HomeMy WebLinkAboutCC_2021_10_26_AgendaPacket CITY OF ATASCADERO CITY COUNCIL AGENDA
In accordance with City Council Resolution No. 2021-066 and the
requirements of AB 361, the City Council Meeting will not be physically open
to the public and City Council Members will be teleconferencing into the
meeting.
HOW TO OBSERVE THE MEETING:
To maximize public safety while still maintaining transparency and public access,
the meeting will be live-streamed on SLO-SPAN.org, on Spectrum cable
Channel 20 in Atascadero, and on KPRL Radio 1230AM and 99.3FM. The video
recording of the meeting will repeat daily on Channel 20 at 1:00 am, 9:00 am, and
6:00 pm and will be available through the City’s website or by visiting
https://us02web.zoom.us/webinar/register/WN_ZwJ7a031S3KXauEym9ehaA.
HOW TO SUBMIT PUBLIC COMMENT:
Members of the public are highly encouraged to participate in live public comment
through the Zoom platform using the link above or by calling 805-538-2888 to listen
and provide public comment via phone.
If you wish to comment but not via a live platform, please email public comments to
cityclerk@atascadero.org by 12:00 pm on the day of the meeting. Such email
comments must identify the Agenda Item Number in the subject line of the
email. The comments will be forwarded to the City Council and made a part of the
administrative record. If a comment is received after the deadline for submission but
before the close of the meeting, the comment will still be included as a part of the
administrative record of the meeting but will be forwarded to the City Council the next
business day. Please note, email comments will not be read into the record.
AMERICAN DISABILITY ACT ACCOMMODATIONS:
Any member of the public who needs accommodations should contact the City
Clerk’s Office at cityclerk@atascadero.org or by calling 805-470-3400 at least 48
hours prior to the meeting or time when services are needed. The City will use their
best efforts to provide reasonable accommodations to afford as much accessibility
as possible while also maintaining public safety in accordance with the City procedure
for resolving reasonable accommodation requests.
City Council agendas and minutes may be viewed on the City's website:
www.atascadero.org.
Copies of the staff reports or other documentation relating to each item of business referred to on
the Agenda are on file in the office of the City Clerk and are available for public inspection on our
website, www.atascadero.org. Contracts, Resolutions and Ordinances will be allocated a number
once they are approved by the City Council. The Minutes of this meeting will reflect these numbers.
All documents submitted by the public during Council meetings that are either read into the record
or referred to in their statement will be noted in the Minutes and available for review by contacting
the City Clerk's office. All documents will be available for public inspection by appointment during
City Hall business hours.
Page 1 of 217
CITY OF ATASCADERO
CITY COUNCIL
AGENDA
Tuesday, October 26, 2021
City Hall Council Chambers, 4th floor
6500 Palma Avenue, Atascadero, California
COUNCIL CLOSED SESSION: 5:00 P.M.
1. ROLL CALL
2. CLOSED SESSION -- PUBLIC COMMENT
3. COUNCIL LEAVES TO BEGIN CLOSED SESSION
4. CLOSED SESSION -- CALL TO ORDER
a. Conference with Real Property Negotiators (Govt. Code 54956.8)
Real Property: 9510 Calle Milano, Atascadero, CA 93422
Agency Negotiator: Rachelle Rickard, City Manager
Negotiating Parties: Curtis J. Coleman and Julie A. Coleman
Subject of Negotiations: Price and terms of payment.
5. CLOSED SESSION – ADJOURNMENT
6. COUNCIL RETURNS
7. CLOSED SESSION – REPORT (IF ANY)
Announcement(s) of any reportable action(s) taken in Closed Session that occur(s) after the adjournment of
Regular Session will be made at the beginning of the next Regular City Council meeting as Closed Session is
not recorded or videotaped.
City Council Closed Session: 5:00 P.M.
City Council Regular Session: 6:00 P.M.
Page 2 of 217
REGULAR SESSION – CALL TO ORDER: 6:00 P.M.
PLEDGE OF ALLEGIANCE: Mayor Pro Tem Newsom
ROLL CALL: Mayor Moreno
Mayor Pro Tem Newsom
Council Member Bourbeau
Council Member Dariz
Council Member Funk
APPROVAL OF AGENDA: Roll Call
Recommendation: Council:
1. Approve this agenda; and
2. Waive the reading in full of all ordinances appearing on this agenda, and the titles
of the ordinances will be read aloud by the City Clerk at the first reading, after the
motion and before the City Council votes.
PRESENTATIONS: None.
A. CONSENT CALENDAR: (All items on the consent calendar are considered to be routine
and non-controversial by City staff and will be approved by one motion if no member of
the Council or public wishes to comment or ask questions. If comment or discussion is
desired by anyone, the item will be removed from the Consent Calendar and will be
considered in the listed sequence with an opportunity for any member of the public to
address the Council concerning the item before action is taken.)
1. City Council Draft Action Minutes – October 12, 2021
▪ Recommendation: Council approve the October 12, 2021 Draft City Council
Regular Meeting Minutes. [City Clerk]
2. September 2021 Accounts Payable and Payroll
▪ Fiscal Impact: $4,201,762.16
▪ Recommendation: Council approve certified City accounts payable, payroll
and payroll vendor checks for September 2021. [Administrative Services]
3. El Camino Real Downtown Infrastructure Enhancement Project Design Award
▪ Fiscal Impact: Award of this contract will result in the expenditure of
approximately $710,000 of Atascadero Downtown Infrastructure State Budget
Allocation funds.
▪ Recommendations: Council:
1. Award a contract to Wallace Group for $598,811 to provide design
engineering and construction document preparation for the El Camino Real
Downtown Infrastructure Enhancement Project (Project No. C2017T01).
2. Authorize the Director of Administrative Services to allocate $3,000,000 in
City of Atascadero Downtown Infrastructure State Budget Allocation Funds
to the El Camino Real Downtown Infrastructure Enhancement Project.
[Public Works]
Page 3 of 217
4. Atascadero Lake Park Improvements for Proposition 68 Parks and
Recreation Grant Per Capita Program Funds
▪ Fiscal Impact: The City of Atascadero is eligible to receive $177,952 through
the Per Capita Program. The Program requires a 20% local match ($35,590)
bringing the total budget amount of the project to $213,524.
▪ Recommendation: Council direct staff to apply for per capita funding through
the California Department of Parks and Recreation - Proposition 68 California
Drought, Water, Parks, Climate, Costal Protection and Outdoor Access for All
Per Capita Program for Lake Park Improvements. [Public Works]
5. Virtual Meetings – AB 361 Requirements
▪ Fiscal Impact: None.
▪ Recommendation: Council adopt Draft Resolution making findings consistent
with the requirements of AB 361 to continue to allow for the conduct of virtual
meetings. [City Manager]
UPDATES FROM THE CITY MANAGER: (The City Manager will give an oral report on any
current issues of concern to the City Council.)
COMMUNITY FORUM: (This portion of the meeting is reserved for persons wanting to
address the Council on any matter not on this agenda and over which the Cou ncil has
jurisdiction. Speakers are limited to three minutes. Please state your name for the record
before making your presentation Comments made during Community Forum will not be a
subject of discussion. A maximum of 30 minutes will be allowed for Commun ity Forum,
unless changed by the Council. Any members of the public who have questions or need
information may contact the City Clerk’s Office, between the hours of 8:30 a.m. and 5:00
p.m. at (805) 470-3400, or cityclerk@atascadero.org.)
B. PUBLIC HEARINGS: None.
C. MANAGEMENT REPORTS:
1. Affordable Housing Impact Fee Nexus Studies Update
▪ Fiscal Impact: Project costs are covered by grant funding received through
Senate Bill 2 (SB 2).
▪ Recommendation: Council review and comment on the nexus study provided
by EPS consultants for a potential affordable housing fee program as part of
an affordable housing strategy. [Community Development]
2. Emergency Evacuation Traffic Planning Study
▪ Fiscal Impact: The study has no direct costs beyond previously approved
consultant costs.
▪ Recommendation: Council receive and file the Emergency Evacuation Traffic
Planning Study. [Fire Department]
Page 4 of 217
D. COUNCIL ANNOUNCEMENTS AND COMMITTEE REPORTS: (On their own
initiative, Council Members may make a brief announcement or a brief report on their own
activities. The following represent standing committees. Informative status reports will
be given, as felt necessary):
Mayor Moreno
1. City Selection Committee
2. County Mayors Round Table
3. Regional Economic Action Coalition (REACH)
4. SLO Council of Governments (SLOCOG)
5. SLO Regional Transit Authority (RTA)
Mayor Pro Tem Newsom
1. City / Schools Committee
2. Design Review Committee
3. League of California Cities – Council Liaison
4. Visit SLO CAL Advisory Committee
Council Member Bourbeau
1. City of Atascadero Finance Committee
2. City / Schools Committee
3. Integrated Waste Management Authority (IWMA)
4. SLO County Water Resources Advisory Committee (WRAC)
Council Member Dariz
1. Air Pollution Control District
2. California Joint Powers Insurance Authority (CJPIA) Board
3. City of Atascadero Finance Committee
Council Member Funk
1. Atascadero Basin Ground Water Sustainability Agency (GSA)
2. Design Review Committee
3. Homeless Services Oversight Council
E. INDIVIDUAL DETERMINATION AND / OR ACTION: (Council Members may ask a
question for clarification, make a referral to staff or take action to have staff place a matter of
business on a future agenda. The Council may take action on items listed on the Agenda.)
1. City Council
2. City Clerk
3. City Treasurer
4. City Attorney
5. City Manager
ADJOURN
Please note: Should anyone challenge any proposed development entitlement listed on this Agenda in court, that person
may be limited to raising those issues addressed at the public hearing described in this notice, or in written correspondence
delivered to the City Council at or prior to this public hearing. Correspondence submitted at this public hearing will be
distributed to the Council and available for review in the City Clerk's office. Page 5 of 217
ITEM NUMBER: A-1
DATE: 10/26/21
Atascadero City Council
October 12, 2021
Page 1 of 5
CITY OF ATASCADERO
CITY COUNCIL
DRAFT MINUTES
Tuesday, October 12, 2021
City Hall Council Chambers, 4th floor
6500 Palma Avenue, Atascadero, California
COUNCIL CLOSED SESSION: 5:30 P.M.
Mayor Moreno called Closed Session to order at 5:30 p.m.
1. ROLL CALL
Present: By Teleconference - Council Members Bourbeau, Dariz and Funk,
Mayor Pro Tem Newsom, and Mayor Moreno
Absent: None
Others Present: None
Staff Present: By Teleconference – City Manager Rachelle Rickard, Administrative
Services Director Jeri Rangel, City Attorney Brian Pierik, Deputy City
Manager/City Clerk Lara Christensen, and IT Manager Luke Knight
2. CLOSED SESSION -- PUBLIC COMMENT – None
3. COUNCIL LEAVES TO BEGIN CLOSED SESSION
IT Manager Knight did not attend this portion of the meeting.
4. CLOSED SESSION -- CALL TO ORDER
City Council Closed Session: 5:30 P.M.
City Council Regular Session: 6:00 P.M.
Page 6 of 217
ITEM NUMBER: A-1
DATE: 10/26/21
Atascadero City Council
October 12, 2021
Page 2 of 5
a. Conference with Real Property Negotiators (Govt. Code 54956.8)
Real Property: 6009 Del Rio Road (APN 049141038 – City Property), 2000
Ramona Road (APN 049141039 – City Property), 2455 El Camino Real
(APN 049151056 – People Self Help Housing Property), 6105 Olmeda
Avenue (APN 029091001 – State of California Property), Atascadero,
California, 93422
Agency Negotiator: Rachelle Rickard, City Manager
Negotiating Parties: People Self Help Housing and State of California
Subject of Negotiations: Purchase price and/or terms of payment.
5. CLOSED SESSION – ADJOURNMENT
6. COUNCIL RETURNS
7. CLOSED SESSION – REPORT (IF ANY)
City Attorney Pierik reported that there was no reportable action from Closed Session
REGULAR SESSION – CALL TO ORDER: 6:00 P.M.
Mayor Moreno called the meeting to order at 6:0 0 p.m. and Council Member Bourbeau led
the Pledge of Allegiance.
ROLL CALL:
Present: By Teleconference - Council Members Bourbeau, Dariz and Funk,
Mayor Pro Tem Newsom, and Mayor Moreno
Absent: None
Others Present: None
Staff Present: By Teleconference – City Manager Rachelle Rickard, Administrative
Services Director Jeri Rangel, Community Development Director Phil
Dunsmore, Fire Chief Casey Bryson, Public Works Director Nick DeBar,
Police Chief Robert Masterson, City Attorney Brian Pierik, Deputy City
Manager/City Clerk Lara Christensen, and IT Manager Luke Knight
APPROVAL OF AGENDA:
MOTION: By Council Member Funk and seconded by Mayor Pro Tem Newsom to:
1. Approve this agenda; and,
2. Waive the reading in full of all ordinances appearing on this
agenda, and the titles of the ordinances will be read aloud by
the City Clerk at the first reading, after the motion and before
the City Council votes.
Motion passed 5:0 by a roll-call vote.
Page 7 of 217
ITEM NUMBER: A-1
DATE: 10/26/21
Atascadero City Council
October 12, 2021
Page 3 of 5
PRESENTATIONS:
1. Proclamation Recognizing October 2021 as Domestic Violence ACTION Month
The City Council presented a proclamation to Jennifer Adams, CEO of Lumina Alliance.
2. Proclamation Recognizing September 15 - October 15, 2021 as National
Hispanic Heritage Month
The City Council presented a proclamation to CR Lara, President of the Latino Outreach
Council
3. Proclamation Recognizing October 3-9, 2021 as Fire Prevention Week
The City Council presented a proclamation to members of Atascadero Fire & Emergency
Services.
A. CONSENT CALENDAR:
1. City Council Draft Action Minutes – September 28, 2021
▪ Recommendation: Council approve the September 28, 2021 Draft City Council
Regular Meeting Minutes. [City Clerk]
2. Lift Station No. 13 and Force Main Replacement Project - Engineering
Design Services Award
▪ Fiscal Impact: $280,735.00
▪ Recommendation: Council authorize the City Manager to execute a contract
for $280,735 with MKN & Associates to provide engineering design services
for the Lift Station No. 13 and Force Main Replacement Project (Project No.
C2020W02). [Public Works]
3. Annexation of the 11885 Halcon Road Subdivision into Community Facilities
District 2005-1, Annexation No. 24 (AT 18-0123)
▪ Fiscal Impact: Assessments for this annexation are estimated to be $2,226
annually, adjusted each year for inflation.
▪ Recommendation: Council adopt Draft Resolution, declaring its intention to
annex territory, into Community Facilities District 2005-1 (Public Services) as
Annexation No. 24 and to authorize the levy of special taxes therein (11885
Halcon Road: AT 18-0123). [Community Development]
MOTION: By Council Member Bourbeau and seconded by Council Member
Funk to approve the Consent Calendar. (#A-2: Contract No. 2021-
031) (#A-4: Resolution No. 2021-068)
Motion passed 5:0 by a roll-call vote.
UPDATES FROM THE CITY MANAGER:
City Manager Rachelle Rickard gave an update on projects and issues within the City.
Page 8 of 217
ITEM NUMBER: A-1
DATE: 10/26/21
Atascadero City Council
October 12, 2021
Page 4 of 5
COMMUNITY FORUM:
The following citizens spoke by telephone or through the webinar on this item: None.
Mayor Moreno closed the COMMUNITY FORUM period.
B. PUBLIC HEARINGS: None.
C. MANAGEMENT REPORTS:
1. The El Camino Plan - Corridor Study Caltrans Sustainable Transportation
Planning Grant
▪ Fiscal Impact: The study has no direct costs beyond previously approved
consultant and staff costs.
▪ Recommendation: Council receive and file the final Draft El Camino Plan.
[Community Development]
Community Development Director Dunsmore gave the report and answered questions from
the Council.
PUBLIC COMMENT:
The following citizens spoke by telephone or through the webinar on this item: Geoff Auslen
Mayor Moreno closed the Public Comment period.
Council received and filed the final Draft El Camino Plan
D. COUNCIL ANNOUNCEMENTS AND COMMITTEE REPORTS:
The following Council Members made brief announcements and gave brief update reports
on their committees since their last Council meeting:
Mayor Moreno
1. County Mayors Round Table
2. SLO Council of Governments (SLOCOG)
3. SLO Regional Transit Authority (RTA)
Mayor Pro Tem Newsom
1. Design Review Committee
Council Member Bourbeau
1. Integrated Waste Management Authority (IWMA)
Council Member Dariz
1. California Joint Powers Insurance Authority (CJPIA) Board
Page 9 of 217
ITEM NUMBER: A-1
DATE: 10/26/21
Atascadero City Council
October 12, 2021
Page 5 of 5
Council Member Dariz noted attending the CJPIA annual Board Meeting and Risk
Management Educational Forum on October 6-8 in San Diego.
Council Member Funk
1. Atascadero Basin Ground Water Sustainability Agency (GSA)
2. Design Review Committee
E. INDIVIDUAL DETERMINATION AND / OR ACTION:
F. ADJOURN
Mayor Moreno recessed the Regular Meeting at 8:05 p.m.
MINUTES PREPARED BY:
______________________________________
Lara K. Christensen
City Clerk
APPROVED:
Page 10 of 217
•••ir?i(^mwraE.^"Atascadero City CouncilStaff Report- Administrative Services DepartmentSeptember 2021 Accounts Payable and PayrollRECOMMENDATION:Council approve certified City accounts payable, payroll and payroll vendor checksfor September 2021.DISCUSSION:Attached for City Council review and approval are the following:PayrollDated 9/2/21 Checks # 35231 -35240Direct DepositsDated 9/16/21 Checks #35241 -35250Direct DepositsDated 9/30/21 Checks # 35251 - 35262Direct Deposits$Accounts PayableDated 9/1/21-9/30/21Checks #168666-168938&EFTs 4155-4182TOTAL AMOUNT11,512.32337,880.5211,914.29340,191.7711,373.52308,243.513,180,646.23$ 4,201,762.16FISCAL IMPACT:Total expenditures for all funds is$ 4,201,762.16CERTIFICATION:The undersigned certifies that the attached demands have been released forpayment and that funds are available for these demands..At^l.J^rf l^angel c))ire(itor of Administrative ServicesATTACHMENT:September 2021 Eden Warrant Register in the amount of$ 3,180,646.23ITEM NUMBER: A-2DATE: 10/26/21Page 11 of 217
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of September 2021
4155 09/02/2021 ANTHEM BLUE CROSS HSA 8,721.82Payroll Vendor Payment
168666 09/02/2021 ANTHEM BLUE CROSS HEALTH 192,568.65Payroll Vendor Payment
168667 09/02/2021 LINCOLN NATIONAL LIFE INS CO 1,823.15Payroll Vendor Payment
168668 09/02/2021 MEDICAL EYE SERVICES 1,706.60Payroll Vendor Payment
168669 09/02/2021 PREFERRED BENEFITS INSURANCE 8,317.80Payroll Vendor Payment
168670 09/02/2021 ATASCADERO MID MGRS ORG UNION 80.00Payroll Vendor Payment
168671 09/02/2021 ATASCADERO POLICE OFFICERS 1,741.50Payroll Vendor Payment
168672 09/02/2021 ATASCADERO PROF. FIREFIGHTERS 1,027.05Payroll Vendor Payment
168673 09/02/2021 MASS MUTUAL WORKPLACE SOLUTION 7,504.65Payroll Vendor Payment
168674 09/02/2021 NATIONWIDE RETIREMENT SOLUTION 1,442.49Payroll Vendor Payment
168675 09/02/2021 NAVIA BENEFIT SOLUTIONS 2,626.87Payroll Vendor Payment
168676 09/02/2021 SEIU LOCAL 620 819.25Payroll Vendor Payment
168677 09/02/2021 VANTAGEPOINT TRNSFR AGT 106099 357.85Payroll Vendor Payment
168678 09/02/2021 VANTAGEPOINT TRNSFR AGT 304633 7,362.44Payroll Vendor Payment
168679 09/02/2021 VANTAGEPOINT TRNSFR AGT 706276 746.00Payroll Vendor Payment
4156 09/03/2021 STATE DISBURSEMENT UNIT 467.07Payroll Vendor Payment
4157 09/03/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 22,107.10Payroll Vendor Payment
4158 09/03/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 29,420.86Payroll Vendor Payment
4159 09/03/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 1,943.09Payroll Vendor Payment
4160 09/03/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 2,697.76Payroll Vendor Payment
4161 09/03/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 5,066.24Payroll Vendor Payment
4162 09/03/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 9,150.09Payroll Vendor Payment
4163 09/03/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 8,444.49Payroll Vendor Payment
4164 09/03/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 13,270.42Payroll Vendor Payment
4165 09/07/2021 RABOBANK, N.A. 69,713.08Payroll Vendor Payment
4166 09/07/2021 EMPLOYMENT DEV DEPARTMENT 22,288.50Payroll Vendor Payment
4167 09/07/2021 EMPLOYMENT DEV. DEPARTMENT 2,673.13Payroll Vendor Payment
168680 09/10/2021 13 STARS MEDIA 662.90Accounts Payable Check
168681 09/10/2021 29TONIGHT, INC. 759.17Accounts Payable Check
168682 09/10/2021 AGM CALIFORNIA, INC. 4,663.00Accounts Payable Check
168683 09/10/2021 ALTHOUSE & MEADE, INC. 450.00Accounts Payable Check
168684 09/10/2021 KELLY AREBALO 1,636.26Accounts Payable Check
168685 09/10/2021 AT&T 547.80Accounts Payable Check
168686 09/10/2021 AT&T 770.65Accounts Payable Check
168687 09/10/2021 ATASCADERO HAY & FEED 1,643.96Accounts Payable Check
168689 09/10/2021 ATASCADERO MUTUAL WATER CO. 35,862.20Accounts Payable Check
168690 09/10/2021 ATASCADERO PICKLEBALL CLUB,INC 633.30Accounts Payable Check
168691 09/10/2021 A-TOWN HUMBLE PIES 85.00Accounts Payable Check
168692 09/10/2021 AURORA WORLD, INC. 139.40Accounts Payable Check
168693 09/10/2021 RICHARD BARTEL 10.00Accounts Payable Check
168694 09/10/2021 BASSETT'S CRICKET RANCH,INC. 223.34Accounts Payable Check
168695 09/10/2021 BELL'S PLUMBING REPAIR, INC. 180.00Accounts Payable Check
168696 09/10/2021 KEITH R. BERGHER 290.00Accounts Payable Check
ITEM NUMBER: A-2
DATE: 10/26/21
ATTACHMENT: 1
Page 12 of 217
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of September 2021
168697 09/10/2021 BERRY MAN, INC. 926.90Accounts Payable Check
168698 09/10/2021 BURT INDUSTRIAL SUPPLY 545.79Accounts Payable Check
168699 09/10/2021 CA HIGHWAY PATROL 200.00Accounts Payable Check
168700 09/10/2021 CCI OFFICE TECHNOLOGIES 243.69Accounts Payable Check
168701 09/10/2021 CHARTER COMMUNICATIONS 4,348.97Accounts Payable Check
168702 09/10/2021 CLEVER CONCEPTS, INC. 47.95Accounts Payable Check
168703 09/10/2021 CRYSTAL CREAMERY, INC. 453.26Accounts Payable Check
168704 09/10/2021 CRYSTAL SPRINGS WATER 20.00Accounts Payable Check
168705 09/10/2021 NICHOLAS DEBAR 300.00Accounts Payable Check
168706 09/10/2021 JOE DEBRUIN, PH.D. 360.00Accounts Payable Check
168707 09/10/2021 DEPARTMENT OF JUSTICE 191.00Accounts Payable Check
168708 09/10/2021 DESTINATION TRAVEL NETWORK 75.00Accounts Payable Check
168709 09/10/2021 DOOMSDAY SKATE, LLC 210.00Accounts Payable Check
168710 09/10/2021 PHILIP DUNSMORE 300.00Accounts Payable Check
168711 09/10/2021 EARTH SYSTEMS PACIFIC 4,144.00Accounts Payable Check
168712 09/10/2021 EIKHOF DESIGN GROUP, INC. 24,869.36Accounts Payable Check
168713 09/10/2021 FARM SUPPLY COMPANY 724.99Accounts Payable Check
168714 09/10/2021 FERGUSON ENTERPRISES, LLC 1,187.10Accounts Payable Check
168715 09/10/2021 FGL ENVIRONMENTAL 162.00Accounts Payable Check
168716 09/10/2021 FRANCHISE TAX BOARD 267.75Accounts Payable Check
168717 09/10/2021 HARRIS STAGE LINES, LLC 900.00Accounts Payable Check
168718 09/10/2021 HART IMPRESSIONS PRINTING 296.61Accounts Payable Check
168719 09/10/2021 IRON MOUNTAIN RECORDS MGMNT 126.96Accounts Payable Check
168720 09/10/2021 JK'S UNLIMITED, INC. 15,901.97Accounts Payable Check
168721 09/10/2021 K & M INTERNATIONAL 2,230.42Accounts Payable Check
168722 09/10/2021 KIRK CONSTRUCTION 150,549.35Accounts Payable Check
168723 09/10/2021 KNECHT'S PLUMBING & HEATING 3,537.56Accounts Payable Check
168724 09/10/2021 LIFE ASSIST, INC. 2,112.93Accounts Payable Check
168725 09/10/2021 JACKSON LIGHT 1,600.00Accounts Payable Check
168726 09/10/2021 MATTHEW LOUGHERY 843.92Accounts Payable Check
168727 09/10/2021 MADRONE LANDSCAPES, INC. 387.00Accounts Payable Check
168728 09/10/2021 MARBORG INDUSTRIES 312.28Accounts Payable Check
168729 09/10/2021 MICHAEL K. NUNLEY & ASSC, INC. 12,029.15Accounts Payable Check
168730 09/10/2021 MID-COAST GEOTECHNICAL, INC. 2,860.00Accounts Payable Check
168731 09/10/2021 EDWARD J. MILLER, JR. 300.00Accounts Payable Check
168732 09/10/2021 MINER'S ACE HARDWARE 670.29Accounts Payable Check
168733 09/10/2021 MISSION UNIFORM SERVICE 155.18Accounts Payable Check
168734 09/10/2021 MNS ENGINEERS, INC. 1,385.00Accounts Payable Check
168735 09/10/2021 MR. B'S AUTO GLASS 55.00Accounts Payable Check
168736 09/10/2021 MV TRANSPORTATION, INC. 19,633.30Accounts Payable Check
168737 09/10/2021 MWI ANIMAL HEALTH 931.98Accounts Payable Check
168738 09/10/2021 DANIELLE NUNES-HAKANSON 73.58Accounts Payable Check
168739 09/10/2021 OFFICE DEPOT INC. 547.18Accounts Payable Check
ITEM NUMBER: A-2
DATE: 10/26/21
ATTACHMENT: 1
Page 13 of 217
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of September 2021
168740 09/10/2021 RON OVERACKER 281.00Accounts Payable Check
168742 09/10/2021 PACIFIC GAS AND ELECTRIC 35,042.79Accounts Payable Check
168743 09/10/2021 PASO ROBLES CHEVROLET 295.00Accounts Payable Check
168744 09/10/2021 PASO ROBLES GLASS 6,480.00Accounts Payable Check
168745 09/10/2021 PEAKWIFI, LLC 650.00Accounts Payable Check
168746 09/10/2021 DEAN PERICIC 2.26Accounts Payable Check
168747 09/10/2021 PFLUMS ATASCADERO MUFFLER 121.75Accounts Payable Check
168748 09/10/2021 PHILLIPS INTERNATIONAL, INC. 1,074.00Accounts Payable Check
168749 09/10/2021 PRAXAIR DISTRIBUTION, INC. 59.86Accounts Payable Check
168750 09/10/2021 PROCARE JANITORIAL SUPPLY,INC. 450.79Accounts Payable Check
168751 09/10/2021 PROSOUND BUSINESS MEDIA, INC. 99.00Accounts Payable Check
168752 09/10/2021 QUINCY ENGINEERING, INC. 20,493.31Accounts Payable Check
168753 09/10/2021 SHIRLEY L. RADCLIFF-BRUTON 1,305.60Accounts Payable Check
168754 09/10/2021 RAINSCAPE, A LANDSCAPE SVC CO. 10,329.55Accounts Payable Check
168755 09/10/2021 JERI RANGEL 300.00Accounts Payable Check
168756 09/10/2021 READYREFRESH BY NESTLE 68.51Accounts Payable Check
168757 09/10/2021 RHODE ISLAND NOVELTY 1,016.40Accounts Payable Check
168758 09/10/2021 RACHELLE RICKARD 799.49Accounts Payable Check
168759 09/10/2021 KIRK ROLES 90.00Accounts Payable Check
168760 09/10/2021 ROLSON MUSIC & SOUND 2,375.00Accounts Payable Check
168761 09/10/2021 CHRISTINA K. SILVA 567.00Accounts Payable Check
168762 09/10/2021 SLO COUNTY HEALTH AGENCY 93,760.00Accounts Payable Check
168763 09/10/2021 SOUZA CONSTRUCTION, INC. 624,873.75Accounts Payable Check
168764 09/10/2021 SPEAKWRITE, LLC. 644.83Accounts Payable Check
168765 09/10/2021 SPECIALIZED EQUIPMENT REPAIR 66.74Accounts Payable Check
168766 09/10/2021 STANLEY CONVERGENT SECURITY 1,004.73Accounts Payable Check
168767 09/10/2021 SUNLIGHT JANITORIAL, INC. 1,700.00Accounts Payable Check
168768 09/10/2021 SWANK MOTION PICTURES, INC. 550.00Accounts Payable Check
168769 09/10/2021 TESCO CONTROLS, INC. 8,500.00Accounts Payable Check
168770 09/10/2021 STEVE TIROTTA 141.32Accounts Payable Check
168771 09/10/2021 ULTREX LEASING 263.18Accounts Payable Check
168772 09/10/2021 UNITED RENTALS (NORTH AM), INC 49,970.63Accounts Payable Check
168773 09/10/2021 DAVID VAN SON 179.00Accounts Payable Check
168774 09/10/2021 VERIZON WIRELESS 2,092.57Accounts Payable Check
168775 09/10/2021 WALSH ENGINEERING 807.50Accounts Payable Check
168776 09/10/2021 WARM FUZZY TOYS 282.46Accounts Payable Check
168777 09/10/2021 WCJ PROPERTY SERVICES 803.25Accounts Payable Check
168778 09/10/2021 WELL SEEN SIGN CO., LLC 469.69Accounts Payable Check
168779 09/10/2021 WEST COAST AUTO & TOWING, INC. 158.78Accounts Payable Check
168780 09/10/2021 WEX BANK - 76 UNIVERSL 13,488.48Accounts Payable Check
168781 09/10/2021 WEX BANK - WEX FLEET UNIVERSAL 7,964.79Accounts Payable Check
168782 09/10/2021 WHITLOCK & WEINBERGER TRANS. 5,558.25Accounts Payable Check
168783 09/10/2021 WILKINS ACTION GRAPHICS 124.08Accounts Payable Check
ITEM NUMBER: A-2
DATE: 10/26/21
ATTACHMENT: 1
Page 14 of 217
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of September 2021
168784 09/10/2021 KAREN B. WYKE 699.90Accounts Payable Check
168785 09/10/2021 XO PANDORA 150.00Accounts Payable Check
168786 09/10/2021 ZOO MED LABORATORIES, INC. 1,002.07Accounts Payable Check
168787 09/10/2021 2 MEXICANS, LLC 1,030.00Accounts Payable Check
168788 09/10/2021 ALTHOUSE & MEADE, INC. 143.75Accounts Payable Check
168789 09/10/2021 APPLIED TECHNOLOGY GROUP, INC. 23,164.91Accounts Payable Check
168790 09/10/2021 ATASCADERO HAY & FEED 151.37Accounts Payable Check
168791 09/10/2021 AVILA TRAFFIC SAFETY 42.68Accounts Payable Check
168792 09/10/2021 CARQUEST OF ATASCADERO 220.40Accounts Payable Check
168793 09/10/2021 K & M INTERNATIONAL 4,503.57Accounts Payable Check
168794 09/10/2021 KID TEES 268.20Accounts Payable Check
168795 09/10/2021 KNECHT'S PLUMBING & HEATING 1,476.89Accounts Payable Check
168796 09/10/2021 PASO ROBLES FORD LINCOLN MERC 375.00Accounts Payable Check
168797 09/10/2021 PAVEMENT ENGINEERING, INC. 30,075.00Accounts Payable Check
168798 09/10/2021 PENGUIN RANDOM HOUSE, LLC 53.97Accounts Payable Check
168799 09/10/2021 STANLEY CONVERGENT SECURITY 287.46Accounts Payable Check
168800 09/10/2021 KURT W. STONE 1,200.00Accounts Payable Check
168801 09/10/2021 WATER SYSTEMS CONSULTING, INC. 6,576.25Accounts Payable Check
4168 09/14/2021 BANK OF NEW YORK MELLON 623,706.25Accounts Payable Check
4169 09/16/2021 ANTHEM BLUE CROSS HSA 8,721.82Payroll Vendor Payment
168802 09/16/2021 ATASCADERO MID MGRS ORG UNION 80.00Payroll Vendor Payment
168803 09/16/2021 ATASCADERO POLICE OFFICERS 1,741.50Payroll Vendor Payment
168804 09/16/2021 ATASCADERO PROF. FIREFIGHTERS 1,027.05Payroll Vendor Payment
168805 09/16/2021 MASS MUTUAL WORKPLACE SOLUTION 18,355.31Payroll Vendor Payment
168806 09/16/2021 NATIONWIDE RETIREMENT SOLUTION 1,533.66Payroll Vendor Payment
168807 09/16/2021 NAVIA BENEFIT SOLUTIONS 2,626.87Payroll Vendor Payment
168808 09/16/2021 SEIU LOCAL 620 821.41Payroll Vendor Payment
168809 09/16/2021 VANTAGEPOINT TRNSFR AGT 106099 357.85Payroll Vendor Payment
168810 09/16/2021 VANTAGEPOINT TRNSFR AGT 304633 14,188.59Payroll Vendor Payment
168811 09/16/2021 VANTAGEPOINT TRNSFR AGT 706276 746.00Payroll Vendor Payment
4170 09/17/2021 STATE DISBURSEMENT UNIT 467.07Payroll Vendor Payment
4171 09/17/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 22,125.18Payroll Vendor Payment
4172 09/17/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 29,742.64Payroll Vendor Payment
4173 09/17/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 1,927.13Payroll Vendor Payment
4174 09/17/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 2,698.04Payroll Vendor Payment
4175 09/17/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 5,066.24Payroll Vendor Payment
4176 09/17/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 8,901.50Payroll Vendor Payment
4177 09/17/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 8,489.23Payroll Vendor Payment
4178 09/17/2021 CALIF PUBLIC EMPLOYEES RETIREMENT SYSTEM 13,188.00Payroll Vendor Payment
4179 09/21/2021 RABOBANK, N.A. 69,812.38Payroll Vendor Payment
4180 09/21/2021 EMPLOYMENT DEV DEPARTMENT 22,229.38Payroll Vendor Payment
4181 09/21/2021 EMPLOYMENT DEV. DEPARTMENT 2,947.26Payroll Vendor Payment
168812 09/24/2021 KELLY AREBALO 85.50Accounts Payable Check
ITEM NUMBER: A-2
DATE: 10/26/21
ATTACHMENT: 1
Page 15 of 217
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of September 2021
168813 09/24/2021 DEPARTMENT OF TRANSPORTATION 4,394.59Accounts Payable Check
168814 09/24/2021 COLETTE LAYTON 1,938.00Accounts Payable Check
168815 09/24/2021 LEE WILSON ELECTRIC CO. INC 1,428.00Accounts Payable Check
168816 09/24/2021 MEYER TREE CONSULTING 215.00Accounts Payable Check
168817 09/24/2021 NORTH COAST ENGINEERING INC. 61.00Accounts Payable Check
168818 09/24/2021 SLO COUNTY SHERIFF'S OFFICE 210.00Accounts Payable Check
168819 09/24/2021 SMART AND FINAL 142.98Accounts Payable Check
168820 09/24/2021 WHITLOCK & WEINBERGER TRANS. 357.50Accounts Payable Check
168821 09/24/2021 13 STARS MEDIA 3,717.10Accounts Payable Check
168822 09/24/2021 A & T ARBORISTS & VEGETATION 10,200.00Accounts Payable Check
168823 09/24/2021 ACTIVE 911, INC. 494.00Accounts Payable Check
168824 09/24/2021 ADAMSKI,MOROSKI,MADDEN, 1,451.00Accounts Payable Check
168825 09/24/2021 AGP VIDEO, INC. 1,425.00Accounts Payable Check
168826 09/24/2021 AK & COMPANY 1,750.00Accounts Payable Check
168827 09/24/2021 ALPHA ELECTRIC SERVICE 300.00Accounts Payable Check
168828 09/24/2021 ALTHOUSE & MEADE, INC. 180.00Accounts Payable Check
168829 09/24/2021 AMERICAN PUBLIC WORKS ASSC 720.00Accounts Payable Check
168830 09/24/2021 AMERICAN WEST TIRE & AUTO INC 3,776.49Accounts Payable Check
168831 09/24/2021 AMERIGAS 128.33Accounts Payable Check
168833 09/24/2021 AT&T 1,157.79Accounts Payable Check
168834 09/24/2021 AT&T 1,205.69Accounts Payable Check
168835 09/24/2021 AVILA TRAFFIC SAFETY 67.97Accounts Payable Check
168836 09/24/2021 BELL'S PLUMBING REPAIR, INC. 260.00Accounts Payable Check
168837 09/24/2021 JOSE R. BENITEZ 120.00Accounts Payable Check
168838 09/24/2021 BREZDEN PEST CONTROL, INC. 170.00Accounts Payable Check
168839 09/24/2021 CASEY BRYSON 118.00Accounts Payable Check
168840 09/24/2021 BURKE,WILLIAMS, & SORENSON LLP 34,202.70Accounts Payable Check
168841 09/24/2021 CA DEPT OF FISH & WILDLIFE 2,516.00Accounts Payable Check
168842 09/24/2021 CALLYO 2,160.00Accounts Payable Check
168843 09/24/2021 CAR EL, INC. 3,396.40Accounts Payable Check
168844 09/24/2021 CARQUEST OF ATASCADERO 55.51Accounts Payable Check
168846 09/24/2021 CHARTER COMMUNICATIONS 4,241.74Accounts Payable Check
168847 09/24/2021 COASTAL REPROGRAPHIC SERVICES 122.61Accounts Payable Check
168848 09/24/2021 COBAN TECHNOLOGIES, INC. 125.00Accounts Payable Check
168849 09/24/2021 DEPARTMENT OF JUSTICE 387.00Accounts Payable Check
168850 09/24/2021 DEPT. OF THE CA HIGHWAY PATROL 905.85Accounts Payable Check
168851 09/24/2021 DOOLEY ENTERPRISES INC 6,560.36Accounts Payable Check
168852 09/24/2021 EARTH SYSTEMS PACIFIC 2,505.00Accounts Payable Check
168853 09/24/2021 EL CAMINO CAR WASH 100.00Accounts Payable Check
168854 09/24/2021 EMERGENCY VEHICLE SPECIALISTS 10,410.57Accounts Payable Check
168855 09/24/2021 ESTRELLA WARBIRDS MUSEUM, INC 500.00Accounts Payable Check
168856 09/24/2021 JENNIFER FANNING 77.00Accounts Payable Check
168857 09/24/2021 FENCE FACTORY ATASCADERO 3,044.93Accounts Payable Check
ITEM NUMBER: A-2
DATE: 10/26/21
ATTACHMENT: 1
Page 16 of 217
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of September 2021
168858 09/24/2021 FERGUSON ENTERPRISES, LLC 568.80Accounts Payable Check
168859 09/24/2021 FGL ENVIRONMENTAL 4,371.00Accounts Payable Check
168860 09/24/2021 GAS COMPANY 475.66Accounts Payable Check
168861 09/24/2021 GIERLICH-MITCHELL, INC. 106,934.45Accounts Payable Check
168862 09/24/2021 KELLY GLEASON 45.58Accounts Payable Check
168863 09/24/2021 MARK D. GREENAWAY 30.00Accounts Payable Check
168864 09/24/2021 HART IMPRESSIONS PRINTING 1,522.06Accounts Payable Check
168865 09/24/2021 HINDERLITER, DE LLAMAS 1,514.97Accounts Payable Check
168866 09/24/2021 HOME DEPOT CREDIT SERVICES 1,248.86Accounts Payable Check
168867 09/24/2021 JPW COMMUNICATIONS 1,000.00Accounts Payable Check
168868 09/24/2021 STEVEN KAHN 207.18Accounts Payable Check
168869 09/24/2021 KPRL 1230 AM 820.00Accounts Payable Check
168870 09/24/2021 KRITZ EXCAVATING & TRUCKNG INC 687.26Accounts Payable Check
168871 09/24/2021 KW CONSTRUCTION 18,437.57Accounts Payable Check
168872 09/24/2021 L.N. CURTIS & SONS 3,187.39Accounts Payable Check
168873 09/24/2021 LEE WILSON ELECTRIC CO. INC 2,584.33Accounts Payable Check
168874 09/24/2021 KENNETH LERNO 129.53Accounts Payable Check
168875 09/24/2021 LIFE ASSIST, INC. 802.31Accounts Payable Check
168876 09/24/2021 MARBORG INDUSTRIES 400.00Accounts Payable Check
168877 09/24/2021 MARK'S TIRE SERVICE 1,977.10Accounts Payable Check
168878 09/24/2021 MEDINA LIGHT SHOW DESIGNS 1,900.00Accounts Payable Check
168879 09/24/2021 METRO MEDIA 495.00Accounts Payable Check
168880 09/24/2021 MEYER TREE CONSULTING 1,897.50Accounts Payable Check
168881 09/24/2021 MID-COAST GEOTECHNICAL, INC. 1,980.00Accounts Payable Check
168882 09/24/2021 MINER'S ACE HARDWARE 275.86Accounts Payable Check
168883 09/24/2021 MISSION UNIFORM SERVICE 536.08Accounts Payable Check
168884 09/24/2021 MOSS, LEVY, & HARTZHEIM LLP 7,000.00Accounts Payable Check
168885 09/24/2021 NORTH COAST ENGINEERING INC. 1,523.50Accounts Payable Check
168886 09/24/2021 NOWDOCS INTERNATIONAL, INC. 387.15Accounts Payable Check
168887 09/24/2021 OASIS EQUIPMENT RENTAL 428.34Accounts Payable Check
168888 09/24/2021 OFFICE DEPOT INC. 1,134.70Accounts Payable Check
168889 09/24/2021 PACIFIC GAS AND ELECTRIC 955.07Accounts Payable Check
168890 09/24/2021 DAWN PATTERSON 87.36Accounts Payable Check
168891 09/24/2021 PERRY'S PARCEL & GIFT 27.96Accounts Payable Check
168892 09/24/2021 PFLUMS ATASCADERO MUFFLER 200.00Accounts Payable Check
168893 09/24/2021 PROCARE JANITORIAL SUPPLY,INC. 1,882.89Accounts Payable Check
168894 09/24/2021 QUADIENT, INC. 696.75Accounts Payable Check
168895 09/24/2021 RAMINHA CONSTRUCTION, INC. 93,871.11Accounts Payable Check
168896 09/24/2021 RANGE MASTER 3,429.98Accounts Payable Check
168897 09/24/2021 READYREFRESH BY NESTLE 129.09Accounts Payable Check
168898 09/24/2021 ROB REYNOLDS CONSTRUCTION, INC 131,731.77Accounts Payable Check
168899 09/24/2021 SAM'S TREE 805, INC. 975.00Accounts Payable Check
168900 09/24/2021 SAN LUIS POWERHOUSE, INC. 945.79Accounts Payable Check
ITEM NUMBER: A-2
DATE: 10/26/21
ATTACHMENT: 1
Page 17 of 217
Check
Number
Check
Date Vendor Description Amount
City of Atascadero
Disbursement Listing
For the Month of September 2021
168901 09/24/2021 SANCON TECHNOLOGIES, INC. 12,000.00Accounts Payable Check
168902 09/24/2021 SIGTRONICS CORP. 947.77Accounts Payable Check
168903 09/24/2021 SLO COUNTY SHERIFF'S OFFICE 597.00Accounts Payable Check
168904 09/24/2021 RYAN SMITH 250.00Accounts Payable Check
168905 09/24/2021 SOUTH COAST EMERGENCY VEH SVC 609.79Accounts Payable Check
168906 09/24/2021 BRUCE ST. JOHN 222.92Accounts Payable Check
168907 09/24/2021 STANLEY CONVERGENT SECURITY 367.20Accounts Payable Check
168908 09/24/2021 STAPLES CREDIT PLAN 232.96Accounts Payable Check
168909 09/24/2021 SWANK MOTION PICTURES, INC. 550.00Accounts Payable Check
168910 09/24/2021 MADALYN TARR 40.25Accounts Payable Check
168911 09/24/2021 TEMPLETON UNIFORMS, LLC 500.53Accounts Payable Check
168912 09/24/2021 THOMSON REUTERS - WEST 175.10Accounts Payable Check
168917 09/24/2021 U.S. BANK 33,335.16Accounts Payable Check
168918 09/24/2021 ULTREX BUSINESS PRODUCTS 30.40Accounts Payable Check
168919 09/24/2021 ULTREX LEASING 263.18Accounts Payable Check
168920 09/24/2021 UNITED RENTALS (NORTH AM), INC 4,357.59Accounts Payable Check
168921 09/24/2021 USA BLUE BOOK 459.64Accounts Payable Check
168922 09/24/2021 DAVID VAN SON 118.00Accounts Payable Check
168923 09/24/2021 VERDIN 12,754.60Accounts Payable Check
168924 09/24/2021 VERIZON WIRELESS 327.46Accounts Payable Check
168925 09/24/2021 VINO VICE, INC. 528.00Accounts Payable Check
168926 09/24/2021 VITAL RECORDS CONTROL 826.40Accounts Payable Check
168927 09/24/2021 WALLACE GROUP 10,525.86Accounts Payable Check
168928 09/24/2021 WELL SEEN SIGN CO., LLC 3,700.72Accounts Payable Check
168929 09/24/2021 WEST COAST AUTO & TOWING, INC. 130.00Accounts Payable Check
168930 09/24/2021 WHITLOCK & WEINBERGER TRANS. 570.00Accounts Payable Check
168931 09/24/2021 WOODS HUMANE SOCIETY 4,750.00Accounts Payable Check
4182 09/30/2021 ANTHEM BLUE CROSS HSA 8,721.82Payroll Vendor Payment
168932 09/30/2021 ATASCADERO PROF. FIREFIGHTERS 1,027.05Payroll Vendor Payment
168933 09/30/2021 MASS MUTUAL WORKPLACE SOLUTION 7,730.49Payroll Vendor Payment
168934 09/30/2021 NATIONWIDE RETIREMENT SOLUTION 1,080.20Payroll Vendor Payment
168935 09/30/2021 SEIU LOCAL 620 792.85Payroll Vendor Payment
168936 09/30/2021 VANTAGEPOINT TRNSFR AGT 106099 357.85Payroll Vendor Payment
168937 09/30/2021 VANTAGEPOINT TRNSFR AGT 304633 6,310.41Payroll Vendor Payment
168938 09/30/2021 VANTAGEPOINT TRNSFR AGT 706276 746.00Payroll Vendor Payment
$ 3,180,646.23
ITEM NUMBER: A-2
DATE: 10/26/21
ATTACHMENT: 1
Page 18 of 217
ITEM NUMBER: A-3
DATE: 10/26/21
Atascadero City Council
Staff Report – Public Works Department
El Camino Real Downtown Infrastructure Enhancement Project
Design Award
RECOMMENDATIONS:
Council:
1. Award a contract to Wallace Group for $598,811 to provide design engineering
and construction document preparation for the El Camino Real Downtown
Infrastructure Enhancement Project (Project No. C2017T01).
