
031-381-055 $485.52
031-381-056 $485.52
031-381-059 $485.52
031-381-060 $485.52
031-381-061 $485.52
031-381-062 $485.52
031-381-065 $485.52
031-381-067 $485.52
045-311-014 $10,924.20
045-311-015 $15,051.12
045-311-016 $10,924.20
045-312-002 $485.52
045-312-003 $485.52
045-312-004 $485.52
045-312-005 $485.52
045-312-006 $485.52
045-312-007 $485.52
045-312-008 $485.52
045-312-009 $485.52
045-312-010 $485.52
045-312-011 $485.52
045-312-012 $485.52
045-312-013 $485.52
045-312-014 $485.52
045-312-015 $485.52
045-312-016 $485.52
045-312-017 $485.52
045-312-018 $485.52
045-312-019 $485.52
045-312-020 $485.52
045-312-021 $485.52
045-312-022 $485.52
045-312-023 $485.52
045-312-024 $485.52
045-312-025 $485.52
045-312-026 $485.52
045-312-027 $485.52
045-312-028 $485.52
045-312-029 $485.52
045-312-030 $485.52
045-312-031 $485.52
045-312-032 $485.52
045-312-033 $485.52
045-312-034 $485.52
045-312-035 $485.52
045-312-036 $485.52
045-312-037 $485.52
045-312-038 $485.52
045-312-039 $485.52
045-312-040 $485.52
045-312-041 $485.52
045-312-042 $485.52
045-312-043 $485.52
045-312-044 $485.52
045-312-045 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 60 of 220
Atascadero Sewer Charges 2022/2023
045-312-046 $485.52
045-312-047 $485.52
045-312-048 $485.52
045-312-049 $485.52
045-312-050 $485.52
045-312-052 $485.52
045-312-056 $485.52
045-313-002 $485.52
045-313-003 $485.52
045-313-004 $485.52
045-313-005 $485.52
045-313-006 $971.04
045-313-007 $971.04
045-313-008 $971.04
045-313-009 $971.04
045-313-011 $485.52
045-313-012 $485.52
045-313-013 $485.52
045-313-014 $971.04
045-313-018 $971.04
045-313-019 $971.04
045-313-020 $971.04
045-313-021 $971.04
045-313-026 $971.04
045-313-027 $971.04
045-314-001 $485.52
045-314-002 $485.52
045-314-003 $485.52
045-314-004 $485.52
045-314-005 $485.52
045-314-006 $485.52
045-314-007 $485.52
045-314-008 $485.52
045-314-009 $485.52
045-314-010 $485.52
045-314-011 $485.52
045-314-012 $485.52
045-314-013 $485.52
045-314-014 $485.52
045-314-015 $485.52
045-314-016 $485.52
045-314-017 $485.52
045-314-018 $485.52
045-314-019 $485.52
045-314-020 $485.52
045-314-021 $485.52
045-314-022 $485.52
045-314-023 $485.52
045-314-024 $485.52
045-314-028 $485.52
045-314-030 $485.52
045-314-031 $485.52
045-314-032 $485.52
045-314-033 $485.52
045-315-001 $485.52
045-315-002 $485.52
045-315-003 $485.52
045-315-004 $485.52
045-315-005 $485.52
045-315-006 $485.52
045-315-007 $485.52
045-315-008 $485.52
045-315-009 $485.52
045-315-010 $485.52
045-315-011 $485.52
045-315-012 $485.52
045-315-013 $485.52
045-315-014 $485.52
045-315-015 $485.52
045-315-016 $485.52
045-315-017 $485.52
045-315-018 $485.52
045-315-019 $485.52
045-315-020 $485.52
045-315-021 $485.52
045-315-022 $485.52
045-315-023 $485.52
045-315-024 $485.52
045-315-027 $485.52
045-315-028 $485.52
045-315-029 $485.52
045-315-030 $485.52
045-315-031 $485.52
045-315-033 $485.52
045-316-041 $364.20
045-316-042 $364.20
045-316-043 $364.20
045-316-044 $364.20
045-316-045 $364.20
045-316-046 $364.20
045-316-047 $364.20
045-316-048 $364.20
045-316-049 $364.20
045-316-050 $364.20
045-316-055 $1,820.76
045-316-056 $485.52
045-316-057 $485.52
045-316-058 $485.52
045-316-059 $485.52
045-316-060 $485.52
045-316-061 $485.52
045-316-062 $485.52
045-316-063 $485.52
045-316-064 $485.52
045-316-065 $485.52
045-316-066 $485.52
045-316-067 $485.52
045-316-068 $485.52
045-316-069 $485.52
045-316-070 $485.52
045-316-071 $485.52
045-316-072 $485.52
045-316-073 $485.52
045-316-074 $485.52
045-316-075 $485.52
045-321-003 $485.52
045-321-004 $10,875.60
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 61 of 220
Atascadero Sewer Charges 2022/2023
045-321-005 $21,047.28
045-321-011 $14,565.60
045-321-012 $17,478.72
045-321-013 $18,935.28
045-321-015 $23,304.96
045-321-016 $156,531.60
045-321-022 $8,375.28
045-321-023 $32,772.60
045-321-026 $21,848.40
045-322-001 $485.52
045-322-002 $485.52
045-322-003 $485.52
045-322-004 $485.52
045-322-005 $485.52
045-322-006 $485.52
045-322-007 $485.52
045-322-008 $485.52
045-322-009 $485.52
045-322-010 $485.52
045-322-011 $485.52
045-322-012 $485.52
045-322-013 $485.52
045-322-014 $485.52
045-322-015 $485.52
045-322-016 $485.52
045-322-017 $485.52
045-322-018 $485.52
045-322-019 $485.52
045-325-009 $364.20
045-325-010 $364.20
045-325-011 $364.20
045-325-012 $364.20
045-325-013 $364.20
045-325-022 $364.20
045-325-023 $364.20
045-325-024 $364.20
045-325-025 $364.20
045-325-026 $364.20
045-325-027 $364.20
045-325-028 $364.20
045-325-029 $364.20
045-325-030 $364.20
045-325-031 $364.20
045-325-032 $364.20
045-325-033 $364.20
045-325-034 $364.20
045-325-035 $364.20
045-325-036 $364.20
045-325-037 $364.20
045-325-038 $364.20
045-325-039 $364.20
045-325-040 $364.20
045-325-041 $364.20
045-325-042 $364.20
045-325-043 $364.20
045-325-044 $364.20
045-325-045 $364.20
045-325-046 $364.20
045-325-047 $364.20
045-325-048 $364.20
045-325-049 $364.20
045-325-050 $364.20
045-325-051 $364.20
045-325-052 $364.20
045-325-053 $364.20
045-325-054 $364.20
045-325-055 $364.20
045-325-056 $364.20
045-325-057 $364.20
045-325-058 $364.20
045-325-059 $364.20
045-325-060 $364.20
045-325-061 $364.20
045-325-062 $364.20
045-325-063 $364.20
045-325-064 $364.20
045-325-065 $364.20
045-325-066 $364.20
045-325-067 $364.20
045-325-068 $364.20
045-325-069 $364.20
045-325-070 $364.20
045-325-071 $364.20
045-325-072 $364.20
045-325-073 $364.20
045-325-074 $364.20
045-331-017 $485.52
045-331-018 $485.52
045-331-019 $485.52
045-331-020 $485.52
045-331-021 $485.52
045-331-022 $485.52
045-331-023 $485.52
045-331-024 $485.52
045-331-025 $485.52
045-331-026 $485.52
045-331-027 $485.52
045-331-028 $485.52
045-331-029 $485.52
045-331-030 $485.52
045-331-031 $485.52
045-331-032 $485.52
045-331-033 $485.52
045-331-034 $485.52
045-331-035 $485.52
045-331-036 $485.52
045-331-037 $485.52
045-331-038 $485.52
045-331-039 $485.52
045-331-040 $485.52
045-331-041 $485.52
045-331-042 $485.52
045-331-043 $485.52
045-331-044 $485.52
045-331-045 $485.52
045-331-046 $485.52
045-331-047 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 62 of 220
Atascadero Sewer Charges 2022/2023
045-331-048 $485.52
045-331-049 $485.52
045-331-052 $485.52
045-331-053 $485.52
045-331-054 $485.52
045-331-055 $485.52
045-331-056 $485.52
045-331-057 $485.52
045-331-058 $485.52
045-331-059 $485.52
045-331-060 $485.52
045-331-065 $485.52
045-331-066 $485.52
045-331-067 $485.52
045-331-068 $485.52
045-331-069 $485.52
045-331-070 $485.52
045-331-071 $485.52
045-331-072 $485.52
045-331-073 $485.52
045-331-074 $485.52
045-331-075 $485.52
045-331-076 $485.52
045-331-077 $485.52
045-331-078 $485.52
045-331-079 $485.52
045-331-080 $485.52
045-331-081 $485.52
045-331-082 $485.52
045-331-083 $485.52
045-331-084 $485.52
045-331-085 $485.52
045-333-014 $485.52
045-333-015 $485.52
045-333-016 $485.52
045-333-017 $485.52
045-333-018 $485.52
045-333-019 $485.52
045-333-020 $485.52
045-333-021 $485.52
045-333-022 $485.52
045-333-023 $485.52
045-333-024 $485.52
045-333-025 $485.52
045-333-026 $485.52
045-333-027 $485.52
045-333-028 $485.52
045-333-029 $485.52
045-333-030 $485.52
045-333-031 $485.52
045-333-032 $485.52
045-333-033 $485.52
045-333-034 $485.52
045-333-035 $485.52
045-333-038 $485.52
045-333-039 $485.52
045-333-040 $485.52
045-333-041 $1,092.48
045-334-010 $485.52
045-334-011 $485.52
045-334-012 $485.52
045-334-013 $485.52
045-334-014 $485.52
045-334-015 $485.52
045-334-016 $485.52
045-334-017 $485.52
045-334-018 $485.52
045-334-019 $485.52
045-334-020 $485.52
045-334-021 $485.52
045-334-022 $485.52
045-334-023 $485.52
045-334-024 $485.52
045-334-025 $485.52
045-334-026 $485.52
045-334-027 $485.52
045-334-028 $485.52
045-334-029 $485.52
045-334-030 $485.52
045-334-031 $485.52
045-334-032 $485.52
045-334-033 $485.52
045-334-034 $485.52
045-334-035 $485.52
045-334-036 $485.52
045-334-037 $485.52
045-334-038 $485.52
045-334-039 $485.52
045-334-040 $485.52
045-334-041 $485.52
045-334-042 $485.52
045-334-043 $485.52
045-335-012 $485.52
045-335-013 $485.52
045-335-014 $485.52
045-335-015 $485.52
045-335-016 $485.52
045-335-017 $485.52
045-335-018 $485.52
045-335-019 $485.52
045-335-020 $485.52
045-335-021 $485.52
045-335-022 $485.52
045-335-023 $485.52
045-335-024 $485.52
045-335-025 $485.52
045-335-026 $485.52
045-335-027 $485.52
045-335-028 $485.52
045-335-029 $485.52
045-335-030 $485.52
045-335-031 $485.52
045-335-032 $485.52
045-335-033 $485.52
045-335-034 $485.52
045-335-035 $485.52
045-335-036 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 63 of 220
Atascadero Sewer Charges 2022/2023
045-335-037 $485.52
045-335-038 $485.52
045-335-039 $485.52
045-335-040 $485.52
045-335-041 $485.52
045-335-042 $485.52
045-335-043 $485.52
045-335-044 $485.52
045-335-045 $485.52
045-335-046 $485.52
045-335-047 $485.52
045-335-048 $485.52
045-336-008 $485.52
045-336-009 $485.52
045-336-010 $485.52
045-336-011 $485.52
045-336-012 $485.52
045-336-013 $485.52
045-336-014 $485.52
045-336-015 $485.52
045-336-016 $485.52
045-336-017 $485.52
045-336-018 $485.52
045-336-019 $485.52
045-336-020 $485.52
045-336-021 $485.52
045-336-022 $485.52
045-336-023 $485.52
045-336-024 $485.52
045-336-025 $485.52
045-336-026 $485.52
045-336-027 $485.52
045-336-028 $485.52
045-336-029 $485.52
045-336-030 $485.52
045-336-031 $485.52
045-336-032 $485.52
045-336-033 $485.52
045-336-034 $485.52
045-336-035 $485.52
045-336-036 $485.52
045-336-037 $485.52
045-336-038 $485.52
045-336-039 $485.52
045-337-001 $485.52
045-337-002 $485.52
045-337-003 $485.52
045-337-004 $485.52
045-337-005 $485.52
045-337-006 $485.52
045-337-007 $485.52
045-337-008 $485.52
045-337-009 $485.52
045-337-012 $485.52
045-337-013 $485.52
045-337-014 $485.52
045-337-015 $485.52
045-337-016 $485.52
045-337-017 $485.52
045-337-018 $485.52
045-337-019 $485.52
045-337-020 $485.52
045-337-021 $485.52
045-337-022 $485.52
045-337-023 $485.52
045-337-024 $485.52
045-337-025 $485.52
045-337-026 $485.52
045-337-027 $485.52
045-338-006 $485.52
045-338-007 $485.52
045-338-008 $485.52
045-338-009 $485.52
045-338-010 $485.52
045-338-011 $485.52
045-338-012 $485.52
045-338-013 $485.52
045-338-014 $485.52
045-338-015 $485.52
045-338-016 $485.52
045-338-017 $485.52
045-338-018 $485.52
045-338-019 $485.52
045-338-020 $485.52
045-338-021 $485.52
045-338-022 $485.52
045-338-023 $485.52
045-338-024 $485.52
045-338-025 $485.52
045-338-026 $485.52
045-338-027 $485.52
045-338-028 $485.52
045-338-029 $485.52
045-339-001 $485.52
045-339-002 $485.52
045-339-004 $485.52
045-339-005 $485.52
045-339-006 $485.52
045-339-007 $485.52
045-339-008 $485.52
045-339-009 $485.52
045-339-010 $485.52
045-339-011 $485.52
045-339-012 $485.52
045-339-013 $485.52
045-339-014 $485.52
045-339-015 $485.52
045-339-016 $485.52
045-339-017 $485.52
045-339-018 $485.52
045-339-019 $485.52
045-339-020 $485.52
045-339-021 $485.52
045-339-022 $485.52
045-339-023 $485.52
045-339-024 $485.52
045-339-033 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 64 of 220
Atascadero Sewer Charges 2022/2023
045-342-011 $485.52
045-351-015 $16,085.28
045-353-007 $2,549.04
045-356-001 $485.52
045-356-002 $485.52
045-356-003 $485.52
045-356-004 $485.52
045-356-005 $485.52
045-356-006 $485.52
045-356-007 $485.52
045-356-008 $485.52
045-356-009 $485.52
045-356-010 $485.52
045-356-011 $485.52
045-356-012 $485.52
045-356-013 $485.52
045-356-014 $485.52
045-356-015 $485.52
045-356-016 $485.52
045-356-017 $485.52
045-356-018 $485.52
045-356-019 $485.52
045-356-020 $485.52
045-356-021 $485.52
045-356-022 $485.52
045-356-023 $485.52
045-356-024 $485.52
045-356-025 $485.52
045-356-026 $485.52
045-356-027 $485.52
045-356-028 $485.52
045-356-029 $485.52
045-356-030 $485.52
045-357-001 $485.52
045-357-002 $485.52
045-357-003 $485.52
045-357-004 $485.52
045-357-005 $485.52
045-357-006 $485.52
045-357-007 $485.52
045-357-008 $485.52
045-357-009 $485.52
045-357-010 $485.52
045-357-011 $485.52
045-357-012 $485.52
045-357-013 $485.52
045-357-014 $485.52
045-357-015 $485.52
045-357-016 $485.52
045-357-017 $485.52
045-357-018 $485.52
045-357-019 $485.52
045-357-020 $485.52
045-357-021 $485.52
045-357-022 $485.52
045-357-023 $485.52
045-357-024 $485.52
045-357-025 $485.52
045-357-026 $485.52
045-357-027 $485.52
045-357-028 $485.52
045-357-029 $485.52
045-357-030 $485.52
045-357-031 $485.52
045-357-032 $485.52
045-357-033 $485.52
045-357-034 $485.52
045-357-035 $485.52
045-357-036 $485.52
045-357-037 $485.52
045-357-038 $485.52
045-357-039 $485.52
045-357-040 $485.52
045-357-041 $485.52
045-357-042 $485.52
045-358-001 $485.52
045-358-002 $485.52
045-358-003 $485.52
045-358-004 $485.52
045-358-005 $485.52
045-358-006 $485.52
045-358-007 $485.52
045-358-008 $485.52
045-358-009 $485.52
045-358-014 $485.52
045-358-015 $485.52
045-358-016 $485.52
045-358-017 $485.52
045-358-018 $485.52
045-358-019 $485.52
045-358-020 $485.52
045-358-021 $485.52
045-358-022 $485.52
045-358-023 $485.52
045-358-024 $485.52
045-358-025 $485.52
045-358-026 $485.52
045-358-027 $485.52
045-358-028 $485.52
045-358-029 $485.52
045-358-030 $485.52
045-358-031 $485.52
045-358-032 $485.52
045-358-033 $485.52
045-358-034 $485.52
045-358-035 $485.52
045-358-036 $485.52
045-358-037 $485.52
045-358-038 $485.52
045-358-039 $485.52
045-358-040 $485.52
045-358-041 $485.52
045-358-042 $485.52
045-358-043 $485.52
045-358-045 $485.52
045-358-046 $485.52
045-358-047 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 65 of 220
Atascadero Sewer Charges 2022/2023
045-358-048 $485.52
045-358-049 $485.52
045-358-050 $485.52
045-358-051 $485.52
045-358-052 $485.52
045-358-053 $485.52
045-359-001 $485.52
045-359-002 $485.52
045-359-003 $485.52
045-359-004 $485.52
045-359-005 $485.52
045-359-006 $485.52
045-359-007 $485.52
045-359-008 $485.52
045-359-009 $485.52
045-359-010 $485.52
045-359-011 $485.52
045-359-012 $485.52
045-359-013 $485.52
045-359-014 $485.52
045-359-015 $485.52
045-359-016 $485.52
045-359-017 $485.52
045-359-018 $485.52
045-359-019 $485.52
045-359-020 $485.52
045-359-021 $485.52
045-359-022 $485.52
045-359-023 $485.52
045-361-001 $291.36
045-361-002 $291.36
045-361-003 $291.36
045-361-004 $291.36
045-361-005 $291.36
045-361-006 $291.36
045-361-007 $291.36
045-361-008 $291.36
045-361-009 $291.36
045-361-010 $291.36
045-361-011 $291.36
045-361-012 $291.36
045-361-013 $291.36
045-361-014 $291.36
045-361-015 $291.36
045-361-016 $291.36
045-361-017 $291.36
045-361-018 $291.36
045-361-019 $291.36
045-361-020 $291.36
045-361-021 $291.36
045-361-022 $291.36
045-361-023 $291.36
045-361-024 $291.36
045-361-025 $291.36
045-361-026 $971.04
045-361-029 $485.52
045-361-030 $485.52
045-361-031 $485.52
045-361-032 $485.52
045-361-033 $485.52
045-361-034 $485.52
045-361-035 $485.52
045-361-036 $485.52
045-402-002 $485.52
045-402-003 $485.52
045-402-007 $485.52
049-031-011 $485.52
049-031-012 $485.52
049-031-013 $485.52
049-031-014 $485.52
049-031-015 $485.52
049-031-016 $485.52
049-031-017 $485.52
049-031-018 $485.52
049-031-019 $485.52
049-031-020 $485.52
049-031-021 $485.52
049-031-022 $485.52
049-031-023 $485.52
049-031-024 $485.52
049-031-025 $485.52
049-031-026 $485.52
049-031-027 $485.52
049-031-028 $485.52
049-031-029 $485.52
049-031-030 $485.52
049-031-031 $485.52
049-031-032 $485.52
049-031-033 $485.52
049-031-034 $485.52
049-031-035 $485.52
049-031-036 $485.52
049-031-038 $485.52
049-031-039 $485.52
049-031-040 $485.52
049-031-041 $485.52
049-031-042 $485.52
049-031-043 $485.52
049-031-044 $485.52
049-031-045 $485.52
049-031-046 $485.52
049-031-047 $485.52
049-031-048 $485.52
049-031-049 $485.52
049-031-050 $485.52
049-031-051 $485.52
049-031-052 $485.52
049-031-053 $485.52
049-031-054 $485.52
049-031-055 $485.52
049-031-056 $485.52
049-031-057 $485.52
049-031-058 $485.52
049-031-059 $485.52
049-031-060 $485.52
049-031-061 $485.52
049-031-062 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 66 of 220
Atascadero Sewer Charges 2022/2023
049-031-063 $485.52
049-031-064 $485.52
049-031-065 $485.52
049-031-066 $485.52
049-032-004 $485.52
049-032-005 $485.52
049-032-006 $485.52
049-032-007 $485.52
049-032-008 $485.52
049-032-009 $485.52
049-032-010 $485.52
049-032-011 $485.52
049-032-012 $485.52
049-032-013 $485.52
049-032-014 $485.52
049-032-015 $485.52
049-032-016 $485.52
049-032-017 $485.52
049-032-018 $485.52
049-032-019 $485.52
049-032-020 $485.52
049-032-021 $485.52
049-032-022 $485.52
049-032-023 $485.52
049-032-024 $485.52
049-032-025 $485.52
049-032-026 $485.52
049-032-027 $485.52
049-032-028 $485.52
049-032-029 $485.52
049-032-030 $485.52
049-032-031 $485.52
049-032-032 $485.52
049-032-033 $485.52
049-032-034 $485.52
049-032-037 $485.52
049-032-038 $485.52
049-032-039 $485.52
049-032-040 $485.52
049-032-041 $485.52
049-032-042 $485.52
049-032-043 $485.52
049-032-044 $485.52
049-032-045 $485.52
049-032-046 $485.52
049-032-047 $485.52
049-032-048 $485.52
049-032-049 $485.52
049-032-050 $485.52
049-032-051 $485.52
049-032-052 $485.52
049-032-053 $485.52
049-032-054 $485.52
049-032-055 $485.52
049-032-056 $485.52
049-032-057 $485.52
049-032-058 $485.52
049-032-059 $485.52
049-032-060 $485.52
049-032-061 $485.52
049-032-062 $485.52
049-032-063 $485.52
049-032-064 $485.52
049-032-065 $485.52
049-032-066 $485.52
049-032-067 $485.52
049-032-068 $485.52
049-032-069 $485.52
049-032-070 $485.52
049-033-006 $485.52
049-033-007 $485.52
049-033-008 $485.52
049-033-009 $485.52
049-033-010 $485.52
049-033-011 $485.52
049-033-012 $485.52
049-033-013 $485.52
049-033-014 $485.52
049-033-015 $485.52
049-033-016 $485.52
049-033-017 $485.52
049-033-025 $485.52
049-033-026 $485.52
049-033-027 $485.52
049-033-028 $485.52
049-033-029 $485.52
049-033-030 $485.52
049-033-031 $485.52
049-033-032 $485.52
049-033-033 $485.52
049-033-034 $485.52
049-033-035 $485.52
049-033-039 $485.52
049-033-040 $485.52
049-033-041 $485.52
049-033-043 $485.52
049-033-044 $485.52
049-033-045 $485.52
049-033-046 $485.52
049-033-047 $485.52
049-033-048 $485.52
049-033-049 $485.52
049-033-050 $485.52
049-033-052 $485.52
049-033-053 $485.52
049-033-054 $485.52
049-034-002 $485.52
049-034-003 $485.52
049-034-004 $485.52
049-034-005 $485.52
049-034-007 $485.52
049-034-008 $485.52
049-034-009 $485.52
049-034-010 $485.52
049-034-012 $485.52
049-034-013 $485.52
049-034-014 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 67 of 220
Atascadero Sewer Charges 2022/2023
049-034-015 $485.52
049-034-016 $485.52
049-034-017 $485.52
049-041-010 $971.04
049-042-013 $485.52
049-044-002 $485.52
049-044-003 $485.52
049-044-004 $485.52
049-044-005 $485.52
049-044-006 $485.52
049-044-007 $485.52
049-044-008 $485.52
049-044-009 $485.52
049-044-010 $485.52
049-044-011 $485.52
049-044-012 $485.52
049-044-013 $485.52
049-044-014 $485.52
049-044-015 $485.52
049-044-016 $485.52
049-044-017 $485.52
049-044-018 $485.52
049-044-019 $485.52
049-044-020 $485.52
049-044-021 $485.52
049-044-022 $485.52
049-044-023 $485.52
049-044-024 $485.52
049-044-025 $485.52
049-044-026 $485.52
049-044-033 $485.52
049-045-001 $485.52
049-045-002 $485.52
049-045-003 $971.04
049-045-021 $485.52
049-045-032 $27,868.80
049-046-002 $485.52
049-046-003 $485.52
049-046-004 $485.52
049-046-005 $485.52
049-046-006 $485.52
049-046-007 $485.52
049-046-008 $485.52
049-046-009 $485.52
049-046-010 $485.52
049-046-011 $485.52
049-046-012 $485.52
049-046-013 $485.52
049-046-014 $485.52
049-046-015 $485.52
049-046-016 $485.52
049-046-017 $485.52
049-046-018 $485.52
049-046-019 $485.52
049-046-020 $485.52
049-046-021 $485.52
049-046-022 $485.52
049-046-023 $485.52
049-046-024 $485.52
049-046-025 $485.52
049-046-026 $485.52
049-046-027 $485.52
049-046-028 $485.52
049-046-029 $485.52
049-046-030 $485.52
049-046-031 $485.52
049-046-032 $485.52
049-046-033 $485.52
049-046-034 $485.52
049-046-035 $485.52
049-046-036 $485.52
049-046-037 $485.52
049-046-038 $485.52
049-046-039 $485.52
049-046-040 $485.52
049-046-041 $485.52
049-046-042 $485.52
049-046-043 $485.52
049-046-044 $485.52
049-046-045 $485.52
049-046-046 $485.52
049-046-047 $485.52
049-046-048 $485.52
049-046-049 $485.52
049-046-050 $485.52
049-046-051 $485.52
049-046-052 $485.52
049-046-053 $485.52
049-046-054 $485.52
049-046-055 $485.52
049-046-056 $485.52
049-046-057 $485.52
049-046-058 $485.52
049-046-059 $485.52
049-046-060 $485.52
049-046-061 $485.52
049-047-001 $485.52
049-047-002 $485.52
049-047-003 $485.52
049-047-004 $485.52
049-047-005 $485.52
049-047-011 $485.52
049-047-012 $485.52
049-047-013 $485.52
049-047-014 $485.52
049-047-018 $485.52
049-047-019 $485.52
049-047-020 $485.52
049-047-021 $485.52
049-047-022 $485.52
049-047-023 $485.52
049-047-024 $485.52
049-048-002 $485.52
049-048-003 $485.52
049-048-004 $485.52
049-048-005 $485.52
049-048-006 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 68 of 220
Atascadero Sewer Charges 2022/2023
049-048-007 $485.52
049-048-008 $485.52
049-048-009 $485.52
049-048-010 $485.52
049-048-011 $485.52
049-048-012 $485.52
049-048-013 $485.52
049-048-014 $485.52
049-048-015 $485.52
049-048-016 $485.52
049-048-017 $485.52
049-048-018 $485.52
049-048-019 $485.52
049-048-020 $485.52
049-048-021 $485.52
049-048-022 $485.52
049-048-023 $485.52
049-048-024 $485.52
049-048-025 $485.52
049-048-026 $485.52
049-048-027 $485.52
049-048-028 $485.52
049-048-029 $485.52
049-048-030 $485.52
049-048-031 $485.52
049-048-032 $485.52
049-048-033 $485.52
049-048-034 $485.52
049-048-035 $485.52
049-048-036 $485.52
049-048-037 $485.52
049-048-038 $485.52
049-048-039 $485.52
049-048-040 $485.52
