HomeMy WebLinkAboutPC Resolution 21-0012FAA:11:J1
SEP 1 201
PC RESOLUTION 2021-0012 CITY OF ATASCADERO
PLANNING
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ATASCADERO, CALIFORNIA,
APPROVING AN AMENDMENT TO AN EXISTING MULTI -FAMILY
DEVELOPMENT TO ALLOW FOR AN EXPANSION OF UNITS FOR
THE MACADERO APARTMENTS
ON APN 030-461-012
AMND21-0058
10205 EL CAMINO REAL
SLO NON-PROFIT HOUSING CORPORATION
WHEREAS, an application was received from Arris Studio Architects, 1327 Archer Street, Suite
220, San Luis Obispo, CA 93401, Applicant, and San Luis Obispo Non-profit Housing Corporation, 478
Leff Street, San Luis Obispo, CA 93401, Owner, to consider an Amendment to an existing 19 -unit
multi -family development to allow an expansion up to 25 -units; and
and
WHEREAS, the site has a General Plan Designation of High Density Residential (HDR);
WHEREAS, the property is in the Residential Multi -Family (RMF -24) zoning district; and
WHEREAS, twenty-four (24) units per acre maximum density is allowed in High Density Multi-
family (RMF -24) zone and the 1.16 -acre site has a maximum base density of up to twenty-eight (2 8) units
and minimum density of twenty-three (23) units; and
WHEREAS, Government Code Section 65915 allows a density bonus of up to 35% above what is
allowed by the zoning code for designating at least 20% of the units for low income and up to four (4)
concessions when 100% are designated for lower income households; and
WHEREAS, the project includes 100% low income restricted affordable units; and
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the California
Environmental Quality Act (CEQA) have been adhered to; and
WHEREAS, a timely and properly noticed Public Hearing upon the subject Major Conditional
Use Permit Amendment application was held by the Planning Commission of the City of Atascadero at
which hearing evidence, oral and documentary, was admitted on behalf of said Conditional Use Permit; and
NOW THEREFORE, the Planning Commission of the City of Atascadero, California, takes the
following actions:
SECTION 1. Recitals: The above recitals are true and correct.
SECTION 2. Public Hearings.
1. The Planning Commission held a duly noticed public hearing to consider the project on
September 7, 2021 and considered testimony and reports from staff, the applicants, and the
public.
SECTION 3. Findings for approval of Conditional Use Permit. The Planning Commission
finds as follows:
1. The proposed project or use is consistent with the General Plan; and
Fact: The use is consistent with the Residential Multi -Family designation of the General Plan and
General Plan Land Use Element Policy 1. 1, preserving the rural atmosphere, 1.1.7, infill within the
urban core, and Housing Element Policies 1.1, providing households for all income levels, 1.3,
encouraging the production of housing with an emphasis on affordability to persons with
disabilities, and 2. 1, facilitating housing development that is affordable to lower income households
by providing concessions.
The proposed project or use satisfies all applicable provisions of the Zoning Ordinance; and
Fact: As proposed, the project will meet the property's setback, height and other site design
requirements. The use of the structure will be limited to uses permitted by the Zoning Ordinance.
The project, with Planning Commission approval of this Conditional Use Permit, satisfies all
applicable provisions of the Zoning Ordinance related to residential accessory structures.
The establishment, and subsequent operation or conduct of the use will not, because of the
circumstances and conditions applied in the particular case, be detrimental to the health, safety or
welfare of the general public or persons residing or working in the neighborhood of the use, or be
detrimental or injurious to property or improvements in the vicinity of the use; and
Fact: The use of the site for high-density residential is typical of the zoning designation. The
proposed structure will be constructed to meet the standards of the building code. The reductions
in proposed parking, landscaping, and storage
4. The proposed project or use will not be inconsistent with the character of the immediate
neighborhood or contrary to its orderly development; and
Fact: The view of the proposed structure from El Camino will be slightly screened with low-lying
vegetation and wooden fencing. The design will fit in with the character and architectural styles of
the surrounding neighborhood.
5. The proposed use or project will not generate a volume of traffic beyond the safe capacity of all
roads providing access to the project, either existing or to be improved in conjunction with the
project, or beyond the normal traffic volume of the surrounding neighborhood that would result
from full development in accordance with the land use element; and
Fact: The addition of a units on the site will not contribute to significant additional traffic in the
neighborhood. The use of the structure will be similar to uses currently onsite. However, there will
be in increase in parking demand that will be accommodated with onsite parking, adjacent street
parking, and transit availability.
6. The proposed project is in compliance with any pertinent City policy or criteria adopted by
ordinance or resolution of the City Council; and
Fact: The proposed expansion of units on site, with staff recommended conditions, is compliant
with all related zoning codes and plans.
SECTION 1. CEOA. The Planning Commission finds as follows:
1. The proposed project is Categorically Exempt (Class 32) from the provisions of the California
Environmental Quality Act (California Public Resources Code §§ 21000, et seq., "CEQA") and
CEQA Guidelines (Title 14 California Code of Regulations §§ 15000, et seq.) CEQA pursuant to
CEQA Guidelines Section 15332, because it includes in -fill development.