2. Authorize the Director of Administrative Services to allocate $3,000,000 in City of
Atascadero Downtown Infrastructure State Budget A llocation Funds to the
El Camino Real Downtown Infrastructure Enhancement Project.
REPORT IN BRIEF:
The El Camino Real Downtown Infrastructure Enhancement Plan (the Project) has been
developed and refined since the Project was formally initiated in August 2017. Over the
following three years, multiple options were considered, with preferred design
alternatives refined through a process of public input, City department review, Council
direction, and technical analysis of traffic modeling and safety cons iderations. The
selected alternative was approved by Council in August 2020. The City is now in a
position to initiate final engineering design services to provide detailed plans,
specifications and estimates to make the Project “shovel ready”.
DISCUSSION:
Background
The approved El Camino Real Downtown Infrastructure Enhancement Plan is a
planning level document that outlines recommendations for road improvements
incorporating enhanced pedestrian and bicycle access along with increased parking
opportunities and safer crosswalks. The primary goal is public safety for all roadway
users: pedestrians, bicyclists, and motorists. A second goal is to enhance economic
development in the downtown by creating a zone that slows traffic speeds, enhances
appearance and safety, and increases parking. The Plan extents include the El Camino
Corridor from the intersection of Highway 41 to the intersection of Rosario Avenue.
Page 19 of 217
ITEM NUMBER: A-3
DATE: 10/26/21
The overall objective for the reconstruction of this segment of roadway has been
consistent since inception in 2017 - to develop a holistic corridor plan within the
Downtown El Camino Real Corridor that considers the needs and goals of all
multimodal users, residents, businesses, and City leaders. The Project was formally
initiated in 2017, with KTUA of San Diego hired in November 2017 to assist the City in
the analysis and development of a corridor plan. Central Coast Transportation
Consulting (CCTC) of Morro Bay worked as a sub consultant to KTUA to provide traffic
engineering and operations analysis.
Project objectives, identified early in the process, have driven the conceptual design.
These objectives include the following:
• Provide public safety for all roadway users by incorporating complete
streets and “road diet” concepts and principles
• Enhance economic development by supporting existing and future
merchants with additional parking
• Support Downtown business synergy through a partnership in crafting a
downtown traffic calming plan
• Enhance the streetscape of El Camino Real by creating a se nse of place and
arrival into the Downtown
• Create safe pedestrian connections and crossings while enhancing the
walkability of Downtown
• Slow vehicular speeds to increase safety and visibility, including an analysis
of impacts to level of service (LOS).
• Enhance the ability to host more special events in the Downtown area
• Accommodate multi-modal transportation, where feasible
After evaluation of multiple options, a traffic analysis was conducted in early 2018, and
a series of public outreach/feedback workshops were in initiated in August 2018.
Twelve workshop events took place, both in person and virtually, that included a
presentation and small breakout sessions with City staff. Participants included
residents, business owners, and other interested persons who completed feedback
survey forms that contained questions to assist the City in determining appropriateness
of the draft concept plans. The draft concept plans were revised based upon feedback
and presented, along with a summary of public feedback, to the Council at their August
11, 2020 meeting. Council approved the concept plans for the Project at that meeting.
As part of the FY 2021-2023 Budget, funds were authorized to provide design
engineering services to take the Plan from concept drawings to a Plans, Specifications
and Estimates (PS&E) package ready for bidding and construction.
Analysis
Staff prepared a Request for Proposal (RFP) and solicited proposals in July 2021 from
qualified consultants to provide design services and prepare construction plans and
specifications for the Project. Most engineering projects are largely the responsibility of the
Public Works Department and involve a clearly defined design objective requiring
preparation of plans, specification and estimates for bidding. In contrast, the El Camino
Real Downtown Infrastructure Enhancement Project will incorporate multiple departments
within the City, most notably Community Development and Public Works. While the
Page 20 of 217
ITEM NUMBER: A-3
DATE: 10/26/21
concept plan has been developed and approved by Council, the upcoming design
process is extensive and will include refining design concepts, defining cohesive design
elements and materials types, identification of engineering constraints and
opportunities, and preparation of a complete bid package for construction. It is
anticipated that this process will include opportunities for public and Council review and
input, and significant interdepartmental coordination with the selected consultant design
team to ensure the Project meets current and future needs.
Major components of this design effort are as follows:
- Topographic Survey, Geotechnical Investigation and Utility Research and
Coordination
- Preliminary Engineering and Cost Estimating
o Concept Refinement
o Conceptual Streetscaping and Landscaping Plan
o Stormwater Facilities and Downtown Watershed Plan Implementation
o Preliminary Cost Estimating
- Preparation of Design Plans, Specifications and Estimates
o Civil Improvements
o Landscaping and Irrigation
o Electrical and Lighting
o Traffic Signal Modifications
Staff received five proposals from highly qualified consultants including Wallace Group,
Quincy Engineering, Rick Engineering, GHD and BKF Engineers. Proposals were
individually reviewed and scored by a selection committee comprised of Public Works
and Community Development staff based upon experience with similar projects,
responsiveness to City needs, experience of key personnel , and other factors. Staff
invited the top three rated consultant teams for in person interviews, held on September
23, 2021. After completion of interviews, staff determined that the design team led by
Wallace Group was best qualified to provide engineering services for this project. The
consultant team includes KTUA, CCTC, Earth Systems Pacific, and Kittleson &
Associates. Amongst other qualifications, this team provides continuity, as the core
members were involved throughout the conceptual design process.
Wallace Group provided a detailed fee estimate worksheet with their proposal that
included labor hours/costs, reimbursable expenses, and subconsultant fees for the work
scope identified in the City’s request for proposals. Staff reviewed Wallace Group’s
work scope and fee and have determined that it is reasonable. Staff is recommending
awarding a contract with Wallace Group on a labor plus reimbursable basis for an
estimated maximum fee of $598,811 for design engineering services for the Project.
Design work is anticipated to take approximately ten months to complete.
Staff anticipates having a PS&E package ready for bidding in the fall of 2022. At this
time, full construction funding sources are not finalized, but efforts to fully fund the
project will be undertaken by staff concurrent with engineering design efforts.
The adopted budget (FY21/22) includes $650,000 in Local Transportation Funds for the
Project. In addition to the available Local Transportation Funds, State Senator Laird was
Page 21 of 217
ITEM NUMBER: A-3
DATE: 10/26/21
successful in securing a $3,000,000 State budget allocation for the City to be used for
downtown infrastructure. While the exact grant requirements have not yet been received
by the City, it is anticipated that the State will require that the funds be spent quickly.
Staff is recommending that the City use the State Downtown Infrastructure funds on the
Project, before using any other available funds including the budgeted Local
Transportation Funds. This will help ensure that the funds are spent in a timely manner.
As the design is developed and community input received, it is anticipated additional
design services may be necessary. Staff is estimating a total cost of about $710,000 for
this phase of the Project. This estimated cost would include the base contract cost of
$598,811 for Wallace Group, anticipated supplemental design services, and staff time
A preliminary construction cost estimate of about $7,600,000 was prepared by staff for
the concept plan that includes construction contingencies, administrative support,
inspection, testing, and other construction related costs. This estimate is very
preliminary since design elements are not yet known. The final design phase will allow
a much more accurate cost estimate by identifying actual design elements and actual
work scope and quantities. The final design process will provide the City an opportunity
to evaluate various options and associated costs to include in the final construction
plans and specifications.
FISCAL IMPACT:
Award of this contract will result in the expenditure of approximately $7 10,000 of
Atascadero Downtown Infrastructure State Budget Allocation funds.
Conceptual Design Phase 131,160$
Final Design
Design Engineering Contract (Wallace group)598,811$
Design Engineering Contingency (10%)59,880
Design Support 50,000
708,691
Construction costs 5,000,000
Testing, inspection and support (15%)750,000
Construction Contingency (20%)1,000,000
Total Estimated Expenditures after
conceptual design phase 7,589,851$
Circulation System Funds 131,160$
Local Transportation Funds 650,000
California State Budget Allocation 3,000,000
Total Available Revenue after conceptual
design phase 3,781,160$
Net Funding (Shortfall) after conceptual
design phase (3,808,691)$
ESTIMATED EXPENDITURES
ESTIMATED REVENUES
Page 22 of 217
ITEM NUMBER: A-3
DATE: 10/26/21
ATTACHMENT:
El Camino Real Downtown Infrastructure Enhancement Concept Plan
Page 23 of 217
ITEM NUMBER: A-3DATE: 10/26/21ATTACHMENT: 1Page 24 of 217
ITEM NUMBER: A-4
DATE: 10/26/21
Atascadero City Council
Staff Report – Public Works Department
Atascadero Lake Park Improvements for Proposition 68
Parks and Recreation Grant Per Capita Program Funds
RECOMMENDATION:
Council direct staff to apply for per capita funding through the California Department of
Parks and Recreation - Proposition 68 California Drought, Water, Parks, Climate, Costal
Protection and Outdoor Access for All Per Capita Program for Lake Park Improvements.
DISCUSSION:
Background
On October 22, 2019, the City Council approved Resolution No. 2019 -080, authorizing
an application for the Per Capita Grant Program with the State Department of Parks and
Recreation. The Per Capita Program is part of the California voter approved Proposition
68, the Parks and Water Bond Act of 2018 (Senate Bill 5). Proposition 68 bond proceeds
have created grant programs for drought, water, parks, climate, coastal protection, and
outdoor access. Specifically, the Per Capita Program provides $177,952 to the City for
local park rehabilitation, creation and improvements. Under this program, grant
recipients are encouraged to utilize awards to rehabilitate existing infrastructure and to
address deficiencies in neighborhoods lacking access to the outdoors.
The process to obtain these grant funds was initiated by the City Council’s adoption of
the Resolution on October 22, 2019 and subsequent submission to the Office of Grants
and Local Services (OGALS) in November 2019. As part of that Council agenda item,
staff provided preliminary considerations of needs for park and recreation improvements
at Paloma Creek Park, Colony Park Community Center, Atascadero Lake Park and the
Zoo with the intent to come back before the Council with a final recommendation for the
allocation of the grant funding. Since that time, staff continued to review and prioritize
the needs of the City’s parks and recreation features, focusing on replacement and
enhancement to maximize community safety and access.
Analysis
As part of the Measure D-20 outreach and prioritization, the City identified repairs and
replacements to various infrastructure and amenities at Atascadero Lake Park to be a
Measure D-20 Tier 1 priority. Staff is recommending that the Council allocate anticipated
Prop. 68 grant funding toward sidewalk improvements to meet ADA accessibility
requirements, along with replacement of the lake pier, at Atascadero Lake Park. These
improvements are located along the shoreline in and around the paddleboat rental and lake
Page 25 of 217
ITEM NUMBER: A-4
DATE: 10/26/21
pier (behind the band shell). Given the condition of these aging facilities, coupled with the
increased popularity of fishing and new energy with a new paddleboat vendor, staff
considered these improvements to be an excellent beneficiary of Proposition 68 funding.
The Atascadero Lake Park pier, portions of which
were likely built over 70 years ago, received its
last significant rebuild in 1996. The pier is utilized
by community members to enjoy the views of
Atascadero Lake and recreational fishing.
Atascadero Lake Park is one of the community’s
major attractions and is a popular public space
throughout the year for residents and visitors alike
while offering a number of amenities, including
the Charles Paddock Zoo. The pier is constructed
primarily of wood, with wood pilings and a
concrete foundation that rests on the lake bed.
The pier is currently in a state of disrepair and has been closed since the summer due
to rotten structural wood members and railing. Funding from the grant would be used
for the design and construction of a replacement pier that would meet ADA requirements.
The sidewalk betweeen the pier and the
paddleboat concessionaire (behind the band
shell), and leading from the upper restrooms,
does not meet current ADA standards. Access to
this area is challenging, primarily during the
summer months when many community events
are held at the park. Specifically, the grant
funding would be used to replace sidewalks and
construct a ramp near the paddleboat vendor to
allow accessibility to the vendor and new pier.
Should the Council choose to move forward with
these improvements, staff will include a detailed
description of the project and required
environmental documents with the grant application package. The proposed design of
the new pier will feature floating platforms attached to the pathway, enabling the
gangway slope to adjust based upon the height of the water level. The p ier is also
proposed to extend further into the lake with a ‘T’ shape end, allowing additional room
for visitors and fisherpersons to access the lake. The grant application is due to OGALS
by December 31, 2021. Per the grant requirements, the park improvements must be
completed by June 30, 2023. The Prop 68 grant match for the pier and sidewalk
improvements are part of the City’s 2021-23 Budget. Should the City not receive the per
capita grant funding, staff will come back to Council with a funding plan and prioritization
of park safety projects.
Lake Park Pier
Portion of sidewalk to receive
ADA upgrades
Page 26 of 217
ITEM NUMBER: A-4
DATE: 10/26/21
ENVIRONMENTAL REVIEW:
The California Environmental Quality Act does not apply to the recommended action in
this report, because the action does not constitute a “Project” under CEQA Guidelines
Sec. 15378. The grant application will include the required environmental report, which
will be conducted by the Planning Department.
FISCAL IMPACT:
The City of Atascadero is eligible to receive $177,952 through the Per Capita Program.
The Program requires a 20% local match ($35,590) bringing the total budget amount of
the project to $213,524. The matching funds for the grant are budgeted as part of the
Measure D-20 Parks Repair and Replacement line item.
ALTERNATIVES:
Council may choose not to approve the proposed Atascadero Lake Park improvements
with anticipated funding by the Per Capita Program. Should this occur, staff requests
specific direction on projects to pursue for funding by the grant.
ATTACHMENTS:
1. Preliminary site map
2. Per Capita Program Procedural Guide
Page 27 of 217
Legend
Proposed Pier Replacement
Sidewalk/Path Improvements
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 1
Page 28 of 217
1
2018-2019 California State Budget, Chapter 29
Budget Item 3790-101-6088 (b) - $185,000,000 shall be available for the Local
Park Rehabilitation, Creation in Urban Areas Program, consistent with subdivision
(a) of Section 80061 of the Public Resources Code.
Procedural Guide
for the
California Drought, Water, Parks, Climate, Coastal
Protection, and Outdoor Access for All Act of 2018
PER CAPITA PROGRAM
September 2020
State of California
The Natural Resources Agency
Department of Parks and Recreation
Office of Grants and Local Services (OGALS)
“Creating Community through People, Parks, and Programs”
Send correspondence to:
Street Address for Overnight Mail: Mailing Address:
Calif. Dept. of Parks and Recreation
Office of Grants and Local Services
1416 Ninth Street, Room 918
Sacramento, CA 95814
Calif. Dept. of Parks and Recreation
Office of Grants and Local Services
P.O. Box 942896
Sacramento, CA 94296-0001
Phone: (916) 653-7423
Website: http://www.parks.ca.gov/grants
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 29 of 217
2
STATE OF CALIFORNIA
DEPARTMENT OF PARKS AND RECREATION
Department Mission
The mission of the California Department of Parks and Recreation is to provide for the
health, inspiration, and education of the people of California by helping to preserve the
state’s extraordinary biological diversity, protecting its most valued natural and cultural
resources, and creating opportunities for high-quality outdoor recreation.
Community Engagement Division Mission
The mission of the Community Engagement Division is to encourage healthy
communities by connecting people to parks, supporting innovative recreational
opportunities, embracing diversity, fostering inclusivity, and delivering superior customer
service, with integrity for the enrichment of all.
The Office of Grants and Local Services Mission
The mission of the Office of Grants and Local Services is to address California’s diverse
recreational, cultural and historical resource needs by developing grant programs,
administering funds, offering technical assistance, building partnerships and providing
leadership through quality customer service.
OGALS VISION GOALS
To Be:
•A leader among park and recreation professionals.
•Proactive in anticipating public park and recreation needs and how new
legislation and grant programs could best meet these needs.
•Honest, knowledgeable and experienced grant administration facilitators.
•Sensitive to local concerns while mindful of prevailing laws, rules and regulations.
•Perceptive to opportunities for partnerships, growth and renewal where few
existed before.
•Committed to providing quality customer service in every interaction and
transaction.
•Responsive to the needs of applicants, grantees, nonprofit organizations, local
governments, legislative members, and department employees.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 30 of 217
3
TABLE OF CONTENTS
PER CAPITA PROGRAM DESCRIPTION ........................................................................ 4
Eligible Recipients (PRC §80062) ...................................................................................... 4
Eligible Projects.................................................................................................................. 5
GRANT PROCESS OVERVIEW........................................................................................ 6
Authorizing Resolution ....................................................................................................... 7
APPLICATION PACKET ................................................................................................. 10
Application Packet Checklist ............................................................................................ 11
Per Capita Project Application Form ................................................................................ 12
Per Capita Match ............................................................................................................. 13
Acquisition Projects .......................................................................................................... 14
Development Projects ...................................................................................................... 16
Development Project Scope/Cost Estimate Form ............................................................ 19
Funding Sources Form ..................................................................................................... 20
CEQA Compliance Certification ......................................... ............................................. 21
Land Tenure ..................................................................................................................... 22
Site Plan ........................................................................................................................... 24
Sub-leases or Agreements ............................................................................................... 24
Photos .............................................................................................................................. 24
Greenhouse Gas Emissions Reduction and Carbon Sequestration ................................. 24
SPECIAL REQUIREMENTS ............................................................................................ 26
Status Report ................................................................................................................... 26
Bond Act Sign .................................................................... ............................................. 28
Deed Restriction............................................................................................................... 29
GRANT PAYMENTS ....................................................................................................... 33
Payment Request Form ................................................................................................... 35
Grant Expenditure Form ................................................................................................... 35
Project Completion Packet ............................................................................................... 37
PER CAPITA CONTRACT .............................................................................................. 42
ACCOUNTING AND AUDITS .......................................................................................... 48
Accounting Requirements ................................................................................................ 49
Audit Checklist ................................................................................................................. 50
REFERENCES ................................................................................................................ 50
Public Resources Code relating to the Proposition 68 Per Capita program ..................... 51
Allocation Tables .............................................................................................................. 54
ALLOCATION TRANSFER ............................................................................................. 54
DEFINITIONS .................................................................................................................. 55
Words and terms shown in SMALL CAPS are in the definitions section.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 31 of 217
4
Per Capita Program Summary
Background
This program originates from Proposition 68, placed on the ballot via Senate Bill 5
(DeLeon, Chapter 852, statutes of 2017), and approved by voters on June 5, 2018.
Funds for the program were appropriated via State Budget item 3790-101-6088(b).
Legislative program information is found in the Public Resources Code (PRC) beginning
at §80000 (see page 51). OGALS retains the right to waive requirements not mandated
by statute. Funds are provided for two programs, as described below:
General Per Capita Program: $185,000,000
Funds are available for local park rehabilitation, creation, and improvement grants to
local governments on a per capita basis. Grant recipients are encouraged to utilize
awards to rehabilitate existing infrastructure and to address deficiencies in
neighborhoods lacking access to the outdoors (PRC §80061(a)).
Urban County Per Capita: $13,875,000
Additional funds are available for Per Capita grants to cities and districts in urbanized
counties (a county with a population of 500,000 or more) providing park and recreation
services within jurisdictions of 200,000 or less in population. An entity eligible to receive
funds under this subdivision shall also be eligible to receive funds available under the
General Per Capita Program (PRC §80061(b)).
Eligible Recipients (PRC §80062)
Sixty percent (60%) of the General Per Capita funds are allocated to the following
entities based on population. The minimum allocation is $200,000.
• Cities
• Eligible Districts, other than a regional park district, regional park and open-space
districts, and regional open-space districts1
Forty percent (40%) of the General Per Capita funds are allocated to the following
entities based on population. The minimum allocation is $400,000.
• Counties
• Regional park districts, regional park and open space districts, and regional open
space districts
Allocations
Visit OGALS’ Per Capita webpage at www.parks.ca.gov/percapita for allocations.
1 For purposes of this chapter, “district” means any regional park district, regional park
and open-space district, or regional open-space district formed pursuant to Article 3
(commencing with §5500) of Chapter 3 of Division 5, any recreation and park district
formed pursuant to Chapter 4 (commencing with §5780) of Division 5, or any authority
formed pursuant to Division 26 (commencing with §35100). With respect to any
community or unincorporated region that is not included within a district, and in which no
city or county provides parks or recreational areas or facilities, “district” also means any
other entity, including, but not limited to, a district operating multiple-use parklands
pursuant to Division 20 (commencing with §71000) of the Water Code.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 32 of 217
5
Eligible Projects
•PROJECTS must be capital outlay for recreational purposes, either acquisition or
DEVELOPMENT. Do not submit combined acquisition and DEVELOPMENT projects, rather
submit separate APPLICATION PACKETS for each PROJECT type.
•Multiple PROJECTS may be completed under one contract; each PROJECT requires a
separate APPLICATION PACKET.
•A PROJECT can only have one location. One PROJECT serving several parks is not
permitted.
•GRANTEES are encouraged to partner with other GRANTEES on PROJECTS
(PRC §80063(b)). See page 54 for information on allocation transfers.
Match
PROJECTS not serving a “severely disadvantaged community” (median household income
less than 60% of the statewide average) require a 20% match (see page 13) (PRC
§80061(c)).
No Supplanting
GRANTEES must use Per Capita grant funds to supplement existing expenditures, rather
than replace them (PRC §80062(d)). For example, a GRANTEE has a budget for
recreational capital expenditures of $500,000 per year, and is receiving a $200,000
allocation under the Per Capita program. The budget cannot be reduced to $300,000,
with the Per Capita funds making up the difference.
Similarly, if a PROJECT has been approved by the governing body, and a funding source
has been identified, Per Capita funds cannot be swapped in as a new funding source
unless the prior funding source is applied to other identified recreational capital projects.
GRANTEES should keep all documents indicating intent to use Per Capita grant funds for
PROJECTS.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 33 of 217
6
Grant Process Overview
The GRANT PERFORMANCE PERIOD is shown on the contract. Visit OGALS’ Per Capita
webpage at www.parks.ca.gov/percapita for deadlines and current information on each
step in the process listed below.
1.OGALS Mandatory Grant Administration Workshops will be held statewide. All
recipients are required to attend.
2.Resolution: GRANTEE passes one resolution approving the filing of all applications
associated with the contract, and provides a copy to OGALS.
3.APPLICATION PACKET(s): The GRANTEE defines the PROJECT SCOPE(s) and amount of
GRANT funds needed for each PROJECT. As PROJECTS are identified, the GRANTEE
submits individual APPLICATION PACKET(s) to OGALS. OGALS reviews each APPLICATION
PACKET and sends a letter of approval to the GRANTEE or requests additional
information.
4.Contract: OGALS sends a contract to the GRANTEE once the OGALS has received and
approved APPLICATION PACKET(S) equaling the total contract amount.
a.The contract section, beginning on page 42, includes a sample contract.
b. The GRANTEE must return the contract signed by the AUTHORIZED REPRESENTATIVE
to OGALS.
c.OGALS returns a copy of the fully executed contract to the GRANTEE.
5.Payments and end of GRANT PERFORMANCE PERIOD: GRANTEE requests payments for
eligible costs. The grant payments section, beginning on page 33, provides payment
request instructions and forms.
a. The GRANTEE may request payments after each PROJECT is approved by OGALS.
b. The GRANTEE completes PROJECT SCOPE(s).
c.The GR ANTEE sends PROJECT COMPLETION PACKET(s) to OGALS.
d.OGALS processes the final payment request after each PROJECT is complete as
documented by the GRANTEE in the PROJECT COMPLETION PACKET, and as verified
by OGALS by conducting a site inspection.
6.Accounting and Audit: DPR’s Audits Office may conduct an audit. The GRANTEE is
required to retain all PROJECT records, including source documentation with original
signatures, for five years following issuance of the final GRANT payment or PROJECT
termination, whichever is later. The Accounting and Audit Section, beginning on
page 48, provides directions and an Audit Checklist for DPR audit and accounting
requirements.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 34 of 217
7
Authorizing Resolution
GRANTEE passes one resolution approving the filing of all APPLICATION PACKETS
associated with the contract, and forwards a copy to OGALS.
The Authorizing Resolution on the following page may be reformatted; however, the
language provided in the resolution must remain unchanged.
The Authorizing Resolution serves two purposes:
1.It is the means by which the GRANTEE’S Governing Body agrees to the terms of the
contract; it provides confirmation that the GRANTEE has the funding to complete,
operate and maintain PROJECTS associated with the contract.
2. Designates a position title to represent the Governing Body on all matters regarding
PROJECTS associated with the contract. The incumbent in this position is referred to
as the AUTHORIZED REPRESENTATIVE.
Resolution items 4, 5, 7, 8 and 9 are required by Proposition 68.
Complete the highlighted areas of the Authorizing Resolution (beginning on following
page). The AUTHORIZED REPRESENTATIVE can delegate signatory authority to other
individuals (by position title) either in entirety or for particular documents. This may be
included in item 11 of the resolution, or the AUTHORIZED REPRESENTATIVE may submit a
letter (on letterhead) or email to OGALS delegating authority.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 35 of 217
8
Resolution Form
Resolution Number: (insert number here)
RESOLUTION OF THE (Title of Governing Body/City Council, Board of Supervisors)
OF (City, County, or District) APPROVING APPLICATION(S) FOR PER CAPITA
GRANT FUNDS
WHEREAS, the State Department of Parks and Recreation has been delegated the
responsibility by the Legislature of the State of California for the administration of the
Per Capita Grant Program, setting up necessary procedures governing application(s);
and
WHEREAS, said procedures established by the State Department of Parks and
Recreation require the grantee’s Governing Body to certify by resolution the approval of
project application(s) before submission of said applications to the State; and
WHEREAS, the grantee will enter into a contract(s) with the State of California to
complete project(s);
NOW, THEREFORE, BE IT RESOLVED that the (grantee’s governing body) hereby:
1.Approves the filing of project application(s) for Per Capita program grant
project(s); and
2.Certifies that said grantee has or will have available, prior to commencement of
project work utilizing Per Capita funding, sufficient funds to complete the
project(s); and
3.Certifies that the grantee has or will have sufficient funds to operate and maintain
the project(s), and
4.Certifies that all projects proposed will be consistent with the park and recreation
element of the [city/county/district’s] general or recreation plan (PRC §80063(a)),
and
5.Certifies that these funds will be used to supplement, not supplant, local
revenues in existence as of June 5, 2018 (PRC §80062(d)), and
6.Certifies that it will comply with the provisions of §1771.5 of the State Labor
Code, and
7.(PRC §80001(b)(8)(A-G)) To the extent practicable, as identified in the
“Presidential Memorandum--Promoting Diversity and Inclusion in Our National
Parks, National Forests, and Other Public Lands and Waters,” dated January 12,
2017, the [city/county/district] will consider a range of actions that include, but are
not limited to, the following:
(A)Conducting active outreach to diverse populations, particularly minority, low-
income, and disabled populations and tribal communities, to increase awareness
within those communities and the public generally about specific programs and
opportunities.
(B)Mentoring new environmental, outdoor recreation, and conservation leaders
to increase diverse representation across these areas.
(C)Creating new partnerships with state, local, tribal, private, and nonprofit
organizations to expand access for diverse populations.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 36 of 217
9
(D)Identifying and implementing improvements to existing programs to increase
visitation and access by diverse populations, particularly minority, low-income,
and disabled populations and tribal communities.
(E)Expanding the use of multilingual and culturally appropriate materials in
public communications and educational strategies, including through social
media strategies, as appropriate, that target diverse populations.
(F)Developing or expanding coordinated efforts to promote youth engagement
and empowerment, including fostering new partnerships with diversity-serving
and youth-serving organizations, urban areas, and programs.
(G)Identifying possible staff liaisons to diverse populations.
8.Agrees that to the extent practicable, the project(s) will provide workforce
education and training, contractor and job opportunities for disadvantaged
communities (PRC §80001(b)(5)).
9.Certifies that the grantee shall not reduce the amount of funding otherwise
available to be spent on parks or other projects eligible for funds under this
division in its jurisdiction. A one-time allocation of other funding that has been
expended for parks or other projects, but which is not available on an ongoing
basis, shall not be considered when calculating a recipient’s annual
expenditures. (PRC §80062(d)).
10.Certifies that the grantee has reviewed, understands, and agrees to the General
Provisions contained in the contract shown in the Procedural Guide; and
11.Delegates the authority to the (designated position, not name of person
occupying position), or designee to conduct all negotiations, sign and submit all
documents, including, but not limited to applications, agreements, amendments,
and payment requests, which may be necessary for the completion of the grant
scope(s); and
12.Agrees to comply with all applicable federal, state and local laws, ordinances,
rules, regulations and guidelines.
Approved and adopted the day of , 20 .
I, the undersigned, hereby certify that the foregoing Resolution Number was duly
adopted by the (grantee’s governing body) following a roll call vote:
Ayes:
Noes:
Absent:
(Clerk)
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 37 of 217
10
Application Packet
•GRANTEE may submit multiple APPLICATION PACKETS.
•Separate APPLICATION PACKETS are required for each PROJECT site and/or PROJECT
type.
•Provide all APPLICATION PACKET items in the order shown in the following checklist.
•Submitted documents need not contain original signatures; but the GRANTEE must
keep all original signed documents.
•GRANTEES are encouraged to submit documents digitally, as .pdf files. Do not send
the APPLICATION PACKET as one file. E-mail each checklist item to the PROJECT
OFFICER as a separate digital file, labeled using the digital file names indicated on
the application checklist.
•If submitting hard copies, number all pages of the APPLICATION PACKET.
Any costs incurred prior to finalizing the contract are at the GRANTEE’S own risk.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 38 of 217
11
State of California – The Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION
Application Packet Checklist
GRANTEES must complete the checklist below and submit it with the APPLICATION PACKET.
An APPLICATION PACKET is not complete unless all items on the checklist are submitted.
Each PROJECT requires its own APPLICATION PACKET. Check if included Check if not applicable Application Item Procedural
Guide
Page #
Check when
signed by
AUTHORIZED
REPRESENTATIVE
Application
Packet
Page #
Application Packet Checklist
Digital file name: checklist.pdf Pg. 11 Pg.
Application
Digital file name: application.pdf Pg. 12 Pg.
Development Project Scope/Cost
Estimate, or
Digital file name: devscope.pdf
Pg. 19 Pg.
Acquisition Requirements
Digital file names: acqscope.pdf & acqdocs.pdf Pg. 14 Pg.
Funding Sources Form
Digital file name: fundingsources.pdf Pg. 20 Pg.
Per Capita Match Calculator
Digital file name: match.pdf Pg. 13 Pg.
CEQA Compliance Certification
Digital file name: ceqa.pdf Pg. 21 Pg.
Land Tenure documentation
Digital file names: ownership.pdf or
nonownership.pdf
Pg. 21 Pg.
Sub-Leases or Agreements
Digital file name: otheragreements.pdf Pg. 24 Pg.
Site Plan
Digital file name: siteplan.pdf Pg. 24 Pg.
GHG Emissions Reduction
Worksheet (at completion)
Digital file name: emissions.pdf
Pg. 24 Pg.
Photos
Digital file name: photos.pdf Pg. 24 Pg.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 39 of 217
12
State of California – The Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION
Per Capita Project Application Form
PROJECT NAME REQUESTED GRANT AMOUNT
$
PROJECT SITE NAME and PHYSICAL ADDRESS
where PROJECT is located including zip code
(substitute latitude and longitude where no street
address is available)
MATCH AMOUNT (if project is not serving
a severely disadvantaged community)
$
LAND TENURE ( all that apply)
Owned in fee simple by GRANTEE
Available (or will be available) under
a ( ) year lease or easement
NEAREST CROSS STREET
Project Type (Check one) Acquisition☐Development☐
COUNTY OF PROJECT LOCATION
GRANTEE NAME AND MAILING ADDRESS
AUTHORIZED REPRESENTATIVE AS SHOWN IN RESOLUTION
Name (typed or printed) and Title Email address Phone
GRANT CONTACT-For administration of grant (if different from AUTHORIZED REPRESENTATIVE)
Name (typed or printed) and Title Email address Phone
GRANT SCOPE: I represent and warrant that this APPLICATION PACKET describes the intended
use of the requested GRANT to complete the items listed in the attached Development
PROJECT Scope/Cost Estimate Form or acquisition documentation. I declare under penalty of
perjury, under the laws of the State of California, that the information contained in this
APPLICATION PACKET, including required attachments, is accurate.
Signature of AUTHORIZED REPRESENTATIVE as shown in Resolution Date
Print Name:
Title:
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 40 of 217
13
Per Capita Match
PROJECTS that do not serve severely disadvantaged communities (median household
income less than 60% of the statewide average) must include 20% match from the
GRANTEE (PRC §80061(c)).
Costs incurred to provide match must be eligible costs. Calculate match using the Per
Capita match calculator at https://www.parksforcalifornia.org/percapita; submit the
report with the APPLICATION PACKET.
Costs incurred to provide match must be eligible costs. State funds are not allowed for
match. Eligible match sources are:
•Federal funds
•Local funds
•Private funds
•IN-HOUSE EMPLOYEE SERVICES
•Volunteer labor – must maintain time and attendance records showing actual
hours worked (see https://independentsector.org for volunteer hourly wage
value)
Match and Eligible Costs
The match is 20% but grantee must show 25% in additional costs if match is required.
For example:
Determining the match amount:
PROJECT amount: $125,000
20% match: ($25,000)
GRANT amount: $100,000
Submitting costs for reimbursement
GRANT amount: $100,000
25% in additional costs: $25,000
PROJECT amount: $125,000
In summary, the 20% match calculation is based on the PROJECT amount, not on the
GRANT amount.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 41 of 217
14
Acquisition Rules
Acquisition Projects
1.Purchase price cannot exceed the appraised value, even if the GRANTEE is willing to
pay the difference.
2.Land cannot be acquired through eminent domain.
3.Associated acquisition costs, such as appraisals, escrow fees, title insurance, etc.,
combined must be less than 25% of the PROJECT costs.
4.A deed restriction must be recorded on the property after the acquisition is complete
(see page 29).
5.Land must be open to the public for recreational purposes within three years from
the date the final payment is issued by the State Controller’s Office (SCO).2
6.GRANTEE must provide Title Insurance.
7.PROJECTS must be consistent with the park and recreation element of the
[city/county/district’s] general or recreation plan (PRC §80063(b)).
8.Per Capita funds must be used to supplement, not supplant, local revenues in
existence as of June 5, 2018 (PRC §80062(d)).
Acquisition Grant Scope/Cost Estimate
Provide the following information on a document signed by the AUTHORIZED
REPRESENTATIVE:
•A brief description, for example, “Acquisition of approximately (enter total acreage
to be acquired) for the development of park by (enter date no later than three
years from the date final payment is issued by the SCO).”
•Estimated total costs for land and relocation
•Estimated total costs other than the purchase price and relocation costs, such as
appraisals, escrow fees, title insurance fees, deed restriction recordation costs
Acquisition Documentation
For each parcel to be acquired, submit these documents:
1.An appraisal conducted within the last twelve months
2.A separate letter from an independent third party, AG rated appraiser certified by
the California Office of Real Estate Appraisers stating the appraisal was reviewed,
and was completed using acceptable methods
3.County Assessor’s parcel map, showing parcel number and parcel to be acquired
4.Estimated value of each parcel to be acquired with a description of how that value
was determined (such as the listed price on MLS, in-house estimation, website
evaluation, assessed value)
5.Acreage of each parcel to be acquired
6.A description of any encumbrances that will remain on the property, such as
grazing, timber, mineral rights or easements
2 Grantees will see this date on their project complete letter – “A final payment was
issued by the SCO on xx/xx/20xx”
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 42 of 217
15
7.A brief description of the intended recreational use of the land with the estimated
date by which the site will be open to the public for recreational purposes
For easement acquisitions, in addition to the requirements above, provide:
8.A copy of the proposed easement guaranteeing the authority to use the property for
the purposes specified in the application.