049-048-041 $485.52
049-048-042 $485.52
049-048-043 $485.52
049-048-044 $485.52
049-048-045 $485.52
049-048-046 $485.52
049-048-047 $485.52
049-048-048 $485.52
049-048-049 $485.52
049-048-050 $485.52
049-048-051 $485.52
049-048-052 $485.52
049-048-053 $485.52
049-048-054 $485.52
049-048-055 $485.52
049-048-056 $485.52
049-048-057 $485.52
049-048-058 $485.52
049-048-059 $485.52
049-048-062 $485.52
049-073-037 $485.52
049-093-015 $485.52
049-093-017 $6,457.44
049-101-015 $485.52
049-102-020 $776.88
049-102-046 $485.52
049-102-051 $485.52
049-102-061 $485.52
049-102-062 $485.52
049-102-063 $485.52
049-102-064 $485.52
049-102-065 $485.52
049-102-066 $485.52
049-102-067 $485.52
049-102-068 $485.52
049-102-070 $776.88
049-102-071 $776.88
049-102-072 $776.88
049-102-073 $776.88
049-102-074 $776.88
049-103-001 $485.52
049-103-002 $485.52
049-103-003 $485.52
049-103-004 $485.52
049-103-005 $485.52
049-103-006 $485.52
049-103-007 $485.52
049-103-008 $485.52
049-103-009 $485.52
049-103-010 $485.52
049-103-012 $485.52
049-103-013 $485.52
049-103-014 $485.52
049-103-015 $485.52
049-103-016 $485.52
049-103-017 $485.52
049-103-018 $485.52
049-103-019 $485.52
049-103-020 $485.52
049-103-022 $485.52
049-103-023 $485.52
049-103-024 $485.52
049-103-025 $485.52
049-103-026 $485.52
049-103-027 $485.52
049-103-028 $485.52
049-103-029 $971.04
049-103-030 $485.52
049-103-031 $485.52
049-103-032 $485.52
049-103-033 $485.52
049-103-034 $485.52
049-103-035 $485.52
049-103-036 $485.52
049-103-037 $485.52
049-103-038 $485.52
049-103-039 $485.52
049-103-040 $485.52
049-104-002 $485.52
049-104-003 $485.52
049-104-004 $485.52
049-104-005 $485.52
049-104-006 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 69 of 220
Atascadero Sewer Charges 2022/2023
049-104-007 $485.52
049-104-008 $485.52
049-104-009 $485.52
049-104-010 $485.52
049-104-011 $485.52
049-104-012 $485.52
049-104-013 $485.52
049-104-014 $485.52
049-104-015 $485.52
049-104-016 $485.52
049-104-017 $485.52
049-104-018 $485.52
049-104-019 $485.52
049-104-020 $485.52
049-104-021 $485.52
049-104-022 $485.52
049-104-023 $485.52
049-104-024 $485.52
049-104-025 $485.52
049-104-026 $485.52
049-104-027 $485.52
049-104-028 $485.52
049-104-029 $485.52
049-104-030 $485.52
049-104-031 $485.52
049-104-032 $485.52
049-105-001 $485.52
049-105-006 $485.52
049-105-007 $485.52
049-105-008 $485.52
049-105-009 $485.52
049-105-010 $485.52
049-105-011 $485.52
049-105-012 $485.52
049-105-013 $485.52
049-105-014 $485.52
049-111-007 $485.52
049-131-022 $1,456.56
049-131-054 $485.52
049-131-071 $485.52
049-131-073 $1,456.56
049-131-084 $485.52
049-131-088 $19,226.64
049-141-044 $485.52
049-141-053 $971.04
049-141-056 $13,594.56
049-151-016 $485.52
049-151-017 $485.52
049-151-029 $485.52
049-151-063 $13,109.04
049-151-065 $485.52
049-151-066 $485.52
049-151-067 $485.52
049-163-010 $485.52
049-163-019 $485.52
049-163-025 $485.52
049-163-031 $485.52
049-163-035 $485.52
049-163-036 $485.52
049-163-046 $485.52
049-163-047 $485.52
049-163-051 $485.52
049-163-052 $485.52
049-163-053 $485.52
049-163-054 $485.52
049-163-068 $485.52
049-163-069 $485.52
049-163-070 $485.52
049-163-071 $485.52
049-163-072 $485.52
049-163-073 $485.52
049-163-074 $485.52
049-163-075 $485.52
049-163-076 $485.52
049-163-077 $679.68
049-163-078 $485.52
049-163-079 $485.52
049-163-080 $485.52
049-163-081 $485.52
049-164-001 $485.52
049-164-002 $485.52
049-164-003 $485.52
049-164-004 $485.52
049-164-005 $485.52
049-164-011 $485.52
049-164-012 $485.52
049-164-013 $485.52
049-164-014 $485.52
049-192-001 $485.52
049-192-002 $485.52
049-192-003 $485.52
049-192-004 $485.52
049-192-005 $485.52
049-192-006 $485.52
049-192-007 $485.52
049-192-008 $485.52
049-192-009 $485.52
049-192-010 $485.52
049-192-011 $485.52
049-192-012 $485.52
049-192-013 $485.52
049-192-014 $485.52
049-192-015 $485.52
049-192-016 $485.52
049-192-017 $485.52
049-192-018 $485.52
049-192-019 $485.52
049-192-020 $485.52
049-192-021 $485.52
049-192-022 $485.52
049-193-001 $485.52
049-193-002 $485.52
049-193-003 $485.52
049-193-004 $485.52
049-193-005 $485.52
049-193-006 $485.52
049-193-007 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 70 of 220
Atascadero Sewer Charges 2022/2023
049-193-008 $485.52
049-193-010 $485.52
049-193-011 $485.52
049-193-012 $485.52
049-193-013 $485.52
049-193-014 $485.52
049-193-015 $485.52
049-193-016 $485.52
049-193-017 $485.52
049-193-018 $485.52
049-193-019 $485.52
049-193-020 $485.52
049-193-021 $485.52
049-193-022 $485.52
049-193-023 $485.52
049-193-024 $485.52
049-193-025 $485.52
049-193-026 $485.52
049-193-027 $485.52
049-193-028 $485.52
049-193-029 $485.52
049-193-030 $485.52
049-193-031 $485.52
049-193-032 $485.52
049-193-033 $485.52
049-193-034 $485.52
049-193-035 $485.52
049-193-036 $485.52
049-193-037 $485.52
049-193-038 $485.52
049-193-039 $485.52
049-193-040 $485.52
049-193-041 $485.52
049-193-042 $485.52
049-193-043 $485.52
049-193-044 $485.52
049-193-045 $485.52
049-193-046 $485.52
049-193-047 $485.52
049-193-048 $485.52
049-193-051 $485.52
049-201-040 $485.52
049-201-048 $485.52
049-211-054 $4,855.20
049-211-055 $4,369.68
049-211-058 $4,855.20
049-211-059 $11,856.36
049-213-001 $4,855.20
049-213-003 $485.52
049-213-004 $485.52
049-213-005 $485.52
049-213-006 $485.52
049-213-007 $485.52
049-213-008 $485.52
049-213-009 $485.52
049-213-010 $485.52
049-213-011 $485.52
049-213-012 $485.52
049-213-013 $485.52
049-213-014 $485.52
049-213-015 $485.52
049-213-016 $485.52
049-213-017 $485.52
049-213-018 $485.52
049-213-019 $485.52
049-213-020 $485.52
049-213-021 $485.52
049-213-022 $485.52
049-213-023 $485.52
049-213-024 $485.52
049-213-025 $485.52
049-213-026 $485.52
049-213-027 $485.52
049-213-028 $485.52
049-214-001 $485.52
049-214-002 $485.52
049-214-003 $485.52
049-214-004 $485.52
049-214-005 $485.52
049-214-006 $485.52
049-214-007 $485.52
049-214-008 $485.52
049-214-009 $485.52
049-214-011 $485.52
049-214-012 $485.52
049-214-013 $485.52
049-214-014 $485.52
049-214-015 $485.52
049-214-016 $485.52
049-214-017 $485.52
049-214-018 $485.52
049-214-019 $485.52
049-214-020 $485.52
049-221-016 $485.52
049-221-027 $485.52
049-221-034 $485.52
049-221-040 $971.04
049-221-044 $3,884.16
049-221-061 $5,826.24
049-221-062 $3,884.16
049-224-001 $485.52
049-224-002 $485.52
049-224-003 $485.52
049-224-004 $485.52
049-224-005 $485.52
049-224-006 $485.52
049-224-007 $485.52
049-224-008 $485.52
049-224-009 $485.52
049-224-010 $485.52
049-224-011 $485.52
049-224-012 $485.52
049-224-013 $485.52
049-224-014 $485.52
049-224-015 $485.52
049-224-016 $485.52
049-224-017 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 71 of 220
Atascadero Sewer Charges 2022/2023
049-224-018 $485.52
049-224-019 $485.52
049-224-020 $485.52
049-224-021 $485.52
049-224-022 $485.52
049-224-023 $485.52
049-224-024 $485.52
049-224-025 $485.52
049-225-008 $485.52
049-225-011 $2,913.12
049-225-012 $971.04
049-225-016 $1,121.52
049-225-017 $2,733.48
049-225-024 $3,641.40
049-225-025 $485.52
049-225-026 $1,942.08
049-225-029 $1,281.72
049-226-001 $1,942.08
049-226-002 $1,291.44
049-226-003 $485.52
049-226-004 $485.52
049-226-005 $485.52
049-226-006 $485.52
049-226-007 $485.52
049-302-009 $485.52
049-302-014 $485.52
049-302-017 $485.52
049-341-003 $485.52
049-341-006 $485.52
049-341-009 $485.52
049-341-010 $485.52
049-341-011 $485.52
049-341-012 $485.52
054-142-003 $485.52
054-142-004 $485.52
054-142-006 $485.52
054-142-008 $485.52
054-142-013 $485.52
054-142-015 $898.20
054-142-016 $485.52
054-142-017 $485.52
054-142-018 $485.52
054-142-021 $971.04
054-142-026 $485.52
054-142-027 $485.52
054-142-028 $485.52
054-142-031 $485.52
054-142-032 $485.52
054-143-008 $485.52
054-151-033 $485.52
054-151-034 $485.52
054-151-037 $485.52
054-151-038 $485.52
054-151-039 $485.52
054-151-040 $485.52
054-151-042 $485.52
054-151-043 $485.52
054-151-044 $898.20
054-151-047 $485.52
054-151-049 $485.52
054-151-059 $1,291.44
054-212-013 $485.52
054-212-014 $485.52
054-212-018 $485.52
054-212-019 $485.52
054-212-020 $485.52
054-212-023 $485.52
054-212-024 $971.04
054-212-025 $485.52
054-212-026 $971.04
054-212-027 $485.52
054-212-028 $485.52
054-212-029 $485.52
054-212-030 $485.52
054-221-008 $485.52
054-221-013 $485.52
054-221-014 $485.52
054-221-015 $485.52
054-241-002 $485.52
054-241-027 $485.52
056-031-029 $485.52
056-031-041 $485.52
056-031-042 $485.52
056-031-043 $485.52
056-031-044 $971.04
056-031-046 $898.20
056-031-047 $485.52
056-031-048 $485.52
056-031-049 $2,913.12
056-031-056 $1,942.08
056-031-060 $2,408.16
056-031-062 $3,884.16
056-031-063 $1,456.56
056-031-064 $485.52
056-031-065 $971.04
056-031-066 $485.52
056-031-067 $485.52
056-041-014 $485.52
056-041-017 $485.52
056-041-023 $485.52
056-041-025 $485.52
056-041-026 $485.52
056-041-029 $1,165.20
056-041-030 $2,427.60
056-041-032 $1,942.08
056-041-033 $485.52
056-041-036 $485.52
056-041-037 $485.52
056-041-038 $485.52
056-041-039 $485.52
056-041-040 $485.52
056-041-041 $485.52
056-041-042 $485.52
056-041-043 $3,884.16
056-041-044 $485.52
056-041-045 $7,282.80
056-041-046 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 72 of 220
Atascadero Sewer Charges 2022/2023
056-041-047 $3,884.16
056-041-048 $485.52
056-051-014 $485.52
056-051-021 $1,456.56
056-051-023 $3,762.84
056-051-024 $485.52
056-051-027 $485.52
056-051-028 $485.52
056-051-029 $1,820.76
056-051-030 $6,894.36
056-051-033 $971.04
056-051-034 $485.52
056-051-037 $485.52
056-051-038 $485.52
056-051-039 $971.04
056-051-043 $485.52
056-051-045 $485.52
056-051-046 $1,456.56
056-051-047 $1,942.08
056-051-048 $1,942.08
056-051-051 $485.52
056-051-053 $485.52
056-051-054 $485.52
056-051-055 $485.52
056-051-056 $485.52
056-051-057 $485.52
056-051-058 $485.52
056-051-059 $485.52
056-061-019 $971.04
056-061-020 $485.52
056-061-022 $485.52
056-061-023 $485.52
056-061-024 $485.52
056-061-027 $485.52
056-061-028 $3,641.40
056-061-029 $485.52
056-061-030 $485.52
056-061-031 $485.52
056-071-006 $18,741.12
056-071-011 $2,427.60
056-071-013 $485.52
056-071-014 $971.04
056-071-015 $485.52
056-071-017 $2,913.12
056-081-007 $485.52
056-081-013 $971.04
056-081-019 $971.04
056-081-029 $3,641.40
056-081-030 $971.04
056-081-031 $1,942.08
056-081-036 $4,855.20
056-091-009 $971.04
056-091-026 $485.52
056-091-028 $485.52
056-091-030 $485.52
056-091-031 $485.52
056-091-036 $485.52
056-091-037 $485.52
056-091-038 $485.52
056-091-039 $485.52
056-091-040 $485.52
056-091-041 $485.52
056-091-042 $485.52
056-091-043 $485.52
056-091-044 $485.52
056-091-045 $485.52
056-091-046 $485.52
056-091-048 $485.52
056-091-052 $485.52
056-091-053 $485.52
056-111-019 $485.52
056-111-020 $485.52
056-111-023 $485.52
056-111-024 $485.52
056-111-028 $485.52
056-111-029 $485.52
056-111-030 $485.52
056-111-032 $485.52
056-111-033 $485.52
056-111-034 $485.52
056-111-035 $485.52
056-111-036 $485.52
056-111-037 $485.52
056-111-038 $485.52
056-111-039 $485.52
056-111-040 $485.52
056-111-041 $485.52
056-111-042 $485.52
056-111-043 $485.52
056-111-044 $485.52
056-111-045 $485.52
056-111-046 $485.52
056-111-047 $485.52
056-111-048 $485.52
056-111-049 $485.52
056-111-050 $485.52
056-111-051 $485.52
056-111-052 $485.52
056-111-053 $485.52
056-121-007 $971.04
056-121-010 $485.52
056-121-014 $485.52
056-121-017 $485.52
056-121-018 $485.52
056-121-019 $485.52
056-121-021 $485.52
056-121-023 $485.52
056-121-024 $485.52
056-121-025 $485.52
056-121-028 $485.52
056-121-029 $485.52
056-121-030 $485.52
056-121-031 $485.52
056-121-032 $485.52
056-121-033 $485.52
056-121-034 $485.52
056-121-035 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 73 of 220
Atascadero Sewer Charges 2022/2023
056-121-036 $485.52
056-121-037 $485.52
056-121-038 $485.52
056-121-039 $485.52
056-131-012 $485.52
056-131-013 $485.52
056-131-014 $485.52
056-131-015 $971.04
056-131-021 $3,884.16
056-131-023 $6,229.20
056-131-024 $12,817.68
056-131-034 $485.52
056-131-035 $485.52
056-131-036 $485.52
056-131-037 $485.52
056-131-038 $485.52
056-131-039 $485.52
056-131-040 $485.52
056-131-041 $485.52
056-131-042 $485.52
056-131-043 $485.52
056-131-044 $485.52
056-131-045 $485.52
056-131-046 $485.52
056-131-047 $485.52
056-131-066 $485.52
056-131-067 $485.52
056-131-068 $485.52
056-131-069 $485.52
056-131-070 $485.52
056-131-071 $485.52
056-131-072 $485.52
056-131-073 $485.52
056-131-074 $485.52
056-131-075 $485.52
056-131-076 $485.52
056-131-077 $485.52
056-131-078 $485.52
056-131-079 $485.52
056-131-080 $485.52
056-131-081 $485.52
056-131-082 $485.52
056-131-083 $485.52
056-141-008 $485.52
056-141-009 $485.52
056-141-011 $485.52
056-141-012 $485.52
056-141-016 $485.52
056-141-017 $485.52
056-141-018 $3,189.84
056-141-019 $485.52
056-141-020 $485.52
056-141-021 $485.52
056-151-005 $485.52
056-151-007 $485.52
056-151-015 $971.04
056-151-017 $485.52
056-151-018 $485.52
056-151-020 $485.52
056-151-025 $485.52
056-151-026 $485.52
056-151-027 $485.52
056-151-028 $485.52
056-151-029 $485.52
056-151-030 $485.52
056-151-031 $485.52
056-151-032 $485.52
056-151-034 $485.52
056-151-036 $485.52
056-151-037 $485.52
056-151-038 $485.52
056-151-039 $485.52
056-151-040 $485.52
056-151-042 $485.52
056-151-043 $971.04
056-151-044 $485.52
056-151-045 $485.52
056-151-046 $485.52
056-162-001 $485.52
056-162-002 $485.52
056-162-005 $485.52
056-162-006 $485.52
056-162-007 $485.52
056-162-009 $485.52
056-162-010 $485.52
056-162-011 $485.52
056-162-012 $485.52
056-162-013 $485.52
056-162-014 $485.52
056-162-015 $485.52
056-162-016 $485.52
056-162-032 $485.52
056-162-033 $485.52
056-162-034 $485.52
056-162-041 $485.52
056-162-042 $485.52
056-162-043 $485.52
056-162-044 $485.52
056-162-045 $485.52
056-162-049 $971.04
056-162-050 $485.52
056-171-009 $485.52
056-171-015 $485.52
056-171-016 $485.52
056-171-020 $485.52
056-171-021 $485.52
056-171-022 $485.52
056-171-025 $485.52
056-171-026 $485.52
056-171-028 $485.52
056-171-029 $485.52
056-171-031 $485.52
056-171-032 $485.52
056-171-036 $485.52
056-171-039 $485.52
056-171-040 $485.52
056-171-041 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 74 of 220
Atascadero Sewer Charges 2022/2023
056-171-044 $485.52
056-171-045 $485.52
056-171-046 $485.52
056-171-047 $485.52
056-171-048 $485.52
056-171-049 $485.52
056-171-050 $485.52
056-181-012 $485.52
056-181-014 $485.52
056-181-015 $485.52
056-181-016 $485.52
056-181-031 $485.52
056-181-032 $485.52
056-181-033 $485.52
056-181-034 $485.52
056-181-035 $485.52
056-181-036 $485.52
056-181-037 $485.52
056-181-038 $485.52
056-181-041 $485.52
056-181-045 $485.52
056-181-046 $485.52
056-181-047 $485.52
056-181-048 $485.52
056-181-049 $485.52
056-181-050 $485.52
056-181-051 $485.52
056-181-052 $485.52
056-181-053 $485.52
056-181-054 $485.52
056-181-055 $485.52
056-181-056 $485.52
056-181-057 $485.52
056-181-058 $485.52
056-181-059 $485.52
056-181-060 $485.52
056-181-061 $485.52
056-181-062 $485.52
056-181-063 $485.52
056-181-064 $485.52
056-181-065 $485.52
056-181-066 $485.52
056-181-067 $485.52
056-181-069 $485.52
056-181-070 $485.52
056-181-072 $485.52
056-181-074 $485.52
056-182-001 $485.52
056-182-002 $485.52
056-182-003 $485.52
056-182-004 $485.52
056-182-005 $485.52
056-182-007 $485.52
056-182-008 $849.72
056-182-010 $485.52
056-182-011 $485.52
056-182-012 $485.52
056-182-013 $485.52
056-182-014 $485.52
056-182-015 $485.52
056-182-016 $485.52
056-182-017 $485.52
056-182-018 $485.52
056-182-019 $971.04
056-182-020 $485.52
056-182-022 $485.52
056-191-019 $485.52
056-191-020 $485.52
056-191-022 $485.52
056-191-023 $485.52
056-191-024 $485.52
056-191-025 $485.52
056-191-026 $485.52
056-191-027 $485.52
056-191-028 $485.52
056-191-029 $485.52
056-191-030 $485.52
056-191-032 $485.52
056-191-033 $485.52
056-191-034 $485.52
056-191-035 $485.52
056-191-036 $849.72
056-191-037 $485.52
056-191-038 $485.52
056-201-003 $485.52
056-201-010 $485.52
056-201-012 $485.52
056-201-015 $485.52
056-201-016 $485.52
056-201-018 $485.52
056-201-021 $485.52
056-201-024 $485.52
056-201-026 $971.04
056-201-027 $485.52
056-201-028 $971.04
056-201-029 $485.52
056-201-030 $485.52
056-201-031 $485.52
056-201-032 $485.52
056-201-033 $485.52
056-201-034 $485.52
056-201-035 $485.52
056-201-036 $485.52
056-201-037 $485.52
056-201-040 $485.52
056-211-008 $485.52
056-211-009 $485.52
056-211-010 $485.52
056-211-026 $485.52
056-211-031 $485.52
056-211-033 $971.04
056-211-034 $971.04
056-211-035 $485.52
056-211-036 $485.52
056-211-038 $485.52
056-211-039 $485.52
056-211-040 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 75 of 220
Atascadero Sewer Charges 2022/2023
056-211-041 $485.52
056-211-047 $485.52
056-211-048 $485.52
056-221-006 $485.52
056-221-009 $485.52
056-221-012 $485.52
056-221-015 $485.52
056-221-021 $485.52
056-221-022 $485.52
056-221-023 $485.52
056-221-025 $485.52
056-221-027 $485.52
056-221-029 $485.52
056-221-030 $485.52
056-221-035 $485.52
056-221-036 $485.52
056-231-007 $485.52
056-231-008 $485.52
056-231-010 $485.52
056-231-011 $485.52
056-231-012 $485.52
056-231-013 $485.52
056-231-014 $485.52
056-231-015 $485.52
056-231-016 $485.52
056-231-017 $485.52
056-231-018 $485.52
056-231-021 $971.04
056-231-022 $485.52
056-231-023 $582.60
056-241-003 $485.52
056-241-007 $485.52
056-241-009 $485.52
056-241-010 $485.52
056-241-011 $485.52
056-241-012 $485.52
056-241-013 $485.52
056-241-015 $485.52
056-241-016 $485.52
056-241-017 $485.52
056-241-018 $485.52
056-242-008 $485.52
056-242-009 $485.52
056-242-010 $485.52
056-242-011 $485.52
056-242-012 $485.52
056-242-016 $971.04
056-251-008 $485.52
056-251-010 $485.52
056-251-011 $485.52
056-251-012 $485.52
056-251-013 $485.52
056-251-017 $485.52
056-251-018 $485.52
056-251-019 $485.52
056-251-020 $485.52
056-251-021 $485.52
056-251-022 $485.52
056-251-023 $485.52
056-251-024 $485.52
056-251-025 $485.52
056-251-026 $485.52
056-251-027 $485.52
056-251-028 $485.52
056-251-029 $485.52
056-251-030 $485.52
056-251-031 $485.52
056-251-033 $485.52
056-251-034 $485.52
056-251-035 $485.52
056-251-036 $485.52
056-251-037 $485.52
056-261-019 $485.52
056-261-021 $485.52
056-261-025 $485.52
056-261-026 $485.52
056-261-047 $485.52
056-261-051 $485.52
056-261-055 $485.52
056-261-057 $485.52
056-261-059 $679.68
056-261-062 $485.52
056-261-063 $485.52
056-261-064 $485.52
056-261-065 $485.52
056-261-066 $485.52
056-261-072 $485.52
056-261-073 $485.52
056-261-074 $485.52
056-261-075 $485.52
056-261-076 $485.52
056-261-077 $485.52
056-261-080 $485.52
056-261-081 $485.52
056-261-082 $485.52
056-261-083 $485.52
056-261-084 $485.52
056-261-085 $485.52
056-261-086 $485.52
056-261-087 $485.52
056-261-088 $485.52
056-261-089 $485.52
056-262-001 $971.04
056-262-002 $485.52
056-262-003 $485.52
056-262-004 $485.52
056-262-010 $485.52
056-262-012 $485.52
056-262-013 $485.52
056-262-014 $485.52
056-262-017 $485.52
056-262-018 $485.52
056-262-019 $485.52
056-262-020 $485.52
056-262-021 $485.52
056-262-022 $485.52
056-271-020 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 76 of 220
Atascadero Sewer Charges 2022/2023
056-271-030 $485.52
056-271-032 $485.52
056-271-041 $485.52
056-271-042 $485.52
056-281-006 $485.52
056-281-010 $485.52
056-281-011 $485.52
056-281-014 $485.52
056-281-015 $485.52
056-281-016 $485.52
056-281-017 $485.52
056-281-027 $485.52
056-281-028 $485.52
056-281-029 $485.52
056-291-001 $485.52
056-291-003 $485.52
056-291-004 $485.52
056-291-007 $485.52
056-291-008 $485.52
056-291-009 $485.52
056-291-010 $485.52
056-301-003 $971.04
056-301-010 $485.52
056-301-011 $485.52
056-301-024 $485.52
056-301-032 $485.52
056-301-033 $1,019.64
056-301-037 $485.52
056-301-038 $485.52
056-301-039 $19,857.72
056-301-041 $485.52
056-301-042 $485.52
056-311-001 $485.52
056-311-002 $485.52
056-311-006 $485.52
056-311-007 $485.52
056-311-010 $485.52
056-311-012 $485.52
056-311-013 $485.52
056-312-003 $485.52
056-312-004 $485.52
056-312-006 $485.52
056-312-007 $485.52
056-312-008 $485.52
056-312-026 $485.52
056-312-027 $485.52
056-312-028 $485.52
056-312-029 $1,869.24
056-312-030 $485.52
056-312-031 $485.52
056-312-032 $485.52
056-312-035 $485.52
056-312-037 $485.52
056-312-038 $485.52
056-321-005 $1,019.64
056-321-006 $485.52
056-321-007 $485.52
056-321-008 $485.52
056-321-010 $485.52
056-321-012 $485.52
056-321-014 $485.52
056-321-015 $485.52
056-321-017 $485.52
056-321-020 $485.52
056-321-021 $485.52
056-322-001 $485.52
056-322-006 $485.52
056-322-007 $485.52
056-322-010 $485.52
056-322-011 $485.52
056-322-016 $485.52
056-322-019 $485.52
056-322-020 $485.52
056-322-021 $485.52
056-322-024 $485.52
056-322-026 $485.52
056-322-027 $485.52
056-322-028 $485.52
056-322-029 $485.52
056-322-032 $485.52
056-351-019 $485.52
056-351-035 $485.52
056-351-056 $485.52
056-351-057 $485.52
056-351-058 $485.52
056-351-059 $485.52
056-351-060 $485.52
056-381-001 $291.36
056-381-002 $291.36
056-381-003 $291.36
056-381-004 $291.36
056-381-005 $291.36
056-381-006 $291.36
056-381-007 $291.36
056-381-010 $291.36
056-381-011 $291.36
056-381-012 $291.36
056-381-013 $291.36
056-381-014 $291.36
056-381-015 $291.36
056-381-016 $291.36
056-381-017 $291.36
056-381-018 $291.36
056-381-019 $291.36
056-381-020 $291.36
056-381-021 $291.36
056-381-022 $291.36
056-381-023 $291.36
056-381-024 $291.36
056-381-025 $291.36
056-381-026 $291.36
056-381-027 $291.36
056-381-028 $291.36
056-381-029 $291.36
056-382-002 $291.36
056-382-003 $291.36
056-382-004 $291.36
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 77 of 220
Atascadero Sewer Charges 2022/2023
056-382-005 $291.36
056-382-006 $291.36