SECTION 3. Approval. The Planning Commission of the City of Atascadero, in a regular session
assembled on September 7, 2021, resolved to approve Amendment (AMND21-0058), subject to the
following:
EXHIBIT A: Conditions of Approval
EXHIBIT B: Project Design Package
On motion by Commissioner Anderson, and seconded by Commissioner Hughes, the foregoing resolution
is hereby adopted in its entirety by the following roll call vote:
AYES: Anderson, Hughes, Schmidt, van den Eikhof
( 5 )
NOES: None (0 )
ABSENT: McIntyre, Carranza (2 )
ABSTAINED: None
ADOPTED: September 7, 2021
CITY OF ATASCADER , CA
Jeff Eikhof
Planning Commission Chairpe1'so
ATTEST:
Phil Dunsmore
Planning Commission Secretary
(0)
EXHIBIT A: Conditions of Approval
AMND 21-0058
Conditions of Approval
Timing
AM N D21-0058
10205 EI Camino Real
BL: Business License
GP: Grading Permit
Expansion of Affordable Housing
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
F0: Final Occupancy
Planning Services Conditions
1.
This Amendment shall be for the addition of 6 units (1 building) and renovation to the
Ongoing
existing 19 units use as described in attached Exhibits B and D located at 10205 EI
Camino Real.
2.
The approval of this use permit shall become final and effective for the purposes of
Ongoing
issuing building permits fourteen (14) days following the Planning Commission
approval unless an appeal to the decision is filed as set forth in Section 9-1.111(b) of
the Zoning Ordinance.
3.
The Community Development Department shall have the authority to approve the
BP
following minor changes to the project that (1) modify the site plan project by less
than 10%, (2) result in a superior site design or appearance, and/or (3) address a
construction design issue that is not substantive to the Master Plan of Development.
The Planning Commission shall have the final authority to approve any other changes
to the Master Plan of Development and any associated Tentative Maps unless
appealed to the City Council.
4.
Approval of this Conditional Use Permit shall be valid for twenty-four (24) months
BP
after its effective date. At the end of the period, the approval shall expire and
become null and void unless the project has received a building permit and started
construction on the project.
5.
The applicant shall defend, indemnify, and hold harmless the City of Atascadero or its
Ongoing
agents, officers, and employees against any claim or action brought to challenge an
approval by the City, or any of its entities, concerning the construction or use of the
detached accessory structure.
6.
All new utilities servicing the project shall be installed underground.
BP
7.
Architectural elevations shall be consistent with Exhibit B. Exterior building and roof
BP / FI
colors and materials shall be consistent across all buildings on site.
8.
A parking management plan shall be submitted to assign parking for each units,
BP
provide basic details on tandem parking management, and clarify parking
management on site.
9.
The applicant shall submit an arborist report at the time of building permit submittal
BP/Fl
to ensure protection and mitigation measures for existing trees on site.
10.
The applicant shall provide, at minimum, 32 on-site parking spaces that comply with
BP / Ongoing
Atascadero Municipal Code Parking and Loading standards.
11.
Approval of the preliminary design and density bonus shall not constitute any waiver of
BP
code requirements except for those approved under this amendment.
12.
Prior to Building Permit Issuance, twenty-four (24) units shall be deed restricted for a 55-
BP
year period. Documentation of the deed restrictions shall be submitted to the City prior
to Final Inspection.
13.
All lighting shall be fully shielded. No fixtures with visible light sources shall be permitted.
BP/ Ongoing
Parking lot lighting shall be the lowest level to achieve safety lighting. Pole height shall
be limited to 16 -feet maximum. Bollard and pedestrian scale lighting shall be
incorporated into the common use areas as feasible and as needed. No flood lighting
shall be permitted.
14.
A decorative fence header shall be added to the existing wooden fence in front of
BP
Building 1.
15.
Additional screening landscaping shall be installed in front of the fence in front of
BP
Building 1. This additional landscaping shall be shown on the landscape plan.
16.
The existing chain link gate for the trach enclosure shall be replaced with an opaque
BP
gate and the cinderblock shall be repainted to match the new colors of the buildings.
17.
The property owner shall obtain a will -serve letter from Atascadero Mutual Water
BP/FI
Company (AMWC) prior to issuance of building permits. Fees shall be paid to
AMWC prior to final inspection of all building permits.
Public
Works Conditions
18.
A preliminary Storm Water Control Plan (SWCP) must be completed showing how
BP
the proposed project will comply with City and State regulations (Regional Water
Quality Control Board Res. No. R3-2013-0032). The preliminary SWCP shall be
completed using the City standard form and should include preliminary calculations
supporting any required treatment or storage areas associated with Drainage
Management Areas (DMA).
19.
The existing driveway approach shall be removed and replaced with an ADA
compliant approach.
20.
The remodel of existing facilities and the new facilities are subject to the current City
BP
sewer fees and said fees shall be paid prior to issuance of building permits.
Fire Department Conditions
21.
Fire truck turnaround must meet City Engineering drawings F-1 and F-2.
BP
Confirm with Civil Engineer to maintain slope and approval will be needed for angle
of approach and departure per 2019 CFC 503.2.8.
22.
Must meet NFPA 13 requirements forsprinklers
BP
23.
Fire lane access will be marked per 2019 California Fire Code 503.3
BP
24.
Driveway clearance to be maintained per City engineering document F-8
BP
`W
r
'm
FE
X
W
i
IL
4)
U) .
\\\
}\\
§k(b
kR#E
ON
;41
I
IWO
6
I
�c
III..147cll
I
mmimomm
f
j � k
al s
7j
G:
���
�;
a
a
q
0
IE /
—�\
11L= 2
IL
IL
9
AP
A"I
e a
r-
4.
0)
06