For relocation costs, in addition to the requirements above, provide:
9.A letter signed by the AUTHORIZED REPRESENTATIVE, listing the relocation costs for
each displaced tenant, certifying that the relocation amount does not exceed the
maximum allowed pursuant to Government Code §7260-7277.
Eligible Acquisition Costs
•IN-HOUSE EMPLOYEE SERVICES – see accounting rules (page 48)
•GRANT/PROJECT administration and accounting
•Public meetings/focus groups/design workshop
•Appraisals, escrow fees, surveying, other costs associated with acquisition
•Cost of land
Ineligible Acquisition Costs – Cannot be charged to the grant
•Costs to fulfill any mitigation requirements imposed by law (PRC §80020)
•Acquisitions where purchase price is greater than appraised value
•Costs for land acquired through eminent domain or condemnation
•Costs incurred outside the GRANT performance period
•Development costs
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 43 of 217
16
Development Project Rules
Development Projects
1.PROJECTS must be consistent with the park and recreation element of the GRANTEE’S
general or recreation plan (PRC §80063(b)).
2.Per Capita funds must be used to supplement, not supplant, local revenues in
existence as of June 5, 2018 (PRC §80062(d)).
3.Contracted work must comply with the provisions of §1771.5 of the State Labor Code.
4.GRANTEE must have adequate liability insurance, performance bond, or other security
necessary to protect the State and GRANTEE’S interest against poor workmanship,
fraud, or other potential loss associated with the completion of the PROJECT.
5.PRE-CONSTRUCTION COSTS may not exceed 25% of the PROJECT amount.
6.The primary purpose of any building constructed or improved must be public
recreation. For example, renovating a gymnasium that includes office space for staff
is eligible; renovating GRANTEE’S office building is not.
7.PROJECTS must be accessible, including an accessible path of travel to the PROJECT.
Eligible Development Costs
All costs must be incurred within the GRANT PERFORMANCE PERIOD. Costs listed below are
examples of eligible costs, and not inclusive. Contact OGALS if you have any questions
regarding a PROJECT cost.
Eligible Pre-construction Costs – up to 25% of PROJECT costs; incurred prior to
groundbreaking as determined by the GRANTEE
•Public meetings, focus groups, design workshops
•Plans, specifications, construction documents, and cost estimates
•Permits
•CEQA
•Bid preparation and packages
•IN-HOUSE EMPLOYEE SERVICES prior to groundbreaking
•GRANT/PROJECT administration and accounting prior to groundbreaking
Eligible Construction Costs – up to 100% of the PROJECT costs; incurred after
groundbreaking.
•Construction – necessary labor and construction activities to complete the PROJECT,
including site preparation (demolition, clearing and grubbing, excavation, grading),
onsite implementation and construction supervision
•Equipment – Equipment use charges (rental and in-house) must be made in
accordance with GRANTEE ’S normal accounting practices.
•Bond and other signs
•Premiums on hazard and liability insurance to cover personnel or property
•Site preparation
•Purchase and installation of equipment: security cameras, lighting, signs, display
boards, sound systems, video equipment, etc.
•Construction management: including site inspections and PROJECT administration
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 44 of 217
17
Distinguishing capital outlay (eligible) from maintenance and repair (not
eligible):
•Capital outlay – building something new, or for existing structures, activities
intended to boost the condition beyond its original or current state.
•Repairs – activities performed to a section of a structure that are intended to
allow the continued use.
•Maintenance – activities intended to be performed on a regular basis to maintain
the expected useful life of a structure.
Examples:
Roof – replacing broken shingles is maintenance; fixing a hole is repair; replacing
the roof is capital outlay.
Playground – adding additional fall material is maintenance; fixing the chains on a
swing set is repair; replacing the play structures is capital outlay.
Windows – repairing the glazing is maintenance; replacing broken panes is repair;
replacing the windows is capital outlay.
•Miscellaneous: other costs incurred during the construction phase, such as
transporting materials, equipment, or personnel, and communications
•IN-HOUSE EMPLOYEE SERVICES after groundbreaking
•GRANT/PROJECT administration and accounting after groundbreaking
Ineligible Development Costs – Cannot be charged to the grant
•PRE-CONSTRUCTION COSTS that exceed 25% of the PROJECT costs
•Development to fulfill any mitigation requirements imposed by law (PRC §80020)
•All non-capital costs, including interpretive and recreational programming, software
and software development
•Construction or improvements to facilities that are not primarily designated for
recreational purposes, such as park district offices
•Construction outside the boundaries of the recreation facility
•Furniture or equipment not site specific and not necessary for the core function of a
new facility (non-capital outlay)
•Costs incurred before or after the GRANT PERFORMANCE PERIOD
•Indirect costs – overhead business expenses of the GRANTEE’S fixed or ordinary
operating costs (rent, mortgage payments, property taxes, utilities, etc.)
•Food and beverages
•Out-of-state travel
•Fundraising and grant writing
•Repairs – activities performed to a section of a structure that are intended to allow
the continued use.
•Maintenance – activities intended to be performed on a regular basis to maintain the
expected useful life of a structure.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 45 of 217
18
Accounting Rules for In-House Employee Services
GRANTEES must follow these accounting practices for services performed by its
employees to be eligible for reimbursement:
•Maintain time and attendance records as charges are incurred, identifying the
employee through a name or other tracking system, and that employee’s actual
time spent on the PROJECT.
•Time estimates, including percentages, for work performed on the PROJECT are
not acceptable.
•Time sheets that do not identify the specific employee’s time spent on the
PROJECT are not acceptable.
•Costs of the salaries and wages must be calculated according to the GRANTEE’S
wage and salary scales, and may include benefit costs such as vacation, health
insurance, pension contributions and workers’ compensation.
•Overtime costs may be allowed under the GRANTEE’S established policy,
provided that the regular work time was devoted to the same PROJECT.
•May not include overhead or cost allocation. These are the costs generally
associated with supporting an employee, such as rent, personnel support, IT,
utilities, etc.
•If planning to claim IN -HOUSE EMPLOYEE SERVICES costs, provide a sample
timesheet for OGALS review to confirm these accounting practices are being
followed.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 46 of 217
19
State of California – The Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION
Development Project Scope/Cost Estimate Form
GRANTEE: PROJECT Name
Install
new
Renovate
existing
Replace
existing Recreation Element
Pool, aquatic center, splash pad
Trails or walking paths
Landscaping or irrigation
Group picnic, outdoor classrooms, other gathering spaces
Play equipment, outdoor fitness equipment
Sports fields, sports courts, court lighting
Community center, gym, other indoor facilities
Restroom, concession stand
Other:
Other:
Minor elements which support one or more of the recreation
elements checked above: benches, lighting, parking, signage, etc.
PRE-CONSTRUCTION (costs incurred prior to ground-breaking, such as design,
permits, bid packages, CEQA); up to 25% of total PROJECT cost. $
Construction $
Total PROJECT cost $
Subtract GRANTEE match if not in severely disadvantaged community
(20% of total PROJECT cost, see page 13)
Less match
-$
Total GRANT amount requested $
The GRANTEE understands that all elements listed on this form must be complete and
open to the public before the final grant payment will be made.
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
Development project scope (Describe the project in 30 words or less):
Project Scope Items - all that apply:
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 47 of 217
20
State of California – The Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION
Funding Sources Form
GRANTEE: PROJECT Name
PROJECTS funded by the program are not complete until the PROJECT SCOPE is complete,
and the PROJECT is open to the public. PROJECTS will:
•Be entirely funded by the GRANT, or
•Require funds in excess of the GRANT.
If the PROJECT requires funds in excess of the GRANT, the SCOPE of the PROJECT may be
either the SCOPE of the larger project, or a subset of the larger project.
For example, if the PROJECT is $100,000 towards construction of a $500,000 park, the
SCOPE can be the $500,000 park, or a $100,000 element of the park, such as a
playground, that can be complete and open to the public.
☐The PROJECT will be entirely funded by the GRANT, or
☐The PROJECT requires funds in excess of the GRANT:
☐The SCOPE is the same as the scope of the larger project, or
☐The SCOPE is a subset of a larger project, the scope of that larger project is:
Larger project cost: $ Anticipated completion date:
List all funds that will be used. Submit revised Funding Sources form should funding
sources be added or modified.
Funding Source Date Committed Amount
Per Capita/State of California July 1, 2018 $
$
$
I represent and warrant that I have full authority to execute this Funding Sources Form
on behalf of the GRANTEE. I declare under penalty of perjury, under the laws of the State
of California, that this status report, and any accompanying documents, for the above-
mentioned GRANT is true and correct to the best of my knowledge.
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 48 of 217
21
State of California – The Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION CEQA Compliance Certification
GRANTEE:
Project Name:
Project Address:
Is CEQA complete? Yes No Is completing CEQA a PROJECT SCOPE item? Yes No
What document was filed, or is expected to be filed for this project’s CEQA analysis:
Date complete/expected to be completed
Notice of Exemption (attach recorded copy if filed)
Notice of Determination (attach recorded copy if filed)
Other:
If CEQA is complete, and a Notice of Exemption or Notice of Determination was not filed, attach
a letter from the Lead Agency explaining why, certifying the project has complied with CEQA
and noting the date that the project was approved by the Lead Agency.
Lead Agency Contact Information
Agency Name:
Contact Person:
Mailing Address:
Phone: ( ) Email:
Certification:
I hereby certify that the above referenced Lead Agency has complied or will comply with
the California Environmental Quality Act (CEQA) and that the project is described in
adequate and sufficient detail to allow the project’s construction or acquisition.
I further certify that the CEQA analysis for this project encompasses all aspects of the
work to be completed with grant funds.
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
FOR OGALS USE ONLY CEQA Document Date Received PO Initials
NOE NOD
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 49 of 217
22
Land Tenure
The purpose of the land tenure requirement is to verify that the GRANTEE has sufficient
legal rights to the property to fulfill the terms of the contract.
•PROJECT amounts up to $100,000 require at least 20 years of land tenure at the
site to be acquired or developed.
•PROJECT amounts greater than $100,000 require at least 30 years of land tenure
at the site to be acquired or developed.
•The 20- or 30-year land tenure requirement begins on July 1, 2018.
•The GRANTEE remains responsible for fulfillment of the terms of the contract, even
if the GRANTEE’S land tenure agreement changes within the contract
PERFORMANCE PERIOD.
Land Tenure Ownership Documentation
If the GRANTEE owns the PROJECT site in fee simple, provide one of the following:
•Deed or deed recordation number, or
•Title report, or
•Tract map or assessor’s map with owner’s name
Land Tenure Non-Ownership Documentation
If the GRANTEE does not own the PROJECT site in fee simple, provide:
•Land Tenure Agreement Checklist (page 22)
•Signed land tenure agreement
If the grantee does not own the project site in fee simple, and the existing land tenure
agreement does not meet the requirements in the Land Tenure Checklist, provide
•Land Tenure Agreement Checklist (page 22)
•Signed land tenure agreement
•An explanation as to how the existing land tenure agreement adequately protects
the State’s interest. OGALS will review and determine if the land tenure is
sufficient.
Land Tenure Agreement Checklist
If the GRANTEE does not own the land in fee simple, complete this checklist. Attach a
copy of the signed land tenure agreement. Identify the page numbers where the
required items can be found in the land tenure agreement and highlight the provisions in
the agreement where the information is located. All items are required.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 50 of 217
23
Land Tenure Checklist
GRANTEE: PROJECT Name
Page Required Item
□ Type of agreement: For example: lease, joint powers agreement,
easement, memorandum of understanding, etc.
□
Parties to the agreement (land owner must be public agency or utility)
and date signed:
Party Date Signed
□ Term of the agreement: years
□
Agreement end date:
•Grant amounts up to $100,000 require at least 20 years of land tenure.
•Grant amounts above $100,000 require at least 30 years of land tenure.
•The land tenure requirement begins on July 1, 2018.
□ Renewal option: Must include an option, which can be non-binding, for the
GRANTEE to renew the agreement beyond the original 20 or 30 year term.
□
Termination clause: Any of the following is acceptable:
•No termination clause – the agreement is non-revocable.
•Termination clause specifies the agreement is revocable only for cause.
•The termination clause cannot allow the land owner to revoke the
agreement without cause, i.e., at will.
□
Site Control, Roles and Responsibilities should the GRANT be awarded,
the agreement:
•Authorizes the GRANTEE to proceed with the construction PROJECT. The
GRANTEE may delegate construction to other entities.
•Establishes when the general public can use the PROJECT and gives
GRANTEE permission to operate the PROJECT site (such as scheduling
recreational programs). The GRANTEE may delegate operational roles to
other entities but is bound through the contract provisions to ensure full
public access for the duration of the land tenure period.
•Identifies which entity will maintain the PROJECT site. The GRANTEE may
delegate maintenance to other entities but is bound through the contract
provisions to ensure maintenance of the PROJECT site for the duration of
the land tenure period.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 51 of 217
24
Site Plan
Provide a drawing showing where all the items listed in the project scope/Cost Estimate
Form will be located. To ensure that any building use meets the requirements of the
program, include the function and approximate square footage of each room within
buildings that are part of the scope, and the approximate total square footage of the
buildings. It does not need to be a detailed engineering rendering.
Sub-leases or Agreements
Provide a list of all other leases, agreements, memoranda of understanding, etc.,
affecting PROJECT property or its operation and maintenance.
Photos
Provide photos that will establish a “before” comparison for the site to be improved.
Greenhouse Gas Emissions Reduction and Carbon Sequestration.3
If your PROJECT involves tree planting, follow the instructions below and submit with the
PROJECT COMPLETION PACKET.
Before getting started, gather the following PROJECT information:
•Tree species
•Size of trees at planting
•Information on the distance and direction to the nearest building (if applicable)
•Information on the age and climate control of any nearby buildings (if applicable)
•Information about the tree’s growing conditions
Getting started:
1.Navigate to the i-Tree site at https://planting.itreetools.org and select the tab for a
new project.
2.On the Location map, select your state, county and city, and then click Next.
3.Configure the project parameters4:
•“Electricity emissions factor” enter 285 and select kilograms
•“Fuel emissions factor” enter 53.1 and select kilograms
•“Years for the project” is the age of the trees 40 years from when they are
planted. So, if the trees will be four years old at the time of planting, enter 44.
•“Tree mortality” enter 0
4.Tree Planting Configurations
•Enter the tree groups for the project; create a new group for each new
species or for each new location.
•Species – select the species; add multiple species by creating new groups.
3 PRC §80001(b)(7)
4 Project parameters are from the California Air Resources Board’s “Quantification
Methodology for the California Natural Resources Agency Urban Greening Grant
Program.”
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 52 of 217
25
•DBH – tree diameter four feet above the ground at time of planting.
•Distance to nearest tree – select from drop down menu
•Tree is (north, south, east or west) of Building – select the direction the tree is
located to the nearest climate-controlled building.
•Climate controls – select the type of climate controls the nearby building has
installed. If a tree is more than 60 feet away from a climate-controlled
building, select “none.”
•Condition – select the overall health of the trees at the time of planting.
•Exposure to sunlight – select the amount of sun that reaches the tree, based
on its surroundings.
•Number of trees – enter the number of trees that are the same species and
the same characteristics (e.g. distance to building, location in respect to
building, exposure to sunlight, etc.) If some of these characteristics change,
multiple lines of the same species should be input into the tool.
Once all the groups are entered, click next
5.Print the report in landscape mode, and submit it to OGALS.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 53 of 217
26
Special Requirements
•Status Reports (page 26)
•Bond Act Sign (page 28)
•Deed Restriction (page 29)
Status Report
OGALS will send a Status Report every six months until receipt of a PROJECT COMPLETION
PACKET. Payment requests will not be processed if Status Reports are overdue. See
sample on following page.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 54 of 217
27
Sample Status Report – Due xx/xx/20xx (30 days from mail date)
Grantee:
Project Number:
Project Name:
Project Scope:
Project Phase: □ Pre-Construction/Pre-Acquisition □ Acquisition and/or Construction
When will you submit your next payment request? For ho w much?
Estimated date of project completion:
Potential obstacles affecting completion:
Is the project: On Time? yes/no Within Budget? yes/no Within Scope? yes/no If no,
explain:
Describe grant-funded work completed since last status report submitted on (DATE):
Are CCC or certified local corps working on this project? Yes/No
Provide photos showing work completed since (DATE)
Describe grant-funded work expected to be completed by (MailDate + 6 mos)
If there have been any changes to the proposed funding for this project, attach a revised
Funding Sources Form.
Provide information on payments to be submitted over the next three years:
Between
7/1/20
and
6/30/21
Between
7/1/21
and
12/31/21
Between
1/1/22
and
6/30/22
Between
7/1/22
and
12/30/22
Between
1/1/23
and
6/30/23
Between
7/1/23
and
12/30/23
After
1/1/24
$ $ $ $ $ $ $
The purpose of this data is to help the State estimate borrowing needs; you will not be
held to these estimates.
I represent and warrant that I have full authority to execute this Grant Progress Status
Report on behalf of the Grantee. I declare under penalty of perjury, under the laws of
the State of California, that this status report, and any accompanying documents, for the
above-mentioned Grant is true and correct to the best of my knowledge.
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
(*Certification to above information requires a signature by a person authorized in the
resolution)
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 55 of 217
28
Bond Act Sign
A sign acknowledging the California Drought, Water, Parks, Climate, Coastal Protection,
and Outdoor Access for All Act of 2018 as the funding source for the project must be
installed during construction and at completion (PRC §80001(b)(3)). If appropriate, the
same sign can be used during construction and completion.
Sign requirements
The sign must be available during construction, at the final inspection of the PROJECT,
and remain in place for a minimum of four (4) years from date of PROJECT completion.
There is no minimum or maximum size other than the minimum size for the logo, as
long as the sign contains the required wording.
Sign Language
All signs must contain the following language:
GAVIN NEWSOM, GOVERNOR
Wade Crowfoot, Secretary for Natural Resources
Armando Quintero, Director, California Department of Parks and Recreation
Use the names of the current officials. The name of the director of the local agency or
other governing body may be added. The sign may also include names (and/or logos) of
other partners, organizations, individuals and elected representatives.
Logo
All signs must display the Parks and Water Bond Act logo (shown on the cover of this
guide). Display the logo to maximize visibility and durability. Download the logo at
http://resources.ca.gov/grants/logo-art/. The logo must measure a minimum of 24″ tall.
Exceptions may be approved, when appropriate, at OGALS’ discretion.
Sign Construction
All materials used shall be durable and resistant to the elements and graffiti.
Sign Cost
The cost of the sign(s) is an eligible PROJECT cost. Permanent signage is encouraged.
Appropriateness of Signs
For projects where the required sign may be out of place or affected by local sign
ordinances, OGALS may authorize a sign that is more appropriate to the project.
State Approval
GRANTEE shall submit the proposed number, locations, size, and language of signs for
preliminary review. Final payments will not be processed until post completion signage
has been approved and installed.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 56 of 217
29
Deed Restriction
The Deed Restriction restricts the title to the property, safeguarding the property for
purposes consistent with the GRANT for the duration of the CONTRACT PERFORMANCE
PERIOD.
If the GRANTEE owns the PROJECT land, a Deed Restriction must be recorded on the title
to the property before OGALS will approve any grant payments. If the GRANTEE is
acquiring land, a deed restriction is required before the PROJECT is complete.
A Deed Restriction is not required if the GRANTEE does not own the PROJECT land, such
as where the GRANTEE is improving property it has access to under a lease agreement.
Deed Restriction Instructions
1.The GRANTEE must own the PROJECT land and have an encumbered contract for the
GRANT amount.
2.The PROJECT OFFICER will send the Deed Restriction to the GRANTEE. Do not alter the
Deed Restriction. The GRANTEE takes the following steps:
1.Add ownership information to Paragraph I of the Deed Restriction: [formal
name of GRANTEE] Insert ownership information as it appears on the deed.
2.Create 3 copies (GRANTEE copy, OGALS copy and recorder’s copy) of the Deed
restriction and the required attachments:
(1)Exhibit A: Label this attachment “Exhibit A (Legal Description of Property).”
Include a formal legal description of every parcel of property to which grant
funds will be used for the development and/or acquisition thereof. This
information can be obtained from the grant deed or title policy. (The
assessor’s parcel number or a street address is NOT a valid legal
description.) and,
(2)Exhibit B: Label this attachment “Exhibit B (Grant Contract)” and include a
complete copy of the Grant Contract and provisions signed by the AUTHORIZED
REPRESENTATIVE and the State of California.
3.Notarize it: Take the following documents to a notary. OGALS recommends
submitting these documents to the OGALS PROJECT OFFICER for review prior to
notarizing.
•Unsigned and undated Deed Restriction
•Exhibit A (Legal Description of Property)
•Exhibit B (Grant Contract)
The AUTHORIZED REPRESENTATIVE dates and signs the Deed Restriction signature
page in the presence of a notary. The notary will complete a Notary
Acknowledgement (Civil Code §1189).
4.Record it: Take the notarized documents bulleted above to the County
Recorder’s Office of the county in which the property is located. Ask the County
Clerk to record the Deed Restriction with Notary Acknowledgement, Exhibit A,
and Exhibit B, on the title to the property.
5.Send it: Send a copy of the notarized and recorded documents bulleted above to
the OGALS PROJECT OFFICER.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 57 of 217
30
RECORDING REQUESTED BY:
California Department of Parks and Recreation
Office of Grants and Local Services
WHEN RECORDED MAIL TO:
Office of Grants and Local Services
PO Box 942896
Sacramento, CA 94296-0001
Attn: [Project Officer]
DEED RESTRICTION
I.WHEREAS, insert ownership information as it appears on the deed
(hereinafter referred to as “Owner(s)” is/are recorded owner(s) of the real property
described in Exhibit A, attached and incorporated herein by reference (hereinafter
referred to as the “Property”); and
II.WHEREAS, the California Department of Parks and Recreation
(hereinafter referred to as “DPR”) is a public agency created and existing under the
authority of section 5001 of the California Public Resources Code (hereinafter referred
to as the “PRC”). And
III.WHEREAS, Owner(s) (or Grantee) received an allocation of grant funds
pursuant to the California Drought, Water, Parks, Climate, Coastal Protection, and
Outdoor Access For All Act of 2018 Per Capita Program for improvements on the
Property; and
IV.WHEREAS, on (enter date), DPR’s Office of Grants and Local Services
conditionally approved Grant [project number], (hereinafter referred to as “Grant”) for
improvements on the Property, subject to, among other conditions, recordation of this
Deed Restriction on the Property; and
V.WHEREAS, but for the imposition of the Deed Restriction condition of the
Grant, the Grant would not be consistent with the public purposes of the Per Capita
Program and the funds that are the subject of the Grant could therefore not have been
allocated; and
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 58 of 217
31
VI.WHEREAS, Owner(s) has/have elected to comply with the Deed
Restriction requirement of the Grant, so as to enable Owner(s), to receive the Grant
funds and perform the work described in the Grant;
NOW, THEREFORE, in consideration of the issuance of the Grant funds by
DPR, the undersigned Owner(s) for himself/herself/themselves and for his/her/their
heirs, assigns, and successors-in-interest, hereby irrevocably covenant(s) with DPR that
the condition of the grant (set forth at paragraph(s) 1 through 5 and in Exhibit B hereto)
shall at all times on and after the date on which this Deed Restriction is recorded
constitute for all purposes covenants, conditions and restrictions on the use and
enjoyment of the Property that are hereby attached to the deed to the Property as fully
effective components thereof.
1.DURATION. This Deed Restriction shall remain in full force and effect and
shall bind Owner(s) and all his/her/their assigns or successors-in-interest for the period
running from July 1, 20xx to June 30, 20xx (20 years) or June 30, 20xx (30 years).
2.TAXES AND ASSESMENTS. It is intended that this Deed Restriction is
irrevocable and shall constitute an enforceable restriction within the meaning of a)
Article XIII, section 8, of the California Constitution; and b) section 402.1 of the
California Revenue and Taxation Code or successor statue. Furthermore, this Deed
Restriction shall be deemed to constitute a servitude upon and burden to the Property
within the meaning of section 3712(d) of the California Revenue and Taxation Code, or
successor statue, which survives a sale of tax-deeded property.
3.RIGHT OF ENTRY. DPR or its agent or employees may enter onto the
Property at times reasonably acceptable to Owner(s) to ascertain whether the use
restrictions set forth above are being observed.
4.REMEDIES. Any act, conveyance, contract, or authorization by Owner(s)
whether written or oral which uses or would cause to be used or would permit use of the
Property contrary to the terms of this Deed Restriction will be deemed a violation and a
breach hereof. DPR may pursue any and all available legal and/or equitable remedies
to enforce the terms and conditions of this Deed Restriction up to and including a lien
sale of the property. In the event of a breach, any forbearance on the part of DPR to
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 59 of 217
32
enforce the terms and provisions hereof shall not be deemed a waiver of enforcement
rights regarding such breach, or any subsequent breach.
SEVERABILITY. If any provision of these restrictions is held to be invalid, or for any
reason becomes unenforceable, no other provision shall be affected or impaired.
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
Business Name (if property is owned by a business):
Additional signature, if required Date
Print Name and Title
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 60 of 217
33
Grant Payments
Payments may be requested after a PROJECT is approved and the contract is
encumbered. Payment requests are processed through the State Controller’s Office and
mailed to the GRANTEE approximately six to eight weeks from the date OGALS approves
the request.
Payment Rules
1.A Grant Expenditure Form (see page 35) is required with all reimbursement and final
payment requests.
2.Payment requests prior to groundbreaking are limited to 25% of the PROJECT amount.
3.Payments before the final payment may not exceed 80% of the PROJECT amount.
20% of the PROJECT amount is retained for the final reimbursement.
4.A deed restriction is required prior to processing any reimbursement payments
except an acquisition ADVANCE.
5.Group costs together to avoid frequent payment requests. Reimbursement requests
greater than $10,000 are encouraged.
6. For PROJECTS where match is required, GRANTEES must show eligible costs equal to
125% of the requested reimbursement amount (see page 13).
7. Complete CEQA prior to requesting any construction reimbursement.
8.Provide a sample timesheet to the PROJECT OFFICER prior to incurring any IN-HOUSE
EMPLOYEE SERVICES costs, and if claiming IN-HOUSE EMPLOYEE SERVICES costs, provide
a sample timesheet with each reimbursement payment request.
9.Provide a summary list of bidders, recommendation by reviewer of bidders, awarding
by governing body and contract agreement to the PROJECT OFFICER prior to requesting
reimbursement for costs on contracts requiring a bid process.
10. Provide construction progress photos, including a photo with the construction sign
visible on the PROJECT site (see page 28), with all construction payment requests.
11. OGALS may withhold payment if the GRANTEE has outstanding issues, such as:
•breach of any other contract with OGALS
•an unresolved audit exception
•an outstanding conversion
•park sites closed or inadequately maintained
•overdue Project Status Reports
•other unmet grant requirements
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 61 of 217
34
Payment Request Form Instructions
•All payment request types (reimbursement, final, ADVANCE) require this form.
•Payment requests may be submitted by e-mail to the PROJECT OFFICER.
•Round all amounts to the nearest whole dollar.
•A Grant Expenditure Form (see page 35) is required with all reimbursement and final
payment requests.
•Complete the Payment Request Form as follows:
1.PROJECT Number - Number assigned by OGALS when this PROJECT was approved.
2.Contract Number - As shown in Certification of Funding section of the contract
3.APPLICANT - GRANTEE name as shown on the contract
4.PROJECT Title - Name of the PROJECT as shown in the Application
5.Type of Payment – check appropriate box on form
6.Payment Information – always round to the nearest dollar.
7.Send Warrant To - AGENCY name, address and contact person
8.Signature of AUTHORIZED REPRESENTATIVE according to the Resolution
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 62 of 217
35
Payment Request Form
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 63 of 217
36
Grant Expenditure Form
All payment requests require a summary of costs incurred. An electronic version of the grant
expenditure form is available at www.parks.ca.gov/grants. GRANTEES may use their own
spreadsheet if it contains the required information shown below. Keep copies of invoices or
warrants with the PROJECT records, available to OGALS on request. Only provide the following
information to OGALS:
PROJECT Number:
Warrant/
Check #(1) Date(2) Recipient(3) Purpose(4) Pre-Construction
Amount(5)
Construction
Amount(6)
PRE-CONSTRUCTION Subtotal (5) $
Construction Subtotal (6) $
Grand Total (5) + (6) $
List only ELIGIBLE COSTS charged to the GRANT.
Column (1) Electronic payment numbers/electronic funds transfer numbers in the “Warrant/Check
Number” column are acceptable. Include an “EP” next to the electronic payment numbers/electronic
funds transfer numbers.
If IN-HOUSE EMPLOYEE SERVICES or GRANTEE’S own equipment was used, a work order or other tracking
number can be used instead of a check/warrant number.
Column (2) Date payment was made to recipient. If IN-HOUSE EMPLOYEE SERVICES were used, provide
the date range with a summary of actual hours worked, and a sample timesheet.
Column (3) Name of Contractor, IN-HOUSE EMPLOYEE SERVICES, or other entity providing services
and/or materials.
Column (4) SCOPE item related to the expenditure and a brief description, such as “playground
design,” “community center permits,” “walkway materials,” “sports field construction.”
Column (5) PRE-CONSTRUCTION costs eligible for up to 25% of the GRANT.
Column (6) DEVELOPMENT costs eligible for up to 100% of GRANT.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 64 of 217
37
Project Completion Packet
PROJECT COMPLETION PACKETS must be submitted by March 31st of the year the contract
expires.
GRANTEES are encouraged to submit documents digitally, as .pdf files. E-mail the documents
to the PROJECT OFFICER as separate digital files, labeled as the document item. GRANTEES
should follow up with PROJECT OFFICER to confirm documents were received.
The final payment (not less than 20% of the PROJECT amount) will be processed after
PROJECT COMPLETION and the following occurs:
1.Approval of the PROJECT COMPLETION PACKET (page 37).
2.Site inspection by the PROJECT OFFICER to verify PROJECT COMPLETION.
To request the final payment and complete the PROJECT, the GRANTEE must submit the
following documents:
1.Payment Request Form (page 35)
2.Grant Expenditure Form (page 35)
3.Final Funding Sources Form (page 20)
4.GHG Emissions Reduction Worksheet (page 24)
5.PROJECT COMPLETION Certification Form (page 38)
6.Photo of the bond act sign and location (page 28)
7.Recorded Deed Restriction, if not already provided (page 29)
8.Completed CEQA, if not already provided (page 21)
9.Notice of Completion (optional)5
10.Audit checklist with items checked that GRANTEE will retain for five years following
receipt of final payment (page 50)
For acquisition PROJECTS, the GRANTEE must submit these additional documents:
1.A copy of the recorded deed to the property
2.A map sufficient to verify the description of the property including parcel numbers and
acreage
3.Copy of title insurance policy
4.Copy of title report
5 OGALS recommends that the GRANTEE file a Notice of Completion with the County Recorder
pursuant to State of California Civil Code §3093. Filing the Notice of Completion is not a
PROJECT COMPLETION requirement.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 65 of 217
38
State of California – The Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION
Project Completion Certification Form
Grantee: Project Number:
Grantee contact for audit purposes
Name:
Address:
Phone: ( ) Email:
Project completion – list the grant scope items:
Provide revised Funding Sources Form
Interest earned on advanced funds: $
Interest spent on eligible costs: $
Was a Notice of Completion filed with the County Recorder or other appropriate entity?
Yes / No
Certification:
I hereby certify that all Grant funds were expended on the above-named Project and that the
Project is complete and we have made final payment for all work done.
I have read California Penal Code §118 and understand that every person who testifies,
declares, deposes, or certifies under penalty of perjury and willfully states as true any
material matter which he or she knows to be false, is guilty of perjury, which is a felony
punishable by imprisonment in state prison for two, three, or four years.
Furthermore, I have read California Penal Code §72 and understand that every person who,
with the intent to defraud, presents for allowance or for payment to any state board or
officer, or to any county, city, or District board or officer, authorized to allow or pay the same
if genuine, any false or fraudulent claim, bill, account, voucher, or writing, is guilty of a
felony-misdemeanor punishable either by imprisonment in county jail for a period of not
more than one year, by a fine not exceeding one thousand dollars, or both, or by
imprisonment in state prison, by a fine not exceeding ten thousand dollars, or both.
I represent and warrant that I have full authority to execute this Project Completion
Certification on behalf of the Grantee. I declare under penalty of perjury that the foregoing
certification of Project Completion for the above-mentioned Grant is true and correct.
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 66 of 217
39
Advance Payments
•OGALS reserves the right to disapprove ADVANCE payment requests.
•Past performance, GRANTEE capacity, and the GRANTEE’S financial resources will all be
considered before issuing an ADVANCE.
•GRANTEES that are unable to finance a considerable portion of their PROJECTS are encouraged
to seek an allocation transfer (page 54).
•ADVANCE payments may be requested for costs the GRANTEE will incur within the next six
months.
•ADVANCE funds must be placed in an interest-bearing account. Any interest earned on those
funds must be spent within six months of receipt.
•The sum of DEVELOPMENT ADVANCES cannot exceed 50% of the PROJECT amount.
Pre-Construction Advance
Payment
Type
Maximum Request When to
Request
Documents to
Send to PROJECT OFFICER
Costs to
be
incurred
in next six
months
Preconstruction
estimate shown on
Development
Project SCOPE/Cost
Estimate Form
After the
contract has
been
encumbered
•Payment Request Form
•ADVANCE justification (see below)
•Sample timesheet if funds will be
spent on IN-HOUSE EMPLOYEE
SERVICES
Construction Advance
Payment
Type
Maximum
Request
When to
Request
Documents to
Send to PROJECT OFFICER
Costs to
be
incurred
in next six
months
No more than 50%
of the grant
amount.
After the
contract has
been
encumbered,
and
construction
will
commence
during the
next six
months
•Payment Request Form
•ADVANCE justification (see below)
•Bid documents (see page 33,
number 9)
•Copy of signed contract and a
notice to proceed or IN-HOUSE
EMPLOYEE SERVICES schedule
•Filed NOD or NOE (page Error!
Bookmark not defined.)
•Sample timesheet if funds will be
spent on IN-HOUSE EMPLOYEE
SERVICES
Advance Justification
Provide the following information:
•Explanation as to why an ADVANCE is needed instead of a reimbursement. Describe any
hardships the GRANTEE will experience if a reimbursement were issued instead of an
ADVANCE.
•A payment schedule, with a month-by-month estimate, for up to six months, showing the
anticipated amount needed, and to whom the funds will be paid (IN-HOUSE EMPLOYEE
SERVICES or name of contractor). The six-month period should begin six to eight weeks after
payment request is submitted.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 67 of 217
40
•A funding plan, indicating how the GRANTEE intends to provide cash flow to the percentage of
the PROJECT exceeding the 50% ADVANCE limit.
•A statement indicating the GRANTEE will put the advanced funds into a separate, interest
bearing account, and spend any interest earned on the PROJECT.
•An acknowledgement that all invoices and contracts pursuant to which payments are made
shall be made available to OGALS on demand.
Clearing the Advance
ADVANCES must be cleared with six months of receipt, or earlier. ADVANCES should be cleared
incrementally, that is, as costs are incurred.
An ADVANCE is cleared as follows:
•Submit a grant expenditure form (see page 35) documenting expenditures of eligible costs
equal to the ADVANCE amount plus any earned interest (or 125% of the ADVANCE amount if
match is required).
•Submit photos of construction completed and the construction sign (see page 28)
with the ADVANCE funds (for construction ADVANCES).
•Return the balance of unspent GRANT funds to OGALS no later than thirty days after the end of
the six-month ADVANCE period.
•OGALS will then return the GRANT funds to the contract balance. OGALS cannot return interest
to the contract balance.
Subsequent Payments
ADVANCE payments must be cleared before any payments will be approved.
This requirement may be waived in cases where a PROJECT requires timely payments to
contractors, and the remaining balance of unspent ADVANCED funds cannot cover the next
PROJECT payment. The following are required to request a waiver:
1.A letter to the PROJECT OFFICER, signed by the AUTHORIZED REPRESENTATIVE, explaining why
the waiver is needed.
2.A statement in the letter that the majority of ADVANCED funds has been cleared.
3.A payment schedule with month by month estimates detailing the anticipated amount needed
including the unspent balance of previously ADVANCED funds, along with the additional
requested reimbursement or ADVANCE.
Acquisition Advance into Escrow
Payment Type When to Request Documents to Send
ADVANCES up to 100% of
the GRANT and MATCH
amounts
After the contract is
encumbered and escrow
is open
See following instructions
1.Escrow letter
2.Title report cover page
3.Payment request form
The following items are required to request an ADVANCE payment into escrow:
1.A letter on the GRANTEE’s letterhead, addressing all of the following elements, and signed by
the GRANTEE’s AUTHORIZED REPRESENTATIVE:
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 68 of 217
41
a)Name, address and telephone number of the title company or escrow holder, and the
escrow account number to which the GRANT funds will be disbursed.
b)Copy of the property appraisal and written concurrence (page 14).
c)GRANT contract number and amount of GRANT funds requested.
d)A statement by the GRANTEE that “the preliminary title report shows that there are no
liens, easements, or any other restrictions that would prevent completion of the
PROJECT SCOPE and fulfillment of the contract provisions.”
e)A statement by the GRANTEE that “all funds (exclusive of the GRANT funds to be provided
under this agreement) needed for the completion of the acquisition of the property or
properties have been secured and have been or will be deposited to escrow on or
about the same date as the requested GRANT funds.” In making this statement, the
GRANTEE is entitled to reasonably rely on the representations of the seller.
2.Cover page of the preliminary title report.
3.Payment Request Form. The “Send Warrant To” item 7 on the Payment Request Form must
be completed using the title company’s or escrow holder’s name, mailing address, and
contact person (see page 35).
After approval by OGALS, the payment will be mailed by the State Controller’s Office to the
designated escrow company within approximately 30 working days.
Returning Unexpended Advanced Funds for Acquisition
If all or a portion of GRANT funds ADVANCED to the title or escrow company are not expended, the
unused portion of the ADVANCED funds must be returned to OGALS within 60 days after completion of the
acquisitions), within 60 days of the acquisition withdrawal, or within 60 days after the end of the GRANT
PERFORMANCE PERIOD, whichever is earliest.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 69 of 217
42
Per Capita Contract
State of California – The Natural Resources Agency
DEPARTMENT OF PARKS AND RECREATION Sample Grant Contract
Per Capita Grant Program
GRANTEE: Grantee Name
GRANT PERFORMANCE PERIOD is from July 1, 2018 through June 30, 2024
CONTRACT PERFORMANCE PERIOD is from July 1, 2018 through June 30, 2048
The GRANTEE agrees to the terms and conditions of this contract (CONTRACT), and the State of
California, acting through its Director of the Department of Parks and Recreation, pursuant to the
State of California, agrees to fund the total State grant amount indicated below.
The GRANTEE agrees to complete the PROJECT SCOPE(s) as defined in the Development
PROJECT SCOPE/Cost Estimate Form or acquisition documentation for the application(s) filed with
the State of California.
The General and Special Provisions attached are made a part of and incorporated into the Contract.
Total State grant amount not to exceed $ [GRANT amount]
GRANTEE
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
STATE OF CALIFORNIA
DEPARTMENT OF PARKS AND RECREATION
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
CERTIFICATION OF FUNDING (FOR STATE USE ONLY)
AMOUNT OF ESTIMATE $ CONTRACT NUMBER FUND
ADJ. INCREASING ENCUMBRANCE $ APPROPRIATION
ADJ. DECREASING ENCUMBRANCE $ ITEM VENDOR NUMBER
UNENCUMBERED BALANCE $ LINE ITEM ALLOTMENT CHAPTER STATUTE FISCAL YEAR
T.B.A. NO. B.R. NO. INDEX Funding Source OBJ. EXPEND
I hereby certify upon my personal knowledge that budgeted funds are available for this encumbrance.
SIGNATURE OF ACCOUNTING OFFICER DATE
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 70 of 217
43
I.RECITALS
This CONTRACT is entered into between the California Department of Parks and Recreation
(hereinafter referred to as “GRANTOR,” “DEPARTMENT” or “STATE”) and [grantee name]
(hereinafter referred to as “GRANTEE”).
The DEPARTMENT hereby grants to GRANTEE a sum (also referred to as “GRANT MONIES”) not
to exceed $grant amount, subject to the terms and conditions of this CONTRACT and the 20xx/xx
California State Budget, Chapter xx, statutes of 20xx, Item number – 3790-xxx-xxxx (appropriation
chapter and budget item number hereinafter referred to as “PER CAPITA GRANT”). These funds
shall be used for completion of the GRANT SCOPE(S).
The Grant Performance Period is from July 1, 20xx to June 30, 20xx.
II.GENERAL PROVISIONS
A.Definitions
As used in this CONTRACT, the following words shall have the following meanings:
1.The term “ACT” means the California Drought, Water, Parks Climate, Coastal Protection, and
Outdoor Access for All Act of 2018, as referred to in section I of this CONTRACT.
2.The term “APPLICATION” means the individual project APPLICATION packet for a project
pursuant to the enabling legislation and/or grant program process guide requirements.
3.The term “DEPARTMENT” or “STATE” means the California Department of Parks and
Recreation.
4.The term “DEVELOPMENT” means capital improvements to real property by means of, but not
limited to, construction, expansion, and/or renovation, of permanent or fixed features of the
property.