056-382-007 $291.36
056-382-008 $291.36
056-382-009 $291.36
056-382-010 $291.36
056-382-013 $291.36
056-382-014 $291.36
056-382-015 $291.36
056-382-016 $291.36
056-382-017 $291.36
056-382-018 $291.36
056-382-019 $291.36
056-382-020 $291.36
056-382-021 $291.36
056-382-022 $291.36
056-382-023 $291.36
056-382-024 $291.36
056-382-025 $291.36
056-382-026 $291.36
056-382-027 $291.36
056-382-028 $291.36
056-382-029 $291.36
056-382-030 $291.36
056-382-031 $291.36
056-383-012 $291.36
056-383-013 $291.36
056-383-014 $291.36
056-383-015 $291.36
056-383-016 $291.36
056-383-017 $291.36
056-383-018 $291.36
056-383-019 $3,641.40
056-383-020 $485.52
056-383-022 $971.04
056-383-024 $291.36
056-383-025 $291.36
056-383-026 $291.36
056-383-027 $291.36
056-383-028 $291.36
056-383-029 $291.36
056-383-030 $291.36
056-383-031 $291.36
056-383-032 $291.36
056-383-033 $291.36
056-383-034 $291.36
056-383-035 $291.36
056-383-036 $291.36
056-383-037 $291.36
056-383-039 $485.52
056-383-040 $485.52
056-383-041 $485.52
056-383-042 $485.52
056-384-001 $485.52
056-384-002 $485.52
056-384-003 $485.52
056-384-004 $485.52
056-384-005 $485.52
056-384-006 $485.52
056-384-007 $485.52
056-384-008 $485.52
056-384-009 $485.52
056-384-010 $485.52
056-384-011 $485.52
056-384-012 $485.52
056-384-013 $485.52
056-384-014 $485.52
056-384-015 $485.52
056-384-016 $485.52
056-384-017 $485.52
056-384-018 $485.52
056-384-019 $485.52
056-384-020 $485.52
056-384-021 $485.52
056-384-022 $485.52
056-384-023 $485.52
056-384-024 $485.52
056-384-025 $485.52
056-384-026 $485.52
056-384-027 $485.52
056-384-028 $485.52
056-384-029 $485.52
056-384-030 $485.52
056-384-031 $485.52
056-384-032 $485.52
ITEM NUMBER: B-1
DATE: 06/28/22
ATTACHMENT: 1A
Page 78 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
Atascadero City Council
Staff Report – Community Development Department
Del Rio Marketplace
(AMND19-0063)
RECOMMENDATION:
Planning Commission Recommends:
City Council Adopt Draft Resolution approving a Conditional Use Permit Amendment,
Tentative Parcel Map (AT22-0011), and EIR Addendum for the Del Rio Marketplace,
subject to findings and conditions of approval.
DISCUSSION:
Background
The Del Rio Area Specific Plan was adopted in 2012 and amended in 2020. The original
plan envisioned the North-End development site as a commercial retail center. The City
initiated an amendment in 2020 to modify traffic mitigation based on the formal withdrawal
of Walmart permits. During that amendment, the list of allowed and conditionally allowed
uses was modified to provide flexibility in land uses and expand light-industrial and
business park uses while eliminating fuel stations, drive-through restaurants, and related
high traffic generating uses.
The site was marketed to
regional tech and
manufacturing companies in
addition to office and grocery
anchors. A local grocery store
has currently signed on to
anchor the site.
Project Site
Page 79 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
The Planning Commission reviewed the project on June 7, 2022 and recommended
approval of the project. The Planning Commission recommended the following
modifications to the project conditions and these recommendations have been included
in the attached resolution:
1. Modification to conditions for 3 story buildings to require a minimum of 16-feet to
the 2nd floor height to allow for a potential 15-foot ceiling for the first floor.
This clarifies condition #29 to ensure that finished ceiling heights in ground floor
spaces are flexible but allow for users that need a full 15-foot space height. A 15-
foot space height allows for uses such as small-scale breweries, coffee roasters,
bakeries, and uses that involve artisan manufacturing or uses with distribution
components.
2. Code exception to allow for the multi-tenant signage as proposed up to 20-feet in
height to the top of the decorative roof feature. (Condition #30)
Center signage that can accommodate additional tenants can eliminate banners
and flag signs which can improve overall center aesthetics however, larger signage
can also have greater impacts on surrounding areas and can be less legible.
Staff has also added the following conditions to the attached resolution for clarity:
• Condition #11: Requiring annexation into the Community Facilities District for
parcels containing residential uses.
• Condition #33: Specifying landscaping species that maximize safety along the
north and east property lines.
Project Summary
The project site is approximately 11.1 acres. A majority of the project site is within the Del
Rio Road Commercial Area Specific Plan (Specific Plan) with the most northern parcel
resting outside the formal Specific plan boundary. The project includes a tentative parcel
map to modify the existing lot lines to accommodate building construction based on the
current plan.
The applicant is proposing a mixed-use commercial center that includes retail, office,
light-industrial, and residential opportunities. The current proposal includes a 32,400
square-foot grocery anchor tenant with 31,700 square-feet of ancillary retail/commercial
uses, 18,600 square-feet of light-industrial space, and 31,500 square-feet of ground floor
office space with options for second and third floor office or residential uses. Should the
upper floors of the office buildings develop as residential, there could be up to an
estimated 92 units. The applicant will be able to decide at time of building permit submittal
what mix of uses the buildings will contain.
Page 80 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
The project approval will establish a Master Plan of Development for the site and provide
a “worst case” scenario traffic analysis to determine required mitigation, consistent with
the Del Rio Road Commercial Area Specific Plan EIR. Per the adopted Specific Plan, the
Master Plan of Development must be approved by City Council.
ANALYSIS:
Use Standards:
The project site is located in the Commercial Retail zoning district with a Specific Plan
Overlay. The Specific Plan refines the list of allowed and conditionally allowed uses to
expand business and light-industrial type uses and restrict drive-through and other high
traffic generating uses. Where silent, all other uses of the underlying zoning district are
allowed.
Mixed-use development is allowed in the CR zoning district with the approval of a
conditional use permit. The proposed plan envisions 3-story buildings at the northern and
south-eastern buildings of the site, above intended light-industrial and office uses (Office
and Exchange buildings). The second and third floor will be designed to either
accommodate expanded office uses or residential units depending on demand. Per
conditions of approval, a maximum of 92 units would be permitted on the site as the base
density.
Site Design:
Page 81 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
The site concept includes an angled design to activate the corner of Del Rio Road and El
Camino Real and to provide sight lines from the intersection into the center. A plaza space
is included at the corner of the site to allow for outdoor oriented uses and to create visual
interest. The Northern portion of the site is envisioned for office and light industrial uses
to create a consolidated business park component. It is important to note that the most
northern parcel included in the development plan is outside the specific plan area, but is
under the same ownership as the adjacent parcels and is included in the overall site
design to provide shared parking and access. This parcel is zoned Commercial Retail
and allows similar land uses as the Specific Plan. The Specific Plan required shared
access to this parcel, which this design accommodates. Parking, access, and drainage
easements will be required to ensure continued functionality of the center as one
development.
The main entrance to the site is provided by a vehicular driveway from El Camino Real.
This driveway is limited to right-in, right-out only to limit traffic conflicts on El Camino Real.
One other driveway located along the El Camino frontage will align with the Home 2 Suites
driveway allowing vehicles to turn both directions while exiting. An additional driveway is
located on Del Rio Road and is envisioned to align with the proposed main commercial
driveway for the Del Rio Ranch project to the south. Road and frontage improvements
will be consistent with the adopted City traffic concept plans with modifications as needed
to accommodate site design specifics and projected traffic needs.
The proposed office buildings with potential for second and third floor residential units
have been sited toward the eastern and northern edges of the property to provide a
transition between the commercial uses and the existing adjacent single-family uses, thus
enhancing neighborhood compatibility. The plan has incorporated a sound wall along
portions of the eastern property line per the standards of the Specific Plan.
The grocery anchor is sited at an angle to provide for a unique site design and enhanced
sight line into the center from the Del Rio Road / El Camino real intersection. At the closest
point to the rear property line, the grocery building will be 45-feet from the adjacent
residential property. The rear loading area for the market faces the new residential
development under the same ownership as this property. In some locations, the grocery
building pad is at a lower elevation than the surrounding residential parcels, further
reducing the visual impact of the building.
Page 82 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
There are no required front and side yard setbacks for the commercial development, there
is, however a required 10-foot rear setback along the eastern property line adjacent to
the residential neighborhood. The proposed project provides a minimum 22-foot setback
from the northern side property line (22-feet to the exchange 1 building and 80-feet to the
3-story mixed-use building) and a minimum 45-feet from the rear property line.
Landscaping and Related Site Improvements
Landscaping is included along all development edges and throughout the parking lot.
Landscape screening is provided along the eastern edge adjacent to the existing
residential properties to support neighborhood compatibility. The northern property is
outside of the formal Specific Plan boundary; however, attention has been given to the
interface between the development and adjacent residential properties. The proposed
office / mixed-use building is setback approximately 80-feet from the northern property
line adjacent to the residential neighborhood. There is a parking area with landscape
between the building and property boundary. The property directly to the north is a flag
lot consisting of a driveway to a single-family residence, providing an additional buffer to
the housing development farther north. Ample room for trees and dense shrubs is
provided with a solid wall or fence proposed as required by code. A condition has been
added to provide dense evergreen landscaping at the project edges to the greatest extent
feasible.
The El Camino frontage has been reserved for drainage improvements which will also
allow ample landscaping and accentuation of the streetscape. Basins will be
approximately 4-feet deep and landscaped with native grasses and trees along the banks.
Basins are conditioned to be unfenced. A basin is also included at the north-eastern
portion of the site. This basin accommodates drainage requirements for the adjacent
residential development and will have a solid fence along the commercial development
Page 83 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
boundary to allow for transparent fencing from the residential side. This basin is
maintained by the adjacent residential development and an easement has been recorded
to ensure continued maintenance and access.
Trash enclosures are placed throughout the site providing accessible locations for all
tenants. Enclosures are designed to accommodate organics and recycling. At the
recommendation of the DRC, trash enclosures were relocated away from the pedestrian
connection to the single-family neighborhood to the east creating a more inviting
connection and allow for an expanded pathway that more directly connects to the Valley
Fresh plaza space. Plaza spaces are included adjacent to the retail buildings to provide
outdoor use opportunities and specifically cater to restaurants, coffee shops, micro-
breweries, and similar uses. A condition has been included to ensure that these spaces
include decorative pavement to highlight these areas.
Architecture:
The Del Rio Commercial Area Specific Plan includes architectural design standards for
properties with the Specific Plan area that focus on contemporary Agrarian themes.
Agrarian design themes blend modern materials with agricultural based building forms to
create a modern rustic architecture. This theme allows for a variety of building features
and roof forms creating cohesiveness throughout the area while allowing for unique
design features and tenant identity.
The proposed elevations for the grocery store include vertical wood-look siding, board
and batten elements, metal roofing, and metal awnings, consistent with an agrarian
theme. Black storefront window and door systems are proposed facing the parking lot
and adjacent plaza spaces. The main building is 35-feet in height with architectural tower
and roofline features reaching 45-feet in height, as allowed by the Specific Plan. other
Page 84 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
buildings are still conceptual in nature to allow for changes based on tenant needs but
include similar elements such as metal siding, exposed rafter tails, and metal trellises and
awnings. A condition is included to require that these buildings incorporate complimentary
agrarian design elements as proposed and as consistent with the Specific Plan.
Signage
The Del Rio Road Commercial Area Specific Plan includes a sign program for
development within the Specific Plan boundaries. The plan allows for wall mounted
signage in addition to awning and projecting signs for each tenant space. The maximum
area permitted for wall signs is 1 square-foot per linear foot of tenant building frontage
and must be proportional to the building in terms of letter size and location. Valley Fresh
is the only tenant identified at this time. The tenant space includes one larger main sign
above the building’s main entrance areas and 2 smaller signs above awnings to the side
(“deli” and “bakery”). The main Valley Fresh sign is comprised of internally illuminated
channel letters, consistent with the Specific Plan sign program. The Valley Fresh tenant
space is 216-feet in length allowing for up to a 216 square-foot sign. The proposed sign
is 214 square-feet, within the requirements of the Specific Plan. The building is located
Page 85 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
toward the rear of the site, necessitating a larger sign for visibility. The sign location and
size are proportional and compatible with the building architecture.
The project also proposes a center
identification sign located at the
intersection of El Camino Real and Del
Rio Road. The sign is envisioned to be
individual letters mounted on an entry
trellis feature above the corner plaza. A
condition has been added that this sign
be backlit or externally illuminated to
minimize glare from internally
illuminated letters and enhance the
sense of place at the corner.
Center entry signs are also proposed at each project driveway entrance allowing for
signage for each tenant along the project frontages to increase visibility. The signs include
a decorative rock veneer base, wood, and steel
elements consistent with the center architecture.
The sign design allows for 15 tenants with varying
degrees of prominence. The total sigh height is
proposed to be 20-feet from the ground level to the
top of the architectural roof feature.
The Atascadero Municipal code allows multi-
tenant free standing signs for commercial centers.
The code allows for a maximum of 1 multi-tenant
sign per property with a maximum height of 12-
feet and a maximum total signage area of 100
square-feet. The sign as proposed would require
approval of a code exception. Planning
Page 86 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
Commission is recommending that the multi-tenant sign be approved as proposed with a
height of 20-feet from the ground level to the top of the architectural roof feature. A
condition is also included to ensure that the monument sign at the north El Camino Real
driveway be redesigned as a center identification sign with reduced tenant signage and
a maximum height of 8-feet. This will allow driveway identification for trucks and patrons
and limit confusion with nearby adjacent residential driveways but will be smaller in scale.
Residential Density
The project site is zoned Commercial Retail with the northerly parcel outside of the
Specific Plan. The Specific Plan allows for all uses listed in the City’s CR zoning district
(with some restrictions for high traffic generating uses) and therefore, allows for
residential uses on the upper floors of commercial and office buildings. The applicant
does not have office tenants lined up for the proposed buildings yet and wants to remain
flexible to allow second and third floor office space as needed. However, if an office user
is not found for the upper floors, the applicant is proposing to include residential units in
these locations. The project area is 11.1 acres allowing a maximum density of up to 266
residential units on the project site. The applicant envisions a maximum of 92 units in the
areas designated for mixed-use, far below the maximum allowable base density. The
project is conditioned with a cap on the number of allowable base units consistent with
the updated traffic analysis.
The project conditions also include requirements for minimum ground floor height to
ensure that the ground floor remains viable for a variety of commercial uses. The condition
specifies a minimum second floor height of 16-feet to allow for a 15-foot ground floor
space height. This height will ensure availability of these spaces for envisioned light
industrial and artisan manufacturing spaces.
With a 16-foot minimum required dimension to the second floor, the third floor will likely
be at 27-feet, meeting height requirements for occupied space at a maximum of 35-feet.
Unoccupied space including varied roof forms can, per the standards of the Specific Plan,
extend to 45-feet in height providing opportunities for added 3rd floor ceiling height and
aesthetic variation.
Parking
A total of 580 parking spaces are provided throughout the project site. Based on the
proposed probable uses for the site, a total of 540 spaces are required by the Atascadero
Municipal Code. Additional spaces have been provided to ensure maximum flexibility for
future tenants. Parking has been located throughout the site to allow for each building to
have adjacent parking areas. Parking lot landscaping has been provided throughout and
parking areas have been designed to allow for roll-up doors on the exchange buildings
should future tenants need direct truck access.
Page 87 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
Tentative Parcel Map
The proposed project includes consideration of a Tentative Parcel Map. The existing
property contains 6 legal lots of record. The existing property lines will conflict with
proposed structures. The tentative map will reconfigure the lot lines to avoid structure
conflicts and create an additional parcel. This will allow for increased financing
opportunities as well as streamlined lease agreements. The project has been conditioned
to provide easements for shared access, parking, and drainage facility maintenance.
Agreements will also be required to be recorded against each parcel notifying any
residential tenant of the commercial nature of the site to ensure that commercial activities
are prioritized.
Specific Plan Compliance
All master plans of development are required to be consistent with the Del Rio Road
Commercial Area Specific Plan. The Specific Plan policies ensure cohesive development
throughout the Specific Plan area in addition to incorporating standards related to
neighborhood compatibility. Although the northerly parcel is outside of the Specific Plan,
the applicant intends to follow the specific plan design standards for this portion of the
project.
The Specific Plan requires buildings to be articulated on all elevations and use materials
and colors compatible with the Specific Plan design theme. The design should include at
least two main materials and one accent material. Appropriate materials include block,
stucco, wood, concrete, and/or decorative veneer. Large, unarticulated elevations are
prohibited. The proposed architecture for the Del Rio Marketplace is consistent with the
design standards listed in the Specific Plan.
The Specific Plan requires internal connectivity to the adjacent commercial parcel to the
North. As this northern parcel is part of the proposed development, the required internal
access connection has been achieved and thus, the project is consistent with this
requirement.
