Loading...
HomeMy WebLinkAboutResolution 2021-064 Conditions of Approval USE21-0035 5075 Cascabel Road. Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Planning Services Conditions 1. This Conditional Use Permit shall allow the accessory structures described in the attached exhibits and located on APN 054-091-019 Ongoing 2. The approval of this use permit shall become final and effective for the purposes of issuing building permits fourteen (14) days following the Planni ng Commission approval unless an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. Ongoing 3. The Community Development Department shall have the authority to approve the following minor changes to the project that (1) modify the site plan project by less than 10%, (2) result in a superior site design or appearance, and/or (3) address a construction design issue that is not substantive to the Master Plan of Development. The Planning Commission shall have the final authority to approve any other changes to the Master Plan of Development and any associated Tentative Maps unless appealed to the City Council. BP 4. Approval of this Conditional Use Permit shall be valid for twenty-four (24) months after its effective date. Building permits must be applied for at the City for Phase I through III prior to August 11, 2023. The project is approved with the following phases: • Phase 1 - Convert an existing 576 animal shelter into a storage structure (immediate) • Phase 2 - Construct a new 576 square foot animal shelter in compliance with AG building setbacks. (within 24 months) • Phase 3 - Construct a new detached workshop. (within 24 months) At the end of the periods listed above, the approval shall expire and become null and void unless the phases have applied for a building permit within the designated timeframes. BP 5. The applicant shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the construction or use of the detached accessory structure. Ongoing 6. Architectural elevations shall be consistent with the Exhibit B and C. Exterior building and roof colors and materials shall be consistent with existing structures on site as approved by the Planning Commission. BP 7. All utilities servicing the accessory structure, if any, shall be installed underground. BP 8. Building Height shall comply with the standards of the Zoning Ordinance. BP 9. The workshop shall comply with size and code standards in affect at the time of permit submittal. BP 10. All site access and driveways shall meet Fire Department and City zoning code standards. BP Ongoing EXHIBIT A Vegetative screening required.11. EXHIBIT B 10’ 6” EXHIBIT C