5. The term “GRANTEE” means the party described as the GRANTEE in Section I of this
CONTRACT.
6.The term “GRANT SCOPE” means the items listed in the GRANT SCOPE/Cost Estimate Form
or acquisition documentation found in each of the APPLICATIONS submitted pursuant to this
grant.
7.The term “PROCEDURAL GUIDE” means the document identified as the “Procedural Guide for
California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access For All
Act of 2018 Per Capita Program.” The PROCEDURAL GUIDE provides the procedures and
policies controlling the administration of the grant.
B.Project Execution
1. Subject to the availability of GRANT MONIES in the act, the STATE hereby grants to the
GRANTEE a sum of money not to exceed the amount stated in Section I of this CONTRACT, in
consideration of, and on condition that, the sum be expended in carrying out the purposes as set
forth in the enabling legislation and referenced in the APPLICATION, Section I of this
CONTRACT, and under the terms and conditions set forth in this CONTRACT.
The GRANTEE shall assume any obligation to furnish any additional funds that may be
necessary to complete the GRANT SCOPE(S).
The GRANTEE agrees to submit any change or alteration from the original GRANT SCOPE(S)
in writing to the STATE for prior approval. This applies to any and all changes that occur after
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 71 of 217
44
STATE has approved the APPLICATION. Changes in the GRANT SCOPE(S) must be
approved in writing by the STATE.
2. The GRANTEE shall complete the GRANT SCOPE(S) in accordance with the time of the Grant
Performance Period set forth in Section I of this CONTRACT, and under the terms and
conditions of this CONTRACT.
3. The GRANTEE shall comply with the California Environmental Quality Act (Public Resources
Code, §21000, et seq., Title 14, California Code of Regulations, §15000 et seq.).
4. The GRANTEE shall comply with all applicable current laws and regulations affecting
DEVELOPMENT projects, including, but not limited to, legal requirements for construction
contracts, building codes, health and safety codes, and laws and codes pertaining to individuals
with disabilities, including but not limited to the Americans With Disabilities Act of 1990 (42
U.S.C. §12101 et seq.) and the California Unruh Act (California Civil Code §51 et seq.).
C.Procedural Guide
1.GRANTEE agrees to abide by the PROCEDURAL GUIDE.
2.GRANTEE acknowledges that STATE may make reasonable changes to its procedures as set
forth in the PROCEDURAL GUIDE. If STATE makes any changes to its procedures and
guidelines, STATE agrees to notify GRANTEE within a reasonable time.
D.Project Administration
1.If GRANT MONIES are advanced for DEVELOPMENT projects, the advanced funds shall be
placed in an interest bearing account until expended. Interest earned on the advanced funds
shall be used on the project as approved by the STATE. If grant monies are advanced and not
expended, the unused portion of the grant and any interest earned shall be returned to the
STATE within 60 days after project completion or end of the Grant Performance Period,
whichever is earlier.
2. The GRANTEE shall submit written project status reports within 30 calendar days after the
STATE has made such a request. In any event, the GRANTEE shall provide the STATE a
report showing total final project expenditures within 60 days of project completion or the end of
the grant performance period, whichever is earlier. The Grant Performance Period is identified in
Section I of this CONTRACT.
3. The GRANTEE shall make property or facilities acquired and/or developed pursuant to this
contract available for inspection upon request by the STATE.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 72 of 217
45
E.Project Termination
1.Project Termination refers to the non-completion of a GRANT SCOPE. Any grant funds that
have not been expended by the GRANTEE shall revert to the STATE.
2.The GRANTEE may unilaterally rescind this CONTRACT at any time prior to the
commencement of the project. The commencement of the project means the date of the letter
notifying GRANTEE of the award or when the funds are appropriated, whichever is later. After
project commencement, this CONTRACT may be rescinded, modified or amended only by
mutual agreement in writing between the GRANTEE and the STATE, unless the provisions of
this CONTRACT provide that mutual agreement is not required.
3.Failure by the GRANTEE to comply with the terms of the (a) PROCEDURAL GUIDE, (b) any
legislation applicable to the ACT, (c) this CONTRACT as well as any other grant contracts,
specified or general, that GRANTEE has entered into with STATE, may be cause for suspension
of all obligations of the STATE unless the STATE determines that such failure was due to no
fault of the GRANTEE. In such case, STATE may reimburse GRANTEE for eligible costs
properly incurred in performance of this CONTRACT despite non-performance of the
GRANTEE. To qualify for such reimbursement, GRANTEE agrees to mitigate its losses to the
best of its ability.
4.Any breach of any term, provision, obligation or requirement of this CONTRACT by the
GRANTEE shall be a default of this CONTRACT. In the case of any default by GRANTEE,
STATE shall be entitled to all remedies available under law and equity, including but not limited
to: a) Specific Performance; b) Return of all GRANT MONIES; c) Payment to the STATE of the
fair market value of the project property or the actual sales price, whichever is higher; and d)
Payment to the STATE of the costs of enforcement of this CONTRACT, including but not limited
to court and arbitration costs, fees, expenses of litigation, and reasonable attorney fees.
5.The GRANTEE and the STATE agree that if the GRANT SCOPE includes DEVELOPMENT,
final payment may not be made until the work described in the GRANT SCOPE is complete and
the GRANT PROJECT is open to the public.
F.Budget Contingency Clause
If funding for any fiscal year is reduced or deleted by the budget act for purposes of this program,
the STATE shall have the option to either cancel this contract with no liability occurring to the
STATE, or offer a CONTRACT amendment to GRANTEE to reflect the reduced grant amount. This
Paragraph shall not require the mutual agreement as addressed in Paragraph E, provision 2, of this
CONTRACT.
G.Hold Harmless
1.The GRANTEE shall waive all claims and recourse against the STATE including the right to
contribution for loss or damage to persons or property arising from, growing out of or in any way
connected with or incident to this CONTRACT except claims arising from the concurrent or sole
negligence of the STATE, its officers, agents, and employees.
2.The GRANTEE shall indemnify, hold harmless and defend the STATE, its officers, agents and
employees against any and all claims, demands, damages, costs, expenses or liability costs
arising out of the ACQUISITION, DEVELOPMENT, construction, operation or maintenance of
the property described as the project which claims, demands or causes of action arise under
California Government Code Section 895.2 or otherwise except for liability arising out of the
concurrent or sole negligence of the STATE, its officers, agents, or employees.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 73 of 217
46
3.The GRANTEE agrees that in the event the STATE is named as codefendant under the
provisions of California Government Code Section 895 et seq., the GRANTEE shall notify the
STATE of such fact and shall represent the STATE in the legal action unless the STATE
undertakes to represent itself as codefendant in such legal action in which event the GRANTEE
agrees to pay the STATE’s litigation costs, expenses, and reasonable attorney fees.
4. The GRANTEE and the STATE agree that in the event of judgment entered against the STATE
and the GRANTEE because of the concurrent negligence of the STATE and the GRANTEE,
their officers, agents, or employees, an apportionment of liability to pay such judgment shall be
made by a court of competent jurisdiction. Neither party shall request a jury apportionment.
5.The GRANTEE shall indemnify, hold harmless and defend the STATE, its officers, agents and
employees against any and all claims, demands, costs, expenses or liability costs arising out of
legal actions pursuant to items to which the GRANTEE has certified. The GRANTEE
acknowledges that it is solely responsible for compliance with items to which it has certified.
H.Financial Records
1.The GRANTEE shall maintain satisfactory financial accounts, documents, including loan
documents, and all other records for the project and to make them available to the STATE for
auditing at reasonable times. The GRANTEE also agrees to retain such financial accounts,
documents and records for five years following project termination or issuance of final payment,
whichever is later.
The GRANTEE shall keep such records as the STATE shall prescribe, including records which
fully d isclose (a) the disposition of the proceeds of STATE funding assistance, (b) the total cost
of the project in connection with such assistance that is given or used, (c) the amount and nature
of that portion of the project cost supplied by other sources, and (d) any other such records that
will facilitate an effective audit.
3.The GRANTEE agrees that the STATE shall have the right to inspect and make copies of any
books, records or reports pertaining to this contract or matters related thereto during regular
office hours. The GRANTEE shall maintain and make available for inspection by the STATE
accurate records of all of its costs, disbursements and receipts with respect to its activities under
this contract. Such accounts, documents, and records shall be retained by the GRANTEE for at
least five years following project termination or issuance of final payment, whichever is later.
4.The GRANTEE shall use a generally accepted accounting system.
I.Use of Facilities
1.The GRANTEE agrees that the GRANTEE shall operate and maintain the property acquired or
developed with the GRANT MONIES, for the duration of the Contract Performance Period.
2.The GRANTEE agrees that, during the Contract Performance Period, the GRANTEE shall
use the property acquired or developed with GRANT MONIES under this contract only for the
purposes of this grant and no other use, sale, or other disposition or change of the use of the
property to one not consistent with its purpose shall be permitted except as authorized by the
STATE and the property shall be replaced with property of equivalent value and usefulness
as determined by the STATE.
3.The property acquired or developed may be transferred to another entity if the successor
entity assumes the obligations imposed under this CONTRACT and with the approval of
STATE.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 74 of 217
47
4.Any real Property (including any portion of it or any interest in it) may not be used as security
for any debt or mitigation, without the written approval of the STATE provided that such
approval shall not be unreasonably withheld as long as the purposes for which the Grant was
awarded are maintained. Any such permission that is granted does not make the STATE a
guarantor or a surety for any debt or mitigation, nor does it waive the STATE’S rights to
enforce performance under the Grant CONTRACT.
5.All real property, or rights thereto, acquired with GRANT MONIES shall be subject to an
appropriate form of restrictive title, rights, or covenants approved by the STATE. If the project
property is taken by use of eminent domain, GRANTEE shall reimburse STATE an amount at
least equal to the amount of GRANT MONIES received from STATE or the pro-rated full market
value of the real property, including improvements, at the time of sale, whichever is higher.
6.If eminent domain proceedings are initiated against GRANTEE, GRANTEE shall notify
STATE within 10 days of receiving the complaint.
J.Nondiscrimination
1.The GRANTEE shall not discriminate against any person on the basis of sex, race, color,
national origin, age, religion, ancestry, sexual orientation, or disability in the use of any
property or facility developed pursuant to this contract.
2.The GRANTEE shall not discriminate against any person on the basis of residence except to
the extent that reasonable differences in admission or other fees may be maintained on the
basis of residence and pursuant to law.
3.All facilities shall be open to members of the public generally, except as noted under the
special provisions of this project contract or under provisions of the enabling legislation and/or
grant program.
K.Severability
If any provision of this CONTRACT or the application thereof is held invalid, that invalidity shall
not affect other provisions or applications of the CONTRACT which can be given effect without the
invalid provision or application, and to this end the provisions of this CONTRACT are severable.
L.Liability
1.STATE assumes no responsibility for assuring the safety or standards of construction, site
improvements or programs related to the GRANT SCOPE. The STATE’S rights under this
CONTRACT to review, inspect and approve the GRANT SCOPE and any final plans of
implementation shall not give rise to any warranty or representation that the GRANT SCOPE
and any plans or improvements are free from hazards or defects.
2.GRANTEE will secure adequate liability insurance, performance bond, and/or other security
necessary to protect the GRANTEE’s and STATE’S interest against poor workmanship, fraud,
or other potential loss associated with completion of the grant project.
M.Assignability
Without the written consent of the STATE, the GRANTEE’S interest in and responsibilities under
this CONTRACT shall not be assignable by the GRANTEE either in whole or in part.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 75 of 217
48
N. Use of Grant Monies
GRANTEE shall not use any grant funds (including any portion thereof) for the purpose of
making any leverage loan, pledge, promissory note or similar financial device or transaction,
without: 1) the prior written approval of the STATE; and 2) any financial or legal interests created
by any such leverage loan, pledge, promissory note or similar financial device or transaction in
the project property shall be completely subordinated to this CONTRACT through a
Subordination Agreement provided and approved by the STATE, signed by all parties involved
in the transaction, and recorded in the County Records against the fee title of the project
property.
N. Section Headings
The headings and captions of the various sections of this CONTRACT have been inserted only
for the purpose of convenience and are not a part of this CONTRACT and shall not be deemed
in any manner to modify, explain, or restrict any of the provisions of this CONTRACT.
O. Waiver
Any failure by a party to enforce its rights under this CONTRACT, in the event of a breach, shall
not be construed as a waiver of said rights; and the waiver of any breach under this CONTRACT
shall not be construed as a waiver of any subsequent breach.
GRANTEE
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
STATE OF CALIFORNIA DEPARTMENT OF PARKS AND RECREATION
AUTHORIZED REPRESENTATIVE Signature Date
Print Name and Title
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 76 of 217
49
Accounting and Audits
Accounting Requirements
GRANTEES must use accounting practices that:
•Provide accounting data that clearly records costs incurred on the PROJECT and accurately
reflects fiscal transactions, with the necessary controls and safeguards.
•Provide good audit trails, especially the source documents (purchase orders, receipts,
progress payments, invoices, timecards, cancelled warrants, warrant numbers, etc.) specific
to the PROJECT.
Accounting Rules for Employee Services (IN-HOUSE EMPLOYEE SERVICES)
GRANTEES must follow these accounting practices for employee services:
•Maintain time and attendance records as charges are incurred, identifying the employee
through a name or other tracking system, and that employee’s actual time spent on the
PROJECT.
•Time estimates, including percentages, for work performed on the PROJECT are not
acceptable.
•Time sheets that do not identify the specific employee’s time spent on the PROJECT are not
acceptable.
•Costs of the salaries and wages must be calculated according to the GRANTEE’S wage and
salary scales, and may include benefit costs such as vacation, health insurance, pension
contributions and workers’ compensation.
•Overtime costs may be allowed under the GRANTEE’S established policy, provided that the
regular work time was devoted to the same PROJECT.
•May not include overhead or cost allocation. These are costs generally associated with
supporting an employee, such as rent, personnel support, IT, utilities, etc.
State Audit
Grants are subject to audit by DPR. All PROJECT records must be retained for five years after
final payment was issued, or PROJECT terminated, whichever is later.
The GRANTEE must provide the following when an audit date and time has been confirmed by
DPR:
•All PROJECT records, including the source documents and cancelled warrants, books, papers,
accounts, time sheets, or other records listed in the Audit Checklist or requested by DPR.
•An employee having knowledge of the PROJECT and its records to assist the DPR auditor.
Record Keeping Recommendation
GRANTEES are encouraged to keep records of all eligible costs, including those not submitted to
OGALS for payment. This provides a potential source of additional eligible costs, should any
submitted expenses be deemed ineligible.
Contact the DPR Audits Office at (916) 657-0370 for questions about these requirements.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 77 of 217
50
Audit Checklist
An audit of the PROJECT may be performed before or following PROJECT completion. The GRANTEE
must retain and make available all PROJECT related records for five years following PROJECT
termination or final payment of GRANT funds. Listed below are some of the items the auditor will
examine during the review of your records as applicable. It is the responsibility of the GRANTEE to
have these records available in a central location ready for review once an audit date and time has
been confirmed. If you have any questions regarding these documents, contact the State
Department of Parks and Recreation Audits Office at (916) 657-0370.
CONTRACTS
□Summary list of bidders (including individual
bid packages)
□Recommendation by reviewer of bids
□Award by governing body (minutes of the
meeting/resolution)
□Construction contract agreement
□Contract bonds (bid, performance, payment)
□Contract change orders
□Contractor's progress billings
□Payments to contractor (cancelled checks/
warrants, bank statements, EFT receipts**)
□Stop Notices (filed by sub-contractors and
release if applicable)
□Liquidated damages (claimed against the
contractor)
□Notice of completion (recorded)
IN-HOUSE EMPLOYEE SERVICES*
□Authorization/work order identifying project
□Daily time sheets signed by employee and
supervisor
□Hourly rate (salary schedules/payroll
register)
□Fringe benefits (provide breakdown)
IN-HOUSE EQUIPMENT*
□Authorization/work order
□Daily time records identifying the project site
□Hourly rate related backup documents
MINOR CONTRACTS/ MATERIALS/
SERVICES/EQUIPMENT RENTALS
□Purchase orders/Contracts/Service
Agreements
□Invoices
□Payments (cancelled checks/ warrants,
bank statements and EFT receipts **)
ACQUISITION
□Appraisal Report
□Did the owner accompany the appraiser?
□10 year history
□Statement of just compensation (signed by
seller)
□Statement of difference (if purchased above
appraisal)
□Waiver of just compensation (if purchased
below appraisal: signed by seller)
□Final Escrow Closing Statement
□Cancelled checks/warrants, bank
statements and EFT receipts, [payment(s) to
seller(s)]
□GRANT deed (vested to the participant) or
final order of condemnation
□Title insurance policy (issued to participant)
□Relocation documents
□Income (rental, grazing, sale of
improvements, etc.)
INTEREST
□Schedule of interest earned on State funds
advanced (Interest on grant advances is
accountable, even if commingled in a pooled
fund account and/or interest was never
allocated back to the grant fund.)
AGREEMENT/CONTRACTS
□Leases, agreements, etc., pertaining to
developed/acquired property
□Proof of insurance pertaining to
developed/acquired property
*Estimated time expended on the projects is
not acceptable. Actual time records and all
supporting documentation must be maintained
as charges are incurred and made available for
verification at the time of audit.
** Front and back if copied.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 78 of 217
51
References
Public Resources Code relating to the Proposition 68 Per Capita program
80000.
This division shall be known, and may be cited, as the California Drought, Water, Parks,
Climate, Coastal Protection, and Outdoor Access For All Act of 2018.
80001.
(b) It is the intent of the people of California that all of the following shall occur in the
implementation of this division:
(3) To the extent practicable, a project that receives moneys pursuant to this division
will include signage informing the public that the project received funds from the
California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access
For All Act of 2018.
(5) To the extent practicable, a project that receives moneys pursuant to this division
will provide workforce education and training, contractor, and job opportunities for
disadvantaged communities.
(7) To the extent practicable, administering entities should measure or require
measurement of greenhouse gas emissions reductions and carbon sequestrations
associated with projects that receive moneys pursuant to this division.
(8) To the extent practicable, as identified in the “Presidential Memorandum--
Promoting Diversity and Inclusion in Our National Parks, National Forests, and
Other Public Lands and Waters,” dated January 12, 2017, the public agencies that
receive funds pursuant to this division will consider a range of actions that include,
but are not limited to, the following:
(A) Conducting active outreach to diverse populations, particularly minority, low-
income, and disabled populations and tribal communities, to increase
awareness within those communities and the public generally about specific
programs and opportunities.
(B) Mentoring new environmental, outdoor recreation, and conservation leaders to
increase diverse representation across these areas.
(C) Creating new partnerships with state, local, tribal, private, and nonprofit
organizations to expand access for diverse populations.
(D) Identifying and implementing improvements to existing programs to increase
visitation and access by diverse populations, particularly minority, low-income,
and disabled populations and tribal communities.
(E) Expanding the use of multilingual and culturally appropriate materials in public
communications and educational strategies, including through social media
strategies, as appropriate, that target diverse populations.
(F) Developing or expanding coordinated efforts to promote youth engagement and
empowerment, including fostering new partnerships with diversity-serving and
youth-serving organizations, urban areas, and programs.
(G) Identifying possible staff liaisons to diverse populations.
80002.
(d) “Department” means the Department of Parks and Recreation.
(n) “Severely disadvantaged community” means a community with a median household
income less than 60 percent of the statewide average.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 79 of 217
52
80020.
Moneys allocated pursuant to this division shall not be used to fulfill any mitigation
requirements imposed by law.
CHAPTER 3.
80060.
For purposes of this chapter, “district” means any regional park district, regional park and
open-space district, or regional open-space district formed pursuant to Article 3
(commencing with §5500) of Chapter 3 of Division 5, any recreation and park district
formed pursuant to Chapter 4 (commencing with §5780) of Division 5, or any authority
formed pursuant to Division 26 (commencing with §35100). With respect to any
community or unincorporated region that is not included within a district, and in which no
city or county provides parks or recreational areas or facilities, “district” also means any
other entity, including, but not limited to, a district operating multiple-use parklands
pursuant to Division 20 (commencing with §71000) of the Water Code.
80061.
(a) The sum of two hundred million dollars ($200,000,000) shall be available to the
department, upon appropriation by the Legislature, for local park rehabilitation,
creation, and improvement grants to local governments on a per capita basis. Grant
recipients shall be encouraged to utilize awards to rehabilitate existing infrastructure
and to address deficiencies in neighborhoods lacking access to the outdoors.
(b) The sum of fifteen million dollars ($15,000,000) shall be available to the department,
upon appropriation by the Legislature, for grants to cities and districts in urbanized
counties providing park and recreation services within jurisdictions of 200,000 or less
in population. For purposes of this subdivision, “urbanized county” means a county
with a population of 500,000 or more. An entity eligible to receive funds under this
subdivision shall also be eligible to receive funds available under subdivision (a).
(c) Unless the project has been identified as serving a severely disadvantaged
community, an entity that receives an award pursuant to this section shall be required
to provide a match of 20 percent as a local share.
80062.
(a)(1) The department shall allocate 60 percent of the funds available pursuant to
subdivision (a) of Section 80061 to cities and districts, other than a regional park
district, regional park and open-space district, open-space authority, or regional
open-space district. Each city’s and district’s allocation shall be in the same ratio as
the city’s or district’s population is to the combined total of the state’s population
that is included in incorporated and unincorporated areas within the county, except
that each city or district shall be entitled to a minimum allocation of two hundred
thousand dollars ($200,000). If the boundary of a city overlaps the boundary of a
district, the population in the overlapping area shall be attributed to each jurisdiction
in proportion to the extent to which each operates and manages parks and
recreational areas and facilities for that population. If the boundary of a city overlaps
the boundary of a district, and in the area of overlap the city does not operate and
manage parks and recreational areas and facilities, all grant funds for that area shall
be allocated to the district.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 80 of 217
53
(2)On or before April 1, 2020, a city and a district that are subject to paragraph (1), and
whose boundaries overlap, shall collaboratively develop and submit to the
department a specific plan for allocating the grant funds in accordance with the
formula specified in paragraph (1). If, by that date, the plan has not been developed
and submitted to the department, the director shall determine the allocation of the
grant funds between the affected jurisdictions.
(b)(1) The department shall allocate 40 percent of the funds available pursuant to
subdivision (a) of §80061 to counties and regional park districts, regional park and
open-space districts, open-space authorities formed pursuant to Division 26
(commencing with §35100), and regional open-space districts formed pursuant to
Article 3 (commencing with §5500) of Chapter 3 of Division 5.
(2)Each county’s allocation under paragraph (1) shall be in the same ratio that the
county’s population is to the total state population, except that each county shall be
entitled to a minimum allocation of four hundred thousand dollars ($400,000).
(3)In any county that embraces all or part of the territory of a regional park district,
regional park and open-space district, open-space authority, or regional open-
space district, and whose board of directors is not the county board of supervisors,
the amount allocated to the county shall be apportioned between that district and
the county in proportion to the population of the county that is included within the
territory of the district and the population of the county that is outside the territory of
the district.
(c)For the purpose of making the calculations required by this section, population shall
be determined by the department, in cooperation with the Department of Finance, on
the basis of the most recent verifiable census data and other verifiable population data
that the department may require to be furnished by the applicant city, county, or
district.
(d)The Legislature intends all recipients of funds pursuant to subdivision (a) of §80061
to use those funds to supplement local revenues in existence on the effective date of
the act adding this division. To receive an allocation pursuant to subdivision (a) of
§80061, the recipient shall not reduce the amount of funding otherwise available to be
spent on parks or other projects eligible for funds under this division in its jurisdiction.
A one-time allocation of other funding that has been expended for parks or other
projects, but which is not available on an ongoing basis, shall not be considered when
calculating a recipient’s annual expenditures. For purposes of this subdivision, the
Controller may request fiscal data from recipients for the preceding three fiscal years.
Each recipient shall furnish the data to the Controller no later than 120 days after
receiving the request from the Controller.
80063.
(a)The director of the department shall prepare and adopt criteria and procedures for
evaluating applications for grants allocated pursuant to subdivision (a) of §80061. The
application shall be accompanied by certification that the project is consistent with the
park and recreation element of the applicable city or county general plan or the district
park recreation plan, as the case may be.
(b)To utilize available grant funds as effectively as possible, overlapping and adjoining
jurisdictions and applicants with similar objectives are encouraged to combine projects
and submit a joint application. A recipient may allocate all or a portion of its per capita
share for a regional or state project.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 81 of 217
54
Allocation Tables
Visit OGALS’ Per Capita webpage at www.parks.ca.gov/percapita for allocations.
Allocation Transfer
Entities that receive an allocation under the Per Capita program may transfer all or part
of that allocation to another eligible entity, provided that the following requirements are
met:
1. All required documentation must be submitted no later than six months from the end
of the encumbrance period.
2. The transferring agency must submit a resolution authorizing the transfer of the
allocation. The resolution must name the recipient entity and the transferred
amount.6
3. The recipient must be eligible to receive Per Capita funds.
4. The recipient must have submitted the authorizing resolution shown on page 7.
5. The recipient must submit a resolution authorizing the receipt of funds; the resolution
must state the donor and the transferred amount.
6 Please contact OGALS for sample transfer and recipient resolutions.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 82 of 217
55
Definitions
Capitalized words and terms used in this guide are defined below.
ADVANCE – payment made to the GRANTEE for work that will occur in the future or work
that has already occurred during the GRANT PERFORMANCE PERIOD and has not been paid
for by the GRANTEE.
APPLICATION PACKET – the Application form and its required attachments described in
the Application Checklist and Directions beginning on page 10.
AUTHORIZED REPRESENTATIVE – the GRANTEE’S designated position authorized in the
Resolution to sign all required GRANT documents.
CEQA – the California Environmental Quality Act established policies and procedures
requiring GRANTEES to identify, disclose to decision makers and the public, and attempt
to lessen, significant impacts to environmental and historical resources that may occur
as a result of the GRANTEE’S proposed PROJECT. (Public Resources Code §21000 et
seq.; Title 14 California Code of Regulations §15000 et seq.)
CONSTRUCTION COSTS – costs incurred starting with the date when ground-breaking
construction activities such as site preparation, grading, or gutting begins, and
continuing to the end of the GRANT PERFORMANCE PERIOD.
CONTRACT PERFORMANCE PERIOD – the amount of time stated on the contract agreement,
specifying the performance of the contractual grant obligations between the GRANTEE
and DPR.
DEVELOPMENT – construction, expansion, or renovation.
DPR – the California Department of Parks and Recreation.
GRANT – funds made available to a GRANTEE for completion of the PROJECT SCOPE(s)
during the GRANT PERFORMANCE PERIOD.
GRANTEE – an entity having a fully executed contract with DPR.
GRANT PERFORMANCE PERIOD – period of time that eligible costs may be incurred by the
GRANTEE and paid for by DPR, as specified in the fully executed contract.
IN-HOUSE EMPLOYEE SERVICES – use of the GRANTEE’S employees working on the
PROJECT SCOPE.
OGALS – DPR’s Office of Grants and Local Services.
PRE-CONSTRUCTION COSTS – costs incurred within the GRANT PERFORMANCE PERIOD for the
planning, design, and permit phase of the PROJECT before construction can begin.
PROJECT – the SCOPE as described in the APPLICATION PACKET to be completed with
GRANT funds.
PROJECT COMPLETION – when the PROJECT is complete and the facilities are open and
useable by the public.
PROJECT COMPLETION PACKET – The documents listed on page 37 that are required in
order to request final payment following PROJECT COMPLETION.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 83 of 217
56
PROJECT OFFICER – an OGALS employee, who acts as a liaison with GRANTEES and
administers GRANT funds, facilitates compliance with the Procedural Guide, and the
GRANT contract.
SCOPE – the acquisition, recreation features, and major support amenities described in
the APPLICATION PACKET that must be completed prior to final GRANT payment.
TOTAL PROJECT COST – the combined dollar amount of all funding sources used to
complete the acquisition, or recreation features and major support amenities described
in the APPLICATION PACKET.
ITEM NUMBER: A-4
DATE: 10/26/21
ATTACHMENT: 2
Page 84 of 217
ITEM NUMBER: A-5
DATE: 10/26/21
Atascadero City Council
Staff Report - City Manager
Virtual Meetings – AB 361 Requirements
RECOMMENDATION:
Council adopt Draft Resolution making findings consistent with the requirements of
AB 361 to continue to allow for the conduct of virtual meetings.
DISCUSSION:
On March 4, 2020, Governor Newsom declared a state of emergency due to the novel
coronavirus COVID-19. That declaration is still in effect. Since March 12, 2020,
Executive Orders from the Governor relaxed various Brown Act meetin g requirements
relating to teleconferencing rules, temporarily suspending the Brown Act provisions
requiring the physical presence of council, board and commission members at public
meetings. The most recent extension of those Orders expired on September 30, 2021.
On Friday, September 17, 2021, the Governor signed AB 361 . AB 361 amends
Government Code section 54953 to provide more clarity on the Brown Act’s rules and
restrictions surrounding the use of teleconferencing to conduct meetings. The newly
enacted Government Code Section 54953(e) creates alternate measures to protect the
ability of the public to appear before local legislative bodies.
With the passage of AB 361, local agencies are allowed to continue to conduct virtual
meetings during a declared state of emergency, provided local agencies comply with
specified requirements. The City Council previously adopted Resolution No. 2021-066
on September 28, 2021, finding that the requisite conditions exist for the legislative
bodies of the City of Atascadero to conduct remote teleconference meetings in
compliance with AB 361. (Government Code Section 54953(e).) AB 361 requires the
City Council to reconsider the circumstances of the state of emergency not later than 30
days after teleconferencing for the first time pursuant to AB 361 and every 30 days
thereafter in order to continue to conduct remote teleconference meetings.
In order to continue remote teleconferencing, the City Council must make the following
findings (Gov. Code § 52953(e)(3)):
• The City Council has reconsidered the circumstances of the state of emergency.
• Any of the following circumstances exist:
Page 85 of 217
ITEM NUMBER: A-5
DATE: 10/26/21
o The state of emergency continues to directly impact the ability of the
members to meet safely in person.
o State or local officials continue to impose or recommend measures to
promote social distancing.
On August 31, 2021, County Health Officer issued Order No. 6 requiring face coverings
in all public indoor settings and this order continues to remain in effect. Additionally, the
City remains subject to the State Occupational Safety and Health Administration
(CalOSHA) regulations which, among other requirements, obligate an employer to
provide training to employees on COVID-19 transmission and risk reduction, including
“The fact that particles containing the virus can travel more than six feet, especially
indoors, so physical distancing, face coverings, increased ventilation indoors, and
respiratory protection decrease the spread of COVID-19, but are most effective when
used in combination.” (CCR Section 3205(c)5(D).)
Adoption of the Draft Resolution reaffirms the Health Officer Order and CalOSHA
requirements as the basis for continuing to meet virtually. Additionally, adoption of the
Draft Resolution does not prohibit the conduct of a traditional or hybrid meeting if the
circumstances of the declared health emergency change.
FISCAL IMPACT:
None.
ATTACHMENT:
Draft Resolution
Page 86 of 217
ITEM NUMBER: A-5
DATE:
ATTACHMENT:
10/26/21
1
DRAFT RESOLUTION
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CALIFORNIA,
PROCLAIMING THE CONTINUING NEED TO MEET BY
TELECONFERENCE PURSUANT TO
GOVERNMENT CODE SECTION 54953(e)
WHEREAS, all meetings of the City of Atascadero legislative bodies are open and public
as required by the Ralph M. Brown Act (Cal. Gov. Code 54950 – 54963); and
WHEREAS, the Brown Act, Government Code section 54953(e), makes provisions for
remote teleconferencing participation in meetings by members of a legislative body, without
compliance with the requirements of Government Code section 54953(b)(3), subject to the
existence of certain conditions; and
WHEREAS, Government Code section 54953(e) was added by AB 361, signed by
Governor Newsom on September 17, 2021; and
WHEREAS, on March 4, 2020, Governor Newsom declared a State of Emergency as a
result of the COVID-19 pandemic; and
WHEREAS, on March 17, 2020, the City of Atascadero declared a State of Emergency as
a result of the COVID-19 pandemic; and
WHEREAS, such State of Emergency remains in effect; and
WHEREAS, COVID-19 continues to threaten the health and lives of City of Atascadero
residents; and
WHEREAS, the Delta variant is highly transmissible in indoor settings and breakthrough
cases are becoming more common; and
WHEREAS, local officials have imposed or recommended measures to promote social
distancing to include the wearing of masks indoors, regardless of vaccination status; and
WHEREAS, the City Council previously adopted Resolution No. 2021-066 on
September 28, 2021, finding that the requisite conditions exist for the legislative bodies of the City
of Atascadero to conduct remote teleconference meetings in compliance with Government Code
Section 54953(e); and
WHEREAS, Government Code Section 54953(e) requires that the City Council must
reconsider the circumstances of the state of emergency every 30 days in order to continue to
conduct remote teleconference meetings in compliance with AB 361.
NOW, THEREFORE BE IT RESOLVED, by the City Council of the City of
Atascadero:
Page 87 of 217
ITEM NUMBER: A-5
DATE:
ATTACHMENT:
10/26/21
1
SECTION 1. Recitals. The above recitals are true and correct and are incorporated into
this Resolution by this reference.
SECTION 2. Findings. The City Council does hereby find that:
1. The City Council has reconsidered the circumstances of the state of emergency
declared as a result of the COVID-19 pandemic.
2. The COVID-19 pandemic continues to directly impact the ability of the members to
meet safely in person whereby holding legislative body meetings in person will present
imminent risk to the health and safety of attendees.
3. State or local officials continue to impose or recommend measures to promote social
distancing.
SECTION 3. Compliance with Government Code Section 54953(e). The City Council and
other legislative bodies will continue to meet by teleconference in accordance with Government
Code section 54953(e).
SECTION 4. Effective Date of Resolution. This Resolution shall take effect immediately
upon its adoption and shall be effective until the earlier of (i) 30 days from the date of adoption of
this Resolution, or (ii) such time the City Council adopts a subsequent resolution in accordance
with Government Code section 54953(e)(3) to extend the time during which the legislative bodies
of the City of Atascadero may continue to teleconference without compliance with paragraph (3)
of subdivision (b) of section 54953.
PASSED AND ADOPTED at a regular meeting of the City Council held on the ______
day of _______________, 2021.
On motion by Council Member ____ and seconded by Council Member ____, the foregoing
Resolution is hereby adopted in its entirety on the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
CITY OF ATASCADERO
______________________________
Heather Moreno, Mayor
ATTEST:
______________________________________
Lara K. Christensen, City Clerk
APPROVED AS TO FORM:
______________________________________
Brian A. Pierik, City Attorney
Page 88 of 217
ITEM NUMBER: C-1
DATE: 10/26/21
Atascadero City Council
Staff Report – Community Development Department
Affordable Housing Impact Fee Nexus Studies Update
RECOMMENDATION:
Council review and comment on the nexus study provided by EPS consultants for a
potential affordable housing fee program as part of an affordable housing strategy.
DISCUSSION:
The adopted 2021-2028 Housing Element requires that the City adopt an inclusionary
housing program to help address the City’s future needs for affordable housing .
In March 2021, following adoption of the Housing Element, Council was asked to review
options for the implementation of an inclusionary housing program. The Council and
Planning Commission discussed:
• Developing a program to encourage the development of housing that is
affordable by design,
• Developing a fee program to collect fees that can be utilized to support the
development of future affordable housing
• Or a combination of policy and incentives that meet Housing Element objectives.
The City Council directed staff to explore a multifaceted approach that included the
potential for an affordable housing linkage fee to capture opportunities for lower-income
housing units with a focus on affordable-by-design strategies to incentivize moderate
and workforce housing units. (See Attachment 1 for a review of goals and
considerations).
Options presented included adoption of mandates for new development to provide
affordable housing, development standards that support and facilitate affordable -by-
design units throughout the City and an affordable housing linkage fee charged on all
new, market-rate residential development above an identified square-footage threshold
to provide a funding source to support the construction of affordable housing . This
report discusses one piece of the program: the relationship (or nexus) between new
housing development and the need to fund future affordable housing through a
potential fee program. Other portions of the housing program will be brought forward to
the City Council at a later date.
Page 89 of 217
ITEM NUMBER: C-1
DATE: 10/26/21
In coordination with MIG, the City’s Housing Element consultant, the C ity hired
Economic & Planning Systems (EPS) to provide analysis and options for the
development of an affordable housing linkage fee as a potential part of the City’s
comprehensive strategy for the provision and facilitation of affordable housing to meet
the City’s affordable housing goals. This is the first step in the analysis which will enable
the consultant team to provide information and calculations for potential linkage fees,
options for charging the fees, and analysis of development costs to ensure that any fee
is realistic and feasible.
ANALYSIS:
The Affordable Housing Impact Fee Nexus Study will examine the gap between the cost
of developing housing and what Very Low- and Low-income households can afford and
recommend strategies to support the City’s affordable housing fund. Impact fees are a
common tool used to increase City funding that can be applied towards the development
of affordable housing. Adoption of impact fees requires a technical study to determine
‘nexus’ between new market rate development and demand for affordable units.
Prototype and Gap Analysis
In order to support an impact fee, a nexus needs to be established between the impact
of new market-rate housing development and the need for affordable housing units. In
general, new market-rate housing generates a need for increased services and thus,
added service sector employees. The nexus analysis looks at what type of housing is
built and how much those households earn and spend in the local economy. That leads
to understanding how many jobs may be generated from that spending and how much
those employees earn. This in turn informs how many housing units are needed for
those added employees and what the gap is between h ousing development costs and
employee household purchasing power.
In determining the impact, a number of assumptions are built into the analysis. In
September and October, EPS met with r egional housing and lending experts from the
nonprofit and private sector to better understand the development process, local
housing market dynamics and issues, and to vet assumptions used in the analysis. The
analysis takes into account local density and typical sizes of housing units developed
for lower-income households.
Page 90 of 217
ITEM NUMBER: C-1
DATE: 10/26/21
Fee Structure Options
There are a variety of ways that a nexus fee can be structured. The fee can be based
on unit type, unit size, lot size, zoning, etc. or a combination of factors. Fees can also
be discounted or waived for units under a certain square-footage to encourage units
that are considered “affordable-by-design”. In general, the analysis correlates key
characteristics of the new development (e.g., unit type, unit size, lot size, zoning, etc.)
to assumptions about household income level when exploring alternative methods to a
flat per unit fee. This means that alternative methods may inherently include some level
of fee discount as we explore geographic or per square-foot based fees. The following
discussion includes each option with pros and cons listed.
A. Single family per unit and multifamily per unit: This would establish a flat fee
based on unit type regardless of unit size.
Pro:
• Easy to administer, with clear definitions.
Con:
• Discourages “affordable by design” and encourages larger units.
Page 91 of 217
ITEM NUMBER: C-1
DATE: 10/26/21
B. Single family per square foot and multifamily per square foot: This would
establish different per square-foot fees based on unit type and establish a
maximum fee so as not to exceed amounts supported by the nexus analysis.
Pros:
• Encourages smaller units and those considered “affordable by design”.
• Straight forward and easy to administer with clear definitions of unit types
and parameters for which square-footage is used to calculate the fee.
Con:
• Fee will tier down from a per unit amount (established through nexus) that
is tied to the median-sized home.
• New units that are smaller than the median-sized home will not generate
as much revenue as they would under a flat fee per unit structure.
• New units that are larger than the median -sized home will not pay more
than the maximum amount established by Nexus , which may end up
being less on a per square foot basis.
C. Unit size as a threshold: This approach would charge one fee to units smaller
than 2,000 square feet, for example, and a different fee to units larger than 2,000
square feet.
Pro:
• Allows for meaningful differences in likely household income based on the
size threshold.
Con:
• Because the maximum fee is tied to a median house size, the per square -
foot fee could be lower for larger homes, resulting in a perception that
larger homes pay less.
D. Zoning based fee (RS vs. other zones): In Atascadero, there is a correlation
between location and cost of housing. Homes on larger acreage tend to be
higher-cost properties regardless of housing unit size. A nexus fee could be tied
to zoning which roughly correlates to lot size which may correlate with home
value and, therefore, household income .
Pro:
• Allows for meaningful differences in household income for larger acreage
property occupants based on zoning.
Con:
• Zoning is not always a perfect indicator of land use type. For example, RS
zoned parcels adjacent to El Camino Real are different than larger view
lots on the west side.
• There is not a meaningful distinction in unit size when compared across
zoning designations based on recent permit history. More analysis is
needed to determine if there is a meaningful distinction in value.
• Many undeveloped parcels left on the west side within the RS zoning are
difficult parcels to develop with larger houses.
Page 92 of 217
ITEM NUMBER: C-1
DATE: 10/26/21
E. Fee based on “in” or “outside” the City’s Urban Services Line: This fee structure
would look at a per unit or per square -foot based fee tied to whether a parcel is
inside or outside the Urban Services Line. The fee has a geographic componen t
that provides some nexus to the larger added value acreage properties while
focusing more on proximity to services and nearness to the City’s core rather
than underlying zoning designations.
Pro:
• Allows meaningful differences in likely unit size and/or household income.
Con:
• Could result in a lower square-foot fee for properties outside the Urban
Services Line depending on the analysis of median house size by
location.
Potential Exemptions
Currently, three is a legal exemption from Inclusionary Housing Fees imposed upon
ADUs under 750 square-feet and deed restricted affordable units. Council may want to
consider policies for additional exemptions which may include , but not be limited to:
▪ Units that are “Affordable by Design” (smaller than 1,000 square feet)
▪ Areas targeted for infill
▪ Deed-restricted units (by income or age)
▪ Replacement units (redevelopment)
▪ Rebuilt units (post fire, flood, earthquake, etc.)