The Specific Plan requires sound walls along the eastern property edge to mitigate noise
from commercial loading areas. The original site development plan had large buildings
adjacent and parallel to the eastern property line with loading docks for multiple retail
stores. The new design minimizes commercial loading in this area and buildings have
been setback from the property line to reduce noise impacts. The grocery store is also
designed at an angle with the rear of the building facing the residential development under
the same ownership as this project. Staff has added a condition that the sound walls be
consistent with the Specific Plan (along the eastern project edge) and that a noise
analysis be provided to determine which property lines require a solid block wall for sound
mitigation.
Page 88 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
Traffic
An updated 2022 Traffic Analysis (attached with the EIR addendum) has been completed
by Central Coast Transportation Consulting (CCTC) to determine how the new land use
plan will impact existing and future traffic. The analysis determined that impacts are
similar or less than those listed with the 2020 Specific Plan update with revised mitigation
measures that add capacity to the El Camino Real / Del Rio intersection.
Traffic mitigation for previous versions of the Project included a dedicated right turn lane
onto Northbound US 101 and signal timing modifications to reduce queuing at the
overpass. The updated 2022 traffic analysis for the revised project concluded that
improvements identified at US101 in the previous EIR mitigation monitoring program are
not required until the area reaches full (cumulative) build-out. Full build-out includes the
development of the proposed project, Del Rio Ranch, approved projects including the
drive-thru restaurant, gas station/convenience store, and nearby multi-family
developments, and all residential and commercial properties that are currently identified
in the General Plan. Revised mitigation measures are instead proposed that will increase
the capacity of the El Camino Real / Del Rio corridor, delaying the need for the dedicated
right turn lane onto NB 101.
The revised mitigation includes modified improvements to the intersection of El Camino
Real and Del Rio Road including the addition of one eastbound dedicated right turn from
Del Rio Road to southbound El Camino Real for total of 3 lanes, and one dedicated
westbound left turn lane from Del Rio Road to El Camino Real. This 3-lane configuration
for the eastbound Del Rio Road approach to El Camino and dedicated left-turn lane on
the westbound Del Rio Road approach to El Camino were not part of the initial mitigation
measures on the Del Rio Specific Plan Update. These improvements, coupled with traffic
signal operational modifications, adds queuing storage and provides intersection
efficiencies to the Del Rio Road/El Camino Real intersection and minimizes impacts to
the 101 Interchange. Updates to Mitigation Measures related to signal timing have been
also been updated to respond to the new intersection lane configuration and interchange
improvement trigger.
*per mitigation
this will be a
dedicated right
turn lane
Page 89 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
While the 2022 Traffic Analysis shows that the dedicated right turn lane onto US101
northbound is not required for the existing plus approved plus proposed development
scenario, a sensitivity analysis to determine the precise number of peak hour trips that
trigger the need for the interchange improvements has not been performed however,
analysis was completed that considers all planned development in the area.
Staff has updated the traffic mitigation measures to be consistent with the 2022 Traffic
Analysis. In addition, staff recently (post Planning Commission) modified the applicable
mitigation measure to include a trigger for a revised traffic analysis of 1,000 total pm peak
hour trips, which are the estimated trips for the existing plus approved plus proposed
project development. The condition would require verification of pm peak hour trips prior
to issuance of each building permit for the proposed project and other development within
the Del Rio Road Commercial Area Specific Plan. This condition was added to ensure
that stalled or phased developments do not hinder development of surrounding properties
and that the 101 interchange improvements are constructed when traffic exceeds the safe
capacity of the interchange.
With this project anticipated to move forward into the construction phase by the end of
the year, the project conditions require the applicant to provide a fair share payment
toward the freeway on-ramp improvements and any signal timing modifications.
The project developer will be required to construct all frontage improvements (curb,
gutter, sidewalk and road widening) and improvements to the intersection of El Camino
Real and Del Rio Road to ensure proper lane alignment and configuration under the
increased capacity scenario. This will necessitate construction of the curb return and
relocation of the signal at the south-east intersection corner (on the Del Rio Ranch
property).
Neighborhood Concerns
Neighborhood concerns were brought up during and following the DRC and Planning
Commission hearings. Concerns include construction and operational noise, safety as it
relates to the interface between residential and commercial development, and solar
access related to any potential for new buildings to shade existing residential properties.
Since the Planning Commission hearing, staff has visited residential neighbors adjacent
to the site to discuss concerns. The project as designed meets all height and setback
standards required by the Del Rio Specific Plan. An error in noticing resulted in the
distribution of a notice to the neighborhood that included an outdated site plan identifying
a sound wall on the north property line. The Design package provided to Council and
attached to this report is the correct plan, which includes a privacy fence not a sound wall.
Noise
The Specific Plan includes a requirement for sound walls to be placed along the eastern
property line. This requirement was included for the original master plan that proposed
multiple loading docks for larger scale retail parallel to the eastern property line and facing
Page 90 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
the existing small-lot residential subdivision. No mitigation for sound walls was included
to the north as the Specific plan borders commercially zoned property to the north. The
current project includes that northern commercial property outside of the Specific Plan
boundary and integrates it into the overall master plan.
The applicant is required to update the acoustical analysis for the center to determine
where sound walls are required. The Atascadero Municipal Code does not require solid
block sound walls between residential and commercial development but does require a
solid fence. The proposed project has been designed with minimized loading dock area
and the loading area has been positioned at an angle facing a landscaped stormwater
basin. The northern portion of the project includes multi-story office and residential
buddings that will act as a barrier to buffer loading dock noise although some parking
areas surround these buildings and may allow for some sound leakage.
Noise generated from the office and residential portion is expected to meet Municipal
Code Standards however, there may be delivery truck noise associated with the
Exchange buildings based on tenants. The property directly to the North is and access
flag serving a single-family residential property adjacent to the newer Annex residential
development. The properties north of that are the existing Colony Homes development.
A wood fence is currently included at the rear yards of these properties. The Council could
consider heightened wall requirements for the project bordering the access flag. The
project is currently conditions to provide a solid sound wall in all locations shown
necessary by an acoustical analysis.
The Project also includes construction of multiple buildings over an estimated 3-5-year
timeframe. The entirety of the site will be graded with the first phase and pad will be left
vacant for future development. The applicant anticipates that the market, Retail 5, and
the Exchange buildings will be constructed as part of phase 1. The Atascadero Municipal
Code limits construction hours to 7am to 9pm. The Council may add a condition that limits
these hours further.
Safety
Neighbor concerns have been expressed related to the interface between the commercial
development and existing residential neighborhoods. With the opportunity for residential
uses to be added to the site, safety may be increased with 24-hour presence. The site
has also been designed to provide sight lines throughout the development to the greatest
extent possible. While the basin that serves the adjacent residential development at the
north-east corner of the site will have solid fencing on the commercial side, the adjacent
residential properties include transparent fencing to allow for increased visibility and
monitoring.
Solar Access
With multi-story buildings proposed, concerns related to solar access for existing solar
installations have been highlighted. The applicant has provided an animation that shows
Page 91 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
building shadowing on both the shortest day of the year in winter and the longest day of
the year in summer. In the winter months, there is some shading on properties to the
north during the morning hours. Based on known existing solar installations, it does not
appear that any existing solar will be affected, either during winter or summer months.
Project Sight Lines
Concerns were also expressed related to sight lines from upper stories to adjacent single-
family neighborhoods. The Exchange 1 building is setback 22-feet from the side property
line resulting in a 47-foot setback from the rear property line of the Colony Homes
Development. The Office 1 building is setback 80-feet from the side property line and
105-feet from the rear property line of the Colony Homes Development. The setback to
the rear property line of the eastern large lot single-family residential property is
approximately 80-feet. The Office 2 building is setback 87-feet from the adjacent
residential property line.
As these buildings could contain residential uses on the second and third floors, living
space windows may be located facing the existing single-family residential properties.
The narrow portion of the Exchange 1 building and the long elevation of the Office 1
building faces the rear yards of existing residential units. The Council may consider
limiting living space windows and balconies on the north side of the Exchange 1 building
on the upper floors. This elevation will likely house the stairs and could reasonably be
designed to limit sight lines to the existing residences.
Page 92 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
Proposed Office 1 building is set farther back from the property line and will have less
impact. The concept design for this building provides a courtyard space that will likely be
designed in a way that has second and third floor spaces that overlook the courtyard.
Council could condition that balconies be prohibited along these elevations. However,
limiting windows may impact the design and function of the building. Alternatively, or in
addition to, the Council could condition that any multi-story building requires DRC review
and approval prior to permit issuance to review specific design details when the buildings
are farther along in the design process.
Conclusion
The proposed project consists of a mixed-use development within the Commercial Retail
zoning district and within the Del Rio Road Commercial Area Specific Plan. The project
proposes a unique new concept by introducing a mix of retail, grocery, office, light-
industrial, and residential uses, consistent with the underlying zoning and the Specific
Plan. The project is located at a key commercial node and is part of a larger vision for the
north end of town.
ENVIRONMENTAL DETERMINATION:
The City of Atascadero prepared an Environmental Impact Report (EIR) for the Del Rio
Road Commercial Area Specific Plan in compliance with the California Environmental
Quality Act (CEQA). The City Council certified the Final Environmental Impact Report
(Final EIR) for the Del Rio Road Commercial Area Specific Plan at a public hearing on
June 26, 2012. The analysis in the Final EIR was at a “project” level of detail, which
anticipated the potential impacts of future approvals to implement the project.
In 2017, the City amended the Del Rio Specific Plan to accommodate the Hilton Hotel on
the western portion of the “Annex” site of the Del Rio Specific Plan to allow for a hotel
instead of retail development. That amendment recognized a reduction in vehicle trips
and associated environmental impacts. A four-story, 120-room hotel, north of Del Rio
Road, between Hwy 101 and El Camino Real has been recently completed as a result of
that amendment.
In 2017, Walmart notified the City that they would no longer be pursuing the development
of their Del Rio store in Atascadero. In 2019, development plans were officially withdrawn
and the site is being marketed for sale. On July 12th, 2020, the tentative parcel map and
associated Master Plan of Development for the project expired. In 2020 amendments to
the Specific Plan were adopted modifying the list of allowed uses on the site, including
the removal of high traffic generating uses, and mitigation measures were modified to
recognize the reduction in trips and traffic impacts through an addendum to the EIR.
The current Master Plan of Development for the Del Rio Marketplace proposes a mix of
uses allowed within the existing Commercial Retail (CR) zoning designation and as
modified by the Specific Plan overlay zone. As traffic impacts recommended mitigation
vary from the previous EIR addendum, a new addendum was prepared to ensure that
Page 93 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
mitigation measures are appropriately correlated to the impacts and to show that impacts
remain the same or are reduced as required by CEQA. The analysis has also shifted from
Level of Service (LOS) to Vehicle Miles Traveled (VMT) with the enaction of new State
law. This addendum considers newly enacted State requirements and reviews traffic
impacts based on VMT, as currently required under CEQA.
After reviewing the facts and analyzing the circumstances, City staff has determined that
a new EIR is not required because none of the circumstances described in CEQA Section
21166, as implemented by CEQA Guidelines Section 15162, would occur. Staff has
prepared an addendum to discuss these issues and the basis for this determination. The
addendum is included in the attached Resolution A for review and consideration.
FINDINGS:
To approve the proposed project, findings are required to be made by the City Council.
The City’s General Plan and Zoning Ordinance identify the specific findings that must be
made to approve a Conditional Use Permit. Findings and the facts to support these
findings are included in the Draft Resolution.
FISCAL IMPACT:
Redevelopment of the vacant and underutilized sites with the marketplace development
will increase property values and provide additional property tax shares to the City. In
addition, sales tax from retail tenants will be fiscally positive. Increased office and artisan
spaces increase opportunities for head of household jobs that encourage additional
spending locally and provide synergy for increased development throughout the area. In
general, residential uses do not generate an amount of revenue sufficient to cover costs.
Based on findings from the 2003 Taussig Study, revenue from new residential
development including property tax revenues, vehicle licensing fees, sales taxes, and
other revenues are insufficient to cover the maintenance and emergency services costs
of new development. Based on the revenue projections from the Taussig Study, the City
has developed standard conditions of approval for new development projects that require
the cost of maintenance and emergency services to be funded by the project through
annexation into the existing community facilities district (CFD). The proposed project will
be required to establish an Owner’s Association or other similar mechanism to maintain
the developments common areas and shared facilities.
ALTERNATIVES:
1. The City Council may make modifications to the project and/or conditions of
approval for the project. Any proposed modifications, including conditions of
approval, should be clearly re-stated in any vote on the attached draft resolution.
Page 94 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
2. The City Council may determine that more information is needed on some aspect
of the project and may refer the item back to the applicant and staff to develop the
additional information. The Council should clearly state the type of information that
is required. A motion, and approval of that motion, is required to continue the item
to a future date.
3. The City Council may deny the project. The Council must specify what findings
cannot be made, and provide a brief oral statement, based on the Staff Report,
oral testimony, site visit, correspondence, or any other rationale introduced and
deliberated by the City Council.
ATTACHMENTS:
1. Draft Resolution
Page 95 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1
DRAFT RESOLUTION
RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF ATASCADERO, CALIFORNIA, APPROVING A CONDITIONAL
USE PERMIT AMENDMENT TO ESTABLISH A MASTER PLAN OF
DEVELOPMENT FOR A MIXED-USE PROJECT, AND A TENTATIVE
PARCEL MAP (AT22-0011) TO ESTABLISH A 7 LOT COMMERCIAL
DEVELOPMENT, INCLUDING AN EIR ADDENDUM, LOCATED AT
THE NORTH-EAST PROJECT SITE OF THE DEL RIO ROAD
COMMERCIAL AREA SPECIFIC PLAN
DEL RIO MARKETPLACE
MP. ANNEX, LLC
(AMND19-0063)
WHEREAS, an application has been received from MP Annex, LLC (284 Higuera St,
San Luis Obispo, CA 93401), Owner and Applicant, to consider Planning Application
AMND19-0063, for a Conditional Use Permit to establish a Master Plan of Development for a
mixed-use project and associated Tentative Parcel Map located at 1745, 1835, 1905, 1955 El
Camino Real, Atascadero, CA 93422 (APNs 049-102-051, 049-102-075, 049-102-031, 049-
102-056, and 049-102-045); and
WHEREAS, the site’s General Plan Land Use Designation is General Commercial (GC);
and
WHEREAS, the site’s Zoning District is Commercial Retail with a Specific Plan #2
Overlay Zone (CR/SP2); and
WHEREAS, the City Council adopted the Del Rio Road Commercial Area Specific Plan
and associated entitlements on July 10, 2012; and
WHEREAS, The Del Rio Road Commercial Area Specific Plan envisions a larger scale
development at this key commercial node in accordance with underlying zoning requirements and
standards adopted in the Specific Plan.
WHEREAS, mixed-use development with residential uses on the second and third floors
is a conditionally allowed use in the Commercial Retail (CR) zoning district; and
WHEREAS, in conjunction with the approval of the Del Rio Road Commercial Area
Specific Plan and associated entitlements, the City Council of the City of Atascadero, on June 26,
2012, certified the Del Rio Road Commercial Area Specific Plan Final Environmental Impact
Report (State Clearinghouse No. 2010051034) (herein referred to as the “DRCASP EIR”), adopted
Page 96 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1
a Statement of Overriding Considerations and adopted a Mitigation Monitoring Program in
compliance with the California Environmental Quality Act (herein referred to as "CEQA"); and
WHEREAS, a subsequent project amendment and EIR addendum was adopted by the City
Council on July 11, 2017 in conjunction with the approval of a Hotel at 1800 El Camino Real; and
WHEREAS, the City Council approved an addendum to the EIR in conjunctions with
amendments to the DRRCASP on September 22, 2020; and
WHEREAS, Central Coast Transportation Consulting prepared a report analyzing impacts
from the proposed development as compared to mitigation measures and timing listed in the
amended EIR and determined that impacts were equal to or less than impacts identified in the
amended EIR; and
WHEREAS, to assess potential environmental impacts associated with the proposed
detailed Master Plan of Development for the Del Rio Marketplace, City staff prepared an
addendum to the DRCASP EIR pursuant to CEQA (herein referred to as “Addendum”); and
WHEREAS, based on the Central Coast transportation Consultant Report and proposed
Master Plan of Development City staff prepared draft language amending Mitigation Measure to
address timing and phasing appropriate to mitigate impacts from the current project; and
WHEREAS, the Addendum concluded that the proposed amendments would not result in
any new or substantially more severe impacts than disclosed in the original Del Rio Road
Commercial Area Specific Plan, as amended; and
WHEREAS, Section 21000, et seq., of the Public Recourses Code and Section 15000, et
seq., of Title 14 of the California Code of Regulations (herein referred to as the “CEQA
Guidelines”), which govern the preparation, content, and processing of environmental impact
reports, have been fully implemented in the preparation of the Del Rio Road Commercial Area
Specific Plan and Addendum; and
WHEREAS, the minimum lot size in the CR zoning district is 0.5 acres; and
WHEREAS, the proposed subdivision includes parcels ranging from 0.7 acres to 3.8 acres;
and
WHEREAS, all shared parking and access easements are required to be recorded to ensure
that all parcels have legal access from the adjacent rights-of-way; and
WHEREAS, the project was reviewed by the Design Review Committee at their regularly
scheduled meeting on March 10, 2022; and
WHEREAS, the project was reviewed by the Planning Commission at their regularly
scheduled meeting on June 7, 2022 and the Planning commission recommended approval of the
project after receiving the staff report and hearing testimony from the public, and
Page 97 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and
WHEREAS, a timely and properly noticed Public Hearing upon the subject conditional
use permit application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said use permit; and
NOW, THEREFORE BE IT RESOLVED by the Planning Commission of the City of
Atascadero:
SECTION 1. Recitals: The above recitals are true and correct.
SECTION 2. Public Hearings.
1. The City Council held a duly noticed public hearing to consider the project on June 28,
2022 and considered testimony and reports from staff, the applicants, and the public.
SECTION 3. Findings. The City Council makes the following findings, determinations
and approvals
1. Findings for Approval of a Conditional Use Permit
A. FINDING: The proposed project or use is consistent with the General Plan
FACT: The project is consistent with the Land Use, Open Space and Circulation (LOC)
Policies and Programs 1.1.7 for infill development; 1.4.1 for screening exterior lights; 2.1.3
and 7.2.3 for providing street trees; and, 8.5.3 for providing on-site stormwater
management. In addition, the project is consistent with Circulation Element (CIR) Policies
and Programs 1.4 for requiring a tree lined street; 1.5.1 for requiring adequate off-street
parking; and 2.3.1 for providing adequate sidewalks as required for all new commercial
development in the City.
The General Plan also includes policies and programs aimed at enhancing the City’s visual
character and promoting economic viability. LOC3 promotes the transformation of El
Camino Real into a distinctive and attractive commercial, office, and industrial park area
which can provide for the long-term economic viability of the community. In addition,
LOC13 provides policies and programs aimed at establishing a range of employment and
business opportunities to provide a sound economic base and ensure that new development
generates sufficient revenue to support public service needs and quality environmental,
social, and educational opportunities. LOC14 also encourages land uses that provide jobs
and services for residents that fit within the city’s character.
The project, as proposed, will provide additional service to surrounding residents and
provide increased property taxes once the site has been developed.
Page 98 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1
B. FINDING: The proposed project or use satisfies all applicable provisions of the Zoning
Ordinance
FACT: The proposed mixed-use development is consistent with the Atascadero Municipal
Code and the Del Rio Road Commercial Area Specific Plan. In the Commercial Retail
Zoning District residential uses on the second and third floors can be permitted though the
Conditional Use Permit process as identified in the Municipal Code. The proposed
structures and site plan are consistent with the applicable provisions of the Atascadero
Municipal Code as conditioned.
C. FINDING: The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety or welfare of the general public or persons residing or
working in the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use
FACT: The proposed development will be located within the Del Rio Road Commercial
Area Specific Plan where commercial uses are identified as desirable and encouraged. The
site design has been reviewed by all City departments for consistency with code
requirements. The project is proposed to have three access points, one off Del Rio Road
and two off El Camino Real. The project is conditioned to construct frontage improvements
along El Camino Real and Del Rio Rd that will ensure safe traffic patterns in and out of
the site. Intersection improvements are also conditioned that will mitigate traffic impacts.
D. FINDING: The proposed project or use will not be inconsistent with the character of
the immediate neighborhood or contrary to its orderly development
FACT: The project is planned in an area zoned for larger scale commercial development.
The project includes a mix of uses that will complement the surrounding area and provide
development in a key commercial node. The proposed project includes landscaping along
the exterior of the project to provide visual screening from adjacent residential properties.
Residential uses are proposed as part of the site development adjacent to existing residential
uses.
E. FINDING: The proposed use or project will not generate a volume of traffic beyond
the safe capacity of all roads providing access to the project, either existing or to be
improved in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance with
the land use element
FACT: The proposed project has been reviewed by Central Coast Transportation
Consultants for compliance with the certified EOIR, as amended. The analysis concluded
that traffic volumes and patterns will be safe and within the capacity of adjacent roadways
with mitigation incorporated.
Page 99 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1
F. FINDING: The proposed project is in compliance with any pertinent City policy or
criteria adopted by ordinance or resolution of the City Council.
FACT: The Design Review Committee has reviewed the proposed project and found the
site plan and elevations to be consistent with the criteria in the City’s Design Review
Manual. The City Council has identified this area for larger-scale commercial and office
development. This plan provides a mix of retail, office, light industrial, and residential
development, consistent with this policy.
2. Findings for Approval of a Tentative Parcel Map
A. FINDING: The proposed subdivision, together with the provisions for its design and
improvement, is consistent with the General Plan (Government Code §§ 66474(a) and
(b)), and
FACT: The site is zoned Commercial Retail and allows for commercial development.
All uses proposed are allowed by the underlying zoning district as modified by the Del
Rio Commercial Area Specific Plan. The subdivision proposed lots ranging from 0.7
to 3.8 acres. Shared access and parking easements are provided. As conditioned, the
proposed tentative map meets all standards of the General Plan.
B. FINDING: The site is physically suitable for the type of development (Government
Code§ 66474(c)), and
FACT: The property is zoned Commercial Retail and is suitable for a mixed-use
development. The site is relatively flat and has frontage on both El Camino Real and
Del Rio Road for access.
C. FINDING: The site is physically suitable for the proposed density of development
(Government Code § 66474(d)), and
FACT: The site is zoned Commercial Retail and does not have specific lot coverage
standards. The maximum residential density is 266 units however, only 82 units are
proposed.
D. FINDING: The design of the subdivision or the proposed improvements will not cause
substantial environmental damage or substantially and avoidably injure fish or wildlife
or their habitat. (Government Code § 66474(e)), and
FACT: The proposed project is on a site with no identified sensitive habitats or species.
No negative impacts to the environment will result from the project.
E. FINDING; The design of the subdivision or the type of improvements will not cause
serious health problems. (Government Code § 66474(f)), and
Page 100 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1
FACT: The project is designed in accordance with all local and State regulations. The
project proposes a mixed-use development at a key commercial node in the City and
will not create any impacts to public health.
F. FINDING; The design of the subdivision will not conflict with easements for access
through or use of property within the proposed subdivision. (Government Code §
66474(g)).
FACT: The proposed project includes conditions to provide shared access and parking
easements throughout the site for the benefit of all parcels. The project also includes
relocation of and existing easement to a neighboring parcel. The relocated easement
will be equivalent to the existing easement.
3. Findings for Approval of a Sign Exception
A. FINDING: The sign is consistent with the purposes set forth in Section 9-15.002;
FACT: The sign allows for visibility of tenant advertising. The Center is a larger
commercial and office center with multiple tenants set back from the right of way.
The larger sign allows for multiple tenants to have visibility along the El Camino
Real and Del Rio street frontages.
B. FINDING: The opportunity to combine signs for more than one (1) use on a
single sign structure has been considered;
FACT: The proposed sign combines multiple tenants onto one sign per center
frontage to provide for consolidated signage.
C. FINDING: The project conforms with all other applicable codes and ordinances
of the City, including, but not limited to, the Zoning Ordinance, General Plan and
its several elements, and the appearance review guidelines.
FACT: The project as condition is consistent with General Plan, Municipal Code,
and Specific Plan standards.
SECTION 4. CEQA. The current Master Plan of Development for the Del Rio
Marketplace proposes a mix of uses allowed within the existing Commercial Retail (CR) zoning
designation and as modified by the Specific Plan overlay zone. As traffic impacts and peak hour
timing vary from the previous EIR addendum, a new addendum was prepared to ensure that
mitigation measures are appropriately correlated to the impacts and to show that impacts remain
the same or are reduced as required by CEQA. The analysis has also shifted from Level of Service
(LOS) to Vehicle Miles Traveled (VMT) with the enaction of new State law. This addendum
considers newly enacted State requirements and reviews traffic impacts based on VMT, as
currently required under CEQA.
Page 101 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1
After reviewing the facts and analyzing the circumstances, City staff has determined that a new
EIR is not required because none of the circumstances described in CEQA Section 21166, as
implemented by CEQA Guidelines Section 15162, would occur. Staff has prepared an addendum
to discuss these issues and the basis for this determination.
SECTION 5. Approval. The City Council of the City of Atascadero, California, in a
regular session assembled on June 28, 2022, resolved to approve a Conditional Use Permit to
establish a Master Plan of Development and a Tentative Parcel Map to allow a 7-lot subdivision
for a mixed-use project (AMND19-0063) subject to the following:
1. EXHIBIT A: Conditions of Approval
2. EXHIBIT B: EIR Addendum and Amended Mitigation Monitoring Program
3. EXHIBIT C: Project Design Package
PASSED AND ADOPTED at a regular meeting of the City Council held on the ____th day
of __________, 2022.
On motion by Council Member ___________ and seconded by Council Member
_____________, the foregoing Resolution is hereby adopted in its entirety on the following roll call
vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
CITY OF ATASCADERO
________________________________
Heather Moreno, Mayor
ATTEST:
Lara K. Christensen, City Clerk
APPROVED AS TO FORM:
Brian A. Pierik, City Attorney
Page 102 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
Planning Department
1. This approval includes the following entitlements:
a) Vesting Tentative Parcel Map (AT22-0011) is for the
creation of 7 legal lots of record described on the attached
exhibits and shall apply to APNs 049-102-051, 075, 031,
056, 045 regardless of owner.
b) Master Plan of Development / conditional Use Permit for a
mixed-use development (Del Rio Marketplace) that
includes a 32,400 square-foot grocery anchor tenant with
31,700 square-feet of ancillary retail/commercial uses,
18,600 square-feet of light-industrial space, and 31,500
square-feet of ground floor office space with options for
second and third floor office or residential uses (up to 92
based density units).
Ongoing PS
2. The approval of these entitlements shall become final and
effective for the purposes of issuing building permits the day
after the city Council hearing, unless an appeal is made in
accordance with the Atascadero Municipal Code.
Ongoing PS
3. The Community Development Director and/or City Engineer
shall have the authority to make modifications to the final map
that remain in substantial conformance with the approved
Tentative Map.
BP / FM PS, CE
4. The Community Development Director and/or city Engineer
shall have the authority to make minor modifications to the
Master Plan of development that are necessary to address code
requirements or result in superior design.
BP / FM PS, CE
5. Approval of these entitlements shall be valid for twenty-four (24)
months after its effective date. At the end of the period, the
approval shall expire and become null and void unless the
project has received a final map (Tentative Map entitlement) or
building permit (Master Plan of Development), or a time
extension has been granted, consistent with the Atascadero
Municipal Code.
BP / FM PS
6. Vesting Tentative Subdivision Map was deemed complete on
May 23, 2022, for the purposes of vested development rights
and fees consistent with the Subdivision Map Act of the State of
California.
On-going PS, CE
7. A final parcel map drawn in substantial conformance with the
approved vesting tentative map, and in compliance with all
conditions set forth herein, shall be submitted for review and
FM PS/CE
Page 103 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
approval in accordance with the Subdivision Map Act and the
City’s Subdivision Ordinance
8. The applicant shall defend, indemnify, and hold harmless the
City of Atascadero or its agents, officers, and employees
against any claim or action brought to challenge an approval by
the City, or any of its entities, concerning the subdivision.
Ongoing
9. All subsequent Tentative Map and construction permits shall be
consistent with the Master Plan of Development approved for
the project.
BP / FM PS, CE
10. The parcel map shall be subject to additional fees for park or
recreation purposes (QUIMBY Act) as required by City
Ordinance
BP PS
11. All maintenance costs listed below shall be 100% funded by
the project in perpetuity, except for public facilities that are
planned for and currently maintained by the City of
Atascadero. The service and maintenance cost shall be
funded through an entity or mechanism established by the
developer, subject to City Staff approval. This entity or
mechanism must be in place prior to, or concurrently with
acceptance of any final map(s) or the issuance of any
building permits. The entity or mechanism shall be
approved by the City Attorney, City Engineer and
Administrative Services Director prior to acceptance of any
Final Map(s) or issuance of any building permits. The
administration of the above mentioned funds, and the
coordination and performance of maintenance activities,
shall be the responsibility of the entity or mechanism.
a) All parking and access areas.
b) All landscaping and lighting within the proposed project area.
c) Common area fencing and/or features.
d) Open areas on private property within the proposed project area
including detention facilities, bio-swales, and other low-impact-
development features.
e) Newly constructed drainage facilities on private property within
the proposed project area.
f) Landscaped frontages within the right-of-way of all public
streets within the defined specific plan boundary.
g) On-site sewer and storm drains located outside of the right-of-
way.
Ongoing PS, CE
12. The emergency services and facility maintenance costs listed
below shall be 100% funded by the project in perpetuity. The
Page 104 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
service and maintenance costs shall be funded through a
community facilities district established by the City at the
developer's cost. The funding mechanism must be in place
prior to or concurrently with acceptance of the final
maps. The funding mechanism shall be approved by the City
Attorney, City Engineer and Administrative Services Director
prior to acceptance of any final map. The administration of
the above mentioned funds shall be by the City. Developer
agrees to participate in the community facilities district and to
take all steps reasonably required by the City with regard to
the establishment of the district and assessment of the
property.
▪ All Atascadero Police Department service costs to the project.
▪ All Atascadero Fire Department service costs to the project.
▪ Off-site common City of Atascadero park facilities
maintenance service costs related to the project
13. Shared parking and access easements shall be recorded over
all parcels. Easements shall also be recorded for shared
drainage facilities. Parking shall not be designated for each use
except for short-term pick-up spaces and residential uses along
the perimeter of the project site as needed.
FM PS, CE
14. An easement shall be recorded on the face of the map, or
recorded by separate instrument prior to final map, to replace
the existing easement to 4890 Obispo Road (APN 049-102-
033). The resulting easement shall be approved by the
benefiting parcel owners and shall be equivalent to the existing
easement rights.
15. Agreements shall be required to be recorded against each
parcel notifying any residential tenant of the commercial nature
of the site to ensure that commercial activities are prioritized.
FM, BP PS, CE
16. All trees landscape on-site or planted as along the street
frontage trees shall be maintained in a manner that allows the
tree to grow to its full natural height and natural canopy. No
growth suppressants shall be permitted that result in stunting or
modifying the natural growth pattern of the tree.
Ongoing PS
17. All native tree removals shall be mitigated in accordance with
eh Atascadero Native Tree Ordinance.
18. All Conditions and mitigation monitoring program for the Del Rio
Road Commercial Area Specific Plan, as amended, are hereby
incorporated by reference.
Ongoing PS
19. The underground stormwater facilities shall be modified to be
located entirely under drive aisles and parking spaces so as not
BP PS, CE
Page 105 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
to preclude tree plantings as shown on the preliminary
landscape plan. All revised drainage plans shall be subject to
the approval of the city Engineer or their designee.
20. Sound walls shall be a solid material and shall be designed to
be compatible with the commercial center. Walls shall be earth
toned in color. Sound walls shall be included along the eastern
property line in accordance with the Specific Plan and as
modified per the recommendations of an acoustic analysis to be
completed with building permit submittal.
BP PS
21. Wood fencing shall be high quality and shall include a top rail.
No dog-eared fencing will be permitted.
BP PS
22. Evergreen landscaping shall be included along project edges
adjacent to residentially zoned parcels to the greatest extent
feasible. Landscape materials shall include trees and shrubs
that provide visual screening above the fence/wall line.
BP PS
23. Landscaping along El Camino Real shall include London Plane
street trees at a spacing of 30-feet on-center. Additional
landscaping shall include accent trees and native grasses
BP PS
24. Del Rio landscaping shall incorporate street trees at a ratio of 1
tree per 30-feet of frontage but may be grouped along the
eastern portion of the frontage to transition to a more rural
character.
BP PS
25. Plaza spaces shall include decorative pavement such as
stamped and/or colored concrete, or similar.
BP PS
26. Future buildings shall be approved by planning staff prior to
permit issuance and shall incorporate design elements
consistent with a contemporary agrarian design theme,
consistent with the Specific Plan and this Master Plan of
Development. Buildings shall compliment the grocery anchor
building in color and style.
BP PS
27. All trash enclosures shall be constructed of dark color split face
block or similar and shall include high quality solid metal doors.
Enclosures shall be designed in accordance with Cal Green
requirements.
BP PS
28. The center identification sign at the corner of El Camino Real
and Del Rio Rd. shall be backlit or externally illuminated
BP PS
29. Second floor height of multi-story buildings shall be a minimum
of 16-feet from finished floor elevation of the ground floor.
BP PS
Page 106 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
30. Stormwater basins collecting public right-of-way runoff may
extend into the public right-of-way at El Camino Real. Maintain
a minimum 2-foot shoulder from the back of walk, subject to the
approval of the city Engineer.
Maximum water depth in surface stormwater basins shall be 2’.
Side slopes of basin shall be 5:1 maximum. Basins shall be
unfenced.
Surrounding grading at basins shall be at 5:1 maximum off of
the street, and at 3:1 maximum up to private improvements. Fill
from top of basin (water surface) to finish surface at private
improvements shall not exceed 5 feet at slopes 5:1 or steeper.
Small landscape walls (3’ or less) may be incorporated into the
designs to add flexibility.
BP PS
31. The multi-tenant sign shall be consistent with project exhibits. BP PS
32. The height of the free-standing monument sign located at the
northern most driveway on El Camino Real shall be a maximum
of 8-feet high and shall have a similar design to the taller
monument signs.
BP PS
33. Landscaping along the north and east property lines shall
include species that make traversing from the commercial
center to the residential area more difficult.
Public Works Project Conditions
City Engineer Project Conditions
33. A blanket parking and access easement shall be recorded on all
parcels. Drainage easements shall be required to facilitate cross
property drainage and accommodate shared stormwater systems.
BP, GP, FM CE
34. Dedications shall be made to accommodate full buildout to the City
Council adopted plan-line.
BP, GP, FM CE
35. Street trees shall be provided along all project frontages. All street
tree maintenance shall be the responsibility of the adjacent
property owner. Trees shall be maintained in a way that supports
to natural growth of the tree and allows the tree to reach its full
natural height and width.
BP, GP CE
Page 107 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
36. Prior to issuance of each building permit the applicant shall verify
that PM peak hour traffic trips are within the limits set by
Mitigation Measure Trans 1d. If trips are exceeded additional
analysis may be required and improvements to the US 101
interchange as outlined in MM TRANS1d may be required.
BP CE
GRADING, DRAINAGE AND STORMWATER
37. The final Stormwater Control Plan (SWCP) and supporting
hydrology report shall be approved by the City Engineer prior to
issuance of any building permit, in accordance with the State
regulations (Regional Water Quality Control Board Res. No. R3-
2013-0032).
BP, GP CE
38. Prior to a final inspection the following City Stormwater
documents shall be completed and approved by the City
Engineer:
● ATAS - SWP-1001_Engineer Certification Form
● ATAS - SWP-1003_OwnerAgentInfo
● ATAS - SWP-1007_Exhibit_B_Instructions_SCM FORM
● ATAS - SWP-1008_Stormwater System Plans and
Manuals
● ATAS - SWP-2002 Stormwater O&M Process and Form
Instructions
● ATAS - SWP-3001_Stormwater System O&M_Agreement
● ATAS - SWP-3002_Private Stormwater System Recorded
Notice
Email publicworks@atascadero.org for copies of the above City
templates.
BP CE
39. A Storm Water Pollution Prevention Plan (SWPPP) is required
prior to any ground disturbing activities. The WDID number
provided upon acceptance of the SWPPP into the State’s
SMARTS system registration shall be noted on the Title Sheet of
the Plans. The QSP shall coordinate with the City Inspector for
State mandated storm water inspections (required by the City)
and shall provide verification of QSP inspections, monitoring,
SWPPP modifications and actions throughout project.
BP CE
40. An Erosion Control Plan (with notes and details) is required at
Building permit and must reference Best Management Practices
(BMPs) as defined by CASQA and/or City of Atascadero
standards and specifications. Place a note on the plans stating
that erosion control measures shall remain in place and be
BP CE
Page 108 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
maintained throughout all ground disturbing operations until
vegetation has been re-established over approximately 70% of
the disturbed area. All finish graded areas shall be landscaped or
revegetated using a native seed mixture per erosion control
standards.
FLOOD CONTROL BASINS
41. All basins must be shown to completely drain within 72 hours, to
the satisfaction of the City Engineer.
Detention Basin. Any drainage basin which has a downstream
outlet designed to meter the outflow shall be classified as a
detention basin. Basin capacity shall be based on receiving
the runoff from a 50-year storm with the watershed in its fully-
developed condition, and releasing the flow equivalent to the
runoff from a 2-year storm with the project site in its pre-
development condition. The outlet shall release water in a non-
erosive manner.
Subsurface Infiltration Basins. Subsurface basins shall be
limited to locations where the depth to seasonally high
groundwater is greater than 10-feet below the deepest portion
of the basin.
Drain Rock. Drain rock shall be clean, crushed
granite (or clean, angular rock of similar approved
hardness) with rock size ranging from 1-1/2-inch to
3/4-inch. Rock gradation shall conform to the
Specification of ASTM C-33 #4.
Operational Requirements.
i. Water quality of inflow (both sediment and
chemical loading) may require pretreatment or
separation
ii. Maintenance plan, including provisions for
vehicular access and confined-space entry safety
requirements, where applicable
iii. A safe overflow path shall be identified on
the plan and may require easements
Easement Requirements. All drainage basins accepting runoff
from roads, streets or other common ownership areas shall be
located in an easement offered for dedication to the public.
Reversionary clauses shall not be permitted. If a fence is
required it shall be located not more than 4-inches inside the
drainage easement line, except where setbacks are required
as part of the land use permit or by the Land Use Ordinance.
BP CE
Page 109 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
Overflow Path Required. The design of all drainage basins
shall identify the designated route for overflow. The Project
Engineer shall design the overflow path so that the flow in a
100- year storm is non-erosive and will not damage
downstream improvements, including other basins. Easements
may be required for concentrated flows across multiple
properties.
UTILITIES
42. New and replacement utility distribution systems and services
shall be constructed underground, to the satisfaction of the City
Engineer
BP CE
43. Each building shall be served with separate services for water,
sewer, gas, power, telephone and cable TV. Utility laterals
shall be located and constructed to each building in accordance
with City Engineering Standards and Standard Specifications
and other applicable codes
BP CE
44. The Applicant shall extend the water distribution system to the
satisfaction of the Atascadero Mutual Water Company (AMWC)
and City Engineer
BP CE
45. The water system shall include easements outside of the road
rights-of-way for water system facilities as required by the
AMWC and to the satisfaction of the City Engineer
BP CE
46. Each lot shall be served with a separate water lateral and meter
in accordance with the AMWC requirements
BP CE
47. A separate water meter(s) shall be installed for irrigation BP CE
48. Above ground facilities required for the water distribution
system, such as backflow prevention device assemblies,
pressure reducing units, and pressure booster stations, shall be
located outside the public right-of-way and, when required,
placed in easements and shall include visual screening to the
satisfaction of AMWC and City Engineer.
BP / FM CE
WASTEWATER
Page 110 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
49. The wastewater collection system shall be designed and
constructed in accordance with City Engineering Standards and
Specifications to the satisfaction of the City Engineer.
a. Gravity sanitary sewer (SS) mains shall terminate in
manholes. The development’s private sanitary
sewer main shall tie in to City sewer on El Camino
Real in a manhole.
b. Sewer Manholes shall be placed at changes in
slope and every 400’.
c. Gravity SS mains shall be a minimum of eight (8)
inches in diameter
BP CE
50. The on-site sewer laterals shall be privately owned and
maintained by individual building owners
BP CE
51. Prior to issuance of first building permit, a Sewer Capacity
Analysis is required to confirm the development does not exceed
previously anticipated capacity with early iterations of the Master
Plan of Development and Del Rio Commercial Area Specific Plan
to include a list of all uses proposed on site per building
BP CE
52. Sewer capacity charges/fees will be applied to building permit at
issuance. The applicant shall pay sewer fees in effect at the time
the Vesting Parcel Map was deemed complete. If any unique
uses are proposed, specific wastewater information may be
required to be submitted, subject to the request and approval of
the City Engineer
BP CE
TRAFFIC
53. Provide Fair share payment for Ramona Rd Realignment and the
right turn lane at US 101 northbound as any associated
improvements and signal timing modifications as listed in the
mitigation measure
BP CE
FRONTAGE IMPROVEMENTS
54. The project shall construct public improvements along El Camino
Real and Del Rio Road in general conformance with the City
Council approved Del Rio Commercial Area Specific Plan Lines in
the vicinity of US 101 Interchange as approved by City Council on
9/22/2020, and other public improvement requirements as
detailed in the Del Rio Commercial Specific Plan approved by
BP CE
Page 111 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
City Council 10/13/2020 as required by traffic impacts, except as
specifically modified by this or subsequent entitlement, to the
satisfaction of the City Engineer.
55. The public improvements, including the Del Rio/ El Camino Real
(ECR) intersection, as required by the Traffic Impact Study for the
project, must be completed by the developer (City has issued final
approval) prior to final occupancy of the first building. The
developer’s design team shall work with the City Engineering staff
for 30%, 60%, 90% and Final design reviews.
a. At Del Rio and El Camino Real Intersection, the
project shall provide:
i. Improvements on project corner
(northeast) including but not limited to
ramps, traffic signal modifications and/or
replacement, and striping.
ii. On southeast corner, improvements are
required to bring the lane alignments and
configurations at the intersection to a width
sufficient to serve the project (as indicated
in the Traffic Impact Study) and
accommodate California Legal Design
Vehicle Semi Truck turning movements.
Pavement widening and improvements on
southeast corner to include, at a minimum,
pavement widening and 5:1 transition to
existing pavement, a temporary AC dike
and ramp at the ultimate build out curb line
location, traffic signal modifications and/or
replacement, and any drainage
improvements.
b. For Del Rio road frontage, the project shall provide:
i. Curb, gutter and attached 8-foot sidewalk
up to the first driveway east of El Camino
Real and a 6-foot sidewalk beyond that
driveway,
ii. A bike lane, one westbound travel lane
and one dedicated left turn lane into the
development,
iii. Improvement past the centerline will be
required to accommodate a temporary
BP CE
Page 112 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
shared/combined eastbound travel lane
and bike lane with minimum 3.5’ shoulder,
however full development of the opposite
side (south side) of Del Rio will be the
responsibility of the adjacent property
owners upon development.
iv. At the eastern end of the property
frontage, transition new pavement to
existing pavement at 5:1 taper. The
sidewalk shall transition to shoulder with
use of HMA Sidewalk Terminus Ramp
County of San Luis Obispo Detail C-7
c. On El Camino Real, the project shall provide:
i. Curb, gutter and 8-foot sidewalk up to
the northern most driveway and a 6-
foot sidewalk beyond the driveway.
ii. Improvements to the centerline of the
roadway, including one through lane
and a dedicated right turn pocket into
the project. Provision must be made
for a left turn lane into the driveway of
1920 El Camino Real. Transitions into
the turn lanes must consider the 40
MPH speed limit for El Camino Real.
A median is required to limit left turns
from the project’s most southern
driveway onto El Camino Real. The
northern driveway must align with the
southern driveway of Home 2 Suites
hotel across the street to prevent
conflicts that would require limiting left
turn movements.
iii. At the northern end of the property
frontage, extend improvements to
meet existing curb, gutter and
sidewalk along the frontage of the
Colony Homes development, Tract
2489. Provide a new driveway apron
per City standard 423 (with 4’
accessible sidewalk) for the access
Page 113 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
easement and driveway adjacent to
the northern property line
56. A separate encroachment permit is required for any work within a
public Right-of-Way or easement
BP CE
57. Prior to Encroachment permit issuance, the Developer shall
execute an “Engineer of Work Agreement” form and provide to
the City designating who will be providing engineering support for
the design and construction of the improvements for the project.
a. In coordination with the developer, the Engineer of
Work (EOW)-designated Inspector, a third party not
affiliated with the developer’s contractor performing
the work, would be required during the inspection
process of the site and frontage improvements. The
City and EOW inspectors to work together in
collection and record keeping necessary for the
inspection and approval of the improvements. The
EOW inspector would be onsite frequently, or when
work requiring inspection occurs, and the City
Inspector would be checking in periodically based
on the agreed upon schedule with City Staff (i.e.
every two weeks)
BP CE
58. Public improvement plans (PIPs) shall be prepared by a licensed
civil engineer. PIPs shall be prepared on 24”x36” plan sheets,
use the City Standard border and signature block, and shall
comply with Section 2 of City Standard Specifications. All plans
shall contain the City of Atascadero "Standard Notes for
Improvement Plans" on file in the City Engineer's office
BP CE
59. Road slope easements shall be dedicated where the road prism
cut/fill slopes extend beyond the right-of-way. The easement
shall extend not less than five feet (horizontally) beyond any
daylight or catch line of the graded slope or other required road
facility (such as a brow ditch, retaining wall, drainage swale, etc.),
to the satisfaction of the City Engineer
BP/FM CE
ROAD IMPROVEMENT REQUIREMENTS
60. The horizontal and vertical design of roads shall be in compliance
with the City of Atascadero Engineering Standards and Standard
Specifications, to the satisfaction of the City Engineer. The City
Engineer reserves the right to make modifications to all submitted
road designs, when in the opinion of the City Engineer, the
public’s health and safety is benefitted
BP CE
Page 114 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
61. The design of structural pavement sections for on-site roads shall
be based on minimum a Traffic Index (TI) = 6.0 and a 20-year
design life. Off-site/public roads must match existing pavement
sections and/or City Standards Specifications to the satisfaction
of the City Engineer
BP CE
62. New roads with pavement placed prior to the construction of
buildings will be subjected to additional construction traffic and
wear associated with the on-site construction not included in the
design life of the pavement section. Therefore to off-set this, the
AC thickness shall be increased from that which is derived from
CalTrans method by either:
a. 1” if the pavement is placed prior to building
construction (not phased)
b. 1.5” if the pavement construction is phased (i.e. – a
portion of the ultimate pavement thickness is
deferred and a final pavement cap placed prior to
final inspection).
c. Final pavement cap shall not be less than 1.5”
d. Street centerline monuments shall be provided at
intersections and at the beginning and end of
curves along the street centerline
BP CE
63. Pavement and base sections shall be designed and constructed
in accordance with the City of Atascadero Engineering Standards
and Standard Specifications. When said standards and
specifications are not clear, lack necessary details, or are silent,
the minimum standard shall be based upon the current edition of
the San Luis Obispo County Public Improvement Standards or
Caltrans Standard Drawings and Standard Specifications, as
determined by the City Engineer
BP CE
FINAL MAP
64. Prior to recording the Final Map, the Applicant shall have the map
reviewed by the public utility providers for power, telephone, gas,
cable TV, and the Atascadero Mutual Water Company. The
Applicant shall obtain a letter from each utility company stating
that the easements and rights-of-way shown on the map for
public utility purposes are acceptable
FM CE
Page 115 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
65. Documents that the City of Atascadero requires to be recorded
concurrently with the Final Map (e.g.: off-site rights-of-way
dedications, easements not shown on the map, agreements, etc.)
shall be listed on the certificate sheet of the map
FM CE
66. The City of Atascadero may require an additional map sheet for
information purposes in accordance with the Subdivision Map Act
FM CE
67. A 6-feet wide Public Utility Easement (PUE) shall be dedicated
contiguous to the new road rights-of-way for the property
frontages along El Camino Real and Del Rio Road.
FM CE
STANDARD CONDITIONS
68. All public improvements shall be constructed in conformance with the
City of Atascadero Engineering Department Standard Specifications
and Drawings.
BP, GP CE
69. In the event that the applicant is allowed to bond for the public
improvements required as a condition of this map, the applicant shall
enter into a Subdivision Improvement Agreement with the City.