▪ Other
Conclusion
Staff and the Consultant are looking for feedback on the preferred fee struct ure based
on examples A through E above and based on the suggested exemptions. The Council
may also wish to provide additional direction on factors to consider for fee analysis. It is
important that local considerations and factors are considered but also vital that the
available data be able to support the analysis and provide a basis for any impact fee.
Next Steps
Once the consultant receives input on a preferred fee structure and factors to consider,
they will complete the nexus study and present their findings. The Council will then
have to opportunity to determine appropriate discounts and exemptions to balance the
need for affordable housing with community and economic growth.
FISCAL IMPACT:
Project costs are covered by grant funding received through Senate Bill 2 (SB 2). SB 2
allocates funding to each local community based on population size. In Atascadero,
$160,000 was allocated towards activities that meet the grant criteria, specifically
activities that demonstrate a clear path to the production of affordable housing. $93,925
was dedicated toward the development and adoption of the 2021 -2028 Housing
Element. The remaining $66,075 of grant funding is earmarked for this project.
Page 93 of 217
ITEM NUMBER: C-1
DATE: 10/26/21
ATTACHMENT:
Overview of Housing Program Goals and Considerations
Page 94 of 217
ITEM NUMBER: C-1
DATE:
ATTACHMENT:
10/26/21
1
Page 95 of 217
ITEM NUMBER: C-1
DATE:
ATTACHMENT:
10/26/21
1
Page 96 of 217
ITEM NUMBER: C-1
DATE:
ATTACHMENT:
10/26/21
1
Page 97 of 217
ITEM NUMBER: C-2
DATE: 10/26/21
Atascadero City Council
Staff Report – Fire Department
Emergency Evacuation Traffic Planning Study
RECOMMENDATION:
Council receive and file the Emergency Evacuation Traffic Planning Study.
DISCUSSION:
The Atascadero City Council, in response to recent catastrophic wildfire events and the
potential for lengthy power shutdowns, adopted “Ensure Comprehensive Safety
Readiness and Risk Mitigation” as one of three main goals in the 2019-2021 City of
Atascadero Action Plan. One of the broad categories included under this goal was to
implement a comprehensive evacuation and communications plan.
In early 2020, staff began researching potential contractors to assist the City in developing
this evacuation and communications plan. Evacuation planning for all hazards is
important, however, using new technology to develop mass-evacuation plans in response
to recent fast-moving wildfires in a wildland urban interface area is critical. Data-driven
wildfire evacuation systems that use GIS mapping plus real-time weather and traffic are
a new and emerging area of expertise.
Atascadero Fire was one of the very first agencies in the State to execute a contract with
Zonehaven to provide the Evacuation Management Platform for the City of Atascadero.
Zonehaven was formed as a result of devastating fires in Northern California and has
since partnered with over 200 cities throughout the State. They developed a wildfire
planning and evacuation management system that can be used for all hazards.
Components of the plan include:
• Smart evacuation zones
• Dynamic, up-to-date maps and plans
• Custom fire/evacuation scenarios and recommendations
• A community evacuation interface with multi-channel notifications
Zonehaven was implemented in Atascadero during 2020 and was ready for use before
the wildfire season of 2021. Zones are identified and available for the public to receive
current information. Fire and Police personnel have trained to activate a zone evacuation
and start the notification process, which includes Hi/Lo sirens, City social media, landline
and cell phone reverse 911 through the Sheriff’s Department and cell phone wireless
emergency alerting through County OES. Zonehaven will be implemented throughout
Page 98 of 217
ITEM NUMBER: C-2
DATE: 10/26/21
San Luis Obispo by fire season 2022 and will give all emergency responders in the county
a common operating platform on which to manage a large-scale evacuation.
To meet the City Council goal of implementing a comprehensive evacuation plan, staff
began to look for a consultant that would assist in further evaluation and detail. Staff was
looking to address issues concerning the challenging geography and road structure of
Atascadero such as clear, pre-identified evacuation routes, identified streets to close for
one-way traffic, identified bottleneck areas for better use of traffic control, and identified
neighborhoods with one way in/out access.
In January of 2021, Atascadero Fire executed a contract with W -Trans to complete an in-
depth traffic and engineering analysis to address the above questions. The final purpose
of the study would be to provide strategies and action items to employ during a wildland
fire or other natural disaster that would facilitate the evacuation of vehicles from zones
established through the Zonehaven platform.
The focus of the study was further defined into the following points:
• Estimate evacuation time for groups of zones under various fire intrusion scenarios
• Determine time savings by operating roads with contraflow lanes
• Recommend traffic signal operational changes during evacuation
• Recommend locations where manual traffic control should be provided
• Identify road closure needs
W-Trans has completed the study and provided recommendations in the attached report.
One notable recommendation is the identified control points. These are ranked in the order
of most critical and will be placed in the Zonehaven platform to identify those intersections
where traffic control must occur to move cars quickly. This traffic control may be done
manually by Police or Public Works staff or may involve changing traffic signals. Another
recommendation includes limiting traffic from entering and exiting the freeway at certain
on/off ramps during an evacuation. For this to occur, it will be critical that Atascadero Fire
and Police Departments establish procedures with Cal Trans and CHP and train with those
partners on a regular basis. For the full list of recommendations, see page 12 of the study.
Evacuation planning continues to evolve in California. Atascadero has led the county
with programs such as the Zonehaven platform and public education campaigns such as
“Defend Atascadero,” “Know your Zone” and “Hear the Hi/Lo, time to go.”
Recommendations from this study are additional tools that will help us to be better
prepared and to better protect our community.
FISCAL IMPACT:
The study has no direct costs beyond previously approved consultant costs.
Implementation of any recommendations may require additional costs that would be
addressed with future budgeting and grant proposals.
ATTACHMENT:
Page 99 of 217
ITEM NUMBER: C-2
DATE: 10/26/21
W-Trans Emergency Evacuation Traffic Planning Study
Page 100 of 217
490 Mendocino Avenue, Suite 201 SANTA ROSA, CA 95401 707.542.9500
7901 Oakport Street, Suite 1500 OAKLAND, CA 94621 510.444.2600
w-trans.com
Draft Report
Emergency Evacuation Traffic Planning
Study
Prepared for the
City of Atascadero
October 14, 2021
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 101 of 217
1
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Introduction
Analysis Focus
This document provides traffic engineering analysis and findings related to Emergency Evacuation for the City of
Atascadero. The purpose of this planning study is to provide strategies and action items to employ during fire
and other natural disaster events to facilitate the evacuation of vehicles from selected zones in Atascadero. The
focus of this analysis was to determine the following information:
Estimate evacuation time for groups of zones under various fire intrusion scenarios.
Determine time savings by operating roads with contraflow lanes.
Recommend traffic signal operational changes during evacuation.
Recommend locations where manual traffic control should be provided.
Identify road closure needs
These efforts utilized information in the Zonehaven app which has already been initiated for the City.
Disclaimer
This document examines the simulation of three different fire evacuation scenarios which have been determined
by the City of Atascadero Fire Department. Data for the evacuation zones were based on information provided
by the Zonehaven mapping software and are disclosed in the report. These scenarios are intended to provide the
City with some general strategies for assignment of personnel at key intersections and roadways during fire
events.
It is important that the City of Atascadero provide evacuation orders to the public as early as possible and to guide
the evacuation on a zone-by-zone basis so that the evacuation can be spread over as much time as possible,
thereby minimizing congestion and delay for its citizens. The City should communicate strategies to the public
through several communication channels well in advance and also during the event so that evacuation does not
occur en masse.
Dissemination of evacuation orders is up to the City of Atascadero to implement and will need to be tailored to
the specifics of any such event. The scenarios evaluated in this report are intended for guidance purposes and do
not comprise a directive for any actual emergency.
It should be acknowledged that evacuation during a fire or other emergency event can produce unexpected traffic
patterns that cannot be predicted in advance. During fire events, traffic can be impacted by many factors such as
the direction of the wind, the path of the fire, the number of firefighting responders, the volume of traffic during
evacuation, the number of people that follow evacuation directions, unsafe traffic maneuvers and behavior by the
public, driver visibility on evacuation routes, etc.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 102 of 217
2
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Study Area Zones and Scenarios
Zonehaven Data
Zonehaven is an on-line platform to assist communities with data and information for fire events. The City of
Atascadero had Zonehaven map the City into zones. This zone system was used for the purposes of this traffic
evaluation study. Figure 1 shows the Zonehaven zones for the City of Atascadero. As shown in Figure 1, there
are a total of 27 evacuation zones within the City of Atascadero.
The City selected a set of zones for evaculation under three different wildfire-related evacuation scenarios.
Scenario A assumes that a westerly wind would cause fire to encroach the City from the west to east and require
zones 3, 7, 8 to evacuate to the north and the south via US-101 and to the east via SR 41. Scenario B also predicts
that a westerly wind would spread fire from the west to east and require zones 1, 2, and 4 to evacuate to the
north and south via US 101 and to the east via SR 41. Scenario C presumes that the fire would encroach the City
due to an easterly wind blowing from the east to the west and would require zones 15, 16, and 18 to evacuate to
the north and south via US 101 and to the west via CA 41. These three scenarios are depicted in Figure 2.
Scenario A
Zones 3, 7 and 8 (west side of 101)
Westerly wind, afternoon peak hour
Evacuation Destinations
o Northbound 101
o Southbound 101
o Eastbound SR-41
Scenario B
Zones 1, 2 and 4 (west side of 101)
Westerly wind, afternoon peak hour
Evacuation Destinations
o Northbound 101
o Southbound 101
o Eastbound SR-41
Scenario C
Zones 15, 16 and 18 (east side of 101)
Easterly wind, afternoon peak hour
Evacuation Destinations
o Northbound 101
o Southbound 101
o Westbound SR-41
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 103 of 217
Emergency Evacuation Traffic Planning Study
Figure 1 – Zonehaven Evacuation Zones
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 104 of 217
4
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Figure 2 Evacuation Zones in City of Atascadero
As presented in Table 1, each of the evacuation zones were recorded with the number of structures,
population, and estimated number of vehicles as provided in the Zonehaven app. As the evacuation zones in
Scenario B and C are located near the urban core with higher densities, they consist of a substantially higher
population as well as number of vehicles compared with zones in Scenario A, which are located in the rural
edge of the City.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 105 of 217
5
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Table 1 – Evacuation Zone Summary
Number of
Structures
Populations Number of
Vehicles
Scenario A
Zone 3 398 443 796
Zone 7 177 432 354
Zone 8 415 563 830
Total 990 1,438 1,980
Scenario B
Zone 1 660 1,023 1,200
Zone 2 850 1,564 1,700
Zone 4 531 826 1,062
Total 1,981 3,413 3,962
Scenario C
Zone 15 570 977 1,140
Zone 16 830 1,801 1,660
Zone 18 1,006 2,497 2,012
Total 2,406 5,275 4,812
Source: Zonehaven, 2021
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 106 of 217
6
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Evacuation Routes
The evacuation routes for zones under each scenario were identified by using Google Maps to choose the shortest
travel time. It is noted that the evacuation routes were selected to start near the center of each zones and connect
to the closest highway access point. Multiple routes for each zone/destination were utilized as much as possible.
All of the individual travel paths assumed from each zone to each of the three evacuation destinations are included
in Appendix A. Following is a summary for each evacuation scenario.
As shown in the Figure 3, evacuation routes from zones 3, 7, and 8 under Scenario A would lead the traffic to
several highway access points including Del Rio Road, San Anselmo Road, Traffic Way, Curbaril Avenue, and Santa
Rosa Road along US 101 and Portola Road, San Gabriel Road, and Los Altos Road along SR 41.
Figure 3 Evacuation Routes for Zones in Scenario A
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 107 of 217
7
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
The evacuation routes for Scenario B are shown in Figure 4. Similarly, to Scenario A, the evacuating traffic from
zones 1,2, and 4 under Scenario B were assumed to access the highways through connections with San Ramon
Road, El Camino Real, Del Rio Road, San Anselmo Road, and Traffic Way along US 101 and Portola Road and San
Gabriel Road along SR 41.
Figure 4 Evacuation Routes for Zones in Scenario B
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 108 of 217
8
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
The evacuation routes for Scenario C are shown in Figure 5. For Scenario C, the evacuating traffic from zones 15,
16, and 18 were assumed to access highways via Del Rio Road, San Anselmo Road, Rosario Avenue, Traffic Way,
and El Camino Real along US 101 and Mercedes, and El Camino Real along SR 41.
Figure 5 Evacuation Routes for Zones in Scenario C
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 109 of 217
9
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Traffic Operational Analysis
Analysis Process
The following process was used to estimate traffic volumes on evacuation routes and analyze the impact of the
additional traffic flow:
Travel paths from each zone to each of the three evacuation destinations were determined. Where feasible,
multiple paths were assumed for the same origin/destination path.
The total evacuating traffic volume for each zone was assumed to be the same number of vehicles recorded
in the Zonehaven app zone.
All scenarios assumed that 75% of the evacuating traffic would be destined for US 101 and the remaining 25%
would be destinated to SR41 (east or west depending on the wind direction)
The volume % by path was estimated assuming that traffic would spread evenly amongst all the paths as
much as possible.
The resulting volume was recorded by specific turning movement at each of the key intersections along each
route.
The City specified that fire events would be most likely in the afternoon, therefore, background traffic for key
intersections on evacuation routes was assumed to be the weekday p.m. peak hour which is generally the
peak traffic hour of the day.
Background traffic volumes were acquired from past traffic studies conducted over the last 5-6 years and were
factored with an annual growth rate of 1.5 percent per year to represent a “normalized” (non-Covid) Year 2020
traffic volume. It should be noted that there was no data for some intersections.
Key intersections were then evaluated to determine their delay and Level of Service with the added traffic.
This process is discussed below.
The resulting traffic volume assignment data is included in Appendix B.
Traffic Analysis Study Area
The study area selected based on evacuation routes consists of the following intersections:
1. Del Rio Road/US101 SB Ramps
2. Del Rio Road/US101 NB Ramps
3. Del Rio Road/El Camino Real
4. San Anselmo Road/US101 SB Ramps
5. San Anselmo Road/US101 NB Ramps
6. San Anselmo Road/El Camino Real
7. Rosario Avenue-US101 NB On-Ramp/El Camino Real
8. Traffic Way/US101 SB Ramps
9. Traffic Way/US101 NB Off-Ramp
10. Traffic Way/El Camino Real
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 110 of 217
10
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
11.SR 41/US101 SB Ramps
12.SR41/El Camino Real
13.US101 NB Ramps-Plaza Del Camino Driveway/El Camino Real
14.Santa Rosa Road/US101 SB Ramps
15.Santa Rosa Road/US101 NB On-Ramp-West Front Road
16.Santa Rosa Road/El Camino Real
17.SR41/San Gabriel Road
18.SR41/Santa Rosa Road
19.SR41/Portola Road
20.SR41/Curbaril Avenue
21.SR41/Atascadero Avenue
Intersection Operations with Evacuation
Operating conditions during the weekday p.m. peak period were evaluated to capture the highest potential
impacts for the wildfire scenarios as well as the highest volumes on the local transportation network. The p.m.
peak hour occurs between 4:00 and 6:00 p.m. and typically reflects the highest level of congestion during the
homeward-bound commute. Because winds are likely to pick up in the afternoon, increasing the wildfire threats,
only afternoon peak period was evaluated.
Each of the study intersections were examined to determine their delay and Level of Service (LOS) with the added
traffic volumes from the various evacuation scenarios. Generally, intersection operations are graded based on
their level of average delay and assigned a grade from LOS A (minor delay) to LOS F (significant delay). LOS D
conditions are generally considered acceptable during peak hour conditions.
As shown in Table 2, upon the addition of project-related traffic to the Existing volumes, the study
intersections are identified which would be expected to experience excessive delay and longer queuing due to
the added traffic. Therefore, these intersections with LOS E and F conditions were targeted for strategies to
increase their capacity and decrease delay for evacuating traffic. These action items are discussed in the next
section.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 111 of 217
11
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Table 2 –Intersection Analysis
Study Intersection
Approach
Scenario A Scenario B Scenario C
PM Peak PM Peak PM Peak
LOS LOS LOS
1. Del Rio Rd/US 101 NB Ramps LOS F
2. Del Rio Rd/US 101 SB Ramps LOS F LOS E
3. Del Rio Rd/El Camino Real LOS E LOS F
4. San Anselmo Rd/US 101 NB Ramps LOS F LOS F
NB (US 101 NB Off-Ramp) Approach LOS F
5. San Anselmo Rd/US 101 SB Ramps LOS F LOS F
SB (US 101 SB Off-Ramp) Approach LOS F
6. San Anselmo Rd/El Camino Real LOS E LOS F
7. Rosario Ave-US 101 NB On-Ramp/El Camino Real
8. Traffic Wy/US 101 SB Ramps
SB (US 101 SB Off-Ramp) Approach LOS F LOS F LOS F
9. Traffic Wy/US 101 NB Off-Ramp
NB (US 101 NB Off-Ramp) Approach LOS F LOS F
10. Traffic Wy/El Camino Real LOS E LOS F LOS F
11. SR 41/US 101 SB Ramps
12. SR 41/El Camino Real LOS E LOS F LOS F
13. US 101 NB Ramps-Plaza Del Camino Driveway/El
Camino Real
14. Santa Rosa Rd/US 101 SB Ramps
15. Santa Rosa Rd/US 101 NB On-Ramp-W Front Rd
16. Santa Rosa Rd/El Camino Real LOS E LOS E
17. SR 41/San Gabriel Rd LOS F
18. SR 41/Santa Rosa Rd
NB (Santa Rosa Rd) Approach LOS F
19. SR 41/Portola Rd LOS F LOS F
20. SR 41/Curbaril Rd LOS F LOS E LOS F
21. SR 41/Atascadero Ave LOS F LOS F LOS F
Notes: LOS = Level of Service
More details on the intersection level of service analysis including calculation sheets for each of the study
intersections under the three evaluation scenarios are included in Appendix C.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 112 of 217
12
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Traffic Recommendations
Considerations & Evacuation Strategy
The goal of any evacuation event is to move as much traffic as possible in the shortest amount of time. Generally,
with mass evacuations, traffic delay can last for hours. It is assumed that any fire event will require residents to
leave the immediate area of the City by using major regional routes such as US 101 and SR 41. Some traffic will
seek back roads out of the area, but for the purposes of this evacuation analysis, it was assumed that all of the
evacuating traffic would seek destinations to one of the three regional routes, north on US 101, south on US 101
and either west or east on SR 41. Following is a summary of the Strategy and Action Items to facilitate vehicle
evaculation during fire or other natural disaster events.
Strategy 1 – Increase vehicle capacity for evacuating traffic at US 101
interchanges.
The City of Atascadero has the luxury of having eight interchanges with US 101. However, with the exception of
the SR 41 interchange, most of these have low vehicle capacity due to the two-lane overpasses. Therefore, the
action items that are recommended were structured to utilize as many interchanges as possible and to increase
the capacity of these interchanges by eliminating off-ramp traffic and traffic from the side of the freeway that is
not in peril. These closures would allow evacuating traffic to access the northbound or southbound ramps without
any conflicts from other traffic competing for available capacity.
Strategy 2 – Increase vehicle capacity at intersections projected to operate
deficiently.
Based on the intersection level of service analysis as well as the review of the evacuation trips, recommended
actions such as closing roadways, modifying traffic signal operation, and providing manual traffic controls were
made at selected intersections for each scenario. These action items are intended to favor capacity for evacuation
routes and increase the capacity of the intersection and facilitate traffic flow during periods of increased traffic
demand.
Strategy 3 – Provide manual traffic control at all-way stop controlled intersections.
There are a number of intersections on local residential and collector streets in Atascadero which are controlled
by all-way Stops. An all-way stop controlled intersection is the lowest capacity traffic control device. Increased
traffic demand on focused approaches will result in excessive queues due to the capacity profile. Action items are
presented in the recommendations to provide manual traffic control at key all-way stop controlled intersections,
especially at those intersections which are key outlets from residential neighborhoods.
Additional Notes
The recommendations include a number of action items calling for manual traffic control by police and local
City staff. A prioritized list of these intersections under each scenario are shown.
It should be noted that use of contra flow lanes (i.e., converting a two-lane two-way roadway to two-lane one-
way) was considered, but dismissed due to the preponderance of two-lane roads and single lane access to US
101 ramps.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 113 of 217
13
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Information on the time to evacuate traffic was requested but cannot accurately be provided due to the level
of complexity and unknown factors during an evaculation. Evaculation should start as early as possible to
ensure the safety of local residents.
Scenario A Evacuation Recommendations
Following is a summary of the Action Items recommended for an evacuation that is typified by Scenario A.
These action items are also depicted in Figure 6 including the priority list of manual traffic control locations.
Del Rio Road Interchange
Close NB and SB Offramps
Close Del Rio Road (West of ECR)
Traffic Signals at interchange ramps go to flashing yellow.
San Anselmo Road Interchange
Close NB and SB Offramps
Close San Anselmo Road (West of ECR)
Ramp intersections are uncontrolled, therefore, no changes would be needed since traffic would have
free access onto freeway due to road closures.
San Anselmo Road/Monterey Road (all-way stop) - Provide manual traffic control.
Santa Lucia Road/Portola Road
Provide manual traffic control at existing all-way stop.
Traffic Way Interchange
Close NB and SB Offramps
Close Traffic Way (West of ECR)
All evacuation movements directed to US 101 SB on-ramp.
Santa Lucia Road/Ardilla Avenue (all-way stop) – Provide manual traffic control.
SR41 Corridor
SR41/San Gabriel Road – Place traffic signal operation on flashing with manual traffic control
SR41/Portola Road - Place traffic signal operation on flashing with manual traffic control
SR41/Curbaril Avenue – Place traffic signal operation on flashing yellow for SR41 approaches and on
flashing red for Curbaril Avenue approaches.
SR41/Atascadero Avenue - Place traffic signal operation on flashing yellow for SR41 approaches and on
flashing red for Atascadero Avenue approaches.
SR 41 Interchange
Close NB and SB Offramps
SR41/101 SB Ramps - Provide manual traffic control.
SR41/El Camino Avenue - Provide manual traffic control.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 114 of 217
14
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Curbaril Interchange
Close NB and SB Offramps
Close Curbaril Avenue (West of San Luis Avenue)
Provide manual traffic control at all-way stop controlled intersections of Curbaril Avenue/101 SB ramps,
Curbaril Avenue/Cristobal Ave.-Marchant Ave., and Curbaril Avenue/Atascadero Avenue.
Santa Rosa Road Interchange
Close NB and SB Offramps
Close Santa Rosa Road (West of ECR)
Close East Front Street (North of Montecito Avenue)
Traffic Signals at interchange ramps go to flashing yellow.
Provide manual traffic control at all-way stop controlled intersections of Santa Rosa Road/Atascadero
Avenue and Portola Road/Atascadero Avenue
US 101 Freeway
Coordinate with Caltrans and the California Highway Patrol to place the following changeable message
signs:
o NB - All Atascadero traffic exit at Santa Barbara Road Only
o SB - All Atascadero traffic exit at San Ramon Road/Santa Cruz Road Only
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 115 of 217
Emergency Evacuation Traffic Planning Study
Figure 6 – Scenario A Recommendations
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 116 of 217
16
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Scenario B Evacuation Recommendations
Following is a summary of the Action Items recommended for an evacuation that is typified by Scenario B. These
action items are also depicted in Figure 7 including the priority list of manual traffic control locations.
Del Rio Road Interchange
Close NB and SB Offramps
Close Del Rio Road (West of ECR)
Traffic Signals at interchange ramps go to flashing yellow.
San Anselmo Road Interchange
Close NB and SB Offramps
Close San Anselmo Road (West of ECR)
Ramp intersections are uncontrolled, therefore, no changes would be needed since traffic would have
free access onto freeway due to road closures.
San Anselmo Road/Monterey Road (all-way stop) - Provide manual traffic control.
Santa Lucia Road/Portola Road
Provide manual traffic control at existing all-way stop.
Traffic Way Interchange
Close NB and SB Offramps
Close Traffic Way (West of ECR)
All evacuation movements directed to US 101 SB on-ramp.
Santa Lucia Road/Ardilla Avenue (all-way stop) – Provide manual traffic control.
SR41 Corridor
SR41/San Gabriel Road – Place traffic signal operation on flashing with manual traffic control
SR41/Portola Road - Place traffic signal operation on flashing with manual traffic control
SR41/Curbaril Avenue – Place traffic signal operation on flashing yellow for SR41 approaches and on
flashing red for Curbaril Avenue approaches.
SR41/Atascadero Avenue - Place traffic signal operation on flashing yellow for SR41 approaches and on
flashing red for Atascadero Avenue approaches.
SR 41 Interchange
Close NB and SB Offramps
SR41/101 SB Ramps - Provide manual traffic control.
SR41/El Camino Avenue - Provide manual traffic control.
Curbaril Interchange
Close NB and SB Offramps
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 117 of 217
17
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
US 101 Freeway
Coordinate with Caltrans and the California Highway Patrol to place the following changeable message
signs:
o NB - All Atascadero traffic exit at Santa Barbara Road Only
o SB - All Atascadero traffic exit at San Ramon Road/Santa Cruz Road Only
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 118 of 217
Emergency Evacuation Traffic Planning Study
Figure 7 – Scenario B Recommendations
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 119 of 217
19
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 14, 2021
Scenario C Evacuation Recommendations
Following is a summary of the Action Items recommended for an evacuation that is typified by Scenario C. These
action items are also depicted in Figure 8 including the priority list of manual traffic control locations.
Del Rio Road Interchange
Close NB and SB Offramps
Close Del Rio Road (West of 101 Ramps)
Traffic Signals at interchange ramps go to flashing yellow.
Del Rio Road/El Camino Real - Place traffic signal operation on flashing with manual traffic control
San Anselmo Road Interchange
Close NB and SB Offramps
Close San Anselmo Road (West of 101 Ramps)
Ramp intersections are uncontrolled, therefore, no changes would be needed since traffic would have
free access onto freeway due to road closures.
San Anselmo Road/El Camino Real - Place traffic signal operation on flashing with manual traffic control
Traffic Way Interchange
Close NB and SB Offramps
Close Traffic Way (West of 101 Ramps)
All evacuation movements directed to US 101 SB on-ramp.
Traffic Way/El Camino Real - Place traffic signal operation on flashing with manual traffic control
SR 41 Interchange
Close NB and SB Offramps
SR41/101 SB Ramps - Provide manual traffic control.
SR41/El Camino Avenue - Provide manual traffic control.
Curbaril Interchange
Close NB and SB Offramps
US 101 Freeway
Coordinate with Caltrans and the California Highway Patrol to place the following changeable message
signs:
o NB - All Atascadero traffic exit at Santa Barbara Road Only
o SB - All Atascadero traffic exit at San Ramon Road/Santa Cruz Road Only
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 120 of 217
Emergency Evacuation Traffic Planning Study
Figure 8 – Scenario C Recommendations
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1
Page 121 of 217
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 2021
Appendix A
Evacuation Routes & Paths
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 122 of 217
Emergency Evacuation Traffic Planning Study
Figure A1 - Scenario A Zone 3
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 123 of 217
Emergency Evacuation Traffic Planning Study
Figure A2 - Scenario A Zone 7
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 124 of 217
Emergency Evacuation Traffic Planning Study
Figure A3 - Scenario A Zone 8
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 125 of 217
Emergency Evacuation Traffic Planning Study
Figure B1 - Scenario B Zone 1
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 126 of 217
Emergency Evacuation Traffic Planning Study
Figure B2 – Scenario B Zone 2
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 127 of 217
Emergency Evacuation Traffic Planning Study
Figure B3 – Scenario B Zone 4
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 128 of 217
Emergency Evacuation Traffic Planning Study
Figure C1 – Scenario C Zone 15
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 129 of 217
Emergency Evacuation Traffic Planning Study
Figure C2 – Scenario C Zone 16
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 130 of 217
Emergency Evacuation Traffic Planning Study
Figure C3 – Scenario C Zone 18
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 131 of 217
ii
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 8, 2021
Appendix B
Traffic Volume Estimates
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 132 of 217
Scenario A Routes and Traffic VolumesDestination Route # (see maps)Total Distance (Miles)Total Time (Minutes)%No. of VehiclesDirection Street Direction Street Direction Street Direction Street Direction Street Direction Street Direction StreetZone 3101 N @ San Anselmo Rd 24.1 818 143SE Santa Lucia North Portola Rd East Ardilla Ave NE San Anselmo Rd North US‐101101 N @ Del Rio Rd 14.8 1017 135SE Santa Lucia NE Santa Ana Rd NE Graves Creek Rd/San Benito Rd North Monterey Rd East Del Rio Rd North US‐101101 S @ San Anselmo Rd 248864SE Santa Lucia North Portola Rd East Ardilla Ave NE San Anselmo Rd South US‐101101 S @ Traffic Way33.9 812 96SE Santa Lucia South US‐101101 S @ CA‐41 45.4 1420 159SE Santa Lucia South Portola Rd East CA‐41 South US‐101SR 41 E @ El Camino Real 56.3 1125199SE Santa Lucia South El Camino Real East CA‐41100 796Zone 7101 N @ CA‐41 26.1 1418 64SE San Marcos Rd SE Los Altos Rd East CA‐41 North US‐101101 N @ Curbaril 16.5 1417 60SE San Marcos Rd SE Los Altos Rd East CA‐41 East Curbaril Ave North US‐101101 S @ CA‐41 26.1 1420 71SE San Marcos Rd SE Los Altos Rd East CA‐41 South US‐101101 S @ Santa Rosa Rd 35.2 1220 71SE San Marcos Rd East CA‐41 East Santa Rosa Road South US‐101SR 41 E @ Los Altos Rd 41.4 52589SE San Marcos Rd SE Los Altos Rd East CA‐41100 354Zone 8101 N @ San Anselmo Rd 24.1 918 149NE Escondido Rd North San Gabriel Rd East Santa Lucia Rd North Portola Rd North San Anselmo Rd North US‐101101 N @ Del Rio Rd 13.9 1017 141NE Escondido Rd North San Gabriel Rd North Santa Ana Rd North Graves Creek Rd North Monterey Rd East Del Rio North US‐101101 S @ Santa Rosa Rd 43.6 920 166NE San Marcos Rd NE Monita Rd SE San Gabriel Rd East CA‐41 South Santa Rosa Rd South US‐101101 S @ CA‐41 33.6 1220 166NE San Marcos Rd NE Monita Rd SE San Gabriel Rd East CA‐41 South US‐101SR 41 E @ El Camino Real 5 3.5 1210 83NE Escondido Rd North San Gabriel Rd East Santa Lucia Rd South El Camino Real East CA‐41SR 41 E @ San Gabriel61.9 515125SE San Marcos Rd South San Gabriel Rd East CA‐41100 830Step 7Westerly WindStep 6Starting Point: San Marcos Rd at Escondido RdStarting Point: Santa Lucia Rd at Lomitas RdStarting Point: 12040 San Marcos RdStep 1 Step 2 Step 3 Step 4 Step 5ITEM NUMBER: C-2DATE: 10/26/21ATTACHMENT: 1APage 133 of 217
Turning Movement Volume: Summary
7/13/2021Report File: N:\...\Scenario A Intersections.pdf
Scenario 1 Scenario AVistro File: N:\...\ATA038.ProjectVolume.vistro
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/Rosario Ave-
US NB On-Ramp7
Intersection NameID
0
Total
Volume
0
Right
0
Left
Eastbound
0
Right
0
Thru
Southbound
0
Thru
0
Left
Northbound
San Anselmo Rd/El Camino
Real6
Intersection NameID
293
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
293
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 NB
Ramps5
Intersection NameID
357
Total
Volume
0
Right
0
Thru
0
Left
Westbound
64
Right
293
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 SB
Ramps4
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/El Camino Real3
Intersection NameID
276
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
276
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/US 101 NB Ramp2
Intersection NameID
276
Total
Volume
0
Thru
0
Left
Westbound
0
Right
276
Thru
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Left
Northbound
Del Rio Rd/US 101 SB Ramp1
Intersection NameID
Scenario A Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 134 of 217
60
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
60
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 NB Ramps15
Intersection NameID
60
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
60
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 SB Ramps14
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/US 101 NB
Ramps (S of Atascadero)13
Intersection NameID
297
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
214
Thru
0
Left
Eastbound
0
Right
0
Thru
83
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/El Camino Real12
Intersection NameID
673
Total
Volume
0
Right
0
Thru
0
Left
Westbound
395
Right
278
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR41/US 101 SB Ramps11
Intersection NameID
282
Total
Volume
0
Right
0
Thru
0
Left
Westbound
83
Right
199
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/El Camino Real10
Intersection NameID
282
Total
Volume
0
Thru
0
Left
Westbound
0
Right
282
Thru
Eastbound
0
Right
0
Left
Northbound
Traffic Wy/US 101 NB Off-
Ramp9
Intersection NameID
378
Total
Volume
0
Right
0
Thru
0
Left
Westbound
96
Right
282
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/US 101 SB Ramps8
Intersection NameID
Scenario A Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 135 of 217
733
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
574
Thru
0
Left
Eastbound
0
Right
0
Thru
159
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Portola Rd23
Intersection NameID
810
Total
Volume
0
Thru
0
Left
Westbound
236
Right
574
Thru
Eastbound
0
Right
0
Left
Northbound
SR 41/Santa Rosa Rd22
Intersection NameID
810
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
354
Thru
0
Left
Eastbound
0
Right
0
Thru
456
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/San Gabriel Rd21
Intersection NameID
354
Total
Volume
0
Right
0
Thru
Westbound
0
Thru
0
Left
Eastbound
0
Right
354
Left
Southbound
SR 41/Los Altos Rd20
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/El Camino Real19
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 NB
Ramps18
Intersection NameID
237
Total
Volume
0
Right
0
Thru
0
Left
Westbound
166
Right
71
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 SB
Ramps17
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/El Camino Real16
Intersection NameID
Scenario A Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 136 of 217
496
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
297
Thru
0
Left
Eastbound
0
Right
0
Thru
199