FM CE
70. An engineer’s estimate of probable cost shall be submitted for review
and approval by the City Engineer to determine the amount of the
bond.
FM CE
71. The Subdivision Improvement Agreement (SIA) shall record
concurrently with the Final Map. If it is the intent of the developer to
pursue a reimbursement agreement with the City for the installation
of off-site sewer facilities, reference to said agreement and terms
shall be included in the SIA.
FM CE
72. The applicant shall be responsible for the relocation and/or alteration
of existing utilities.
BP, GP CE
73. The applicant shall install all new utilities (water, gas, electric, cable
TV and telephone) underground. Utilities shall be extended to the
property line frontage of each lot or its public utility easement.
BP, GP CE
Page 116 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
74. The applicant shall monument all property corners for construction
control and shall promptly replace them if disturbed.
FM CE
75. The applicant shall acquire title interest in any off-site land that may
be required to allow for the construction of the improvements. The
applicant shall bear all costs associated with the necessary
acquisitions. The applicant shall also gain concurrence from all
adjacent property owners whose ingress and egress is affected by
these improvements.
FM CE
76. Slope easements shall be provided as needed to accommodate cut
or fill slopes.
FM CE
77. Drainage easements shall be provided as needed to accommodate
both public and private drainage facilities.
FM CE
78. The final map shall be signed by the City Engineer prior to the map
being placed on the agenda for City Council acceptance.
FM CE
79. Prior to recording the parcel map, the applicant shall submit a map
drawn in substantial conformance with the approved tentative map
and in compliance with all conditions set forth herein. The map shall
be submitted for review and approval by the City in accordance with
the Subdivision Map Act and the City's Subdivision Ordinance.
FM CE
80. Prior to recording the parcel map, the applicant shall either bond for
or set monuments at all new property corners. A registered civil
engineer licensed to perform land surveying or licensed land
surveyor shall indicate by certificate on the parcel map, that corners
have been set or shall be set by a date specific and that they will be
sufficient to enable the survey to be retraced.
FM CE
81. Prior to recording the tract map, the applicant shall pay all outstanding
plan check/inspection fees.
FM CE
82. Prior to recording the map, the applicant shall bond for or complete
all improvements required by these conditions of approval
FM CE
83. Prior to recording the parcel map, the applicant shall have the map
reviewed by all applicable public and private utility companies (cable,
telephone, gas, electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility company indicating their
FM CE
Page 117 of 220
ITEM NUMBER: B-2
DATE:
ATTACHMENT:
06/28/22
1A
Conditions of Approval
AMND19-0063
Vesting Tentative Parcel Map AT22-0011
(Del Rio Marketplace)
APNs 049-102-051, 075, 031, 056, 045
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
review of the map. The letter shall identify any new easements that
may be required by the utility company. A copy of the letter shall be
submitted to the City. New easements shall be shown on the map.
84. Prior to the final inspection of any public improvements, the applicant
shall submit a written statement from a registered civil engineer that
all work has been completed and is in full compliance with the
approved plans.
FM CE
85. Prior to the final inspection, the applicant shall submit a written
certification from a registered civil engineer or land surveyor that all
survey monuments have been set as shown on the final map.
BP, GP CE
86. An encroachment permit shall be obtained prior to any work within
City rights of way.
BP, GP CE
87. Prior to the issuance of building permits the applicant shall submit a
grading and drainage plan prepared by a registered civil engineer for
review and approval by the City Engineer.
BP, GP CE
FIRE DEPARTMENT PROJECT CONDITIONS
88. Internal project and driveways shall meet the City of Atascadero F-7
standard.
BP FD
89. Fire hydrants shall be located within 100-feet of the fire department
connection for each building.
BP FD
90. A 26-foot wide fire lane shall be provided no closer than 15-feet and
no farther than 30-feet from any building exceeding 30-feet in height,
subject to the approval of the Fire Marshal. This may be
accommodated within the parking lot drive aisles.
BP FD
91. An Atascadero Construction Site Safety Plan is required to be
submitted and approved prior issuance of building permits.
BP FD
Page 118 of 220
EXHIBIT A
ADDENDUM TO FINAL ENVIRONMENTAL IMPACT REPORT –
Del Rio Road Commercial Area Specific Plan
(Certified by the Atascadero City Council on June 26, 2012
and amended by the Council on September 22, 2020)
1.1 INTRODUCTION
The California Environmental Quality Act (CEQA) requires public agencies to analyze and
consider the environmental consequences of decisions to approve development projects
that they exercise discretion over. CEQA achieves this objective by requiring agencies to
prepare Environmental Impact Reports (EIR’s) for projects with the potential to cause
significant impacts on the physical environment. EIR’s are public documents that analyze
environmental effects related to the planning, construction, and operation of a project,
and indicate ways to reduce or avoid possible environmental damage. An EIR also
discloses growth-inducing impacts, effects found not to be significant, significant
cumulative impacts, and significant impacts that cannot be avoided, if any. The purpose
of an EIR is to inform. EIR’s are not policy documents that recommend project approval
or denial.
As a lead agency, the City of Atascadero prepared an Environmental Impact Report (EIR)
for the Del Rio Road Commercial Area Specific Plan in compliance with the California
Environmental Quality Act (CEQA) (Public Resources Code, section 21000 et seq.) and
the State CEQA Guidelines (California Code of Regulations, Section 15000 et seq., as
amended). The City Council certified the Final Environmental Impact Report (Final EIR)
for the Del Rio Road Commercial Area Specific Plan at a public hearing on June 26, 2012.
As noted in the Final EIR, the analysis in the Final EIR was at a “project” level of detail,
which anticipated the potential impacts of future approvals to implement the project.
Public Resources Code Section 21166 limits the ability of an agency to require an
additional EIR, once one has been certified for a project. Section 21166 provides as
follows:
§21166. Subsequent or Supplemental Impact Report; Conditions.
When an environmental impact report has been prepared for a project pursuant to this division, no
subsequent or supplemental environmental impact report shall be required by the lead agency or by any
responsible agency, unless one or more of the following events occurs:
(a). Substantial changes are proposed in the project which will require major revisions of the
environmental impact report.
(b). Substantial changes occur with respect to the circumstances under which the project is being
undertaken which will require major revisions in the environmental impact report.
(c). New information, which was not known and could not have been known at the time the
environmental impact report was certified as complete, becomes available.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 119 of 220
The CEQA Guidelines further refine the circumstances under which a supplemental or
subsequent EIR may be required. Guidelines Section 15162 provides as follows:
15162. Subsequent EIRs and Negative Declarations.
(a) When an EIR has been certified or negative declaration adopted for a project, no subsequent EIR
shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence in
the light of the whole record, one or more of the following:
(1). Substantial changes are proposed in the project which will require major revisions of the
previous EIR or negative declaration due to the involvement of new significant environmental
effects or a substantial increase in the severity of previously identified significant effects;
(2). Substantial changes occur with respect to the circumstances under which the project is
undertaken which will require major revisions of the previous EIR or negative declaration due to
the involvement of new significant environmental effects or a substantial increase in the severity
of previously identified significant effects; or
(3). New information of substantial importance, which was not known and could not have been
known with the exercise of reasonable diligence at the time the previous EIR was certified as
complete or the negative declaration was adopted, shows any of the following:
(A). The project will have one or more significant effects not discussed in the previous
EIR or negative declaration;
(B). Significant effects previously examined will be substantially more severe than shown
in the previous EIR;
(C). Mitigation measures or alternatives previously found not to be feasible would in fact
be feasible and would substantially reduce one or more significant effects of the project,
but the project proponents decline to adopt the mitigation measure or alternative; or
(D). Mitigation measures or alternatives which are considerably different from those
analyzed in the previous EIR would substantially reduce one or more significant effects on
the environment, but the project proponents decline to adopt the mitigation measure or
alternative.
In 2017, the City amended the Del Rio Specific Plan to accommodate the Hilton Hotel on
the western portion of the “Annex” site of the Del Rio Specific Plan to allow for a hotel
instead of retail development. That amendment recognized a reduction in vehicle trips
and associated environmental impacts. A four-story, 120-room hotel, north of Del Rio
Road, between Hwy 101 and El Camino Real has been recently completed as a result of
that amendment.
In 2017, Walmart notified the City that they would no longer be pursuing the development
of their Del Rio store in Atascadero. In 2019, development plans were officially withdrawn
and the site is being marketed for sale. On July 12th, 2020, the tentative parcel map and
associated Master Plan of Development for the project expired. In 2020 amendments to
the Specific Plan were adopted modifying the list of allowed uses on the site, including
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 120 of 220
the removal of high traffic generating uses, and mitigation measures were modified to
recognize the reduction in trips and traffic impacts through an addendum to the EIR.
The City is currently processing a Master Plan of Development for the North-East project
site within the Del Rio Specific Plan. The master plan proposes a mix of uses allowed
within the existing Commercial Retail (CR) zoning designation and as modified by the
Specific Plan overlay zone. As traffic impacts and peak hour timing vary from the previous
EIR addendum, a new addendum is being prepared to ensure that mitigation measures
are appropriately correlated to the impacts and to show that impacts remain the same or
are reduced as required by CEQA. The analysis has also shifted from Level of Service
(LOS) to Vehicle Miles Traveled (VMT) with the enaction of new State law. This
addendum considers newly enacted State requirements and reviews traffic impacts
based on VMT, as currently required under CEQA.
Before acting on the proposed amendments, the Planning Commission and the City
Council must apply the standards outlined above to determine whether a subsequent or
supplement EIR is required.
After reviewing the facts and analyzing the circumstances, City staff has determined that
a new EIR is not required because none of the circumstances described in CEQA Section
21166, as implemented by CEQA Guidelines Section 15162, would occur. Staff has
prepared an addendum to discuss these issues and the basis for this determination.
2.0 Del Rio Road / US 101 Interchange / Del Rio Road & El Camino Real
The certified Final EIR for the Del Rio Road Commercial Area Specific Plan included a
traffic analysis originally completed in 2010 for the Specific Plan. In 2019 and 2020,
following Walmart’s cancelation of the Atascadero store and submittal of the Annex site
Master Plan of Development amendment, staff consulted with W-trans to complete a
traffic sensitivity analysis of the Del Rio Road Interchange corridor to assess the intensity
of development that can be accommodated in the vicinity of the Del Rio Road interchange
while maintaining acceptable operations and identify final buildout configurations. New
future growth assumptions were factored in as well as updated regional modeling to ensure
the most accurate impact analysis.
The July 2020 Analysis considered the following:
1. In addition to a higher-altitude evaluation of the traffic generated by predictive land
use development scenarios completed in 2019, the 2020 analysis incorporated
regional growth and 20-year forecast scenarios in order to allow Caltrans to
determine long-range impacts to their facilities and ensure informed future
planning efforts.
2. The analyses investigated the traffic signal configurations, roadway geometrics, and
right-of-way impacts including delay time and queue length. The 2020 analysis
concluded that the mitigation measures proposed (detailed below) are feasible and
appropriate to the impacts.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 121 of 220
3. Caltrans owns and operates the two traffic signals at the ramp intersections of Del
Rio and US 101. Caltrans priority will be mainline traffic operations on US 101 and
ensuring exiting traffic does not queue onto the mainline traffic lanes from off ramps.
The analyses studied the timing of the traffic signals and ramp queuing in
preparation for coordinating with Caltrans on implementing the proposed mitigation
measures.
The most recent analysis and addendum modified mitigation measures in response to
changing land use patterns and more current development proposals. Table 1 below
shows the current mitigation measures and recommended timing changes based on the
Marketplace Development plan:
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 122 of 220
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 123 of 220
Vehicle Miles Traveled Analysis
While the City of Atascadero has not yet adopted VMT standards the State Office of
Planning and Research (OPR) has published recommended thresholds which are applied
below. OPR’s Technical Advisory on Evaluating Transportation Impacts in CEQA
provides guidance for evaluating VMT for various project types.
Mixed-use projects can evaluate the individual components separately or focus the
analysis on the dominant use. As shown in Table 4, the non-residential components of
the project generate over 90 percent of the project’s daily trips and are therefore the
dominant use. OPR also notes that local- serving retail can be presumed to have a less-
than-significant impact because these uses don’t typically generate new demand, but
instead shift travel patterns as customers shift to more convenient shopping locations.
The proposed retail uses on the site are anchored by a 32,400 sq.ft. grocery store which
is expected to be local serving.
OPR’s suggested threshold for office uses is 15 percent below the regional average of
work VMT. Work VMT captures trips from home to work. The SLOCOG Travel Demand
Model was applied to estimate the work VMT.
The project’s VMT was estimated using the SLOCOG Travel Demand Model. The
regional VMT is summarized in Table 2.
The project is expected to increase overall regional VMT slightly and reduce residential
and office VMT. This reduction in office VMT and residential VMT indicates a less-than-
significant impact to VMT. The retail component of the project is considered local-serving
and is presumed to have a less than-significant VMT impact.
The provision of commercial uses in a predominantly residential area improves the jobs-
housing balance which shortens commute trips lengths. The mix of uses on the project
site provides destinations serving project residents as well as other residents nearby. This
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 124 of 220
is consistent with SB 743 and regional planning goals to encourage mixed-use infill
developments.
Summary
The certified Final EIR, with the inclusion of mitigation measures in the certified Final EIR,
modified with input from Caltrans, concluded that, in order to mitigate impacts created by
the completion of the Del Rio Road Commercial Area Specific Plan, a new 5-legged
roundabout would be needed at the US 101 / Del Rio Road interchange. With the revised
land-use development scenarios including updated future regional impacts and future
anticipated development within the City, the new 2020 traffic analysis concluded that
construction of roundabouts is not warranted and that alternative mitigation strategies can
be implemented that will maintain functionality of the overpass and intersections.
With the revised land-use development scenarios for the Specific Plan area and updated
projections for local and regional growth, traffic impacts at the Del Rio / 101 interchange
and at the Del Rio / El Camino Real intersection decrease. The supplemental traffic
analysis completed for the Del Rio Marketplace in 2022 show that there are no "new
significant environmental effects or substantial increase in the severity of previously
identified significant effects." (Section 15162(a)(1)). Conditions have been included for
the project that modify the timing of mitigations measures and mitigation measures have
been updated to include this revised timing.
2.1 Application of CEQA Guideline Section 15612
Is there substantial evidence in the record revealing that there have been substantial
changes proposed in the project which will require major revisions of the previous
EIR due to the involvement of new significant environmental effects or a substantial
increase in the severity of previously identified significant effects as a result of the
Master Plan of Development amendment and revised land use development
scenarios?
No. The City has completed extensive analyses of the revised traffic impacts based on
the modified land use development scenarios and the estimated foreseeable regional and
local future impacts. Under the anticipated land use scenarios throughout the Specific
Plan area and the submitted Master Plan of Development for the Del Rio Marketplace,
the modified development pattern will result in a decrease in traffic impacts until full build-
out of the area, supporting modified mitigation timing, both at the interchange and local
intersection. As noted above, the original EIR analyzed the impacts of the Specific Plan
Amendment with regionally serving commercial retail uses throughout the majority of the
project. The 2020 addendum analyzed land uses comprised of a mixture of residential,
retail, office park, and tourist serving uses. With the supplemental traffic analysis
identifying uses in both the Specific Plan area, as well as an update to the baseline and
regional traffic modeling, impact timing is modified and mitigation is proposed that
responds to these changes. The amendment to the mitigation measures responds to the
Master Plan of Development for the Del Rio Marketplace, ensuring that development
within the Specific Plan area does not degrade the interchange to unacceptable levels.
The proposed modification allows for property development to proceed with construction
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 125 of 220
of identified improvements and fair-share fees associated with impacts that necessitate
improvements at full area build-out. Therefore, no new significant environmental effects
or a substantial increase in the severity of previously identified significant effects has
been identified with this analysis that would result in major changes to the FEIR. The
proposed amendments, as has been shown, maintain the environmental impact
resulting from development within the Specific Plan area and modify mitigation timing
to respond to proposed development plans.
Is there substantial evidence in the record revealing that there have been substantial
changes with respect to the circumstances under which the project is undertaken
which will require major revisions of the previous EIR due to the involvement of new
significant environmental effects or a substantial increase in the severity of previously
identified significant effects as a result of the MP Annex LLC’s proposed hotel use
within the Specific Plan?
No, there is no evidence suggesting that there have been substantial changes with
respect to the circumstances under which the project is undertaken which will require
major revisions to the previous EIR due to the involvement of new significant impacts or
increases in the severity of previously identified impacts. All uses proposed are allowed
or conditionally allowed within the underlying Commercial Retail (CR) zoning designation.
The additional traffic supplemental analysis reveals that no new significant environmental
effects would result from the development plan and there will be no increase in the
severity of any previously identified significant effects. It has been shown that the
proposed amendments will in fact decrease the immediacy of traffic impacts to the Del
Rio / 101 interchange as well as the Del Rio / El Camino Real intersection.
Is there substantial evidence in the record revealing that there is new information of
substantial importance related to the proposed amendments, which was not known
and could not have been known with the exercise of reasonable diligence at the time
the previous EIR was certified that shows: (1) the project will have one or more
significant effects not discussed in the EIR, (2) significant effects previously shown
will be substantially more severe that shown in the previous EIR, (3) mitigation
measure or alternatives previously found to be infeasible would in fact be feasible, or
(4) there are considerably different mitigation measure or alternatives from those
analyzed in the previous EIR that would substantially reduce one or more significant
effects?
No, there is no evidence suggesting that there is new information of substantial
importance relating to new significant effects or the severity of previously identified
significant effects, or new alternatives or mitigation measures or the efficacy of previously
considered alternatives or mitigation measures. At the time of the certification of the
original EIR, traffic impacts and mitigations were identified based on the construction of
a regional retail center on the Annex portion of the Specific Plan area and a Walmart store
on the Major Tenant site. The 202 EIR Addendum analyzed a modified land use pattern
and determined that impacts would be substantially less with full project area build-out,
eliminating the need for round-abouts at the affected intersections. This new analysis
reveals that no new significant environmental effects would result from the development
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 126 of 220
of the Marketplace project as proposed, and in fact there will be a modification in traffic
patterns and peak-hour impacts that allow for modified mitigation measure timing and
signal function. As a consequence of this conclusion, it can be concluded that no new
mitigation measures or alternatives need be analyzed.
3.0 BASIS FOR DECISION TO PREPARE AN ADDENDUM
CEQA Guidelines Section 15164 explains when an addendum to an EIR is required:
(a) The lead agency or a responsible agency shall prepare an addendum to a
previously certified EIR if some changes or additions are necessary but none
of the conditions described in Section 15162 calling for preparation of a
subsequent EIR have occurred.
(b) An addendum to an adopted negative declaration may be prepared if only
minor technical changes or additions are necessary or none of the conditions
described in Section 15162 calling for the preparation of a subsequent EIR
or negative declaration have occurred.
(c) An addendum need not be circulated for public review but can be included
in or attached to the final EIR or adopted negative declaration.
(d) The decision-making body shall consider the addendum with the final
EIR or adopted negative declaration prior to making a decision on the
project.
(e) A brief explanation of the decision not to prepare a subsequent EIR pursuant
to Section 15162 should be included in an addendum to an EIR, the lead
agency's required findings on the project, or elsewhere in the record. The
explanation must be supported by substantial evidence.
Although the project description has been refined with the submittal of a more
precise development plan, an addendum is appropriate because impacts have been
shown to decrease or say the same from the previously certified FEIR as amended
and because none of the conditions described in Section 15162 calling for
preparation of a subsequent EIR have occurred.
More specifically, the project will reduce or maintain the level of anticipated traffic
intensive development, therefore maintaining acceptable levels of service and
supporting reduced VMT. These occurrences do not constitute substantial changes
to the project or the circumstances due to the involvement of new significant
environmental effects or a substantial increase in the severity of previously identified
significant effects. Similarly, neither subsequent considerations nor statutory
changes constitute new information that would show new effects or substantially
more severe effects. Likewise, there are no known mitigation measures that would
in fact be infeasible or that the project proponents have declined to implement.
Furthermore, there have been no other changes, evidence or new information which
would require revisions to the previous EIR. Because none of the criterion in section
15162 has been met, an addendum is appropriate.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 127 of 220
Attachments:
Attachment 1: Redlined Mitigation Measures and Monitoring
Program for modified measures
Attachment 2: 2022 Refined Traffic Analysis and Mitigation
Identification
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 128 of 220
Del Rio Marketplace
Draft Transportation Impact Study
Central Coast Transportation Consulting
895 Napa Avenue, Suite A-6
Morro Bay, CA 93442
(805) 316-0101
March 2022
Prepared For: Cannon
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 129 of 220
Central Coast Transportation Consulting March 2022
2Del Rio Marketplace
Draft Transportation Impact Study Introduction
Executive Summary
This study evaluates the potential transportation impacts of the proposed Del Rio Marketplace project
in the City of Atascadero. The project includes a grocery store under Phase 1 and additional retail, light
industrial, office, and residential uses under Phase 2. The following sections summarize the key
findings:
Intersection Operations: The study intersections operate acceptably under Existing Plus Approved
Plus Project Conditions except at the Del Rio Road/El Camino Real (#4) intersection where the
following improvements are recommended prior to occupancy of the first phase:
• Add a westbound left turn lane with permissive phasing,
• Modify the southbound and northbound left turns to protected-permissive phasing,
• Restripe the eastbound approach to a left, through, and right turn lane and modify the left
turn to protected-permissive phasing,
• Add overlap phasing to the southbound right turn pocket currently under construction,
• Replace eight-inch traffic signal heads with 12-inch heads,
• Install yellow reflective tape on all backplates,
• Install new signage and replace non-reflective signs, and
• Optimize signal timings including updating pedestrian and yellow clearance times.
In addition, the following improvements are recommended under Cumulative Conditions:
• Del Rio Road/Ramona Road (#1): Realign Ramona Road approximately 200 feet west of the
existing location to provide greater separation from the US 101 Southbound Ramps.
• Del Rio Road/US 101 Southbound Ramps (#2): Construct an eastbound right turn lane and
optimize the coordinated signal timing with the Northbound Ramps.
• Del Rio Road/US 101 Northbound Ramps (#3): Construct a westbound right turn lane and
optimize the coordinated signal timing with the Southbound Ramps.
The improvements recommended prior to Phase 1 at the Del Rio Road/El Camino Real (#4)
intersection operate at level of service (LOS C) under Cumulative Conditions with the addition of
project traffic. No traffic signal coordination or restriping of the northbound approach are required
for acceptable queuing.
We recommend the project construct the improvements at Del Rio Road/El Camino Real (#4) and
make a fair share contribution towards the recommended improvements west of El Camino Real.
Site Access and On-Site Circulation: As shown on Figure 2, the project proposes two driveways
on El Camino Real and two on Del Rio Road with limited access proposed and recommended at two
of the driveways. We recommend truck turning templates for deliveries and fire access be applied to
the ultimate site plan and frontage improvement designs. We also recommended convenient sidewalk
connections between all buildings and the frontage improvements, and crosswalks and bike parking be
provided at key locations.
Vehicle Miles Traveled (VMT): The project is expected to have a less-than-significant impact to
VMT.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 130 of 220
Central Coast Transportation Consulting March 2022
3Del Rio Marketplace
Draft Transportation Impact Study Introduction
Contents
1.0 Introduction ................................................................................................................................... 4
2.0 CEQA Transportation Analysis .................................................................................................. 9
3.0 Local Transportation Analysis ...................................................................................................13
4.0 References .....................................................................................................................................25
Figure 1: Project and Study Locations .............................................................................................................. 5
Figure 2: Site Plan ................................................................................................................................................. 6
Figure 3: Existing Volumes and Lane Configurations .................................................................................14
Figure 4: Existing Plus Approved Plus Phase 1 Volumes ...........................................................................17
Figure 5: Existing Plus Approved Plus Project Volumes ............................................................................18
Figure 6: Cumulative Plus Project Volumes ..................................................................................................21
Table 1: Amended Specific Plan Mitigation Summary ................................................................................... 8
Table 2: VMT Analysis ......................................................................................................................................11
Table 3: Existing PM Peak Hour LOS............................................................................................................13
Table 4: Trip Generation ...................................................................................................................................15
Table 5: Project Trip Distribution ...................................................................................................................16
Table 6: Existing and Existing Plus Project PM Peak Hour Levels of Service ........................................16
Table 7: Existing Plus Approved Plus Project PM Peak Hour Intersection Queues ..............................19
Table 8: Cumulative Plus Project PM Peak Hour Levels of Service ..........................................................22
Table 9: Cumulative and Cumulative Plus Project PM Peak Hour Queues .............................................23
Appendix A: Traffic Counts
Appendix B: Intersection Calculation Sheets
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 131 of 220
Central Coast Transportation Consulting March 2022
4Del Rio Marketplace
Draft Transportation Impact Study Introduction
1.0 Introduction
This study evaluates the potential transportation impacts of the proposed Del Rio Marketplace project
in the City of Atascadero. The project includes a 32,400 square foot (s.f.) grocery store under Phase 1
and 203,700 total s.f. including additional retail, light industrial, office, and residential units under Phase
2. The project location and study intersections are shown on Figure 1. The site plan is shown in Figure
2.