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Mercedes Ave26
Intersection NameID
673
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
673
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/ Atascadero Ave25
Intersection NameID
733
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
60
Right
673
Thru
0
Left
Northbound
SR 41/Curbaril Ave24
Intersection NameID
Scenario A Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 137 of 217
Scenario B Routes and Traffic VolumesDestination Route # (see maps)Total Distance (Miles)Total Time (Minutes)%No. of VehiclesDirection Street Direction Street Direction Street Direction Street Direction Street Direction StreetZone 1101 N @ Del Rio Rd21.3 425 300East Del Rio Rd North US‐101101 N @ San Ramon Rd 12.5 620 240East Del Rio Rd North San Ramon Rd North US‐101101 S @ Del Rio Rd21.3 335 420East Del Rio Rd South US‐101SR 41 E @ CA‐101 34620240East Del Rio Rd South US‐101 East CA‐41100 1200Zone 2101 N @ Del Rio Rd11.6 420 340East Graves Creek Rd North Monterey Rd East Del Rio Rd North US‐101101 N @ San Anselmo Rd21.1 320 340East Graves Creek Rd South Monterey Rd East San Anselmo Rd North US‐101101 S @ San Anselmo Rd21.1 340 680East Graves Creek Rd South Monterey Rd East San Anselmo Rd South US‐101SR 41 E @ CA‐101 43.9 1020340East Graves Creek Rd South Monterey Rd East San Anselmo Rd South US‐101 East CA‐41100 1700Zone 4101 N @ San Anselmo Rd11.9 5 15159East Santa Lucia Rd North Portola Rd East Ardilla Rd North San Anselmo Rd North US‐101101 N @ San Anselmo Rd22.3 610 106East Santa Lucia Rd North Chaupline Ave North Vernado Ave West Ardilla Rd North San Anselmo Rd North US‐101101 N @ Rosario Ave 32.6 610 106East Santa Lucia Rd East Traffic Way North El Camino Real West Rosario Ave North US‐101101 S @ Traffic Way 42.2 440 425East Santa Lucia Rd North Ardilla Ave East Traffic Way South US‐101SR 41 E @ El Camino Real52.3 525266East Santa Lucia Rd South El Camino Real East CA‐41Westerly WindStarting Point: Del Rio Rd at La Canada LnStarting Point: Graves Creek Rd at Balboa RdStarting Point: Santa Lucia Rd at Cascabel RdStep 1 Step 2 Step 3 Step 4 Step 5 Step 6ITEM NUMBER: C-2DATE: 10/26/21ATTACHMENT: 1APage 138 of 217
Turning Movement Volume: Summary
7/6/2021Report File: N:\...\Scenario B Intersections.pdf
Scenario 2 Scenario BVistro File: N:\...\ATA038.ProjectVolume.vistro
106
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
106
Left
Northbound
El Camino Real/Rosario Ave-
US NB On-Ramp7
Intersection NameID
0
Total
Volume
0
Right
0
Left
Eastbound
0
Right
0
Thru
Southbound
0
Thru
0
Left
Northbound
San Anselmo Rd/El Camino
Real6
Intersection NameID
606
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
606
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 NB
Ramps5
Intersection NameID
1626
Total
Volume
0
Right
0
Thru
0
Left
Westbound
1020
Right
606
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 SB
Ramps4
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/El Camino Real3
Intersection NameID
640
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
640
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/US 101 NB Ramp2
Intersection NameID
1300
Total
Volume
0
Thru
0
Left
Westbound
660
Right
640
Thru
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Left
Northbound
Del Rio Rd/US 101 SB Ramp1
Intersection NameID
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 139 of 217
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 NB Ramps15
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 SB Ramps14
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/US 101 NB
Ramps (S of Atascadero)13
Intersection NameID
606
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
340
Thru
0
Left
Eastbound
0
Right
0
Thru
266
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/El Camino Real12
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR41/US 101 SB Ramps11
Intersection NameID
612
Total
Volume
0
Right
0
Thru
0
Left
Westbound
266
Right
240
Thru
106
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/El Camino Real10
Intersection NameID
612
Total
Volume
0
Thru
0
Left
Westbound
0
Right
612
Thru
Eastbound
0
Right
0
Left
Northbound
Traffic Wy/US 101 NB Off-
Ramp9
Intersection NameID
796
Total
Volume
0
Right
0
Thru
0
Left
Westbound
424
Right
372
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/US 101 SB Ramps8
Intersection NameID
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 140 of 217
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Portola Rd23
Intersection NameID
0
Total
Volume
0
Thru
0
Left
Westbound
0
Right
0
Thru
Eastbound
0
Right
0
Left
Northbound
SR 41/Santa Rosa Rd22
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/San Gabriel Rd21
Intersection NameID
0
Total
Volume
0
Right
0
Thru
Westbound
0
Thru
0
Left
Eastbound
0
Right
0
Left
Southbound
SR 41/Los Altos Rd20
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/El Camino Real19
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 NB
Ramps18
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 SB
Ramps17
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/El Camino Real16
Intersection NameID
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 141 of 217
240
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
240
Thru
0
Left
Northbound
San Ramon Rd/US 101 SB
Ramp (N of Atascadero)28
Intersection NameID
240
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
240
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/US 101 NB (N
of Atascadero)27
Intersection NameID
846
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
606
Thru
0
Left
Eastbound
0
Right
0
Thru
240
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Mercedes Ave26
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/ Atascadero Ave25
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Curbaril Ave24
Intersection NameID
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 142 of 217
Scenario C Routes and Traffic VolumesDestination Route # (see maps)Total Distance (Miles)Total Time (Minutes)%No. of VehiclesDirection Street Direction Street Direction Street Direction Street Direction Street Direction StreetZone 15101 S @ San Asnselmo Rd 31.4 420 228West San Benito Rd South El Camino Real West San Anselmo Rd South US‐101101 S @ San Asnselmo Rd 41.4 520 228South Colima Rd SW San Anselmo Rd South El Camino Real West San Anselmo Rd South US‐101101 N @ Del Rio Rd 21325 285West San Benito Rd North El Camino Real West Del Rio Rd North US‐101101 N @ San Ramon Rd 12.1 415 171West San Benito Rd North El Camino Real West San Ramon Rd North US‐101SR 41 W @ Portola Rd 53.8 710 114West San Benito Rd South El Camino Real West San Anselmo Rd South Portola Rd West CA‐41SR 41 W @ CA‐10162.8 710114West San Benito Rd South El Camino Real West San Anselmo Rd South US‐101 West CA‐41100 1140Zone 16101 N @ San Asnselmo Rd 32.7 418 299West Dolores Ave West San Anselmo Rd South El Camino Real West San Anselmo Rd North US‐101101 N @ Del Rio Rd 12.3 410 166West Dolores Ave North El Camino Real West Del Rio Rd North US‐101101 N @ Del Rio Rd 22.4 610 166West Dolores Ave NE San Anselmo Rd NW Del Rio Rd North US‐101101 S @ San Anselmo Rd 31.1 421 349West Dolores Ave South El Camino Real West San Anselmo Rd South US‐101101 S @ San Asnselmo Rd 41.8 620 332East Dolores Ave SW San Jacinto Ave North El Camino Real West San Anselmo Rd South US‐101SR 41 W @ San Anselmo Rd 52.4 68 133West Dolores Ave West San Anselmo Rd South El Camino Real West San Anselmo Rd South US‐101 West CA‐41SR 41 W @ El Camino Real62.3 67116West Dolores Ave South El Camino Real West CA‐41SR 41 W @ Portola Rd 73.7 96100West Dolores Ave West San Anselmo Rd South El Camino Real West San Anselmo Rd South Portola Rd West CA‐41100 1660Zone 18101 N @ Rosario Ave 20.7 320 402West Rosario Ave North US‐101101 N @ San Anselmo Rd 11.1 415 302South Bajada Ave SW Dulzura Ave West Nogales Ave West San Jacinto Ave North El Camino Real North US‐101101 S @ Traffic Way 31440 805South Bajada Ave SW Traffic Way South US‐101SR 41 W @ El Camino Real 41.3 425503West Rosario Ave South El Camino Real West CA‐41100 2012Step 2 Step 3 Step 4 Step 5 Step 6Easterly WindStarting Point: San Benito Rd at Colima RdStarting Point: Dolores Ave at Curvado CircleStarting Point: Bajada Ave at Rosario AveStep 1ITEM NUMBER: C-2DATE: 10/26/21ATTACHMENT: 1APage 143 of 217
Turning Movement Volume: Summary
7/6/2021Report File: N:\...\Scenario C Intersections.pdf
Scenario 3 Scenario CVistro File: N:\...\ATA038.ProjectVolume.vistro
1010
Total
Volume
0
Right
402
Thru
503
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
105
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/Rosario Ave-
US NB On-Ramp7
Intersection NameID
2209
Total
Volume
0
Right
0
Left
Eastbound
1584
Right
0
Thru
Southbound
0
Thru
625
Left
Northbound
San Anselmo Rd/El Camino
Real6
Intersection NameID
2209
Total
Volume
601
Right
1608
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 NB
Ramps5
Intersection NameID
1469
Total
Volume
0
Right
196
Thru
1273
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 SB
Ramps4
Intersection NameID
788
Total
Volume
0
Right
166
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
171
Thru
451
Left
Northbound
Del Rio Rd/El Camino Real3
Intersection NameID
617
Total
Volume
617
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/US 101 NB Ramp2
Intersection NameID
0
Total
Volume
0
Thru
0
Left
Westbound
0
Right
0
Thru
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Left
Northbound
Del Rio Rd/US 101 SB Ramp1
Intersection NameID
Scenario C Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 144 of 217
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 NB Ramps15
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 SB Ramps14
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/US 101 NB
Ramps (S of Atascadero)13
Intersection NameID
608
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
608
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/El Camino Real (S of
Atascadero)12
Intersection NameID
884
Total
Volume
0
Right
884
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR41/US 101 SB Ramps11
Intersection NameID
1413
Total
Volume
0
Right
805
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
608
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/El Camino Real10
Intersection NameID
805
Total
Volume
805
Thru
0
Left
Westbound
0
Right
0
Thru
Eastbound
0
Right
0
Left
Northbound
Traffic Wy/US 101 NB Off-
Ramp9
Intersection NameID
805
Total
Volume
0
Right
0
Thru
805
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/US 101 SB Ramps8
Intersection NameID
Scenario C Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 145 of 217
1080
Total
Volume
0
Right
884
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
196
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Portola Rd23
Intersection NameID
1080
Total
Volume
1080
Thru
0
Left
Westbound
0
Right
0
Thru
Eastbound
0
Right
0
Left
Northbound
SR 41/Santa Rosa Rd22
Intersection NameID
1080
Total
Volume
0
Right
1080
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/San Gabriel Rd21
Intersection NameID
1080
Total
Volume
0
Right
1080
Thru
Westbound
0
Thru
0
Left
Eastbound
0
Right
0
Left
Southbound
SR 41/Los Altos Rd20
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/El Camino Real19
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 NB
Ramps18
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 SB
Ramps17
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/El Camino Real16
Intersection NameID
Scenario C Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 146 of 217
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Ramon Rd/US 101 SB
Ramp (N of Atascadero)28
Intersection NameID
171
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
171
Left
Northbound
El Camino Real/US 101 NB (N
of Atascadero)27
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Mercedes Ave26
Intersection NameID
884
Total
Volume
0
Right
884
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/ Atascadero Ave25
Intersection NameID
884
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
884
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Curbaril Ave24
Intersection NameID
Scenario C Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 147 of 217
Turning Movement Volume: Summary
7/13/2021Report File: N:\...\Scenario A Intersections.pdf
Scenario 1 Scenario AVistro File: N:\...\ATA038.ProjectVolume.vistro
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/Rosario Ave-
US NB On-Ramp7
Intersection NameID
0
Total
Volume
0
Right
0
Left
Eastbound
0
Right
0
Thru
Southbound
0
Thru
0
Left
Northbound
San Anselmo Rd/El Camino
Real6
Intersection NameID
293
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
293
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 NB
Ramps5
Intersection NameID
357
Total
Volume
0
Right
0
Thru
0
Left
Westbound
64
Right
293
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 SB
Ramps4
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/El Camino Real3
Intersection NameID
276
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
276
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/US 101 NB Ramp2
Intersection NameID
276
Total
Volume
0
Thru
0
Left
Westbound
0
Right
276
Thru
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Left
Northbound
Del Rio Rd/US 101 SB Ramp1
Intersection NameID
Scenario A Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 148 of 217
60
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
60
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 NB Ramps15
Intersection NameID
60
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
60
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 SB Ramps14
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/US 101 NB
Ramps (S of Atascadero)13
Intersection NameID
297
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
214
Thru
0
Left
Eastbound
0
Right
0
Thru
83
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/El Camino Real12
Intersection NameID
673
Total
Volume
0
Right
0
Thru
0
Left
Westbound
395
Right
278
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR41/US 101 SB Ramps11
Intersection NameID
282
Total
Volume
0
Right
0
Thru
0
Left
Westbound
83
Right
199
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/El Camino Real10
Intersection NameID
282
Total
Volume
0
Thru
0
Left
Westbound
0
Right
282
Thru
Eastbound
0
Right
0
Left
Northbound
Traffic Wy/US 101 NB Off-
Ramp9
Intersection NameID
378
Total
Volume
0
Right
0
Thru
0
Left
Westbound
96
Right
282
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/US 101 SB Ramps8
Intersection NameID
Scenario A Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 149 of 217
733
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
574
Thru
0
Left
Eastbound
0
Right
0
Thru
159
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Portola Rd23
Intersection NameID
810
Total
Volume
0
Thru
0
Left
Westbound
236
Right
574
Thru
Eastbound
0
Right
0
Left
Northbound
SR 41/Santa Rosa Rd22
Intersection NameID
810
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
354
Thru
0
Left
Eastbound
0
Right
0
Thru
456
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/San Gabriel Rd21
Intersection NameID
354
Total
Volume
0
Right
0
Thru
Westbound
0
Thru
0
Left
Eastbound
0
Right
354
Left
Southbound
SR 41/Los Altos Rd20
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/El Camino Real19
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 NB
Ramps18
Intersection NameID
237
Total
Volume
0
Right
0
Thru
0
Left
Westbound
166
Right
71
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 SB
Ramps17
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/El Camino Real16
Intersection NameID
Scenario A Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 150 of 217
496
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
297
Thru
0
Left
Eastbound
0
Right
0
Thru
199
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Mercedes Ave26
Intersection NameID
673
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
673
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/ Atascadero Ave25
Intersection NameID
733
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
60
Right
673
Thru
0
Left
Northbound
SR 41/Curbaril Ave24
Intersection NameID
Scenario A Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 151 of 217
Emergency Evacuation Traffic Planning Study for the City of Atascadero
October 2021
Appendix C
Intersection Level of Service Calculations
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 152 of 217
HCM 6th Signalized Intersection Summary
1: US 101 SB Ramps & Del Rio Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 389 60 145 135 0000232091
Future Volume (veh/h) 0 389 60 145 135 0000232091
Initial Q (Qb), veh 000000 000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 0 1870 1870 1870 1870 0 1870 1870 1870
Adj Flow Rate, veh/h 0 418 65 156 145 0 249 0 98
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, %022220 222
Cap, veh/h 0 682 106 358 267 0 451 0 401
Arrive On Green 0.00 0.43 0.43 0.43 0.43 0.00 0.25 0.00 0.25
Sat Flow, veh/h 0 1580 246 330 619 0 1781 0 1585
Grp Volume(v), veh/h 0 0 483 301 0 0 249 0 98
Grp Sat Flow(s),veh/h/ln 0 0 1826 949 0 0 1781 0 1585
Q Serve(g_s), s 0.0 0.0 5.2 2.7 0.0 0.0 3.1 0.0 1.2
Cycle Q Clear(g_c), s 0.0 0.0 5.2 7.9 0.0 0.0 3.1 0.0 1.2
Prop In Lane 0.00 0.13 0.52 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 0 788 625 0 0 451 0 401
V/C Ratio(X)0.00 0.00 0.61 0.48 0.00 0.00 0.55 0.00 0.24
Avail Cap(c_a), veh/h 0 0 1153 868 0 0 1125 0 1001
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)0.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 5.6 6.1 0.0 0.0 8.2 0.0 7.5
Incr Delay (d2), s/veh 0.0 0.0 0.8 0.6 0.0 0.0 1.1 0.0 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.0 0.9 0.5 0.0 0.0 0.8 0.0 0.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 0.0 6.3 6.7 0.0 0.0 9.3 0.0 7.8
LnGrp LOS AAAAAA AAA
Approach Vol, veh/h 483 301 347
Approach Delay, s/veh 6.3 6.7 8.9
Approach LOS A A A
Timer - Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 14.9 10.4 14.9
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 7.2 5.1 9.9
Green Ext Time (p_c), s 2.0 1.3 1.1
Intersection Summary
HCM 6th Ctrl Delay 7.2
HCM 6th LOS A
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 153 of 217
HCM 6th Signalized Intersection Summary
2: US 101 NB Ramps & Del Rio Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 343 292 0 0 180 193 79 0 162 0 0 0
Future Volume (veh/h) 343 292 0 0 180 193 79 0 162 0 0 0
Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 0 0 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 373 317 0 0 196 210 86 0 176
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, %220022222
Cap, veh/h 453 276 0 0 444 476 345 0 307
Arrive On Green 0.54 0.54 0.00 0.00 0.54 0.54 0.19 0.00 0.19
Sat Flow, veh/h 496 514 0 0 826 885 1781 0 1585
Grp Volume(v), veh/h 690 0000406860176
Grp Sat Flow(s),veh/h/ln 1011 00001711 1781 0 1585
Q Serve(g_s), s 11.7 0.0 0.0 0.0 0.0 4.3 1.2 0.0 3.0
Cycle Q Clear(g_c), s 16.0 0.0 0.0 0.0 0.0 4.3 1.2 0.0 3.0
Prop In Lane 0.54 0.00 0.00 0.52 1.00 1.00
Lane Grp Cap(c), veh/h 730 00009203450307
V/C Ratio(X) 0.95 0.00 0.00 0.00 0.00 0.44 0.25 0.00 0.57
Avail Cap(c_a), veh/h 730 00009209580852
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 9.6 0.0 0.0 0.0 0.0 4.2 10.2 0.0 10.9
Incr Delay (d2), s/veh 21.1 0.0 0.0 0.0 0.0 0.3 0.4 0.0 1.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.0 0.0 0.0 0.0 0.0 0.6 0.4 0.0 0.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 30.7 0.0 0.0 0.0 0.0 4.5 10.5 0.0 12.6
LnGrp LOS C AAAAABAB
Approach Vol, veh/h 690 406 262
Approach Delay, s/veh 30.7 4.5 11.9
Approach LOS C A B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 9.8 20.0 20.0
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 5.0 18.0 6.3
Green Ext Time (p_c), s 0.8 0.0 1.8
Intersection Summary
HCM 6th Ctrl Delay 19.2
HCM 6th LOS B
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 154 of 217
HCM 6th Signalized Intersection Summary
3: El Camino Real & Del Rio Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 82 82 267 21 91 9 226 117 20 14 99 55
Future Volume (veh/h) 82 82 267 21 91 9 226 117 20 14 99 55
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 85 85 275 22 94 9 233 121 21 14 102 57
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, %222222222222
Cap, veh/h 233 200 324 109 299 25 269 939 796 118 470 263
Arrive On Green 0.20 0.20 0.20 0.20 0.20 0.21 0.15 0.50 0.50 0.07 0.42 0.41
Sat Flow, veh/h 641 980 1585 142 1464 125 1781 1870 1585 1781 1127 630
Grp Volume(v), veh/h 170 0 275 125 0 0 233 121 21 14 0 159
Grp Sat Flow(s),veh/h/ln 1620 0 1585 1730 0 0 1781 1870 1585 1781 0 1757
Q Serve(g_s), s 1.5 0.0 8.8 0.0 0.0 0.0 6.7 1.8 0.4 0.4 0.0 3.1
Cycle Q Clear(g_c), s 4.5 0.0 8.8 3.0 0.0 0.0 6.7 1.8 0.4 0.4 0.0 3.1
Prop In Lane 0.50 1.00 0.18 0.07 1.00 1.00 1.00 0.36
Lane Grp Cap(c), veh/h 433 0 324 433 0 0 269 939 796 118 0 733
V/C Ratio(X) 0.39 0.00 0.85 0.29 0.00 0.00 0.87 0.13 0.03 0.12 0.00 0.22
Avail Cap(c_a), veh/h 917 0 826 945 0 0 338 939 796 135 0 733
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 18.4 0.0 20.2 17.9 0.0 0.0 21.9 7.0 6.6 23.2 0.0 9.9
Incr Delay (d2), s/veh 0.2 0.0 2.4 0.5 0.0 0.0 14.9 0.3 0.1 0.2 0.0 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.7 0.0 3.2 1.3 0.0 0.0 3.5 0.6 0.1 0.1 0.0 1.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 18.6 0.0 22.7 18.4 0.0 0.0 36.8 7.3 6.7 23.3 0.0 10.6
LnGrp LOS B A C B A A D A A C A B
Approach Vol, veh/h 445 125 375 173
Approach Delay, s/veh 21.1 18.4 25.6 11.6
Approach LOS C B C B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.5 30.5 14.8 12.0 26.0 14.8
Change Period (Y+Rc), s 3.5 4.5 3.5 3.5 4.5 3.5
Max Green Setting (Gmax), s 4.5 26.0 28.0 10.5 20.0 28.0
Max Q Clear Time (g_c+I1), s 2.4 3.8 10.8 8.7 5.1 5.0
Green Ext Time (p_c), s 0.0 0.7 0.5 0.0 0.7 0.7
Intersection Summary
HCM 6th Ctrl Delay 20.8
HCM 6th LOS C
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 155 of 217
HCM 6th Signalized Intersection Summary
6: El Camino Real & San Anselmo Rd 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 336 26 153 7 20 0 241 217 21 6 200 240
Future Volume (veh/h) 336 26 153 7 20 0 241 217 21 6 200 240
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 357 28 163 7 21 0 256 231 22 6 213 255
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, %222222222222
Cap, veh/h 399 31 381 94 281 0 293 1142 108 11 674 293
Arrive On Green 0.24 0.24 0.24 0.20 0.20 0.00 0.16 0.35 0.35 0.01 0.19 0.19
Sat Flow, veh/h 1657 130 1585 462 1385 0 1781 3281 310 1781 3554 1546
Grp Volume(v), veh/h 385 0 163 28 0 0 256 124 129 6 213 255
Grp Sat Flow(s),veh/h/ln 1787 0 1585 1847 0 0 1781 1777 1814 1781 1777 1546
Q Serve(g_s), s 16.5 0.0 6.9 1.0 0.0 0.0 11.1 3.9 3.9 0.3 4.1 12.6
Cycle Q Clear(g_c), s 16.5 0.0 6.9 1.0 0.0 0.0 11.1 3.9 3.9 0.3 4.1 12.6
Prop In Lane 0.93 1.00 0.25 0.00 1.00 0.17 1.00 1.00
Lane Grp Cap(c), veh/h 430 0 381 374 0 0 293 618 631 11 674 293
V/C Ratio(X) 0.90 0.00 0.43 0.07 0.00 0.00 0.87 0.20 0.20 0.54 0.32 0.87
Avail Cap(c_a), veh/h 430 0 381 374 0 0 293 618 631 90 720 313
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.0 0.0 25.4 25.5 0.0 0.0 32.2 18.0 18.1 39.1 27.6 31.1
Incr Delay (d2), s/veh 23.8 0.0 3.5 0.4 0.0 0.0 23.9 0.2 0.2 35.0 0.3 21.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 9.7 0.0 2.7 0.5 0.0 0.0 6.4 1.5 1.5 0.2 1.6 6.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.8 0.0 28.9 25.9 0.0 0.0 56.1 18.2 18.2 74.1 27.8 52.3
LnGrp LOS D A C C AAEBBECD
Approach Vol, veh/h 548 28 509 474
Approach Delay, s/veh 45.7 25.9 37.3 41.6
Approach LOS DCDD
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 23.0 17.0 19.0 20.0 4.5 31.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 13.0 16.0 16.0 4.0 25.0
Max Q Clear Time (g_c+I1), s 18.5 13.1 14.6 3.0 2.3 5.9
Green Ext Time (p_c), s 0.2 0.0 0.3 0.1 0.0 1.1
Intersection Summary
HCM 6th Ctrl Delay 41.3
HCM 6th LOS D
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 156 of 217
HCM 6th Signalized Intersection Summary
10: El Camino Real & Traffic Way 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 5
HCM 6th Edition methodology cannot be performed with phasing conflicts.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 157 of 217
HCM 6th Signalized Intersection Summary
11: US 101 SB Ramps & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 6
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 158 of 217
HCM 6th Signalized Intersection Summary
12: El Camino Real & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 197 532 458 179 253 107 198 438 291 195 322 99
Future Volume (veh/h) 197 532 458 179 253 107 198 438 291 195 322 99
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.97 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1841 1856 1856 1841 1856 1856 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 205 554 477 186 264 111 206 456 303 203 335 103
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %343343333333
Cap, veh/h 358 673 1231 215 934 382 271 830 359 190 931 408
Arrive On Green 0.10 0.37 0.37 0.12 0.39 0.39 0.08 0.24 0.24 0.11 0.26 0.26
Sat Flow, veh/h 3428 1841 2768 1767 2418 989 3428 3526 1526 1767 3526 1546
Grp Volume(v), veh/h 205 554 477 186 189 186 206 456 303 203 335 103
Grp Sat Flow(s),veh/h/ln 1714 1841 1384 1767 1749 1658 1714 1763 1526 1767 1763 1546
Q Serve(g_s), s 6.6 31.7 13.4 12.0 8.6 9.0 6.8 13.2 22.0 12.5 9.0 4.4
Cycle Q Clear(g_c), s 6.6 31.7 13.4 12.0 8.6 9.0 6.8 13.2 22.0 12.5 9.0 4.4
Prop In Lane 1.00 1.00 1.00 0.60 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 358 673 1231 215 675 640 271 830 359 190 931 408
V/C Ratio(X) 0.57 0.82 0.39 0.87 0.28 0.29 0.76 0.55 0.84 1.07 0.36 0.25
Avail Cap(c_a), veh/h 358 673 1231 259 675 640 458 942 408 190 931 408
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.74 0.74 0.74 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 49.5 33.4 21.6 50.0 24.5 24.6 52.3 39.0 42.3 51.7 34.7 17.8
Incr Delay (d2), s/veh 1.6 8.3 0.7 22.2 1.0 1.1 4.4 0.6 13.6 83.8 0.3 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.9 15.3 4.4 6.6 3.7 3.7 3.1 5.7 9.5 9.9 3.8 2.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 51.1 41.7 22.3 72.2 25.5 25.8 56.7 39.5 55.9 135.6 35.0 18.2
LnGrp LOS D D C E C C E D E F C B
Approach Vol, veh/h 1236 561 965 641
Approach Delay, s/veh 35.8 41.1 48.3 64.1
Approach LOS D D D E
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 19.1 47.0 12.7 37.2 16.7 49.4 16.0 33.9
Change Period (Y+Rc), s 5.0 4.6 3.5 6.6 4.6 * 4.6 3.5 * 6.6
Max Green Setting (Gmax), s 17.0 37.8 15.5 26.0 11.5 * 45 12.5 * 31
Max Q Clear Time (g_c+I1), s 14.0 33.7 8.8 11.0 8.6 11.0 14.5 24.0
Green Ext Time (p_c), s 0.1 2.1 0.3 2.5 0.2 2.3 0.0 2.4
Intersection Summary
HCM 6th Ctrl Delay 45.6
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 159 of 217
HCM 6th Signalized Intersection Summary
13: El Camino Real & US 101 NB Ramps /Plaza Del Camino Driveway 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)000000000000
Future Volume (veh/h)000000000000
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 000000000000
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, %222222222222
Cap, veh/h 0 748 0 748 634 160 1421 0 160 1421
Arrive On Green 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sat Flow, veh/h 0 1870 1585 0 1870 1585 1781 3647 0 1781 3647 0
Grp Volume(v), veh/h 000000000000
Grp Sat Flow(s),veh/h/ln 0 1870 1585 0 1870 1585 1781 1777 0 1781 1777 0
Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Prop In Lane 0.00 1.00 0.00 1.00 1.00 0.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 748 0 748 634 160 1421 0 160 1421
V/C Ratio(X) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Avail Cap(c_a), veh/h 0 748 0 748 634 160 1421 0 160 1421
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Uniform Delay (d), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LnGrp LOS A A AAAAAAAA
Approach Vol, veh/h 0 A 0 0 0 A
Approach Delay, s/veh 0.0 0.0 0.0 0.0
Approach LOS
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 22.5 22.5 22.5 22.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 18.0 18.0 18.0 18.0
Max Q Clear Time (g_c+I1), s 0.0 0.0 0.0 0.0
Green Ext Time (p_c), s 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 0.0
HCM 6th LOS A
Notes
Unsignalized Delay for [EBR, SBR] is excluded from calculations of the approach delay and intersection delay.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 160 of 217
HCM 6th Signalized Intersection Summary
14: US 101 South Ramp & Santa Rosa 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 279 183 102 307 121 0 0 0 320 14 77
Future Volume (veh/h) 2 279 183 102 307 121 0 0 0 320 14 77
Initial Q (Qb), veh 000000 000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 2 303 199 111 334 132 348 15 0
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, %222222 222
Cap, veh/h 91 391 256 192 377 137 735 32
Arrive On Green 0.37 0.37 0.37 0.74 0.74 0.74 0.43 0.43 0.00
Sat Flow, veh/h 1 1057 691 228 1020 370 1711 74 0
Grp Volume(v), veh/h 504 0 0 577 0 0 363 0 0
Grp Sat Flow(s),veh/h/ln 1750 0 0 1618 0 0 1785 0 0
Q Serve(g_s), s 0.0 0.0 0.0 2.0 0.0 0.0 5.8 0.0 0.0
Cycle Q Clear(g_c), s 10.2 0.0 0.0 12.2 0.0 0.0 5.8 0.0 0.0
Prop In Lane 0.00 0.39 0.19 0.23 0.96 0.00
Lane Grp Cap(c), veh/h 738 0 0 706 0 0 767 0
V/C Ratio(X) 0.68 0.00 0.00 0.82 0.00 0.00 0.47 0.00
Avail Cap(c_a), veh/h 790 0 0 751 0 0 767 0
HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 0.86 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 11.2 0.0 0.0 4.7 0.0 0.0 8.2 0.0 0.0
Incr Delay (d2), s/veh 2.2 0.0 0.0 5.8 0.0 0.0 2.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.4 0.0 0.0 2.3 0.0 0.0 2.0 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 13.4 0.0 0.0 10.5 0.0 0.0 10.3 0.0 0.0
LnGrp LOS BAABAA BA
Approach Vol, veh/h 504 577 363 A
Approach Delay, s/veh 13.4 10.5 10.3
Approach LOS B B B
Timer - Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 18.8 21.2 18.8
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 12.2 7.8 14.2
Green Ext Time (p_c), s 0.9 1.0 0.6
Intersection Summary
HCM 6th Ctrl Delay 11.4
HCM 6th LOS B
Notes
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 161 of 217
HCM 6th Signalized Intersection Summary
15: East Front Road/US 101 North Ramp & Santa Rosa 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 10
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 72 396 78 8 332 337 193 171 76 0 0 0
Future Volume (veh/h) 72 396 78 8 332 337 193 171 76 0 0 0
Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 78 430 85 9 361 366 210 186 83
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, %222222222
Cap, veh/h 152 484 89 97 741 634 311 276 123
Arrive On Green 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Sat Flow, veh/h 126 1210 223 13 1853 1585 779 690 308
Grp Volume(v), veh/h 593 0 0 370 0 366 479 0 0
Grp Sat Flow(s),veh/h/ln 1559 0 0 1866 0 1585 1776 0 0
Q Serve(g_s), s 8.8 0.0 0.0 0.0 0.0 7.2 8.9 0.0 0.0
Cycle Q Clear(g_c), s 14.7 0.0 0.0 5.9 0.0 7.2 8.9 0.0 0.0
Prop In Lane 0.13 0.14 0.02 1.00 0.44 0.17
Lane Grp Cap(c), veh/h 726 0 0 839 0 634 710 0 0
V/C Ratio(X) 0.82 0.00 0.00 0.44 0.00 0.58 0.67 0.00 0.00
Avail Cap(c_a), veh/h 726 0 0 839 0 634 710 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.73 0.00 0.00 0.60 0.00 0.60 1.00 0.00 0.00
Uniform Delay (d), s/veh 11.4 0.0 0.0 9.0 0.0 9.4 9.9 0.0 0.0
Incr Delay (d2), s/veh 5.4 0.0 0.0 0.2 0.0 0.8 5.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.7 0.0 0.0 1.8 0.0 1.9 3.5 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 16.8 0.0 0.0 9.2 0.0 10.1 14.9 0.0 0.0
LnGrp LOS BAAAABBAA
Approach Vol, veh/h 593 736 479
Approach Delay, s/veh 16.8 9.7 14.9
Approach LOS B A B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 20.0 20.0 20.0
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 10.9 16.7 9.2
Green Ext Time (p_c), s 1.0 0.0 2.0
Intersection Summary
HCM 6th Ctrl Delay 13.4
HCM 6th LOS B
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 162 of 217
HCM 6th Signalized Intersection Summary
16: El Camino Real & Santa Rosa Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 11
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 219 4 309 4 25 19 412 681 4 9 617 309
Future Volume (veh/h) 219 4 309 4 25 19 412 681 4 9 617 309
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 231 4 325 4 26 20 434 717 4 9 649 325
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 336 6 620 8 50 39 356 1881 10 20 1174 509
Arrive On Green 0.19 0.19 0.19 0.06 0.06 0.06 0.20 0.52 0.52 0.01 0.33 0.33
Sat Flow, veh/h 1752 30 1583 139 902 694 1781 3623 20 1781 3554 1540
Grp Volume(v), veh/h 235 0 325 50 0 0 434 352 369 9 649 325
Grp Sat Flow(s),veh/h/ln 1783 0 1583 1734 0 0 1781 1777 1866 1781 1777 1540
Q Serve(g_s), s 11.0 0.0 14.1 2.5 0.0 0.0 18.0 10.7 10.7 0.5 13.5 16.1
Cycle Q Clear(g_c), s 11.0 0.0 14.1 2.5 0.0 0.0 18.0 10.7 10.7 0.5 13.5 16.1
Prop In Lane 0.98 1.00 0.08 0.40 1.00 0.01 1.00 1.00
Lane Grp Cap(c), veh/h 342 0 620 96 0 0 356 923 969 20 1174 509
V/C Ratio(X) 0.69 0.00 0.52 0.52 0.00 0.00 1.22 0.38 0.38 0.45 0.55 0.64
Avail Cap(c_a), veh/h 475 0 739 96 0 0 356 923 969 99 1174 509
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.36 0.00 0.36 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 33.9 0.0 21.0 41.3 0.0 0.0 36.0 13.0 13.0 44.2 24.7 25.6
Incr Delay (d2), s/veh 0.3 0.0 0.1 2.3 0.0 0.0 121.1 1.2 1.1 5.8 1.9 6.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.7 0.0 5.0 1.1 0.0 0.0 19.6 4.3 4.5 0.2 5.8 6.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 34.2 0.0 21.0 43.6 0.0 0.0 157.1 14.2 14.1 50.0 26.6 31.6
LnGrp LOS C A C D A A F B B D C C
Approach Vol, veh/h 560 50 1155 983
Approach Delay, s/veh 26.6 43.6 67.8 28.4
Approach LOS C D E C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 23.0 34.7 22.3 6.0 51.7 10.0
Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0
Max Green Setting (Gmax), s 18.0 23.0 24.0 5.0 36.0 5.0
Max Q Clear Time (g_c+I1), s 20.0 18.1 16.1 2.5 12.7 4.5
Green Ext Time (p_c), s 0.0 2.2 1.0 0.0 3.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 44.9
HCM 6th LOS D
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 163 of 217
HCM 6th Signalized Intersection Summary
17: San Gabriel Road & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 12
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 18 321 28 86 306 84 9 9 41 393 18 9
Future Volume (veh/h) 18 321 28 86 306 84 9 9 41 393 18 9
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 19 338 29 91 322 88 9 9 43 414 19 9
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %272272222222
Cap, veh/h 163 525 45 122 406 111 126 133 437 603 22 10
Arrive On Green 0.09 0.32 0.32 0.07 0.30 0.30 0.36 0.36 0.36 0.36 0.36 0.36
Sat Flow, veh/h 1781 1631 140 1781 1358 371 139 366 1207 1312 60 29
Grp Volume(v), veh/h 19 0 367 91 0 410 61 0 0 442 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1771 1781 0 1729 1712 0 0 1401 0 0
Q Serve(g_s), s 0.5 0.0 9.7 2.7 0.0 11.9 0.0 0.0 0.0 14.6 0.0 0.0
Cycle Q Clear(g_c), s 0.5 0.0 9.7 2.7 0.0 11.9 1.3 0.0 0.0 15.9 0.0 0.0
Prop In Lane 1.00 0.08 1.00 0.21 0.15 0.70 0.94 0.02
Lane Grp Cap(c), veh/h 163 0 570 122 0 517 696 0 0 635 0 0
V/C Ratio(X) 0.12 0.00 0.64 0.75 0.00 0.79 0.09 0.00 0.00 0.70 0.00 0.00
Avail Cap(c_a), veh/h 212 0 1168 440 0 1362 906 0 0 817 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 22.8 0.0 15.8 25.0 0.0 17.6 11.5 0.0 0.0 16.0 0.0 0.0
Incr Delay (d2), s/veh 0.3 0.0 1.2 10.3 0.0 2.8 0.1 0.0 0.0 1.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 3.3 1.4 0.0 4.2 0.4 0.0 0.0 4.5 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 23.1 0.0 17.0 35.3 0.0 20.4 11.6 0.0 0.0 17.8 0.0 0.0
LnGrp LOS C A B D A C BAABAA
Approach Vol, veh/h 386 501 61 442
Approach Delay, s/veh 17.3 23.1 11.6 17.8
Approach LOS B C B B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 7.2 23.6 23.8 8.5 22.3 23.8
Change Period (Y+Rc), s 3.5 6.0 4.0 3.5 6.0 4.0
Max Green Setting (Gmax), s 13.5 36.0 27.0 6.5 43.0 27.0
Max Q Clear Time (g_c+I1), s 4.7 11.7 17.9 2.5 13.9 3.3
Green Ext Time (p_c), s 0.1 2.0 1.8 0.0 2.4 0.3
Intersection Summary
HCM 6th Ctrl Delay 19.3
HCM 6th LOS B
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 164 of 217
HCM 6th Signalized Intersection Summary
19: Portola Road & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 13
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 57 990 318 46 390 17 44 26 41 11 46 29
Future Volume (veh/h) 57 990 318 46 390 17 44 26 41 11 46 29
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 59 1031 331 48 406 18 46 27 43 11 48 30
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %272272222222
Cap, veh/h 91 831 267 80 1135 1001 136 54 65 76 111 63
Arrive On Green 0.05 0.64 0.64 0.04 0.63 0.63 0.11 0.11 0.11 0.11 0.11 0.11
Sat Flow, veh/h 1781 1303 418 1781 1796 1585 529 505 610 120 1038 589
Grp Volume(v), veh/h 59 0 1362 48 406 18 116 0 0 89 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1721 1781 1796 1585 1644 0 0 1747 0 0
Q Serve(g_s), s 2.1 0.0 40.6 1.7 6.8 0.3 1.1 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 2.1 0.0 40.6 1.7 6.8 0.3 4.1 0.0 0.0 3.0 0.0 0.0
Prop In Lane 1.00 0.24 1.00 1.00 0.40 0.37 0.12 0.34
Lane Grp Cap(c), veh/h 91 0 1097 80 1135 1001 255 0 0 250 0 0
V/C Ratio(X) 0.65 0.00 1.24 0.60 0.36 0.02 0.46 0.00 0.00 0.36 0.00 0.00
Avail Cap(c_a), veh/h 210 0 1097 185 1135 1001 794 0 0 848 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 29.7 0.0 11.5 29.8 5.6 4.4 27.2 0.0 0.0 26.7 0.0 0.0
Incr Delay (d2), s/veh 7.6 0.0 116.4 7.0 0.9 0.0 1.5 0.0 0.0 1.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 0.0 44.1 0.8 1.8 0.1 1.7 0.0 0.0 1.3 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 37.3 0.0 127.9 36.9 6.5 4.4 28.7 0.0 0.0 27.8 0.0 0.0
LnGrp LOS D A F D A A C A A C A A
Approach Vol, veh/h 1421 472 116 89
Approach Delay, s/veh 124.2 9.5 28.7 27.8
Approach LOS F A C C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.4 45.9 11.4 6.7 45.5 11.4
Change Period (Y+Rc), s 3.5 5.3 4.6 3.5 5.3 4.6
Max Green Setting (Gmax), s 6.6 40.6 29.4 7.5 39.7 29.4
Max Q Clear Time (g_c+I1), s 3.7 42.6 5.0 4.1 8.8 6.1
Green Ext Time (p_c), s 0.0 0.0 0.5 0.0 2.4 0.7
Intersection Summary
HCM 6th Ctrl Delay 89.0
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 165 of 217
HCM 6th Signalized Intersection Summary
20: Curbaril Ave & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 14
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 23 40 18 72 36 34 6 1073 153 60 520 29
Future Volume (veh/h) 23 40 18 72 36 34 6 1073 153 60 520 29
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 24 41 19 74 37 35 6 1106 158 62 536 30
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, %272272222222
Cap, veh/h 45 859 758 95 430 407 42 516 73 75 406 22
Arrive On Green 0.03 0.48 0.48 0.05 0.51 0.51 0.32 0.32 0.32 0.32 0.32 0.32
Sat Flow, veh/h 1781 1796 1585 1781 849 803 3 1607 229 94 1264 68
Grp Volume(v), veh/h 24 41 19 74 0 72 1270 0 0 628 0 0
Grp Sat Flow(s),veh/h/ln 1781 1796 1585 1781 0 1652 1839 0 0 1426 0 0
Q Serve(g_s), s 1.2 1.1 0.6 3.6 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 1.2 1.1 0.6 3.6 0.0 2.0 28.0 0.0 0.0 28.0 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.49 0.00 0.12 0.10 0.05
Lane Grp Cap(c), veh/h 45 859 758 95 0 837 632 0 0 503 0 0
V/C Ratio(X) 0.53 0.05 0.03 0.78 0.00 0.09 2.01 0.00 0.00 1.25 0.00 0.00
Avail Cap(c_a), veh/h 112 859 758 153 0 837 632 0 0 503 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 42.0 12.1 12.0 40.7 0.0 11.1 30.5 0.0 0.0 29.9 0.0 0.0
Incr Delay (d2), s/veh 7.1 0.1 0.1 9.6 0.0 0.2 459.7 0.0 0.0 127.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.4 0.2 1.7 0.0 0.7 93.8 0.0 0.0 28.3 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 49.0 12.2 12.1 50.4 0.0 11.3 490.2 0.0 0.0 156.9 0.0 0.0
LnGrp LOS D B B D A B F A A F A A
Approach Vol, veh/h 84 146 1270 628
Approach Delay, s/veh 22.7 31.1 490.2 156.9
Approach LOS C C F F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.2 47.0 32.0 5.7 49.5 32.0
Change Period (Y+Rc), s 3.5 5.3 4.0 3.5 5.3 4.0
Max Green Setting (Gmax), s 7.5 41.7 28.0 5.5 43.7 28.0
Max Q Clear Time (g_c+I1), s 5.6 3.1 30.0 3.2 4.0 30.0
Green Ext Time (p_c), s 0.0 0.2 0.0 0.0 0.4 0.0
Intersection Summary
HCM 6th Ctrl Delay 341.9
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 166 of 217
HCM 6th Signalized Intersection Summary
21: Atascadero Ave & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 15
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 110 724 42 11 54 70 31 478 14 68 540 128
Future Volume (veh/h) 110 724 42 11 54 70 31 478 14 68 540 128
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 121 796 46 12 59 77 34 525 15 75 593 141
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, %272272222222
Cap, veh/h 80 630 556 25 226 295 32 487 440 41 326 313
Arrive On Green 0.04 0.35 0.35 0.01 0.32 0.32 0.28 0.28 0.28 0.20 0.20 0.20
Sat Flow, veh/h 1781 1796 1585 1781 707 923 113 1751 1585 209 1651 1585
Grp Volume(v), veh/h 121 796 46 12 0 136 559 0 15 668 0 141
Grp Sat Flow(s),veh/h/ln 1781 1796 1585 1781 0 1630 1865 0 1585 1860 0 1585
Q Serve(g_s), s 5.0 39.1 2.2 0.7 0.0 6.9 31.0 0.0 0.8 22.0 0.0 8.7
Cycle Q Clear(g_c), s 5.0 39.1 2.2 0.7 0.0 6.9 31.0 0.0 0.8 22.0 0.0 8.7
Prop In Lane 1.00 1.00 1.00 0.57 0.06 1.00 0.11 1.00
Lane Grp Cap(c), veh/h 80 630 556 25 0 521 518 0 440 367 0 313
V/C Ratio(X) 1.52 1.26 0.08 0.48 0.00 0.26 1.08 0.00 0.03 1.82 0.00 0.45
Avail Cap(c_a), veh/h 80 630 556 80 0 571 518 0 440 367 0 313
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 53.3 36.2 24.2 54.6 0.0 28.2 40.3 0.0 29.4 44.8 0.0 39.5
Incr Delay (d2), s/veh 285.8 131.3 0.0 5.3 0.0 0.1 62.4 0.0 0.0 380.1 0.0 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 8.5 39.0 0.8 0.4 0.0 2.7 22.8 0.0 0.3 48.9 0.0 3.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 339.1 167.5 24.3 59.9 0.0 28.3 102.7 0.0 29.4 424.9 0.0 39.8
LnGrp LOS F F C E A C F A C F A D
Approach Vol, veh/h 963 148 574 809
Approach Delay, s/veh 182.2 30.8 100.8 357.8
Approach LOS F C F F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.6 44.4 26.0 9.0 41.0 35.6
Change Period (Y+Rc), s 4.0 5.3 4.0 4.0 5.3 4.6
Max Green Setting (Gmax), s 5.0 39.1 22.0 5.0 39.1 31.0
Max Q Clear Time (g_c+I1), s 2.7 41.1 24.0 7.0 8.9 33.0
Green Ext Time (p_c), s 0.0 0.0 0.0 0.0 0.4 0.0
Intersection Summary
HCM 6th Ctrl Delay 211.5
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 167 of 217
Turning Movement Volume: Summary
7/6/2021Report File: N:\...\Scenario B Intersections.pdf
Scenario 2 Scenario BVistro File: N:\...\ATA038.ProjectVolume.vistro
106
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
106
Left
Northbound
El Camino Real/Rosario Ave-
US NB On-Ramp7
Intersection NameID
0
Total
Volume
0
Right
0
Left
Eastbound
0
Right
0
Thru
Southbound
0
Thru
0
Left
Northbound
San Anselmo Rd/El Camino
Real6
Intersection NameID
606
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
606
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 NB
Ramps5
Intersection NameID
1626
Total
Volume
0
Right
0
Thru
0
Left
Westbound
1020
Right
606
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 SB
Ramps4
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/El Camino Real3
Intersection NameID
640
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
640
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/US 101 NB Ramp2
Intersection NameID
1300
Total
Volume
0
Thru
0
Left
Westbound
660
Right
640
Thru
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Left
Northbound
Del Rio Rd/US 101 SB Ramp1
Intersection NameID
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 168 of 217
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 NB Ramps15
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 SB Ramps14
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/US 101 NB
Ramps (S of Atascadero)13
Intersection NameID
606
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
340
Thru
0
Left
Eastbound
0
Right
0
Thru
266
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/El Camino Real12
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR41/US 101 SB Ramps11
Intersection NameID
612
Total
Volume
0
Right
0
Thru
0
Left
Westbound
266
Right
240
Thru
106
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/El Camino Real10
Intersection NameID
612
Total
Volume
0
Thru
0
Left
Westbound
0
Right
612
Thru
Eastbound
0
Right
0
Left
Northbound
Traffic Wy/US 101 NB Off-
Ramp9
Intersection NameID
796
Total
Volume
0
Right
0
Thru
0
Left
Westbound
424
Right
372
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/US 101 SB Ramps8
Intersection NameID
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 169 of 217
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Portola Rd23
Intersection NameID
0
Total
Volume
0
Thru
0
Left
Westbound
0
Right
0
Thru
Eastbound
0
Right
0
Left
Northbound
SR 41/Santa Rosa Rd22
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/San Gabriel Rd21
Intersection NameID
0
Total
Volume
0
Right
0
Thru
Westbound
0
Thru
0
Left
Eastbound
0
Right
0
Left
Southbound
SR 41/Los Altos Rd20
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/El Camino Real19
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 NB
Ramps18
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 SB
Ramps17
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/El Camino Real16
Intersection NameID
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 170 of 217
240
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
240
Thru
0
Left
Northbound
San Ramon Rd/US 101 SB
Ramp (N of Atascadero)28
Intersection NameID
240
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
240
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/US 101 NB (N
of Atascadero)27
Intersection NameID
846
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
606
Thru
0
Left
Eastbound
0
Right
0
Thru
240
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Mercedes Ave26
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/ Atascadero Ave25
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Curbaril Ave24
Intersection NameID
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 171 of 217
HCM 6th Signalized Intersection Summary
1: US 101 SB Ramps & Del Rio Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 753 720 145 135 0000232091
Future Volume (veh/h) 0 753 720 145 135 0000232091
Initial Q (Qb), veh 000000 000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 0 1870 1870 1870 1870 0 1870 1870 1870
Adj Flow Rate, veh/h 0 810 774 156 145 0 249 0 98
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, %022220 222
Cap, veh/h 0 451 431 175 111 0 410 0 365
Arrive On Green 0.00 0.51 0.51 0.51 0.51 0.00 0.23 0.00 0.23
Sat Flow, veh/h 0 879 840 0 217 0 1781 0 1585
Grp Volume(v), veh/h 0 0 1584 301 0 0 249 0 98
Grp Sat Flow(s),veh/h/ln 0 0 1719 217 0 0 1781 0 1585
Q Serve(g_s), s 0.0 0.0 16.0 0.0 0.0 0.0 3.9 0.0 1.6
Cycle Q Clear(g_c), s 0.0 0.0 16.0 16.0 0.0 0.0 3.9 0.0 1.6
Prop In Lane 0.00 0.49 0.52 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 0 882 287 0 0 410 0 365
V/C Ratio(X)0.00 0.00 1.80 1.05 0.00 0.00 0.61 0.00 0.27
Avail Cap(c_a), veh/h 0 0 882 287 0 0 914 0 814
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)0.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 7.6 9.7 0.0 0.0 10.7 0.0 9.8
Incr Delay (d2), s/veh 0.0 0.0 362.4 67.0 0.0 0.0 1.5 0.0 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.0 91.2 6.0 0.0 0.0 1.3 0.0 0.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 0.0 370.0 76.8 0.0 0.0 12.2 0.0 10.2
LnGrp LOS A A F F A A B A B
Approach Vol, veh/h 1584 301 347
Approach Delay, s/veh 370.0 76.8 11.6
Approach LOS F E B
Timer - Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 20.0 11.2 20.0
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 18.0 5.9 18.0
Green Ext Time (p_c), s 0.0 1.3 0.0
Intersection Summary
HCM 6th Ctrl Delay 274.7
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 172 of 217
HCM 6th Signalized Intersection Summary
2: US 101 NB Ramps & Del Rio Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 707 292 0 0 180 193 79 0 162 0 0 0
Future Volume (veh/h) 707 292 0 0 180 193 79 0 162 0 0 0
Initial Q (Qb), veh 0 00000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 0 0 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 768 317 0 0 196 210 86 0 176
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 20022222
Cap, veh/h 524 131 0 0 444 476 345 0 307
Arrive On Green 0.54 0.54 0.00 0.00 0.54 0.54 0.19 0.00 0.19
Sat Flow, veh/h 590 243 0 0 826 885 1781 0 1585
Grp Volume(v), veh/h 1085 0000406860176
Grp Sat Flow(s),veh/h/ln 833 00001711 1781 0 1585
Q Serve(g_s), s 11.7 0.0 0.0 0.0 0.0 4.3 1.2 0.0 3.0
Cycle Q Clear(g_c), s 16.0 0.0 0.0 0.0 0.0 4.3 1.2 0.0 3.0
Prop In Lane 0.71 0.00 0.00 0.52 1.00 1.00
Lane Grp Cap(c), veh/h 654 00009203450307
V/C Ratio(X) 1.66 0.00 0.00 0.00 0.00 0.44 0.25 0.00 0.57
Avail Cap(c_a), veh/h 654 00009209580852
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh10.9 0.0 0.0 0.0 0.0 4.2 10.2 0.0 10.9
Incr Delay (d2), s/veh 302.8 0.0 0.0 0.0 0.0 0.3 0.4 0.0 1.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln58.3 0.0 0.0 0.0 0.0 0.6 0.4 0.0 0.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 313.7 0.0 0.0 0.0 0.0 4.5 10.5 0.0 12.6
LnGrp LOS F AAAAABAB
Approach Vol, veh/h 1085 406 262
Approach Delay, s/veh 313.7 4.5 11.9
Approach LOS F A B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 9.8 20.0 20.0
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 5.0 18.0 6.3
Green Ext Time (p_c), s 0.8 0.0 1.8
Intersection Summary
HCM 6th Ctrl Delay 197.0
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 173 of 217
HCM 6th Signalized Intersection Summary
3: El Camino Real & Del Rio Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 82 82 267 21 91 9 226 117 20 14 99 55
Future Volume (veh/h) 82 82 267 21 91 9 226 117 20 14 99 55
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 85 85 275 22 94 9 233 121 21 14 102 57
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 2 22222222222
Cap, veh/h 233 200 324 109 299 25 269 939 796 118 470 263
Arrive On Green 0.20 0.20 0.20 0.20 0.20 0.21 0.15 0.50 0.50 0.07 0.42 0.41
Sat Flow, veh/h 641 980 1585 142 1464 125 1781 1870 1585 1781 1127 630
Grp Volume(v), veh/h 170 0 275 125 0 0 233 121 21 14 0 159
Grp Sat Flow(s),veh/h/ln1620 0 1585 1730 0 0 1781 1870 1585 1781 0 1757
Q Serve(g_s), s 1.5 0.0 8.8 0.0 0.0 0.0 6.7 1.8 0.4 0.4 0.0 3.1
Cycle Q Clear(g_c), s 4.5 0.0 8.8 3.0 0.0 0.0 6.7 1.8 0.4 0.4 0.0 3.1
Prop In Lane 0.50 1.00 0.18 0.07 1.00 1.00 1.00 0.36
Lane Grp Cap(c), veh/h 433 0 324 433 0 0 269 939 796 118 0 733
V/C Ratio(X) 0.39 0.00 0.85 0.29 0.00 0.00 0.87 0.13 0.03 0.12 0.00 0.22
Avail Cap(c_a), veh/h 917 0 826 945 0 0 338 939 796 135 0 733
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh18.4 0.0 20.2 17.9 0.0 0.0 21.9 7.0 6.6 23.2 0.0 9.9
Incr Delay (d2), s/veh 0.2 0.0 2.4 0.5 0.0 0.0 14.9 0.3 0.1 0.2 0.0 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln1.7 0.0 3.2 1.3 0.0 0.0 3.5 0.6 0.1 0.1 0.0 1.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 18.6 0.0 22.7 18.4 0.0 0.0 36.8 7.3 6.7 23.3 0.0 10.6
LnGrp LOS B A C B A A D A A C A B
Approach Vol, veh/h 445 125 375 173
Approach Delay, s/veh 21.1 18.4 25.6 11.6
Approach LOS C B C B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s7.5 30.5 14.8 12.0 26.0 14.8
Change Period (Y+Rc), s 3.5 4.5 3.5 3.5 4.5 3.5
Max Green Setting (Gmax), s4.5 26.0 28.0 10.5 20.0 28.0
Max Q Clear Time (g_c+I1), s2.4 3.8 10.8 8.7 5.1 5.0
Green Ext Time (p_c), s 0.0 0.7 0.5 0.0 0.7 0.7
Intersection Summary
HCM 6th Ctrl Delay 20.8
HCM 6th LOS C
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 174 of 217
HCM 6th TWSC
4: San Anselmo Avenue & US 101 South 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 4
Intersection
Int Delay, s/veh 25.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 937 1208 288 392 00001671176
Future Vol, veh/h 0 937 1208 288 392 00001671176
Conflicting Peds, #/hr 0 0000000085072
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 --------50
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 1018 1313 313 426 00001821191
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 2331 0 0 2812 3383 498
Stage 1 ------1052 1052 -
Stage 2 ------1760 2331 -
Critical Hdwy - - - 4.12 - - 6.42 6.52 6.22
Critical Hdwy Stg 1 ------5.42 5.52 -
Critical Hdwy Stg 2 ------5.42 5.52 -
Follow-up Hdwy - - - 2.218 - - 3.518 4.018 3.318
Pot Cap-1 Maneuver 0 - - ~ 212 - 0 ~ 20 8 572
Stage 1 0 ----0 336303-
Stage 2 0 ----0 ~ 15271-
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - ~ 212 - - 0 0 533
Mov Cap-2 Maneuver ------ 00-
Stage 1 ------ 3360-
Stage 2 ------ 00-
Approach EB WB SB
HCM Control Delay, s 0 118.7
HCM LOS -
Minor Lane/Major Mvmt EBT EBR WBL WBTSBLn1SBLn2
Capacity (veh/h) - - ~ 212 - - 533
HCM Lane V/C Ratio - - 1.477 - - 0.359
HCM Control Delay (s) - - 280.2 0 - 15.5
HCM Lane LOS - - F A - C
HCM 95th %tile Q(veh) - - 18.9 - - 1.6
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 175 of 217
HCM 6th TWSC
5: US 101 North & San Anselmo Avenue 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 5
Intersection
Int Delay, s/veh 10.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 741 252 0 0 415 214 174 0 397 0 0 0
Future Vol, veh/h 741 252 0 0 415 214 174 0 397 0 0 0
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length --------25---
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 22222222222
Mvmt Flow 805 274 0 0 451 233 189 0 432 0 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 684 0 - - - 0 2452 2568 274
Stage 1 ------1884 1884 -
Stage 2 ------568684-
Critical Hdwy 4.12 -----6.42 6.52 6.22
Critical Hdwy Stg 1 ------5.42 5.52 -
Critical Hdwy Stg 2 ------5.42 5.52 -
Follow-up Hdwy 2.218 -----3.518 4.018 3.318
Pot Cap-1 Maneuver 909 - 0 0 - - ~ 34 26 765
Stage 1 - - 0 0 - - ~ 131 119 -
Stage 2 - - 0 0 - - 567 449 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 909 -----00765
Mov Cap-2 Maneuver ------00-
Stage 1 ------00-
Stage 2 ------5670-
Approach EB WB NB
HCM Control Delay, s 22.8 0
HCM LOS -
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT WBT WBR
Capacity (veh/h) - 765 909 - - -
HCM Lane V/C Ratio - 0.564 0.886 - - -
HCM Control Delay (s) - 15.6 30.6 0 - -
HCM Lane LOS - C D A - -
HCM 95th %tile Q(veh) - 3.6 12.1 - - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 176 of 217
HCM 6th Signalized Intersection Summary
6: El Camino Real & San Anselmo Rd 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 336 26 153 7 20 0 241 217 21 6 200 240
Future Volume (veh/h) 336 26 153 7 20 0 241 217 21 6 200 240
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 357 28 163 7 21 0 256 231 22 6 213 255
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, %222222222222
Cap, veh/h 399 31 381 94 281 0 293 1142 108 11 674 293
Arrive On Green 0.24 0.24 0.24 0.20 0.20 0.00 0.16 0.35 0.35 0.01 0.19 0.19
Sat Flow, veh/h 1657 130 1585 462 1385 0 1781 3281 310 1781 3554 1546
Grp Volume(v), veh/h 385 0 163 28 0 0 256 124 129 6 213 255
Grp Sat Flow(s),veh/h/ln 1787 0 1585 1847 0 0 1781 1777 1814 1781 1777 1546
Q Serve(g_s), s 16.5 0.0 6.9 1.0 0.0 0.0 11.1 3.9 3.9 0.3 4.1 12.6
Cycle Q Clear(g_c), s 16.5 0.0 6.9 1.0 0.0 0.0 11.1 3.9 3.9 0.3 4.1 12.6
Prop In Lane 0.93 1.00 0.25 0.00 1.00 0.17 1.00 1.00
Lane Grp Cap(c), veh/h 430 0 381 374 0 0 293 618 631 11 674 293
V/C Ratio(X) 0.90 0.00 0.43 0.07 0.00 0.00 0.87 0.20 0.20 0.54 0.32 0.87
Avail Cap(c_a), veh/h 430 0 381 374 0 0 293 618 631 90 720 313
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.0 0.0 25.4 25.5 0.0 0.0 32.2 18.0 18.1 39.1 27.6 31.1
Incr Delay (d2), s/veh 23.8 0.0 3.5 0.4 0.0 0.0 23.9 0.2 0.2 35.0 0.3 21.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 9.7 0.0 2.7 0.5 0.0 0.0 6.4 1.5 1.5 0.2 1.6 6.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.8 0.0 28.9 25.9 0.0 0.0 56.1 18.2 18.2 74.1 27.8 52.3
LnGrp LOS D A C C AAEBBECD
Approach Vol, veh/h 548 28 509 474
Approach Delay, s/veh 45.7 25.9 37.3 41.6
Approach LOS DCDD
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 23.0 17.0 19.0 20.0 4.5 31.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 13.0 16.0 16.0 4.0 25.0
Max Q Clear Time (g_c+I1), s 18.5 13.1 14.6 3.0 2.3 5.9
Green Ext Time (p_c), s 0.2 0.0 0.3 0.1 0.0 1.1
Intersection Summary
HCM 6th Ctrl Delay 41.3
HCM 6th LOS D
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 177 of 217
HCM 6th TWSC
7: El Camino Real & US 10 NB On/Rosario Ave 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 7
Intersection
Int Delay, s/veh 10.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 44 7 27 253 529 78 27 486 4
Future Vol, veh/h 0 0 0 44 7 27 253 529 78 27 486 4
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length ------75--60--
Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 0 0 48 8 29 275 575 85 29 528 4
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1756 1758 330 532 0 0 660 0 0
Stage 1 1168 1168 -------
Stage 2 588 590 -------
Critical Hdwy 6.63 6.53 6.93 4.13 - - 4.13 - -
Critical Hdwy Stg 1 5.83 5.53 -------
Critical Hdwy Stg 2 5.43 5.53 -------
Follow-up Hdwy 3.519 4.019 3.319 2.219 - - 2.219 - -
Pot Cap-1 Maneuver 84 84 667 1034 - - 926 - -
Stage 1 259 267 -------
Stage 2 554 494 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 60 0 667 1034 - - 926 - -
Mov Cap-2 Maneuver 60 0 -------
Stage 1 190 0 -------
Stage 2 537 0 -------
Approach WB NB SB
HCM Control Delay, s 155.1 2.9 0.5
HCM LOS F
Minor Lane/Major Mvmt NBL NBT NBRWBLn1 SBL SBT SBR
Capacity (veh/h) 1034 - - 92 926 - -
HCM Lane V/C Ratio 0.266 - - 0.922 0.032 - -
HCM Control Delay (s) 9.7 - - 155.1 9 - -
HCM Lane LOS A - - F A - -
HCM 95th %tile Q(veh) 1.1 - - 5.2 0.1 - -
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 178 of 217
HCM 6th TWSC
8: US 101 South On & Traffic Way 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 8
Intersection
Int Delay, s/veh 134.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 665 520 178 386 00001621141
Future Vol, veh/h 0 665 520 178 386 00001621141
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - Stop
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 723 565 193 420 00001761153
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 1288 0 0 1812 2094 420
Stage 1 ------ 806806-
Stage 2 ------1006 1288 -
Critical Hdwy - - - 4.12 - - 6.42 6.52 6.22
Critical Hdwy Stg 1 ------5.42 5.52 -
Critical Hdwy Stg 2 ------5.42 5.52 -
Follow-up Hdwy - - - 2.218 - - 3.518 4.018 3.318
Pot Cap-1 Maneuver 0 - - 538 - 0 ~ 86 52 633
Stage 1 0 ----0 439395-
Stage 2 0 ----0 353234-
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - 538 - - ~ 46 0 633
Mov Cap-2 Maneuver ------ ~ 460-
Stage 1 ------ 4390-
Stage 2 ------ 1880-
Approach EB WB SB
HCM Control Delay, s 0 4.9 $ 901.8
HCM LOS F
Minor Lane/Major Mvmt EBT EBR WBL WBTSBLn1
Capacity (veh/h) - - 538 - 117
HCM Lane V/C Ratio - - 0.36 - 2.824
HCM Control Delay (s) - - 15.4 0$ 901.8
HCM Lane LOS - - C A F
HCM 95th %tile Q(veh) - - 1.6 - 30.7
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 179 of 217
HCM 6th TWSC
9: US 101 North Off & Traffic Way 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 9
Intersection
Int Delay, s/veh 131.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1056 0 0 415 155 261
Future Vol, veh/h 1056 0 0 415 155 261
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 22222
Mvmt Flow 1148 0 0 451 168 284
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 - - - 1599 574
Stage 1 - - - - 1148 -
Stage 2 - - - - 451 -
Critical Hdwy - - - - 6.63 6.93
Critical Hdwy Stg 1 - - - - 5.83 -
Critical Hdwy Stg 2 - - - - 5.43 -
Follow-up Hdwy - - - - 3.519 3.319
Pot Cap-1 Maneuver - 0 0 - ~ 106 463
Stage 1 - 0 0 - 265 -
Stage 2 - 0 0 - 641 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - - ~ 106 463
Mov Cap-2 Maneuver - - - - ~ 106 -
Stage 1 - - - - 265 -
Stage 2 - - - - 641 -
Approach EB WB NB
HCM Control Delay, s 0 0 $ 595.6
HCM LOS F
Minor Lane/Major Mvmt NBLn1 EBT WBT
Capacity (veh/h) 205 - -
HCM Lane V/C Ratio 2.206 - -
HCM Control Delay (s) $ 595.6 - -
HCM Lane LOS F - -
HCM 95th %tile Q(veh) 35.7 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 180 of 217
HCM 6th Signalized Intersection Summary
10: El Camino Real & Traffic Way 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 10
HCM 6th Edition methodology cannot be performed with phasing conflicts.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 181 of 217
HCM 6th Signalized Intersection Summary
11: US 101 SB Ramps & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 11
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 182 of 217
HCM 6th Signalized Intersection Summary
12: El Camino Real & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 12
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 197 658 458 179 253 107 198 438 291 378 322 99
Future Volume (veh/h) 197 658 458 179 253 107 198 438 291 378 322 99
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.97 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1841 1856 1856 1841 1856 1856 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 205 685 477 186 264 111 206 456 303 394 335 103
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 3 43343333333
Cap, veh/h 358 673 1231 215 934 382 271 830 359 190 931 408
Arrive On Green 0.10 0.37 0.37 0.12 0.39 0.39 0.08 0.24 0.24 0.11 0.26 0.26
Sat Flow, veh/h 3428 1841 2768 1767 2418 989 3428 3526 1526 1767 3526 1546
Grp Volume(v), veh/h 205 685 477 186 189 186 206 456 303 394 335 103
Grp Sat Flow(s),veh/h/ln1714 1841 1384 1767 1749 1658 1714 1763 1526 1767 1763 1546
Q Serve(g_s), s 6.6 42.4 13.4 12.0 8.6 9.0 6.8 13.2 22.0 12.5 9.0 4.4
Cycle Q Clear(g_c), s 6.6 42.4 13.4 12.0 8.6 9.0 6.8 13.2 22.0 12.5 9.0 4.4
Prop In Lane 1.00 1.00 1.00 0.60 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 358 673 1231 215 675 640 271 830 359 190 931 408
V/C Ratio(X) 0.57 1.02 0.39 0.87 0.28 0.29 0.76 0.55 0.84 2.07 0.36 0.25
Avail Cap(c_a), veh/h 358 673 1231 259 675 640 458 942 408 190 931 408
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.89 0.89 0.89 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh49.5 36.8 21.6 50.0 24.5 24.6 52.3 39.0 42.3 51.7 34.7 17.8
Incr Delay (d2), s/veh 2.0 37.3 0.8 22.2 1.0 1.1 4.4 0.6 13.6 498.7 0.3 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln2.9 25.3 4.4 6.6 3.7 3.7 3.1 5.7 9.5 31.8 3.8 2.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 51.5 74.0 22.4 72.2 25.5 25.8 56.7 39.5 55.9 550.5 35.0 18.2
LnGrp LOS D F C E C C E D E F C B
Approach Vol, veh/h 1367 561 965 832
Approach Delay, s/veh 52.6 41.1 48.3 277.0
Approach LOS D D D F
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s19.1 47.0 12.7 37.2 16.7 49.4 16.0 33.9
Change Period (Y+Rc), s 5.0 4.6 3.5 6.6 4.6 * 4.6 3.5 * 6.6
Max Green Setting (Gmax), s17.0 37.8 15.5 26.0 11.5 * 45 12.5 * 31
Max Q Clear Time (g_c+I1), s14.0 44.4 8.8 11.0 8.6 11.0 14.5 24.0
Green Ext Time (p_c), s 0.1 0.0 0.3 2.5 0.2 2.3 0.0 2.4
Intersection Summary
HCM 6th Ctrl Delay 99.9
HCM 6th LOS F
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 183 of 217
HCM 6th Signalized Intersection Summary
13: El Camino Real & US 101 NB Ramps /Plaza Del Camino Driveway 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 13
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 00000000000
Future Volume (veh/h) 0 00000000000
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 0 00000000000
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 22222222222
Cap, veh/h 0 748 0 748 634 160 1421 0 160 1421
Arrive On Green 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sat Flow, veh/h 0 1870 1585 0 1870 1585 1781 3647 0 1781 3647 0
Grp Volume(v), veh/h 0 00000000000
Grp Sat Flow(s),veh/h/ln 0 1870 1585 0 1870 1585 1781 1777 0 1781 1777 0
Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Prop In Lane 0.00 1.00 0.00 1.00 1.00 0.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 748 0 748 634 160 1421 0 160 1421
V/C Ratio(X) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Avail Cap(c_a), veh/h 0 748 0 748 634 160 1421 0 160 1421
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Uniform Delay (d), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LnGrp LOS A A AAAAAAAA
Approach Vol, veh/h 0 A 0 0 0 A
Approach Delay, s/veh 0.0 0.0 0.0 0.0
Approach LOS
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 22.5 22.5 22.5 22.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 18.0 18.0 18.0 18.0
Max Q Clear Time (g_c+I1), s 0.0 0.0 0.0 0.0
Green Ext Time (p_c), s 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 0.0
HCM 6th LOS A
Notes
Unsignalized Delay for [EBR, SBR] is excluded from calculations of the approach delay and intersection delay.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 184 of 217
HCM 6th Signalized Intersection Summary
14: US 101 South Ramp & Santa Rosa 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 14
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 208 17 102 307 121 0 0 0 320 14 77
Future Volume (veh/h) 2 208 17 102 307 121 0 0 0 320 14 77
Initial Q (Qb), veh 0 00000 000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 2 226 18 111 334 132 348 15 0
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 22222 222
Cap, veh/h 92 624 49 194 381 139 743 32
Arrive On Green 0.37 0.37 0.37 0.73 0.73 0.73 0.43 0.43 0.00
Sat Flow, veh/h 3 1706 135 237 1042 379 1711 74 0
Grp Volume(v), veh/h 246 0 0 577 0 0 363 0 0
Grp Sat Flow(s),veh/h/ln1844 0 0 1657 0 0 1785 0 0
Q Serve(g_s), s 0.0 0.0 0.0 8.1 0.0 0.0 5.8 0.0 0.0
Cycle Q Clear(g_c), s 3.9 0.0 0.0 12.0 0.0 0.0 5.8 0.0 0.0
Prop In Lane 0.01 0.07 0.19 0.23 0.96 0.00
Lane Grp Cap(c), veh/h 765 0 0 714 0 0 775 0
V/C Ratio(X) 0.32 0.00 0.00 0.81 0.00 0.00 0.47 0.00
Avail Cap(c_a), veh/h 828 0 0 768 0 0 775 0
HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 0.86 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 9.3 0.0 0.0 4.9 0.0 0.0 8.0 0.0 0.0
Incr Delay (d2), s/veh 0.2 0.0 0.0 5.3 0.0 0.0 2.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln1.2 0.0 0.0 2.2 0.0 0.0 2.0 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 9.5 0.0 0.0 10.1 0.0 0.0 10.1 0.0 0.0
LnGrp LOS A AABAA BA
Approach Vol, veh/h 246 577 363 A
Approach Delay, s/veh 9.5 10.1 10.1
Approach LOS A B B
Timer - Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 18.6 21.4 18.6
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 5.9 7.8 14.0
Green Ext Time (p_c), s 0.6 1.0 0.6
Intersection Summary
HCM 6th Ctrl Delay 10.0
HCM 6th LOS A
Notes
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 185 of 217
HCM 6th Signalized Intersection Summary
15: East Front Road/US 101 North Ramp & Santa Rosa 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 15
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 72 396 78 8 332 337 193 171 76 0 0 0
Future Volume (veh/h) 72 396 78 8 332 337 193 171 76 0 0 0
Initial Q (Qb), veh 0 00000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 78 430 85 9 361 366 210 186 83
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 22222222
Cap, veh/h 152 484 89 97 741 634 311 276 123
Arrive On Green 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Sat Flow, veh/h 126 1210 223 13 1853 1585 779 690 308
Grp Volume(v), veh/h 593 0 0 370 0 366 479 0 0
Grp Sat Flow(s),veh/h/ln1559 0 0 1866 0 1585 1776 0 0
Q Serve(g_s), s 8.8 0.0 0.0 0.0 0.0 7.2 8.9 0.0 0.0
Cycle Q Clear(g_c), s 14.7 0.0 0.0 5.9 0.0 7.2 8.9 0.0 0.0
Prop In Lane 0.13 0.14 0.02 1.00 0.44 0.17
Lane Grp Cap(c), veh/h 726 0 0 839 0 634 710 0 0
V/C Ratio(X) 0.82 0.00 0.00 0.44 0.00 0.58 0.67 0.00 0.00
Avail Cap(c_a), veh/h 726 0 0 839 0 634 710 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.95 0.00 0.00 0.60 0.00 0.60 1.00 0.00 0.00
Uniform Delay (d), s/veh11.4 0.0 0.0 9.0 0.0 9.4 9.9 0.0 0.0
Incr Delay (d2), s/veh 6.9 0.0 0.0 0.2 0.0 0.8 5.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln5.0 0.0 0.0 1.8 0.0 1.9 3.5 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 18.3 0.0 0.0 9.2 0.0 10.1 14.9 0.0 0.0
LnGrp LOS B AAAABBAA
Approach Vol, veh/h 593 736 479
Approach Delay, s/veh 18.3 9.7 14.9
Approach LOS B A B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 20.0 20.0 20.0
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 10.9 16.7 9.2
Green Ext Time (p_c), s 1.0 0.0 2.0
Intersection Summary
HCM 6th Ctrl Delay 13.9
HCM 6th LOS B
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 186 of 217
HCM 6th Signalized Intersection Summary
16: El Camino Real & Santa Rosa Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 16
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 219 4 309 4 25 19 412 681 4 9 617 309
Future Volume (veh/h) 219 4 309 4 25 19 412 681 4 9 617 309
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 231 4 325 4 26 20 434 717 4 9 649 325
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 22222222222
Cap, veh/h 336 6 620 8 50 39 356 1881 10 20 1174 509
Arrive On Green 0.19 0.19 0.19 0.06 0.06 0.06 0.20 0.52 0.52 0.01 0.33 0.33
Sat Flow, veh/h 1752 30 1583 139 902 694 1781 3623 20 1781 3554 1540
Grp Volume(v), veh/h 235 0 325 50 0 0 434 352 369 9 649 325
Grp Sat Flow(s),veh/h/ln1783 0 1583 1734 0 0 1781 1777 1866 1781 1777 1540
Q Serve(g_s), s 11.0 0.0 14.1 2.5 0.0 0.0 18.0 10.7 10.7 0.5 13.5 16.1
Cycle Q Clear(g_c), s 11.0 0.0 14.1 2.5 0.0 0.0 18.0 10.7 10.7 0.5 13.5 16.1
Prop In Lane 0.98 1.00 0.08 0.40 1.00 0.01 1.00 1.00
Lane Grp Cap(c), veh/h 342 0 620 96 0 0 356 923 969 20 1174 509
V/C Ratio(X) 0.69 0.00 0.52 0.52 0.00 0.00 1.22 0.38 0.38 0.45 0.55 0.64
Avail Cap(c_a), veh/h 475 0 739 96 0 0 356 923 969 99 1174 509
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.36 0.00 0.36 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh33.9 0.0 21.0 41.3 0.0 0.0 36.0 13.0 13.0 44.2 24.7 25.6
Incr Delay (d2), s/veh 0.3 0.0 0.1 2.3 0.0 0.0 121.1 1.2 1.1 5.8 1.9 6.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln4.7 0.0 5.0 1.1 0.0 0.0 19.6 4.3 4.5 0.2 5.8 6.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 34.2 0.0 21.0 43.6 0.0 0.0 157.1 14.2 14.1 50.0 26.6 31.6
LnGrp LOS C A C D A A F B B D C C
Approach Vol, veh/h 560 50 1155 983
Approach Delay, s/veh 26.6 43.6 67.8 28.4
Approach LOS C D E C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s23.0 34.7 22.3 6.0 51.7 10.0
Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0
Max Green Setting (Gmax), s18.0 23.0 24.0 5.0 36.0 5.0
Max Q Clear Time (g_c+I1), s20.0 18.1 16.1 2.5 12.7 4.5
Green Ext Time (p_c), s 0.0 2.2 1.0 0.0 3.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 44.9
HCM 6th LOS D
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 187 of 217
HCM 6th Signalized Intersection Summary
17: San Gabriel Road & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 17
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 18 321 28 86 306 84 9 9 41 39 18 9
Future Volume (veh/h) 18 321 28 86 306 84 9 9 41 39 18 9
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 19 338 29 91 322 88 9 9 43 41 19 9
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 72272222222
Cap, veh/h 257 647 56 151 458 125 139 41 141 264 75 26
Arrive On Green 0.14 0.40 0.40 0.08 0.34 0.34 0.12 0.12 0.12 0.12 0.12 0.12
Sat Flow, veh/h 1781 1631 140 1781 1358 371 149 327 1137 776 601 206
Grp Volume(v), veh/h 19 0 367 91 0 410 61 0 0 69 0 0
Grp Sat Flow(s),veh/h/ln1781 0 1771 1781 0 1729 1613 0 0 1583 0 0
Q Serve(g_s), s 0.3 0.0 5.4 1.7 0.0 7.1 0.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.3 0.0 5.4 1.7 0.0 7.1 1.1 0.0 0.0 1.2 0.0 0.0
Prop In Lane 1.00 0.08 1.00 0.21 0.15 0.70 0.59 0.13
Lane Grp Cap(c), veh/h 257 0 703 151 0 583 321 0 0 364 0 0
V/C Ratio(X) 0.07 0.00 0.52 0.60 0.00 0.70 0.19 0.00 0.00 0.19 0.00 0.00
Avail Cap(c_a), veh/h 338 0 1862 702 0 2171 1375 0 0 1357 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh12.7 0.0 7.9 15.1 0.0 9.9 13.6 0.0 0.0 13.6 0.0 0.0
Incr Delay (d2), s/veh 0.1 0.0 0.6 4.6 0.0 1.6 0.3 0.0 0.0 0.2 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln0.1 0.0 1.1 0.7 0.0 1.7 0.4 0.0 0.0 0.4 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 12.8 0.0 8.5 19.8 0.0 11.4 13.9 0.0 0.0 13.9 0.0 0.0
LnGrp LOS B AABABBAABAA
Approach Vol, veh/h 386 501 61 69
Approach Delay, s/veh 8.7 12.9 13.9 13.9
Approach LOS ABBB
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s6.4 19.6 8.3 8.4 17.5 8.3
Change Period (Y+Rc), s 3.5 6.0 4.0 3.5 6.0 4.0
Max Green Setting (Gmax), s13.5 36.0 27.0 6.5 43.0 27.0
Max Q Clear Time (g_c+I1), s3.7 7.4 3.2 2.3 9.1 3.1
Green Ext Time (p_c), s 0.2 2.1 0.3 0.0 2.5 0.3
Intersection Summary
HCM 6th Ctrl Delay 11.4
HCM 6th LOS B
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 188 of 217
HCM 6th TWSC
18: Santa Rosa Road & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 18
Intersection
Int Delay, s/veh 1.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 369 41 31 401 74 26
Future Vol, veh/h 369 41 31 401 74 26
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 100 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 91 91 91 91 91 91
Heavy Vehicles, % 7 22722
Mvmt Flow 405 45 34 441 81 29
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 450 0 937 428
Stage 1 - - - - 428 -
Stage 2 - - - - 509 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1110 - 294 627
Stage 1 - - - - 657 -
Stage 2 - - - - 604 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1110 - 285 627
Mov Cap-2 Maneuver - - - - 412 -
Stage 1 - - - - 657 -
Stage 2 - - - - 585 -
Approach EB WB NB
HCM Control Delay, s 0 0.6 15.5
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 452 - - 1110 -
HCM Lane V/C Ratio 0.243 - - 0.031 -
HCM Control Delay (s) 15.5 - - 8.3 -
HCM Lane LOS C - - A -
HCM 95th %tile Q(veh) 0.9 - - 0.1 -
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 189 of 217
HCM 6th Signalized Intersection Summary
19: Portola Road & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 19
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 57 416 82 46 390 17 44 26 41 11 46 29
Future Volume (veh/h) 57 416 82 46 390 17 44 26 41 11 46 29
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 59 433 85 48 406 18 46 27 43 11 48 30
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %272272222222
Cap, veh/h 91 930 183 80 1135 1001 136 54 65 76 111 63
Arrive On Green 0.05 0.64 0.64 0.04 0.63 0.63 0.11 0.11 0.11 0.11 0.11 0.11
Sat Flow, veh/h 1781 1458 286 1781 1796 1585 529 505 610 120 1038 589
Grp Volume(v), veh/h 59 0 518 48 406 18 116 0 0 89 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1745 1781 1796 1585 1644 0 0 1747 0 0
Q Serve(g_s), s 2.1 0.0 9.7 1.7 6.8 0.3 1.1 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 2.1 0.0 9.7 1.7 6.8 0.3 4.1 0.0 0.0 3.0 0.0 0.0
Prop In Lane 1.00 0.16 1.00 1.00 0.40 0.37 0.12 0.34
Lane Grp Cap(c), veh/h 91 0 1112 80 1135 1001 255 0 0 250 0 0
V/C Ratio(X) 0.65 0.00 0.47 0.60 0.36 0.02 0.46 0.00 0.00 0.36 0.00 0.00
Avail Cap(c_a), veh/h 210 0 1112 185 1135 1001 794 0 0 848 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 29.7 0.0 5.9 29.8 5.6 4.4 27.2 0.0 0.0 26.7 0.0 0.0
Incr Delay (d2), s/veh 7.6 0.0 1.4 7.0 0.9 0.0 1.5 0.0 0.0 1.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 0.0 2.5 0.8 1.8 0.1 1.7 0.0 0.0 1.3 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 37.3 0.0 7.3 36.9 6.5 4.4 28.7 0.0 0.0 27.8 0.0 0.0
LnGrp LOS D A A D A A C A A C A A
Approach Vol, veh/h 577 472 116 89
Approach Delay, s/veh 10.4 9.5 28.7 27.8
Approach LOS B A C C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.4 45.9 11.4 6.7 45.5 11.4
Change Period (Y+Rc), s 3.5 5.3 4.6 3.5 5.3 4.6
Max Green Setting (Gmax), s 6.6 40.6 29.4 7.5 39.7 29.4
Max Q Clear Time (g_c+I1), s 3.7 11.7 5.0 4.1 8.8 6.1
Green Ext Time (p_c), s 0.0 3.2 0.5 0.0 2.4 0.7
Intersection Summary
HCM 6th Ctrl Delay 13.0
HCM 6th LOS B
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 190 of 217
HCM 6th Signalized Intersection Summary
20: Curbaril Ave & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 20
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 23 40 18 72 36 34 6 400 93 60 520 29
Future Volume (veh/h) 23 40 18 72 36 34 6 400 93 60 520 29
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 24 41 19 74 37 35 6 412 96 62 536 30
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 2 72272222222
Cap, veh/h 45 859 758 95 430 407 44 473 109 80 444 24
Arrive On Green 0.03 0.48 0.48 0.05 0.51 0.51 0.32 0.32 0.32 0.32 0.32 0.32
Sat Flow, veh/h 1781 1796 1585 1781 849 803 6 1474 340 107 1381 75
Grp Volume(v), veh/h 24 41 19 74 0 72 514 0 0 628 0 0
Grp Sat Flow(s),veh/h/ln1781 1796 1585 1781 0 1652 1820 0 0 1563 0 0
Q Serve(g_s), s 1.2 1.1 0.6 3.6 0.0 2.0 0.0 0.0 0.0 4.6 0.0 0.0
Cycle Q Clear(g_c), s 1.2 1.1 0.6 3.6 0.0 2.0 23.4 0.0 0.0 28.0 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.49 0.01 0.19 0.10 0.05
Lane Grp Cap(c), veh/h 45 859 758 95 0 837 627 0 0 548 0 0
V/C Ratio(X) 0.53 0.05 0.03 0.78 0.00 0.09 0.82 0.00 0.00 1.15 0.00 0.00
Avail Cap(c_a), veh/h 112 859 758 153 0 837 627 0 0 548 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh42.0 12.1 12.0 40.7 0.0 11.1 28.0 0.0 0.0 30.3 0.0 0.0
Incr Delay (d2), s/veh 7.1 0.1 0.1 9.6 0.0 0.2 8.5 0.0 0.0 85.9 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln0.6 0.4 0.2 1.7 0.0 0.7 11.2 0.0 0.0 24.5 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 49.0 12.2 12.1 50.4 0.0 11.3 36.6 0.0 0.0 116.2 0.0 0.0
LnGrp LOS D B B D A B D A A F A A
Approach Vol, veh/h 84 146 514 628
Approach Delay, s/veh 22.7 31.1 36.6 116.2
Approach LOS C C D F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s8.2 47.0 32.0 5.7 49.5 32.0