The following intersections were analyzed during the weekday PM peak hour:
1. Del Rio Road/Ramona Road
2. Del Rio Road/US 101 Southbound Ramps
3. Del Rio Road/US 101 Northbound Ramps
4. Del Rio Road/El Camino Real
5. Del Rio Road/Del Rio Marketplace/Del Rio Ranch
6. El Camino Real/Del Rio Marketplace Southern Driveway
The level of service (LOS) and queuing are reported for each of the study intersections. The
intersections were evaluated under the following scenarios:
• Existing Conditions reflects recent traffic counts and the existing transportation network.
• Existing Plus Approved Plus Phase 1 adds approved and constructed projects plus Project-
generated grocery store traffic to Existing Conditions volumes.
• Existing Plus Approved Plus Project (Phase 1 and 2) adds approved and constructed
projects plus Project-generated traffic to Existing Conditions volumes.
• Cumulative Plus Project represents future traffic conditions reflective of the buildout of
land uses in the area, including the proposed Project.
Each scenario is described in more detail in the appropriate chapter.
1.1 BACKGROUND
The project would develop the northeast corner of El Camino Real/Del Rio Road (known as the
‘Annex East’) east of the US 101/Del Rio Road interchange. Past studies identified the need for new
roundabouts along Del Rio Road to accommodate traffic from the Walmart project and other area
development. The withdrawal of the Walmart project enabled identification of smaller and less costly
improvements to maintain traffic flows and acceptable operations.
1.1.1 Del Rio Road Interchange Traffic Analysis
The Del Rio Road/US 101 Interchange Traffic Sensitivity Analysis (W-Trans, March 2020) was prepared to
evaluate multiple land use alternatives and their potential impacts to the Del Rio Road/US 101
interchange. This analysis resulted in the abandonment of the roundabout concept in favor of lower
cost improvements to the signalized intersections along the corridor. Mitigation 1 would add a
westbound right turn lane to the Del Rio Road/US 101 NB Ramps and Mitigation 2 would retime the
signals and modify the Del Rio Road/El Camino Real intersection to construct a southbound right
turn lane and provide more efficient signal phasing. Combined, these two mitigations would result in
acceptable operations under the most intensive likely scenario.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 132 of 220
Figure 1: Project and Study Locations
Del Rio Marketplace
Legend:
x - Study
Intersection
- Barrel
Creek
- Del Rio
Marketplace
- Del Rio
Ranch
6 5
2 3 4
1
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 133 of 220
Figure 2: Site Plan
Del Rio Marketplace
02 4 8
3/32” = 1’-0” 24X36 SHEET
0 2 4 8
3/32” = 1’-0”24X36 SHEET
02 4 8
1”=40’24X36 SHEETSECTION E22’-0”54’-0”26’-6”40’-0”87’-0”54’-0”45’-0”DEL RIO MARKETPLACE 2678-01-CO21
21 FEBRUARY 2022 A3ARCHITECTURAL SITE PLAN
PLAZA
LOADING
PLAZA
PLAZA
PLAZA
PASEO/BBQ
PLAZA
PLAZA
OUTDOORSPACE
OUTDOORSPACE
BASIN
(E) BASIN
BASIN
BASIN
VALLEY FRESH MARKET32,400 SF
RETAIL 26,000 SF
RETAIL 36,000 SF
RETAIL 14,500 SFEXCHANGE 110,000 SF3-STORY BUILDING
EXCHANGE 28,600 SF3-STORY BUILDING
OFFICE 1GROUND FLOOR18,000 SF3-STORY BUILDING
RETAIL 59,000 SF
ENTRY
SE
C
T
IO
N
C
S
E
C
T
IO
N
C
SECTION A
SECTION A
SECTION BSECTION B
SECTION DSECTION DRETAIL 46,200 SF
DEL RIO ROADSECTION FEL CAMINO REAL
PERIMETERSOUND WALLSSO(E) RESIDENTIAL
NFF(E) RESIDENTIAL
(E) RESIDENTIAL PERIMETERSOUND WALL
(E) RESIDENTIAL
(E) RESIDENTIAL
PERIMETERSOUND WALL
()
PERIMETERSOUND WALL
OFFICE 2GROUND FLOOR13,500 SF3-STORY BUILDING
PLAZA
PASEO
80’-0”
BASIN
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 134 of 220
Central Coast Transportation Consulting March 2022
7Del Rio Marketplace
Draft Transportation Impact Study Introduction
1.1.2 Del Rio Commercial Area Specific Plan
The proposed project is in the Del Rio Commercial Area Specific Plan. The Specific Plan was amended
to accommodate the withdrawal of the Walmart project and interest in alternative land uses. The
amendment and Final Environmental Impact Report (FEIR) Addendum were supported by the Del
Rio Specific Plan Amendment Traffic Analysis (W-Trans, August 2020) that describes existing and future
traffic operations along Del Rio Road.
The traffic analysis identifies four mitigations, effectively the same as Mitigation 1 and 2 described
above in the Del Rio Road Interchange Traffic Analysis section, which can accommodate the planned
growth with acceptable traffic operations. It also concludes that a large regional retail project on the
Walmart site would require widening the Del Rio Road overcrossing. The amendment assumed this
site would be a Business Park.
Since the amendment, additional information about project development east and west of the Del Rio
Interchange has been received from applicants. In May 2021, CCTC prepared the Del Rio Ranch
Transportation Impact Study for the former Walmart site south of Del Rio Road. The proposed project’s
land uses included light industrial, multi-family dwellings, RV campsites, a hotel, a conference center,
an amphitheater, and a small shopping center. In January 2022, CCTC prepared the Barrel Creek Draft
Transportation Impact Study located north of Del Rio Road and west of US Highway 101. The proposed
project’s land uses included light industrial, single family dwellings, multi-family dwellings, a hotel, a
restaurant and a winery and brewery.
The amended Specific Plan recommended that the traffic signal modifications described in mitigation
4 at the Del Rio Rd/El Camino Real (#4) intersection be completed prior to occupancy of the Business
Park. The Specific Plan mitigations and recommendations are summarized in Table 1.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 135 of 220
Central Coast Transportation Consulting March 2022
8Del Rio Marketplace
Draft Transportation Impact Study Introduction
Table 1: Amended Specific Plan Mitigation Summary
Consistent with the amended Specific Plan, we recommend the Del Rio Rd/El Camino Real (#4)
intersection improvements be completed prior to occupancy of the proposed project.
Amended Specific Plan Potential Study Area Mitigations CCTC Recommendation
#1: This mitigation measure includes the addition of a westbound right-turn lane to
the intersection of Del Rio Rd/US 101 NB Ramps, such that there would be two
westbound lanes on Del Rio Rd from El Camino Real to US 101 NB Ramps. This
would require widening Del Rio Rd, the construction of a retaining wall on the north
side, and reconstruction of the curb return. By splitting westbound traffic into
through and right-turn lanes, the queue length could be reduced by providing drivers
two lanes to stack in rather than one for both movements combined. Additionally,
splitting through and right-turning traffic would allow turning drivers to bypass
through drivers who are waiting for a green light, reducing delay and improving
operations at Del Rio Rd/US 101 NB Ramps.
Existing Plus Approved Plus
Project volumes operate
acceptably without the
additional westbound right turn
lane at Del Rio Rd/US 101
Northbound Ramps (#3).
Recommend project pay their
fair share toward future
improvements.
#2: This mitigation measure would involve several modifications to the traffic signal
at Del Rio Rd/El Camino Real to more efficiently orchestrate the movement of
conflicting traffic. This modification involves the replacement of the northbound left-
turn protected phasing (green arrow) with protected-permissive phasing (green arrow
that goes to green ball or flashing yellow arrow), and the southbound left-turn
protected phasing with permissive phasing (green ball or flashing yellow arrow). The
eastbound and westbound phases, which currently activate at the same time, would
be split to operate sequentially, or one direction and then the other. These changes
would require modification to the existing signal infrastructure to incorporate updated
signal heads. In addition, this mitigation includes adjustment to the signal phasing in
terms of recalls, phase lengths, and the overall cycle length.
Protected -permissive phasing is
recommended on both the
northbound and southbound
approaches, see #4. Eastbound
and westbound split phasing
not recommended as interim
measure based on unacceptable
operations with project traffic.
#3: 'This mitigation measure would combine Mitigation 1 and 2.Not recommended, see #2.
Cumulative Plus Project
operates acceptably at the Del
Rio Rd/El Camino Real (#4)
intersection without signal
coordination or restriping of the
northbound approach.
Recommend Marketplace
project construct the following
improvements prior to
occupancy:
- Restripe eastbound approach
to a left, through, and right turn
lane.
- Install westbound left turn
lane.
- Modify all approaches to
protected-permissive phasing
except westbound.
- Install southbound right turn
overlap.
- Update signal timing.
#4: This option includes any modifications that may be required to achieve
acceptable operations with the addition of traffic that would be generated by the
Amended Specific Plan scenario. In addition to Mitigation 1 and Mitigation 2 above,
the intersection of Del Rio Rd/El Camino Real would need to be further modified to
reconfigure the eastbound approach from through/left-turn and right-turn lanes, to
left-turn lane and through/right-turn lanes, essentially moving the through movement
from the left lane to the right lane. This may require widening the eastbound
departure (on the east leg of the intersection) to avoid excessive lateral shifting of
through traffic. With a dedicated eastbound left-turn lane, the eastbound-westbound
split phasing could be replaced with concurrent timing, as well as protected-
permissive phasing for the eastbound left-turn movement. With protected left-turn
phasing in the eastbound direction and a prohibition of eastbound U-turns, it would
be possible to include a southbound right-turn overlap, which is a green arrow that
enables southbound right turning drivers to continue without stopping concurrently
with the eastbound left-turn movement. Additionally, the signal at Del Rio Rd/El
Camino Real would need to be coordinated with the signals at Del Rio Rd/US 101
NB Ramps and Del Rio Rd/US 101 SB Ramps. This would require extending the
interconnect hardware between the ramp signals to Del Rio Rd/El Camino Real, and
potentially upgrading the signal hardware at Del Rio Rd/El Camino Real to be
compatible with interconnect technology if it is not already. (Note: Existing
interconnect conduit and cable.)
Amended Specific Plan Mitigation Summary
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 136 of 220
Central Coast Transportation Consulting March 2022
9Del Rio Marketplace
Draft Transportation Impact Study CEQA Transportation Analysis
2.0 CEQA Transportation Analysis
This section presents analysis relevant to the California Environmental Quality Act (CEQA), notably
analysis of the existing setting, plan consistency, vehicle miles traveled (VMT), and transportation
safety.
2.1 EXISTING CIRCULATION NETWORK
The existing roadways adjacent to the proposed project are described below.
• US 101 is a four-lane freeway serving intercity and regional travel. There is a full access
interchange at Del Rio Road.
• El Camino Real is a major arterial paralleling US 101. There are two to four travel lanes, Class
II bikeways, and intermittent sidewalks.
• Del Rio Road is a minor arterial west of El Camino Real and a collector east of El Camino Real.
There are two travel lanes, intermittent Class II bike lanes, and intermittent sidewalks. There
are proposed Class II bike lanes through the study area.
The existing study intersections are described below:
• Del Rio Road/Ramona Road (#1) Side-street stop controlled with marked crosswalk on the
south leg only.
• Del Rio Road/US 101 Southbound Ramps (#2): Existing traffic signal with marked crosswalk
and pedestrian signals on the south leg only.
• Del Rio Road/US 101 Northbound Ramps (#3): Existing traffic signal with marked crosswalk
and pedestrian signals on the south leg only.
• Del Rio Road/El Camino Real (#4): Existing traffic signal with marked crosswalks and
pedestrian signals on all legs.
2.1.1 Transit
The San Luis Obispo Regional Transit Authority (RTA) operates fixed route transit service in the study
area. RTA Route 9 is a bus service traveling between San Luis Obispo, Santa Margarita, Atascadero,
Templeton, Paso Robles, and San Miguel with hourly headways on weekdays and reduced frequency
on weekends. The closest bus stops to the project site are on El Camino Real south of Del Rio Road
at Mission Oaks Plaza.
2.2 CEQA TRANSPORTATION THRESHOLDS
The CEQA transportation thresholds are described below.
2.2.1 City of Atascadero
While the City of Atascadero has not yet adopted VMT standards the State Office of Planning and
Research (OPR) has published recommended thresholds which are applied below. OPR’s Technical
Advisory on Evaluating Transportation Impacts in CEQA provides guidance for evaluating VMT for various
project types.
Mixed-use projects can evaluate the individual components separately or focus the analysis on the
dominant use. As shown in Table 4, the non-residential components of the project generate over 90
percent of the project’s daily trips and are therefore the dominant use. OPR also notes that local-
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 137 of 220
Central Coast Transportation Consulting March 2022
10Del Rio Marketplace
Draft Transportation Impact Study CEQA Transportation Analysis
serving retail can be presumed to have a less-than-significant impact because these uses don’t typically
generate new demand, but instead shift travel patterns as customers shift to more convenient shopping
locations. The proposed retail uses on the site are anchored by a 32,400 s.f. grocery store which is
expected to be local serving.
OPR’s suggested threshold for office uses is 15 percent below the regional average of work VMT.
Work VMT captures trips from home to work. The SLOCOG Travel Demand Model was applied to
estimate the work VMT.
While LOS is not an allowable CEQA metric it remains in planning documents for the City of
Atascadero and is analyzed under the local transportation analysis section of this report.
2.2.2 Caltrans
Caltrans has eliminated LOS consistent with SB 743 and now relies on VMT and safety to evaluate
transportation impacts. Caltrans recently issued a series of policy documents related to transportation
impacts and CEQA determinations. Caltrans published a VMT-Focused TIS Guide in May 2020 which
replaced the prior guide reliant on LOS. The TIS Guide notes that lead agencies have the discretion to
choose VMT thresholds and methods, and generally conforms to OPR guidance.
2.3 RTP CONSISTENCY
SLOCOG’s 2019 Regional Transportation Plan (RTP) serves as a blueprint planning the region’s
transportation system. It integrates land use and transportation planning to identify and prioritize
regional transportation improvements.
Figure 13-7 of the RTP shows an existing jobs-housing imbalance within subregions, with the Central
County subregion having more than two jobs per housing unit and all other subregions having less
than one job per housing unit. This imbalance causes congestion and increases trip lengths as
commuters travel to and from the Central County for work.
The RTP’s Action Strategies direct new growth to existing mixed-use corridors since these areas
support a more efficient transportation network. El Camino Real is one of four corridors identified in
the RTP as the priority areas for growth.
The proposed project conforms to the RTP’s preferred growth scenario by adding jobs to a mixed-use
corridor in the North County subregion, thereby improving the jobs-housing balance in the region and
improving land use location efficiency.
2.4 VEHICLE MILES TRAVELED (VMT)
The project’s VMT was estimated using the SLOCOG Travel Demand Model. The regional VMT is
summarized in Table 2.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 138 of 220
Central Coast Transportation Consulting March 2022
11Del Rio Marketplace
Draft Transportation Impact Study CEQA Transportation Analysis
Table 2: VMT Analysis
The project is expected to increase overall regional VMT slightly and reduce residential and office
VMT. This reduction in office VMT and residential VMT indicates a less-than-significant impact to
VMT. The retail component of the project is considered local-serving and is presumed to have a less-
than-significant VMT impact.
The provision of commercial uses in a predominantly residential area improves the jobs-housing
balance which shortens commute trips lengths. The mix of uses on the project site provides
destinations serving project residents as well as other residents nearby. This is consistent with SB 743
and regional planning goals to encourage mixed-use infill developments.
2.5 EMERGENCY ACCESS
The project proposes four driveways, two on Del Rio Road and two on El Camino Real. We
recommend truck turning templates for fire access be applied to the ultimate site plan and frontage
improvement designs to confirm adequate emergency access. Fire Department approval is also
required on all development plans.
2.6 COLLISIONS
CCTC obtained traffic collision data from the Statewide Integrated Traffic Records System (SWITRS),
the City’s collision database, and the Caltrans Traffic Accident Surveillance and Analysis System
(TASAS). The US 101 Northbound and Southbound ramp intersections have a total collision rate
lower than the statewide average.
The average collision rate at the Del Rio Road/El Camino Real (#4) intersection exceeds the statewide
average collision rate for similar facilities. Approximately 30 percent of collisions were caused by
improper turning, 20 percent auto right-of-way violations, and an additional 20 percent unsafe speed.
50 percent of collisions involved a fixed object and approximately 20 percent of collisions were
broadside. No pedestrian, bicycle, severe injury, or fatal collisions occurred. We recommend the
following be completed with the improvements at Del Rio Road/El Camino Real (#4):
• Replace eight-inch traffic signal heads with 12-inch heads.
• Install yellow reflective tape on traffic signal backplates.
• Install LEFT TURN YIELD ON GREEN (R10-12) and TURNING VEHICLES YIELD
TO PEDESTRIANS (R10-15) signs as needed.
• Replace signs to comply with CAMUTCD Table 2A-3 for sign reflectivity.
Scenario Employees Population
Residential
VMT
Office
VMT
2020 No Project 8,899,234 117,276 246,732 4,480,333 1,595,434
2020 With Project 8,899,902 117,474 246,942 4,478,439 1,594,930
Change from No Project 669 198 210 -1,894 -504
Source: SLOCOG TDM, CCTC, 2022
1. Residential VMT is produced by households (sum of home-based productions); office
VMT is attracted to offices (sum of home-based-work attractions).
Regional VMT Analysis
Total
Regional
VMT
Demographics VMT By Trip Purpose
1
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 139 of 220
Central Coast Transportation Consulting March 2022
12Del Rio Marketplace
Draft Transportation Impact Study
• Update signal timing including pedestrian timing and yellow and red clearance intervals to
meet current CAMUTCD standards, as necessary.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 140 of 220
Central Coast Transportation Consulting March 2022
13Del Rio Marketplace
Draft Transportation Impact Study Local Transportation Analysis
3.0 Local Transportation Analysis
While LOS is not an allowable CEQA metric it remains in planning documents for the City of
Atascadero. The study intersections were analyzed with the Synchro 10 software package applying the
HCM 6th Edition methods, except where unusual signal phasing required the use of HCM 2000.
The City’s Circulation Element specifies that level of service (LOS) C or better operations shall be
maintained as the standard at all intersections and on all arterial and collector roads. Upon City Council
approval, LOS D is acceptable where residences are not directly impacted and improvements to meet
the City’s standard would be prohibitively costly or disruptive.
Caltrans has eliminated LOS consistent with SB 743 and now relies on VMT and safety to evaluate
transportation impacts.
3.1 EXISTING OPERATIONS
Traffic count data at the study intersections was collected in February 2022. Consistent with recent
studies in the area, only the weekday PM peak hour was analyzed since this is the hour which dictates
future improvements. Additionally, the project is expected to generate more vehicle trips during the
PM peak hour than during the AM peak hour, as shown in the trip generation section of this report.
Figure 3 shows the existing traffic volumes and lane configurations. Traffic count sheets are provided
in Appendix A. Table 3 summarizes the LOS, with detailed calculation sheets included in Appendix
B.
Table 3: Existing PM Peak Hour LOS
No LOS or queuing deficiencies are reported under Existing Conditions.
Intersection Delay1 LOS
9.6 A
4. Del Rio Rd/El Camino Real 10.8 B
1. HCM 6th average control delay in seconds per vehicle (HCM 2000 used
for Intersections 2 and 3). For side-street-stop controlled intersections the
worst approach's delay is reported in parentheses next to the overall
intersection delay.
Existing PM Peak Hour Levels of Service
Existing
1. Del Rio Rd/Ramona Rd 0.7 (9.4) - (A)
2. Del Rio Rd/US 101 SB Ramps 12.2 B
3. Del Rio Rd/US 101 NB Ramps
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 141 of 220
Figure 3: Existing Volumes and Lane Configurations
Del Rio Marketplace
Legend:
- Traffic
Signal
PM Peak
Hour Traffic
Volumes
x - Study
Intersection
- Del Rio
Marketplace - Stop
Sign
5
2 3 4
6
1
1.2.3.
4.5.6.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 142 of 220
Central Coast Transportation Consulting March 2022
15Del Rio Marketplace
Draft Transportation Impact Study Local Transportation Analysis
3.2 EXISTING PLUS APPROVED PLUS PROJECT CONDITIONS
The amount of traffic affecting the study locations is estimated in three steps: trip generation, trip
distribution, and trip assignment. Trip generation refers to the total number of trips generated by the
site. Trip distribution identifies the general origins and destination of these trips, and trip assignment
specifies the routes taken to reach these origins and destinations.
3.2.1 Trip Generation
The Institute of Transportation Engineers (ITE) Trip Generation Manual 11th Edition was used to
estimate the trip generation of the Del Rio Marketplace project. Pass-by and internal capture trips were
deducted to obtain total external trips. Table 4 summarizes the project trip generation.
Table 4: Trip Generation
The proposed project would generate 5,495 net new trips per weekday, including 327 AM peak hour
trips and 397 PM peak hour trips. The project trip generation is similar to the original Specific Plan as
Daily
Land Use Size Total In Out Total In Out Total
Grocery Store1 32.400 KSF 3,241 54 39 93 155 155 310
-370 0 0 0 -37 -37 -74
2,871 54 39 93 118 118 236
Shopping Plaza w/Supermarket2 64.100 KSF 6,057 140 86 226 293 318 611
Light Industrial3 18.600 KSF 120 14 2 16 2 10 12
Office4 31.500 KSF 425 55 7 62 11 53 64
Residential5 82.000 DU 553 8 25 33 26 16 42
-1,220 0 0 0 -122 -122 -244
-440 -5 -5 -10 -44 -44 -88
5,495 212 115 327 166 231 397
Specific Plan (Shopping Center)8 104.050 KSF 4,182 96 62 158 192 200 392
Amended SP (Business Park)9 190.000 KSF 2,364 46 30 76 37 43 80
KSF = Thousand Square Feet; ITE = Institute of Transportation Engineers.
1. ITE Land Use Code #850, Supermarket. Average rates used for AM. Fitted curve equation used for Daily and PM.
2. ITE Land Use Code #821, Shopping Plaza. Average rates used for daily and AM. Fitted curve equation used for PM.
9. Trip generation (Annex only). Planning Commission, September 2020.
Source: ITE Trip Generation Manual, 11th Ed., 2021, and Trip Generation Handbook, 3rd Edition.
6. PM peak hour pass-by trips multiplied by a factor of 5 to determine daily pass-by trips.
8. Total trip generation (Annex East) including pass-by and diverted trips. W-Trans TIA, March 2012.
3. ITE Land Use Code #110, Light Industrial. Fitted curve equations used.
4. ITE Land Use Code #710, General Office Building. Fitted curve equations used.
5. ITE Land Use Code #220, Multifamily Housing (Low-Rise). Fitted curve equation used for Daily, average rates used for
AM and PM based on data cluster.
7. AM and PM Internal Capture from TripGen 10 software. PM multiplied by a factor of 5 to determine daily trips.
Del Rio Marketplace Project Trip Generation
AM Peak Hour PM Peak Hour
Pass-By Trips6
Phase 1 + Phase 2
Phase 1
Pass-By Trips3
Net New Trips (Phase 1 only)
Internal Capture7
Net New Trips (Phase 1 & 2)
Specific Plan
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 143 of 220
Central Coast Transportation Consulting March 2022
16Del Rio Marketplace
Draft Transportation Impact Study Local Transportation Analysis
analyzed in the Del Rio Road Area Specific Plan Traffic Impact Analysis (W-Trans, March 2012) and is higher
than the estimates analyzed in the amended Specific Plan.
3.2.2 Trip Distribution and Assignment
Trip distribution and assignment for the project trips were estimated using available studies in the area
and local knowledge as summarized in Table 5.
Table 5: Project Trip Distribution
Figure 4 shows the Existing Plus Approved Plus Phase 1 volumes and Figure 5 shows the Existing
Plus Approved Plus Project volumes.
3.3 EXISTING PLUS APPROVED PLUS PROJECT INTERSECTION OPERATIONS
Table 6 summarizes the LOS and Table 7 presents the key queues for the study intersections, with
detailed calculation sheets included in Appendix B.
Table 6: Existing and Existing Plus Project PM Peak Hour Levels of Service
Location Distribution
El Camino Real (North) 10%
El Camino Real (South) 30%
Del Rio (East)10%
Del Rio (West)10%
US 101 (North)20%
US 101 (South)20%
Total 100%
Project Trip Distribution
Intersection Delay1 LOS Delay1 LOS Delay1 LOS
0.7 (9.4) - (A)
12.2 - (A)
9.6 B
10.8 A
- - 3.4(9.6) - (A) 5.3(10.5) - (A)
- - 2.4(12.8) - (B) 3.0(13.2) - (B)
Existing (EX)
2. Del Rio Rd/US 101 SB Ramps
1. Del Rio Rd/Ramona Rd
Existing Plus Approved Plus Project PM Peak Hour Levels of Service
0.7 (10.2) - (B)
13.5 B
4. Del Rio Rd/El Camino Real
5. Del Rio Rd/Project Driveway/
Del Rio Ranch
6. El Camino Real/Marketplace
Southern Driveway
EX + Approved
+ Phase 1
EX + Approved
+ Project
3. Del Rio Rd/US 101 NB Ramps A
69.6 E
0.6 (10.2) - (B)
13.5 B
9.9 A
94.2 F
9.8
1. HCM 6th average control delay in seconds per vehicle (HCM 2000 used for Intersections 2 and 3). For side-street-
stop controlled intersections the worst approach's delay is reported in parentheses next to the overall intersection delay.
Unacceptable operations shown in bold text.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 144 of 220
Figure 4: Existing Plus Approved Plus Phase 1 Volumes
Del Rio Marketplace
Legend:
- PM Peak Hour
Traffic Volumes
x - Study
Intersection
- Del Rio
Marketplace
5
2 3 4
6
1
1.2.3.
5.6.4.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 145 of 220
Figure 5: Existing Plus Approved Plus Project Volumes
Del Rio Marketplace
Legend:
- PM Peak Hour
Traffic Volumes
x - Study
Intersection
- Del Rio
Marketplace
5
2 3 4
6
1
1.2.3.
5.6.4.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 146 of 220
Central Coast Transportation Consulting March 2022
19Del Rio Marketplace
Draft Transportation Impact Study Local Transportation Analysis
Table 7: Existing Plus Approved Plus Project PM Peak Hour Intersection Queues
All study locations operate with acceptable LOS with the addition of project traffic except Del Rio
Road/El Camino Real (#4). The eastbound left turn movement queue exceeds storage at the
intersection with the addition of project traffic.
At Del Rio Road/US 101 Southbound Ramps (#3), the addition of project traffic would cause the
eastbound through movement queue to block the upstream intersection of Ramona Road.
3.3.1 Recommended Improvements
The following intersection improvements are recommended with the addition of project traffic:
• Del Rio Road/Ramona Road (#1): Ramona Road carries low volumes, the queues reported at
the Southbound Ramps would not be exceeded 95 percent of the time, and average queues
are not expected to block Ramona Road. Do Not Block Intersection Markings per the
California Manual on Uniform Traffic Control Devices (CAMUTCD) Section 3B.17 could be
considered to address this infrequent blockage.
• Del Rio Road/El Camino Real (#4): The following improvements would bring the
intersection operations to LOS B with acceptable queuing and are recommended prior to
occupancy of the first phase:
o Add a westbound left turn lane with permissive phasing,
o Modify the southbound and northbound left turns to protected-permissive phasing,
o Restripe the eastbound approach to a left, through, and right turn lane and modify
the left turn to protected-permissive phasing,
EBT 40 39 55 57
WBT 290 85 76 82
SBL2 705 130 167 #176
SBR25112020
EBT 290 163 236 244
WBT 240 50 104 129
NBL3 475 58 35 35
NBR 175 42 51 52
EBL 240 177 #614 #688
EBR 240 51 57 57
NBL 280 181 237 237
SBL 150 18 52 52
Bold indicates queue length longer than storage length.
Existing Plus Approved Plus Project PM Peak Hour Intersection Queues1
1. Queue length in feet that would not be exceeded 95 percent of the time. # indiciates that the 95th percentile volume
exceeds capacity and the queue may be longer. M indicates the queue is metered by an upstream signal.
2. Deceleration length of 235 feet has been subtracted from the storage length per the Highway Design Manual for 30
mph design speed.
3. Deceleration length of 425 feet has been subtracted from the storage length per the Highway Design Manual for 50
mph design speed.
2. Del Rio Rd/
US 101 NB Ramps
1. Del Rio Rd/
US 101 SB Ramps
Existing (EX)EX + AP +
Phase 1
EX + AP +
ProjectIntersection Movement
Storage Length
(ft)
3. Del Rio Rd/
El Camino Real
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 147 of 220
Central Coast Transportation Consulting March 2022
20Del Rio Marketplace
Draft Transportation Impact Study Local Transportation Analysis
o Add overlap phasing to the southbound right turn pocket currently under
construction, and
o Optimize signal timings including updating pedestrian and yellow clearance times.
3.4 SITE ACCESS AND ON-SITE CIRCULATION
This section discusses issues related to site access and on-site circulation. On-site circulation
deficiencies would occur if the project designs fail to meet appropriate standards, provide adequate
truck access, or would result in hazardous conditions.
The American Association of State Highway and Transportation Officials (AASHTO) states that,
“ideally, driveways should not be located within the functional area of an intersection or the influence
area of an adjacent driveway.”
As shown on Figure 2, the project proposes two driveways on El Camino Real and two driveways on
Del Rio Road. Full access is proposed at the northern driveway on El Camino Real across from an
existing driveway and on Del Rio Road across from the future Del Rio Ranch entrance. Right-in/right-
out only turns are recommended and proposed at the eastern driveway on Del Rio Road due to the
proximity to the Obispo Road intersection. Left-in/right-in/right-out only turns are recommended
and proposed at the southern driveway on El Camino Real due to the proximity to the Del Rio
Road/El Camino Real (#4) intersection.
To maintain sight distance at project driveways, all landscaping, signage, or other obstructions shall
comply with City Standard Drawing Number 414.
Preliminary truck turning templates provided by the applicant may have used a larger design vehicle
than necessary and showed the need for one way travel on the internal circulation system during
deliveries. Truck turning templates for truck deliveries and fire access should be applied to the ultimate
site plan and frontage improvement designs. We recommend two-way travel with allowance for
oncoming vehicles be provided on roadways fronting buildings.
We recommend convenient sidewalk connections between all buildings, the frontage improvements,
and crosswalks at key locations. Convenient and secure bike parking should also be provided at the
market, plazas, and/or building entrances.
3.5 CUMULATIVE PLUS PROJECT CONDITIONS
Cumulative Conditions (2035) represent build-out of the land uses in the region. Cumulative traffic
volume forecasts were developed based on the Del Rio Commercial Area Specific Plan Amendment Traffic
Analysis (W-Trans, August 2020), Del Rio Ranch Traffic Impact Study (CCTC, May 2021), and the Barrel
Creek Draft Traffic Impact Study (CCTC, January 2022). The amended Specific Plan analysis forecasts
were updated to include the Del Rio Ranch and Barrel Creek projects as currently proposed. In
addition, the forecasts were updated based on the difference between the 2022 counts and the 2018
data previously used in the Specific Plan amendment. The estimated trips from the existing hotel were
also subtracted from the cumulative base volumes.
Figure 6 shows the Cumulative Plus Project traffic volumes, respectively. Under Cumulative
Conditions, a peak hour factor (PHF) of 0.92 was used for the analysis. In addition, two percent trucks
were assumed under Cumulative Conditions.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 148 of 220
Figure 6: Cumulative Plus Project Volumes
Del Rio Marketplace
Legend:
- PM Peak Hour
Traffic Volumes
x - Study
Intersection
- Del Rio
Marketplace
5
2 3 4
6
1
1.2.3.
5.6.4.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 149 of 220
Central Coast Transportation Consulting March 2022
22Del Rio Marketplace
Draft Transportation Impact Study Local Transportation Analysis
Table 8 presents the LOS and Table 9 presents the key queues for the study intersections under
Cumulative Plus Project Conditions, with detailed calculation sheets included in Appendix B.
Table 8: Cumulative Plus Project PM Peak Hour Levels of Service
Intersection Delay1 LOS
6. El Camino Real/Marketplace Southern Driveway
Cumulative Plus Project PM Peak Hour Levels of Service
2.9(13.5) - (B)
14.2 B
34.7
Cumulative+Project
Unacceptable operations shown in bold text.
1. HCM 6th average control delay in seconds per vehicle (HCM 2000 used for Intersections 2
and 3). For side-street-stop controlled intersections the worst approach's delay is reported in
parentheses next to the overall intersection delay.
4. Del Rio Rd/El Camino Real 194.2 F
5. Del Rio Rd/Project Driveway/Del Rio Ranch 5.3(17.5) - (C)
C
3. Del Rio Rd/US 101 NB Ramps
2. Del Rio Rd/US 101 SB Ramps
0.9(11.6) - (B)1. Del Rio Rd/Ramona Rd
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 150 of 220
Central Coast Transportation Consulting March 2022
23Del Rio Marketplace
Draft Transportation Impact Study Local Transportation Analysis
Table 9: Cumulative and Cumulative Plus Project PM Peak Hour Queues
The following LOS and queuing deficiencies are reported:
• Del Rio Road/US 101 Southbound Ramps (#2): The eastbound through movement queue
length further blocks the Ramona Road intersection and the westbound through movement
exceeds the storage length on the US 101 overpass. The southbound offramp approach queues
would not affect US 101 freeway operations.
• Del Rio Road/US 101 Northbound Ramps (#3): The eastbound through movement queues
exceed the storage length on the US 101 Overpass and the westbound queue would reach El
Camino Real. The northbound offramp approach would not affect US 101 freeway
operations.
• Del Rio Road/El Camino Real (#4): The intersection operates unacceptably, and the
northbound left turn and eastbound left/through queue length exceeds the available storage.
3.5.1 Recommended Cumulative Improvements
The following improvements are recommended at the study intersections under Cumulative Plus
Project Conditions:
• Del Rio Road/Ramona Road (#1): Consistent with recent studies in the area, realigning
Ramona Road approximately 200 feet to the west would provide greater separation from the
US 101 ramps and accommodate the queues.
• Del Rio Road/US 101 Southbound Ramps (#2): Consistent with recent studies in the area,
optimizing signal timings would improve corridor operations. In addition, an eastbound right
EBT 40 103
WBT 290 #311
SBL2 705 #336
SBR 25 44
EBT 290 m321
WBT 240 247
NBL3 475 64
NBR 175 94
EBL/T 240 #905
EBR 240 131
NBL 280 334
SBL 150 59
4. Del Rio Rd/El Camino Real
3. Del Rio Rd/US 101 NB Ramps
2. Del Rio Rd/US 101 SB Ramps
Cumulative Plus Project PM Peak Hour Intersection Queues1
Intersection Movement Storage Length
(ft)
Cumulative Plus
Project
1. Queue length in feet that would not be exceeded 95 percent of the time. # indiciates that the 95th
percentile volume exceeds capacity and the queue may be longer. M indicates the queue is metered by an
upstream signal.
2. Deceleration length of 235 feet has been subtracted from the storage length per the Highway Design
Manual for 30 mph design speed.
3. Deceleration length of 425 feet has been subtracted from the storage length per the Highway Design
Manual for 50 mph design speed.
Bold indicates queue length longer than storage length.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 151 of 220
Central Coast Transportation Consulting March 2022
24Del Rio Marketplace
Draft Transportation Impact Study Local Transportation Analysis
turn lane is recommended to reduce queuing on the US 101 overpass. The turn lane could use
the existing Ramona Road intersection approach and be constructed when the Del Rio
Road/Ramona Road (#1) intersection is realigned.
• Del Rio Road/US 101 Northbound Ramps (#3): Consistent with recent studies in the area,
constructing a westbound right turn lane and optimizing signal timings would improve
corridor operations.
• Del Rio Road/El Camino Real (#4): The improvements recommended under Existing Plus
Approved Plus Project Conditions operate at LOS C with acceptable queuing under
Cumulative Plus Project Conditions. The natural cycle length at the US 101 Ramp intersections
is shorter than the El Camino Real intersection due to the number of intersection approaches
and crosswalk lengths. With an additional turn lane added in each direction between the US
101 Northbound Ramps and El Camino Real, traffic signal coordination or restriping of the
northbound approach is not required or recommended.
With the recommended improvements, all study intersections would operate acceptably at LOS C or
better and queuing would not encroach into the deceleration distance needed for vehicles exiting US
101.
All recommended intersection improvements have been previously identified in historic studies except
the eastbound right turn lane at Del Rio Road/ US 101 Southbound Ramps (#3).
We recommend the project make a fair share contribution towards the cost of the improvements at
Ramona Road and the US 101 Ramp intersections. We recommend the project construct the proposed
improvements at Del Rio Road/El Camino Real (#4) prior to occupancy of the first phase.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 152 of 220
Central Coast Transportation Consulting March 2022
25Del Rio Marketplace
Draft Transportation Impact Study References
4.0 References
California Department of Transportation. 2012, 2018. Highway Design Manual.
______. 2019. California Manual on Uniform Traffic Control Devices, 2014 Edition, Revision 4.
______. May 2020. Vehicle Miles Traveled-Focused Transportation Impact Study Guide.
California Governor’s Office of Planning and Research (OPR). December 2018. Technical Advisory
on Evaluating Transportation Impacts in CEQA.
Central Coast Transportation Consulting (CCTC). May 2021. Del Rio Ranch Transportation Impact
Study.
_____. January 2022. Barrel Creek Draft Transportation Impact Study.
City of Atascadero. September 2010. Bicycle Transportation Plan.
______. March 2014. Standard Specifications and Drawings.
______. July 2016. General Plan 2025, Update #3.
Federal Highway Administration (FWHA). September 2005. Safety Effects of Marked Versus
Unmarked Crosswalks at Uncontrolled Locations Final Report and Recommended Guidelines.
GHD. January 2020. City of Atascadero 2020 Speed Zone Survey Update.
Institute of Transportation Engineers (ITE). 2021. Trip Generation Manual, 11th Edition.
______. 2017. Trip Generation Handbook, 3rd Edition.
San Luis Obispo Council of Governments. 2014. Regional Transportation Plan/Sustainable
Communities Strategy.
Transportation Research Board. 2016. Highway Capacity Manual, 6th Edition.
W-Trans. 2008. Interchange Improvement Study for the City of Atascadero.
______. March 2012. Del Rio Road Area Specific Plan Traffic Impact Analysis.
______. March 2020. Del Rio Road/US 101 Interchange Traffic Sensitivity Analysis.
______. August 2020. Del Rio Specific Plan Amendment Traffic Analysis.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 153 of 220
Redlined Mitigation Monitoring and Reporting Program
for the
2022 Addendum to the FINAL
Environmental Impact Report
Del Rio Road Commercial Area Specific Plan
City of Atascadero, San Luis Obispo County, California
State Clearinghouse No. 2010051034
The attached Mitigation Monitoring Program excerpts represent measures modified
for the Marketplace development. The full Mitigation Monitoring Program is on file at
the City of Atascadero.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 154 of 220
City of Atascadero - Del Rio Road Commercial Area Specific Plan Mitigation Monitoring and Reporting Program
Michael Brandman Associates
H:\Client (PN-JN)\3622\36220003\3 - Final EIR\MMRP\33620003 Del Rio Road MMRP.doc 1
Table 1 (cont.): Del Rio Road Commercial Area Specific Plan Mitigation Monitoring and Reporting Program
Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial
MM TRANS-lc: Prior to occupancy of the first new building within the
Specific Plan on the east side of El Camino Real, modifications to the
traffic signal at Del Rio Road/El Camino Real shall be completed by the
developer to more efficiently orchestrate the movement of conflicting
traffic. This modification requires the replacement of the northbound
left-turn protected phasing (green arrow) with protected-permissive
phasing (green arrow that goes to green ball or flashing yellow arrow),
and the southbound left-turn protected phasing with permissive phasing
(green ball or flashing yellow arrow). The eastbound and westbound
phases, which currently activate at the same time, shall be split to operate
sequentially, or one direction and then the other. These changes shall
require modification to the existing signal infrastructure to incorporate
updated signal heads. In addition, this mitigation includes adjustment to
the signal phasing in terms of recalls, phase lengths, and the overall cycle
length.
Site inspection;
acceptance of
improvements
Prior to issuance of
the final certificate
of occupancy for
Walmart
City of Atascadero
Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial
MM TRANS-lc: Prior to occupancy of the first new building within the
Specific Plan on the east side of El Camino Real, modifications
improvements to the intersection and traffic signals at Del Rio Road/El
Camino Real shall be completed by the developer to more efficiently
orchestrate the movement of conflicting traffic. This modification
requires tThese improvements include the following: he replacement of
the northbound left-turn protected phasing (green arrow) with
protected-permissive phasing (green arrow that goes to green ball or
flashing yellow arrow), and the southbound left-turn protected phasing
with permissive phasing (green ball or flashing yellow arrow). The
eastbound and westbound phases, which currently activate at the same
time, shall be split to operate sequentially, or one direction and then the
other. These changes shall require modification to the existing signal
infrastructure to incorporate updated signal heads. In addition, this
mitigation includes adjustment to the signal phasing in terms of recalls,
phase lengths, and the overall cycle length. 1) add a westbound left
turn lane with permissive phasing; 2) modify the southbound and
northbound left turns to protected-permissive phasing,; 3) restripe the
eastbound approach to a left, through, and right turn lane and modify
the left turn to protected-permissive phasing;4) add overlap phasing to
the southbound right turn pocket fronting 1920 El Camino Real;5)
replace eight-inch traffic signal heads with 12-inch heads, 6) install
yellow reflective tape on all backplates; 7) install new signage and
replace non-reflective signs; and 8) optimize signal timings including
updating pedestrian and yellow clearance times. All the listed items
shall be coordinated and approved by the City Engineer.
Site inspection;
acceptance of
improvements
Prior to issuance of
the final certificate
of occupancy for
Walmart
City of Atascadero
MM TRANS 1-d
Prior to issuance of any building permit within the Del Rio Road
Commercial Area Specific Plan, the pm peak hour trips shall be
evaluated to ensure that total pm peak hour trips do not exceed 1,000.
If trips associated with a proposed building permit does not exceed
this threshold, the applicantPrior to occupancy of the first use that
exceeds 134 p.m. cumulative peak hour trips,All projects shall pay
their fair share toward the addition of a westbound to northbound
right-turn lane shall be added toat the intersection of Del Rio
Road/US 101, such that there would be two westbound travel lanes
on Del Rio Road from El Camino Real to the US 101 North ramp.
This would require widening Del Rio Road, the construction of a
retaining wall on the north side of Del Rio Road, and reconstruction
of the curb return. If trips associated with a proposed building
permit exceeds this threshold, the applicant may be required to
construct the above improvements and as detailed below.
Receipt of fees / Site
inspection;
acceptance of
improvements
Prior to issuance of
each building permit
for the project
City of Atascadero
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 155 of 220
City of Atascadero - Del Rio Road Commercial Area Specific Plan Mitigation Monitoring and Reporting Program
Michael Brandman Associates
H:\Client (PN-JN)\3622\36220003\3 - Final EIR\MMRP\33620003 Del Rio Road MMRP.doc 2
Table 1 (cont.): Del Rio Road Commercial Area Specific Plan Mitigation Monitoring and Reporting Program
Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial
Concurrent with the addition of the right turn lane noted above, the
intersection of Del Rio Road/El Camino Real shall be reconfigured at
the eastbound approach from through /left-turn and right-turn lanes,
to left-turn lane and through/right-turn lanes, moving the through
movement from the left lane to the right lane.
This includes widening the eastbound departure (on the east leg of the
intersection) to avoid excessive lateral shifting of through traffic. With
a dedicated eastbound left-turn lane, the eastbound-westbound split
phasing shall be required to be replaced with concurrent timing, as well
as protected-permissive phasing for the eastbound left-turn movement.
With protected left-turn phasing in the eastbound direction and a
prohibition of eastbound U-turns, a southbound right-turn overlap shall
be provided, which is a green arrow that enables southbound right-
turning drivers to continue without stopping concurrently with the
eastbound left-turn movement. Additionally, the signal at Del Rio
Road/El Camino Real shall be coordinated with the signals at Del Rio
Road/US 101 North Ramps and Del Rio Road/US 101 South Ramps.
This will require extending the interconnect hardware between the
ramp signals to Del Rio Road/El Camino Real, and potentially
upgrading the signal hardware at Del Rio Road/El Camino Real to be
compatible with interconnect technology if it is not already.
All development within the Specific Plan area shall be responsible for
paying their fair share towards these improvements as a special impact
fee. The special impact fee will be in addition to the Citywide impact
fees in place at the time of development and shall be collected prior to
issuance of any permit. Should a developer construct the improvements,
any costs of the installed improvements in excess of the project’s
proportional share, may be eligible for a TIF fee credit. Any potential
TIF fee credit will be calculated by the City and will comply with any
City resolution guiding TIF Fee credits in place at the time of
construction of the improvements. The developer constructing the
improvements may also be eligible for reimbursement from other
development within the Specific Plan area should improvements be
installed prior to Specific Plan build-out.
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 156 of 220
City of Atascadero - Del Rio Road Commercial Area Specific Plan Mitigation Monitoring and Reporting Program
Michael Brandman Associates
H:\Client (PN-JN)\3622\36220003\3 - Final EIR\MMRP\33620003 Del Rio Road MMRP.doc 3
Table 1 (cont.): Del Rio Road Commercial Area Specific Plan Mitigation Monitoring and Reporting Program
Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial
MM TRANS 1-e
Prior to issuance of building permits for any land use that exceeds 293
traffic capacity cumulative weekday p.m. peak hour trips within the
Specific Plan area, the following improvements shall be completed, as
determined by a traffic analysis for each project and subject to the
approval of the City Engineer:
Widening the eastbound approach to Del Rio Road/El Camino
Real to three lanes that extend upstream to Del Rio Road/US
101 North Ramps, with one lane each assigned to left turns,
through lanes, and right turns.
The westbound approach to US 101 north ramps shall be
widened to include a right-turn only pocket.
A second northbound left-turn lane at Del Rio Rd/El Camino
Real shall be constructed to accommodate traffic leaving the
commercial developments and heading toward the freeway.
Overlaps to traffic signal operations shall be added to further
improve traffic flow.
The Del Rio Road overpass shall to be widened to four lanes,
with a through/left-turn combined lane and through lane
approaching eastbound to Del Rio Road/US 101 North Ramps
and left-turn and through/left-turn combined lanes on the
westbound approach to Del Rio Road/US 101 South Ramps.
At Del Rio Road/US 101 South Ramps, the southbound
approach shall be expanded to include an additional left-turn
lane, and the phasing shall be modified to split the eastbound
and westbound approaches.
Interconnect shall be provided between all three signals to
coordinate cycles.
Should a developer construct the improvements, any costs of the
installed improvements in excess of the project’s proportional share, may
be eligible for a TIF fee credit. Any potential TIF fee credit will be
calculated by the City and will comply with any City resolution guiding
TIF Fee credits in place at the time of construction of the
improvements. The developer constructing the improvements may also
be eligible for reimbursement from other development within the
Specific Plan area should improvements be installed prior to Specific
Plan build-out.
Site inspection;
acceptance of
improvements
Prior to issuance of
each building
permit
City of Atascadero
ITEM NUMBER: B-2
DATE: 06/28/22
ATTACHMENT: 1B
Page 157 of 220
2 0 7 &83 3 &. (7,7/( 6 ((7 ( / 5 , 2 0 5 . ( 7 3 / & (3(563(&7,9( 9,(: /RFDWLRQ 'HVFULSWLRQ 352-(&7 ,5(&725 2:1(5 0 '211 (17(535,6(6 //&