Change Period (Y+Rc), s 3.5 5.3 4.0 3.5 5.3 4.0
Max Green Setting (Gmax), s7.5 41.7 28.0 5.5 43.7 28.0
Max Q Clear Time (g_c+I1), s5.6 3.1 30.0 3.2 4.0 25.4
Green Ext Time (p_c), s 0.0 0.2 0.0 0.0 0.4 0.9
Intersection Summary
HCM 6th Ctrl Delay 71.6
HCM 6th LOS E
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 191 of 217
HCM 6th Signalized Intersection Summary
21: Atascadero Ave & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 21
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 110 51 42 11 54 70 31 478 14 68 540 128
Future Volume (veh/h) 110 51 42 11 54 70 31 478 14 68 540 128
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 121 56 46 12 59 77 34 525 15 75 593 141
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, % 2 72272222222
Cap, veh/h 111 285 251 26 78 102 37 575 521 57 454 436
Arrive On Green 0.06 0.16 0.16 0.01 0.11 0.11 0.33 0.33 0.33 0.27 0.27 0.27
Sat Flow, veh/h 1781 1796 1585 1781 707 923 113 1751 1585 209 1651 1585
Grp Volume(v), veh/h 121 56 46 12 0 136 559 0 15 668 0 141
Grp Sat Flow(s),veh/h/ln1781 1796 1585 1781 0 1630 1865 0 1585 1860 0 1585
Q Serve(g_s), s 5.0 2.2 2.0 0.5 0.0 6.5 23.0 0.0 0.5 22.0 0.0 5.7
Cycle Q Clear(g_c), s 5.0 2.2 2.0 0.5 0.0 6.5 23.0 0.0 0.5 22.0 0.0 5.7
Prop In Lane 1.00 1.00 1.00 0.57 0.06 1.00 0.11 1.00
Lane Grp Cap(c), veh/h 111 285 251 26 0 180 612 0 521 511 0 436
V/C Ratio(X) 1.09 0.20 0.18 0.46 0.00 0.75 0.91 0.00 0.03 1.31 0.00 0.32
Avail Cap(c_a), veh/h 111 878 774 111 0 796 722 0 614 511 0 436
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh37.5 29.3 29.2 39.1 0.0 34.5 25.8 0.0 18.2 29.0 0.0 23.1
Incr Delay (d2), s/veh 110.8 0.1 0.1 4.6 0.0 2.4 13.4 0.0 0.0 151.6 0.0 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln5.5 0.9 0.7 0.3 0.0 2.6 11.7 0.0 0.2 31.0 0.0 2.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 148.3 29.4 29.3 43.8 0.0 36.9 39.2 0.0 18.2 180.7 0.0 23.3
LnGrp LOS F C C D A D D A B F A C
Approach Vol, veh/h 223 148 574 809
Approach Delay, s/veh 93.9 37.5 38.6 153.2
Approach LOS F D D F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s5.2 18.0 26.0 9.0 14.2 30.9
Change Period (Y+Rc), s 4.0 5.3 4.0 4.0 5.3 4.6
Max Green Setting (Gmax), s5.0 39.1 22.0 5.0 39.1 31.0
Max Q Clear Time (g_c+I1), s2.5 4.2 24.0 7.0 8.5 25.0
Green Ext Time (p_c), s 0.0 0.1 0.0 0.0 0.4 1.3
Intersection Summary
HCM 6th Ctrl Delay 98.4
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 192 of 217
Turning Movement Volume: Summary
7/6/2021Report File: N:\...\Scenario C Intersections.pdf
Scenario 3 Scenario CVistro File: N:\...\ATA038.ProjectVolume.vistro
1010
Total
Volume
0
Right
402
Thru
503
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
105
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/Rosario Ave-
US NB On-Ramp7
Intersection NameID
2209
Total
Volume
0
Right
0
Left
Eastbound
1584
Right
0
Thru
Southbound
0
Thru
625
Left
Northbound
San Anselmo Rd/El Camino
Real6
Intersection NameID
2209
Total
Volume
601
Right
1608
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 NB
Ramps5
Intersection NameID
1469
Total
Volume
0
Right
196
Thru
1273
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Anselmo Rd/US101 SB
Ramps4
Intersection NameID
788
Total
Volume
0
Right
166
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
171
Thru
451
Left
Northbound
Del Rio Rd/El Camino Real3
Intersection NameID
617
Total
Volume
617
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Del Rio Rd/US 101 NB Ramp2
Intersection NameID
0
Total
Volume
0
Thru
0
Left
Westbound
0
Right
0
Thru
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Left
Northbound
Del Rio Rd/US 101 SB Ramp1
Intersection NameID
Scenario C Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 193 of 217
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 NB Ramps15
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/US 101 SB Ramps14
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
El Camino Real/US 101 NB
Ramps (S of Atascadero)13
Intersection NameID
608
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
608
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/El Camino Real (S of
Atascadero)12
Intersection NameID
884
Total
Volume
0
Right
884
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR41/US 101 SB Ramps11
Intersection NameID
1413
Total
Volume
0
Right
805
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
608
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/El Camino Real10
Intersection NameID
805
Total
Volume
805
Thru
0
Left
Westbound
0
Right
0
Thru
Eastbound
0
Right
0
Left
Northbound
Traffic Wy/US 101 NB Off-
Ramp9
Intersection NameID
805
Total
Volume
0
Right
0
Thru
805
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Traffic Wy/US 101 SB Ramps8
Intersection NameID
Scenario C Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 194 of 217
1080
Total
Volume
0
Right
884
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
196
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Portola Rd23
Intersection NameID
1080
Total
Volume
1080
Thru
0
Left
Westbound
0
Right
0
Thru
Eastbound
0
Right
0
Left
Northbound
SR 41/Santa Rosa Rd22
Intersection NameID
1080
Total
Volume
0
Right
1080
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/San Gabriel Rd21
Intersection NameID
1080
Total
Volume
0
Right
1080
Thru
Westbound
0
Thru
0
Left
Eastbound
0
Right
0
Left
Southbound
SR 41/Los Altos Rd20
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/El Camino Real19
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 NB
Ramps18
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Santa Rosa Rd/US 101 SB
Ramps17
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
Curbaril Ave/El Camino Real16
Intersection NameID
Scenario C Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 195 of 217
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
San Ramon Rd/US 101 SB
Ramp (N of Atascadero)28
Intersection NameID
171
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
171
Left
Northbound
El Camino Real/US 101 NB (N
of Atascadero)27
Intersection NameID
0
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Mercedes Ave26
Intersection NameID
884
Total
Volume
0
Right
884
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
0
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/ Atascadero Ave25
Intersection NameID
884
Total
Volume
0
Right
0
Thru
0
Left
Westbound
0
Right
0
Thru
0
Left
Eastbound
0
Right
884
Thru
0
Left
Southbound
0
Right
0
Thru
0
Left
Northbound
SR 41/Curbaril Ave24
Intersection NameID
Scenario C Project Trips
Version 2021 (SP 0-0)
Generated with
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 196 of 217
HCM 6th Signalized Intersection Summary
1: US 101 SB Ramps & Del Rio Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 113 60 145 135 0000232091
Future Volume (veh/h) 0 113 60 145 135 0000232091
Initial Q (Qb), veh 000000 000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 0 1870 1870 1870 1870 0 1870 1870 1870
Adj Flow Rate, veh/h 0 122 65 156 145 0 249 0 98
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, %022220 222
Cap, veh/h 0 380 202 454 272 0 500 0 445
Arrive On Green 0.00 0.33 0.33 0.33 0.33 0.00 0.28 0.00 0.28
Sat Flow, veh/h 0 1148 612 570 821 0 1781 0 1585
Grp Volume(v), veh/h 0 0 187 301 0 0 249 0 98
Grp Sat Flow(s),veh/h/ln 0 0 1760 1391 0 0 1781 0 1585
Q Serve(g_s), s 0.0 0.0 1.6 2.3 0.0 0.0 2.4 0.0 1.0
Cycle Q Clear(g_c), s 0.0 0.0 1.6 4.0 0.0 0.0 2.4 0.0 1.0
Prop In Lane 0.00 0.35 0.52 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 0 583 726 0 0 500 0 445
V/C Ratio(X)0.00 0.00 0.32 0.41 0.00 0.00 0.50 0.00 0.22
Avail Cap(c_a), veh/h 0 0 1367 1371 0 0 1383 0 1231
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I)0.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 5.2 5.9 0.0 0.0 6.2 0.0 5.7
Incr Delay (d2), s/veh 0.0 0.0 0.3 0.4 0.0 0.0 0.8 0.0 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.0 0.2 0.4 0.0 0.0 0.5 0.0 0.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 0.0 5.5 6.3 0.0 0.0 7.0 0.0 5.9
LnGrp LOS AAAAAA AAA
Approach Vol, veh/h 187 301 347
Approach Delay, s/veh 5.5 6.3 6.7
Approach LOS A A A
Timer - Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 10.8 9.8 10.8
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 3.6 4.4 6.0
Green Ext Time (p_c), s 0.8 1.4 1.3
Intersection Summary
HCM 6th Ctrl Delay 6.3
HCM 6th LOS A
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 197 of 217
HCM 6th Signalized Intersection Summary
2: US 101 NB Ramps & Del Rio Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 67 292 0 0 180 810 79 0 162 0 0 0
Future Volume (veh/h) 67 292 0 0 180 810 79 0 162 0 0 0
Initial Q (Qb), veh 0 00000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 0 0 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 73 317 0 0 196 880 86 0 176
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 20022222
Cap, veh/h 144 412 0 0 160 717 345 0 307
Arrive On Green 0.54 0.54 0.00 0.00 0.54 0.54 0.19 0.00 0.19
Sat Flow, veh/h 0 766 0 0 297 1333 1781 0 1585
Grp Volume(v), veh/h 390 00001076 86 0 176
Grp Sat Flow(s),veh/h/ln 766 00001630 1781 0 1585
Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 16.0 1.2 0.0 3.0
Cycle Q Clear(g_c), s 16.0 0.0 0.0 0.0 0.0 16.0 1.2 0.0 3.0
Prop In Lane 0.19 0.00 0.00 0.82 1.00 1.00
Lane Grp Cap(c), veh/h 556 00008763450307
V/C Ratio(X) 0.70 0.00 0.00 0.00 0.00 1.23 0.25 0.00 0.57
Avail Cap(c_a), veh/h 556 00008769580852
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 0.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 5.5 0.0 0.0 0.0 0.0 6.9 10.2 0.0 10.9
Incr Delay (d2), s/veh 4.0 0.0 0.0 0.0 0.0 112.6 0.4 0.0 1.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln1.1 0.0 0.0 0.0 0.0 29.2 0.4 0.0 0.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 9.5 0.0 0.0 0.0 0.0 119.5 10.5 0.0 12.6
LnGrp LOS A AAAAFBAB
Approach Vol, veh/h 390 1076 262
Approach Delay, s/veh 9.5 119.5 11.9
Approach LOS A F B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 9.8 20.0 20.0
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 5.0 18.0 18.0
Green Ext Time (p_c), s 0.8 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 78.3
HCM 6th LOS E
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 198 of 217
HCM 6th Signalized Intersection Summary
3: El Camino Real & Del Rio Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 82 82 267 21 257 9 677 288 20 14 99 55
Future Volume (veh/h) 82 82 267 21 257 9 677 288 20 14 99 55
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 85 85 275 22 265 9 698 297 21 14 102 57
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 2 22222222222
Cap, veh/h 221 189 332 85 354 12 331 939 796 116 430 240
Arrive On Green 0.21 0.21 0.21 0.21 0.21 0.22 0.19 0.50 0.50 0.07 0.38 0.37
Sat Flow, veh/h 574 899 1585 65 1687 55 1781 1870 1585 1781 1127 630
Grp Volume(v), veh/h 170 0 275 296 0 0 698 297 21 14 0 159
Grp Sat Flow(s),veh/h/ln1474 0 1585 1807 0 0 1781 1870 1585 1781 0 1757
Q Serve(g_s), s 0.0 0.0 8.9 2.5 0.0 0.0 10.0 5.1 0.4 0.4 0.0 3.3
Cycle Q Clear(g_c), s 5.1 0.0 8.9 8.2 0.0 0.0 10.0 5.1 0.4 0.4 0.0 3.3
Prop In Lane 0.50 1.00 0.07 0.03 1.00 1.00 1.00 0.36
Lane Grp Cap(c), veh/h 410 0 332 451 0 0 331 939 796 116 0 670
V/C Ratio(X) 0.42 0.00 0.83 0.66 0.00 0.00 2.11 0.32 0.03 0.12 0.00 0.24
Avail Cap(c_a), veh/h 829 0 810 979 0 0 331 939 796 132 0 670
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh18.7 0.0 20.3 20.0 0.0 0.0 21.9 7.9 6.8 23.7 0.0 11.4
Incr Delay (d2), s/veh 0.2 0.0 2.0 2.3 0.0 0.0 508.5 0.9 0.1 0.2 0.0 0.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln1.7 0.0 3.2 3.5 0.0 0.0 50.3 1.6 0.1 0.2 0.0 1.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 18.9 0.0 22.3 22.3 0.0 0.0 530.3 8.8 6.8 23.9 0.0 12.2
LnGrp LOS B A C C A A F A A C A B
Approach Vol, veh/h 445 296 1016 173
Approach Delay, s/veh 21.0 22.3 367.1 13.2
Approach LOS C C F B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s7.5 31.0 15.3 14.0 24.5 15.3
Change Period (Y+Rc), s 3.5 4.5 3.5 3.5 4.5 3.5
Max Green Setting (Gmax), s4.5 26.0 28.0 10.5 20.0 28.0
Max Q Clear Time (g_c+I1), s2.4 7.1 10.9 12.0 5.3 10.2
Green Ext Time (p_c), s 0.0 1.9 0.5 0.0 0.7 1.7
Intersection Summary
HCM 6th Ctrl Delay 202.7
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 199 of 217
HCM 6th TWSC
4: San Anselmo Avenue & US 101 South 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 4
Intersection
Int Delay, s/veh 168.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 331 188 1561 588 00001671176
Future Vol, veh/h 0 331 188 1561 588 00001671176
Conflicting Peds, #/hr 0 0000000085072
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 --------50
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 360 204 1697 639 00001821191
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 564 0 0 4580 4597 711
Stage 1 ------4033 4033 -
Stage 2 ------ 547564-
Critical Hdwy - - - 4.12 - - 6.42 6.52 6.22
Critical Hdwy Stg 1 ------5.42 5.52 -
Critical Hdwy Stg 2 ------5.42 5.52 -
Follow-up Hdwy - - - 2.218 - - 3.518 4.018 3.318
Pot Cap-1 Maneuver 0 - -~ 1008 - 0 ~ 1 ~ 1 433
Stage 1 0 ----0 ~ 98-
Stage 2 0 ----0 580508-
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - -~ 1008 - - 0 0 403
Mov Cap-2 Maneuver ------ 00-
Stage 1 ------ ~ 90-
Stage 2 ------ 00-
Approach EB WB SB
HCM Control Delay, s 0 235.8
HCM LOS -
Minor Lane/Major Mvmt EBT EBR WBL WBTSBLn1SBLn2
Capacity (veh/h) - -~ 1008 - - 403
HCM Lane V/C Ratio - - 1.683 - - 0.475
HCM Control Delay (s) - -$ 324.6 0 - 21.7
HCM Lane LOS - - F A - C
HCM 95th %tile Q(veh) - - 92.9 - - 2.5
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 200 of 217
HCM 6th TWSC
5: US 101 North & San Anselmo Avenue 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 5
Intersection
Int Delay, s/veh 10.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 135 252 0 0 2023 815 174 0 397 0 0 0
Future Vol, veh/h 135 252 0 0 2023 815 174 0 397 0 0 0
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length --------25---
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 22222222222
Mvmt Flow 147 274 0 0 2199 886 189 0 432 0 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 3085 0 - - - 0 3210 3653 274
Stage 1 ------568568-
Stage 2 ------2642 3085 -
Critical Hdwy 4.12 -----6.42 6.52 6.22
Critical Hdwy Stg 1 ------5.42 5.52 -
Critical Hdwy Stg 2 ------5.42 5.52 -
Follow-up Hdwy 2.218 -----3.518 4.018 3.318
Pot Cap-1 Maneuver ~ 106 - 0 0 - - ~ 11 5 765
Stage 1 - - 0 0 - - 567 506 -
Stage 2 - - 0 0 - - ~ 54 28 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 106 -----00765
Mov Cap-2 Maneuver ------00-
Stage 1 ------00-
Stage 2 ------~ 540-
Approach EB WB NB
HCM Control Delay, s 102.8 0
HCM LOS -
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT WBT WBR
Capacity (veh/h) - 765 ~ 106 - - -
HCM Lane V/C Ratio - 0.564 1.384 - - -
HCM Control Delay (s) - 15.6 294.7 0 - -
HCM Lane LOS - C F A - -
HCM 95th %tile Q(veh) - 3.6 10.4 - - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 201 of 217
HCM 6th Signalized Intersection Summary
6: El Camino Real & San Anselmo Rd 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 336 26 153 7 20 0 866 217 21 6 200 1824
Future Volume (veh/h) 336 26 153 7 20 0 866 217 21 6 200 1824
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 357 28 163 7 21 0 921 231 22 6 213 1940
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, %222222222222
Cap, veh/h 394 31 376 92 277 0 289 1169 110 11 711 309
Arrive On Green 0.24 0.24 0.24 0.20 0.20 0.00 0.16 0.36 0.36 0.01 0.20 0.20
Sat Flow, veh/h 1657 130 1585 462 1385 0 1781 3281 310 1781 3554 1547
Grp Volume(v), veh/h 385 0 163 28 0 0 921 124 129 6 213 1940
Grp Sat Flow(s),veh/h/ln 1787 0 1585 1847 0 0 1781 1777 1814 1781 1777 1547
Q Serve(g_s), s 16.7 0.0 7.0 1.0 0.0 0.0 13.0 3.9 3.9 0.3 4.1 16.0
Cycle Q Clear(g_c), s 16.7 0.0 7.0 1.0 0.0 0.0 13.0 3.9 3.9 0.3 4.1 16.0
Prop In Lane 0.93 1.00 0.25 0.00 1.00 0.17 1.00 1.00
Lane Grp Cap(c), veh/h 425 0 376 369 0 0 289 633 646 11 711 309
V/C Ratio(X) 0.91 0.00 0.43 0.08 0.00 0.00 3.18 0.20 0.20 0.54 0.30 6.27
Avail Cap(c_a), veh/h 425 0 376 369 0 0 289 633 646 89 711 309
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.6 0.0 25.9 26.0 0.0 0.0 33.5 17.8 17.8 39.6 27.2 32.0
Incr Delay (d2), s/veh 25.6 0.0 3.6 0.4 0.0 0.0 990.8 0.1 0.1 35.1 0.2 2379.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 10.0 0.0 2.8 0.5 0.0 0.0 84.9 1.5 1.5 0.2 1.6 209.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 55.3 0.0 29.5 26.4 0.0 0.0 1024.3 18.0 18.0 74.7 27.5 2411.3
LnGrp LOS E A C C A A F B B E C F
Approach Vol, veh/h 548 28 1174 2159
Approach Delay, s/veh 47.6 26.4 807.4 2169.7
Approach LOS D C F F
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 23.0 17.0 20.0 20.0 4.5 32.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 13.0 16.0 16.0 4.0 25.0
Max Q Clear Time (g_c+I1), s 18.7 15.0 18.0 3.0 2.3 5.9
Green Ext Time (p_c), s 0.1 0.0 0.0 0.1 0.0 1.1
Intersection Summary
HCM 6th Ctrl Delay 1447.7
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 202 of 217
HCM 6th TWSC
7: El Camino Real & US 10 NB On/Rosario Ave 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 7
Intersection
Int Delay, s/veh 2266.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 547 409 27 147 529 78 27 591 4
Future Vol, veh/h 0 0 0 547 409 27 147 529 78 27 591 4
Conflicting Peds, #/hr 0 00000000000
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length ------75--60--
Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 0 0 595 445 29 160 575 85 29 642 4
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1640 1642 330 646 0 0 660 0 0
Stage 1 938 938 -------
Stage 2 702 704 -------
Critical Hdwy 6.63 6.53 6.93 4.13 - - 4.13 - -
Critical Hdwy Stg 1 5.83 5.53 -------
Critical Hdwy Stg 2 5.43 5.53 -------
Follow-up Hdwy 3.519 4.019 3.319 2.219 - - 2.219 - -
Pot Cap-1 Maneuver ~ 100 ~ 99 667 937 - - 926 - -
Stage 1 ~ 342 ~ 342 -------
Stage 2 ~ 490 ~ 439 -------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 80 0 667 937 - - 926 - -
Mov Cap-2 Maneuver ~ 80 0 -------
Stage 1 ~ 284 0 -------
Stage 2 ~ 475 0 -------
Approach WB NB SB
HCM Control Delay, s $ 5437.9 1.9 0.4
HCM LOS F
Minor Lane/Major Mvmt NBL NBT NBRWBLn1 SBL SBT SBR
Capacity (veh/h) 937 - - 83 926 - -
HCM Lane V/C Ratio 0.171 - -12.873 0.032 - -
HCM Control Delay (s) 9.6 - -$ 5437.9 9 - -
HCM Lane LOS A - - F A - -
HCM 95th %tile Q(veh) 0.6 - - 126.4 0.1 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 203 of 217
HCM 6th TWSC
8: US 101 South On & Traffic Way 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 8
Intersection
Int Delay, s/veh 17.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 293 96 983 386 00001621141
Future Vol, veh/h 0 293 96 983 386 00001621141
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - Stop
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 318 104 1068 420 00001761153
Major/Minor Major1 Major2 Minor2
Conflicting Flow All - 0 0 422 0 0 2926 2978 420
Stage 1 ------2556 2556 -
Stage 2 ------ 370422-
Critical Hdwy - - - 4.12 - - 6.42 6.52 6.22
Critical Hdwy Stg 1 ------5.42 5.52 -
Critical Hdwy Stg 2 ------5.42 5.52 -
Follow-up Hdwy - - - 2.218 - - 3.518 4.018 3.318
Pot Cap-1 Maneuver 0 - - 1137 - 0 ~ 17 14 633
Stage 1 0 ----0 ~ 5954-
Stage 2 0 ----0 699588-
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - 1137 - - 0 0 633
Mov Cap-2 Maneuver ------ 00-
Stage 1 ------ ~ 590-
Stage 2 ------ 00-
Approach EB WB SB
HCM Control Delay, s 0 24.1 8.5
HCM LOS A
Minor Lane/Major Mvmt EBT EBR WBL WBTSBLn1
Capacity (veh/h) - - 1137 - 1365
HCM Lane V/C Ratio - - 0.94 - 0.242
HCM Control Delay (s) - - 33.6 0 8.5
HCM Lane LOS - - D A A
HCM 95th %tile Q(veh) - - 16.2 - 1
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 204 of 217
HCM 6th TWSC
9: US 101 North Off & Traffic Way 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 9
Intersection
Int Delay, s/veh 150
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 444 0 0 1220 155 261
Future Vol, veh/h 444 0 0 1220 155 261
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 22222
Mvmt Flow 483 0 0 1326 168 284
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 - - - 1809 242
Stage 1 - - - - 483 -
Stage 2 - - - - 1326 -
Critical Hdwy - - - - 6.63 6.93
Critical Hdwy Stg 1 - - - - 5.83 -
Critical Hdwy Stg 2 - - - - 5.43 -
Follow-up Hdwy - - - - 3.519 3.319
Pot Cap-1 Maneuver - 0 0 - ~ 78 759
Stage 1 - 0 0 - 587 -
Stage 2 - 0 0 - 247 -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - - ~ 78 759
Mov Cap-2 Maneuver - - - - ~ 78 -
Stage 1 - - - - 587 -
Stage 2 - - - - 247 -
Approach EB WB NB
HCM Control Delay, s 0 0 $ 750.2
HCM LOS F
Minor Lane/Major Mvmt NBLn1 EBT WBT
Capacity (veh/h) 178 - -
HCM Lane V/C Ratio 2.54 - -
HCM Control Delay (s) $ 750.2 - -
HCM Lane LOS F - -
HCM 95th %tile Q(veh) 38.7 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 205 of 217
HCM 6th Signalized Intersection Summary
10: El Camino Real & Traffic Way 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 10
HCM 6th Edition methodology cannot be performed with phasing conflicts.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 206 of 217
HCM 6th Signalized Intersection Summary
11: US 101 SB Ramps & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 11
HCM 6th Edition methodology supports speed limit in the range of 25 to 55 mph.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 207 of 217
HCM 6th Signalized Intersection Summary
12: El Camino Real & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 12
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 197 318 458 179 253 107 198 438 291 112 322 707
Future Volume (veh/h) 197 318 458 179 253 107 198 438 291 112 322 707
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.97 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1841 1856 1856 1841 1856 1856 1856 1856 1856 1856 1856
Adj Flow Rate, veh/h 205 331 477 186 264 111 206 456 303 117 335 736
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 3 43343333333
Cap, veh/h 449 722 1305 215 934 382 271 830 359 143 837 367
Arrive On Green 0.09 0.26 0.26 0.12 0.39 0.39 0.08 0.24 0.24 0.08 0.24 0.24
Sat Flow, veh/h 3428 1841 2768 1767 2418 989 3428 3526 1526 1767 3526 1545
Grp Volume(v), veh/h 205 331 477 186 189 186 206 456 303 117 335 736
Grp Sat Flow(s),veh/h/ln1714 1841 1384 1767 1749 1658 1714 1763 1526 1767 1763 1545
Q Serve(g_s), s 6.6 17.5 14.5 12.0 8.6 9.0 6.8 13.2 22.0 7.6 9.3 19.3
Cycle Q Clear(g_c), s 6.6 17.5 14.5 12.0 8.6 9.0 6.8 13.2 22.0 7.6 9.3 19.3
Prop In Lane 1.00 1.00 1.00 0.60 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 449 722 1305 215 675 640 271 830 359 143 837 367
V/C Ratio(X) 0.46 0.46 0.37 0.87 0.28 0.29 0.76 0.55 0.84 0.82 0.40 2.01
Avail Cap(c_a), veh/h 449 722 1305 259 675 640 458 942 408 190 837 367
HCM Platoon Ratio 0.67 0.67 0.67 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.87 0.87 0.87 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh49.0 32.4 24.3 50.0 24.5 24.6 52.3 39.0 42.3 52.5 37.3 21.8
Incr Delay (d2), s/veh 0.6 1.8 0.7 22.2 1.0 1.1 4.4 0.6 13.6 18.2 0.4 462.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln2.9 8.5 5.1 6.6 3.7 3.7 3.1 5.7 9.5 4.0 4.0 53.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 49.6 34.2 25.0 72.2 25.5 25.8 56.7 39.5 55.9 70.6 37.7 484.4
LnGrp LOS D C C E C C E D E E D F
Approach Vol, veh/h 1013 561 965 1188
Approach Delay, s/veh 33.0 41.1 48.3 317.6
Approach LOS C D D F
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s19.1 50.1 12.7 34.1 19.8 49.4 12.9 33.9
Change Period (Y+Rc), s 5.0 4.6 3.5 6.6 4.6 * 4.6 3.5 * 6.6
Max Green Setting (Gmax), s17.0 37.8 15.5 26.0 11.5 * 45 12.5 * 31
Max Q Clear Time (g_c+I1), s14.0 19.5 8.8 21.3 8.6 11.0 9.6 24.0
Green Ext Time (p_c), s 0.1 3.8 0.3 2.6 0.2 2.3 0.1 2.4
Intersection Summary
HCM 6th Ctrl Delay 128.9
HCM 6th LOS F
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 208 of 217
HCM 6th Signalized Intersection Summary
13: El Camino Real & US 101 NB Ramps /Plaza Del Camino Driveway 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 13
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 0 00000000000
Future Volume (veh/h) 0 00000000000
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 0 00000000000
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 22222222222
Cap, veh/h 0 748 0 748 634 160 1421 0 160 1421
Arrive On Green 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sat Flow, veh/h 0 1870 1585 0 1870 1585 1781 3647 0 1781 3647 0
Grp Volume(v), veh/h 0 00000000000
Grp Sat Flow(s),veh/h/ln 0 1870 1585 0 1870 1585 1781 1777 0 1781 1777 0
Q Serve(g_s), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Prop In Lane 0.00 1.00 0.00 1.00 1.00 0.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 748 0 748 634 160 1421 0 160 1421
V/C Ratio(X) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Avail Cap(c_a), veh/h 0 748 0 748 634 160 1421 0 160 1421
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Uniform Delay (d), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
LnGrp LOS A A AAAAAAAA
Approach Vol, veh/h 0 A 0 0 0 A
Approach Delay, s/veh 0.0 0.0 0.0 0.0
Approach LOS
Timer - Assigned Phs 2468
Phs Duration (G+Y+Rc), s 22.5 22.5 22.5 22.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 18.0 18.0 18.0 18.0
Max Q Clear Time (g_c+I1), s 0.0 0.0 0.0 0.0
Green Ext Time (p_c), s 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 0.0
HCM 6th LOS A
Notes
Unsignalized Delay for [EBR, SBR] is excluded from calculations of the approach delay and intersection delay.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 209 of 217
HCM 6th Signalized Intersection Summary
14: US 101 South Ramp & Santa Rosa 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 14
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2 208 17 102 307 121 0 0 0 320 14 77
Future Volume (veh/h) 2 208 17 102 307 121 0 0 0 320 14 77
Initial Q (Qb), veh 0 00000 000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 2 226 18 111 334 132 348 15 0
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 22222 222
Cap, veh/h 92 624 49 194 381 139 743 32
Arrive On Green 0.37 0.37 0.37 0.73 0.73 0.73 0.43 0.43 0.00
Sat Flow, veh/h 3 1706 135 237 1042 379 1711 74 0
Grp Volume(v), veh/h 246 0 0 577 0 0 363 0 0
Grp Sat Flow(s),veh/h/ln1844 0 0 1657 0 0 1785 0 0
Q Serve(g_s), s 0.0 0.0 0.0 8.1 0.0 0.0 5.8 0.0 0.0
Cycle Q Clear(g_c), s 3.9 0.0 0.0 12.0 0.0 0.0 5.8 0.0 0.0
Prop In Lane 0.01 0.07 0.19 0.23 0.96 0.00
Lane Grp Cap(c), veh/h 765 0 0 714 0 0 775 0
V/C Ratio(X) 0.32 0.00 0.00 0.81 0.00 0.00 0.47 0.00
Avail Cap(c_a), veh/h 828 0 0 768 0 0 775 0
HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 0.86 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 9.3 0.0 0.0 4.9 0.0 0.0 8.0 0.0 0.0
Incr Delay (d2), s/veh 0.2 0.0 0.0 5.3 0.0 0.0 2.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln1.2 0.0 0.0 2.2 0.0 0.0 2.0 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 9.5 0.0 0.0 10.1 0.0 0.0 10.1 0.0 0.0
LnGrp LOS A AABAA BA
Approach Vol, veh/h 246 577 363 A
Approach Delay, s/veh 9.5 10.1 10.1
Approach LOS A B B
Timer - Assigned Phs 4 6 8
Phs Duration (G+Y+Rc), s 18.6 21.4 18.6
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 5.9 7.8 14.0
Green Ext Time (p_c), s 0.6 1.0 0.6
Intersection Summary
HCM 6th Ctrl Delay 10.0
HCM 6th LOS A
Notes
Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay.
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 210 of 217
HCM 6th Signalized Intersection Summary
15: East Front Road/US 101 North Ramp & Santa Rosa 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 15
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 72 396 78 8 332 337 193 171 76 0 0 0
Future Volume (veh/h) 72 396 78 8 332 337 193 171 76 0 0 0
Initial Q (Qb), veh 0 00000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 78 430 85 9 361 366 210 186 83
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 22222222
Cap, veh/h 152 484 89 97 741 634 311 276 123
Arrive On Green 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Sat Flow, veh/h 126 1210 223 13 1853 1585 779 690 308
Grp Volume(v), veh/h 593 0 0 370 0 366 479 0 0
Grp Sat Flow(s),veh/h/ln1559 0 0 1866 0 1585 1776 0 0
Q Serve(g_s), s 8.8 0.0 0.0 0.0 0.0 7.2 8.9 0.0 0.0
Cycle Q Clear(g_c), s 14.7 0.0 0.0 5.9 0.0 7.2 8.9 0.0 0.0
Prop In Lane 0.13 0.14 0.02 1.00 0.44 0.17
Lane Grp Cap(c), veh/h 726 0 0 839 0 634 710 0 0
V/C Ratio(X) 0.82 0.00 0.00 0.44 0.00 0.58 0.67 0.00 0.00
Avail Cap(c_a), veh/h 726 0 0 839 0 634 710 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.95 0.00 0.00 0.60 0.00 0.60 1.00 0.00 0.00
Uniform Delay (d), s/veh11.4 0.0 0.0 9.0 0.0 9.4 9.9 0.0 0.0
Incr Delay (d2), s/veh 6.9 0.0 0.0 0.2 0.0 0.8 5.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln5.0 0.0 0.0 1.8 0.0 1.9 3.5 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 18.3 0.0 0.0 9.2 0.0 10.1 14.9 0.0 0.0
LnGrp LOS B AAAABBAA
Approach Vol, veh/h 593 736 479
Approach Delay, s/veh 18.3 9.7 14.9
Approach LOS B A B
Timer - Assigned Phs 2 4 8
Phs Duration (G+Y+Rc), s 20.0 20.0 20.0
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 16.0 16.0
Max Q Clear Time (g_c+I1), s 10.9 16.7 9.2
Green Ext Time (p_c), s 1.0 0.0 2.0
Intersection Summary
HCM 6th Ctrl Delay 13.9
HCM 6th LOS B
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 211 of 217
HCM 6th Signalized Intersection Summary
16: El Camino Real & Santa Rosa Road 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 16
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 219 4 309 4 25 19 412 681 4 9 617 309
Future Volume (veh/h) 219 4 309 4 25 19 412 681 4 9 617 309
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 231 4 325 4 26 20 434 717 4 9 649 325
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 22222222222
Cap, veh/h 336 6 620 8 50 39 356 1881 10 20 1174 509
Arrive On Green 0.19 0.19 0.19 0.06 0.06 0.06 0.20 0.52 0.52 0.01 0.33 0.33
Sat Flow, veh/h 1752 30 1583 139 902 694 1781 3623 20 1781 3554 1540
Grp Volume(v), veh/h 235 0 325 50 0 0 434 352 369 9 649 325
Grp Sat Flow(s),veh/h/ln1783 0 1583 1734 0 0 1781 1777 1866 1781 1777 1540
Q Serve(g_s), s 11.0 0.0 14.1 2.5 0.0 0.0 18.0 10.7 10.7 0.5 13.5 16.1
Cycle Q Clear(g_c), s 11.0 0.0 14.1 2.5 0.0 0.0 18.0 10.7 10.7 0.5 13.5 16.1
Prop In Lane 0.98 1.00 0.08 0.40 1.00 0.01 1.00 1.00
Lane Grp Cap(c), veh/h 342 0 620 96 0 0 356 923 969 20 1174 509
V/C Ratio(X) 0.69 0.00 0.52 0.52 0.00 0.00 1.22 0.38 0.38 0.45 0.55 0.64
Avail Cap(c_a), veh/h 475 0 739 96 0 0 356 923 969 99 1174 509
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.36 0.00 0.36 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh33.9 0.0 21.0 41.3 0.0 0.0 36.0 13.0 13.0 44.2 24.7 25.6
Incr Delay (d2), s/veh 0.3 0.0 0.1 2.3 0.0 0.0 121.1 1.2 1.1 5.8 1.9 6.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln4.7 0.0 5.0 1.1 0.0 0.0 19.6 4.3 4.5 0.2 5.8 6.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 34.2 0.0 21.0 43.6 0.0 0.0 157.1 14.2 14.1 50.0 26.6 31.6
LnGrp LOS C A C D A A F B B D C C
Approach Vol, veh/h 560 50 1155 983
Approach Delay, s/veh 26.6 43.6 67.8 28.4
Approach LOS C D E C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s23.0 34.7 22.3 6.0 51.7 10.0
Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0
Max Green Setting (Gmax), s18.0 23.0 24.0 5.0 36.0 5.0
Max Q Clear Time (g_c+I1), s20.0 18.1 16.1 2.5 12.7 4.5
Green Ext Time (p_c), s 0.0 2.2 1.0 0.0 3.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 44.9
HCM 6th LOS D
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 212 of 217
HCM 6th Signalized Intersection Summary
17: San Gabriel Road & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 17
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 18 321 28 86 1386 84 9 9 41 39 18 9
Future Volume (veh/h) 18 321 28 86 1386 84 9 9 41 39 18 9
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 19 338 29 91 1459 88 9 9 43 41 19 9
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 72272222222
Cap, veh/h 133 1060 91 119 1077 65 74 27 94 154 47 17
Arrive On Green 0.07 0.65 0.65 0.07 0.64 0.64 0.08 0.08 0.08 0.08 0.08 0.08
Sat Flow, veh/h 1781 1631 140 1781 1677 101 145 336 1149 842 578 213
Grp Volume(v), veh/h 19 0 367 91 0 1547 61 0 0 69 0 0
Grp Sat Flow(s),veh/h/ln1781 0 1771 1781 0 1778 1631 0 0 1633 0 0
Q Serve(g_s), s 0.7 0.0 6.1 3.4 0.0 43.0 0.0 0.0 0.0 0.1 0.0 0.0
Cycle Q Clear(g_c), s 0.7 0.0 6.1 3.4 0.0 43.0 2.3 0.0 0.0 2.4 0.0 0.0
Prop In Lane 1.00 0.08 1.00 0.06 0.15 0.70 0.59 0.13
Lane Grp Cap(c), veh/h 133 0 1151 119 0 1142 195 0 0 219 0 0
V/C Ratio(X) 0.14 0.00 0.32 0.76 0.00 1.35 0.31 0.00 0.00 0.32 0.00 0.00
Avail Cap(c_a), veh/h 173 0 1151 359 0 1142 705 0 0 700 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh29.0 0.0 5.2 30.7 0.0 12.0 29.3 0.0 0.0 29.4 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.0 0.2 11.4 0.0 165.5 0.9 0.0 0.0 0.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln0.3 0.0 1.4 1.7 0.0 62.4 0.9 0.0 0.0 1.1 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 29.5 0.0 5.3 42.2 0.0 177.5 30.2 0.0 0.0 30.2 0.0 0.0
LnGrp LOS C A A D A F C A A C A A
Approach Vol, veh/h 386 1638 61 69
Approach Delay, s/veh 6.5 170.0 30.2 30.2
Approach LOS A F C C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s8.0 49.5 9.5 8.5 49.0 9.5
Change Period (Y+Rc), s 3.5 6.0 4.0 3.5 6.0 4.0
Max Green Setting (Gmax), s13.5 36.0 27.0 6.5 43.0 27.0
Max Q Clear Time (g_c+I1), s5.4 8.1 4.4 2.7 45.0 4.3
Green Ext Time (p_c), s 0.1 2.1 0.3 0.0 0.0 0.2
Intersection Summary
HCM 6th Ctrl Delay 132.3
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 213 of 217
HCM 6th TWSC
18: Santa Rosa Road & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 18
Intersection
Int Delay, s/veh 3.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 369 41 31 1481 74 26
Future Vol, veh/h 369 41 31 1481 74 26
Conflicting Peds, #/hr 0 00000
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 100 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 91 91 91 91 91 91
Heavy Vehicles, % 7 22722
Mvmt Flow 405 45 34 1627 81 29
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 450 0 2123 428
Stage 1 - - - - 428 -
Stage 2 - - - - 1695 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1110 - ~ 55 627
Stage 1 - - - - 657 -
Stage 2 - - - - 163 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1110 - ~ 53 627
Mov Cap-2 Maneuver - - - - 130 -
Stage 1 - - - - 657 -
Stage 2 - - - - 158 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 62.9
HCM LOS F
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 164 - - 1110 -
HCM Lane V/C Ratio 0.67 - - 0.031 -
HCM Control Delay (s) 62.9 - - 8.3 -
HCM Lane LOS F - - A -
HCM 95th %tile Q(veh) 3.9 - - 0.1 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 214 of 217
HCM 6th Signalized Intersection Summary
19: Portola Road & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 19
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 57 416 82 46 1470 17 44 26 41 11 46 29
Future Volume (veh/h) 57 416 82 46 1470 17 44 26 41 11 46 29
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 59 433 85 48 1531 18 46 27 43 11 48 30
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %272272222222
Cap, veh/h 91 930 183 80 1135 1001 136 54 65 76 111 63
Arrive On Green 0.05 0.64 0.64 0.04 0.63 0.63 0.11 0.11 0.11 0.11 0.11 0.11
Sat Flow, veh/h 1781 1458 286 1781 1796 1585 529 505 610 120 1038 589
Grp Volume(v), veh/h 59 0 518 48 1531 18 116 0 0 89 0 0
Grp Sat Flow(s),veh/h/ln 1781 0 1745 1781 1796 1585 1644 0 0 1747 0 0
Q Serve(g_s), s 2.1 0.0 9.7 1.7 40.2 0.3 1.1 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 2.1 0.0 9.7 1.7 40.2 0.3 4.1 0.0 0.0 3.0 0.0 0.0
Prop In Lane 1.00 0.16 1.00 1.00 0.40 0.37 0.12 0.34
Lane Grp Cap(c), veh/h 91 0 1112 80 1135 1001 255 0 0 250 0 0
V/C Ratio(X) 0.65 0.00 0.47 0.60 1.35 0.02 0.46 0.00 0.00 0.36 0.00 0.00
Avail Cap(c_a), veh/h 210 0 1112 185 1135 1001 794 0 0 848 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 29.7 0.0 5.9 29.8 11.7 4.4 27.2 0.0 0.0 26.7 0.0 0.0
Incr Delay (d2), s/veh 7.6 0.0 1.4 7.0 163.1 0.0 1.5 0.0 0.0 1.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 0.0 2.5 0.8 60.5 0.1 1.7 0.0 0.0 1.3 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 37.3 0.0 7.3 36.9 174.8 4.4 28.7 0.0 0.0 27.8 0.0 0.0
LnGrp LOS D A A D F A C A A C A A
Approach Vol, veh/h 577 1597 116 89
Approach Delay, s/veh 10.4 168.8 28.7 27.8
Approach LOS B F C C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.4 45.9 11.4 6.7 45.5 11.4
Change Period (Y+Rc), s 3.5 5.3 4.6 3.5 5.3 4.6
Max Green Setting (Gmax), s 6.6 40.6 29.4 7.5 39.7 29.4
Max Q Clear Time (g_c+I1), s 3.7 11.7 5.0 4.1 42.2 6.1
Green Ext Time (p_c), s 0.0 3.2 0.5 0.0 0.0 0.7
Intersection Summary
HCM 6th Ctrl Delay 118.2
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 215 of 217
HCM 6th Signalized Intersection Summary
20: Curbaril Ave & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 20
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 23 40 18 72 36 34 6 400 93 60 1404 29
Future Volume (veh/h) 23 40 18 72 36 34 6 400 93 60 1404 29
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 24 41 19 74 37 35 6 412 96 62 1447 30
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Percent Heavy Veh, % 2 72272222222
Cap, veh/h 45 859 758 95 430 407 44 473 109 59 527 11
Arrive On Green 0.03 0.48 0.48 0.05 0.51 0.51 0.32 0.32 0.32 0.32 0.32 0.32
Sat Flow, veh/h 1781 1796 1585 1781 849 803 6 1473 340 50 1641 34
Grp Volume(v), veh/h 24 41 19 74 0 72 514 0 0 1539 0 0
Grp Sat Flow(s),veh/h/ln1781 1796 1585 1781 0 1652 1820 0 0 1725 0 0
Q Serve(g_s), s 1.2 1.1 0.6 3.6 0.0 2.0 0.0 0.0 0.0 4.6 0.0 0.0
Cycle Q Clear(g_c), s 1.2 1.1 0.6 3.6 0.0 2.0 23.4 0.0 0.0 28.0 0.0 0.0
Prop In Lane 1.00 1.00 1.00 0.49 0.01 0.19 0.04 0.02
Lane Grp Cap(c), veh/h 45 859 758 95 0 837 626 0 0 597 0 0
V/C Ratio(X) 0.53 0.05 0.03 0.78 0.00 0.09 0.82 0.00 0.00 2.58 0.00 0.00
Avail Cap(c_a), veh/h 112 859 758 153 0 837 626 0 0 597 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh42.0 12.1 12.0 40.7 0.0 11.1 28.0 0.0 0.0 30.4 0.0 0.0
Incr Delay (d2), s/veh 7.1 0.1 0.1 9.6 0.0 0.2 8.5 0.0 0.0 714.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln0.6 0.4 0.2 1.7 0.0 0.7 11.2 0.0 0.0 130.9 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 49.0 12.2 12.1 50.4 0.0 11.3 36.6 0.0 0.0 745.3 0.0 0.0
LnGrp LOS D B B D A B D A A F A A
Approach Vol, veh/h 84 146 514 1539
Approach Delay, s/veh 22.7 31.1 36.6 745.3
Approach LOS C C D F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s8.2 47.0 32.0 5.7 49.5 32.0
Change Period (Y+Rc), s 3.5 5.3 4.0 3.5 5.3 4.0
Max Green Setting (Gmax), s7.5 41.7 28.0 5.5 43.7 28.0
Max Q Clear Time (g_c+I1), s5.6 3.1 30.0 3.2 4.0 25.4
Green Ext Time (p_c), s 0.0 0.2 0.0 0.0 0.4 0.9
Intersection Summary
HCM 6th Ctrl Delay 513.5
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 216 of 217
HCM 6th Signalized Intersection Summary
21: Atascadero Ave & SR 41 07/26/2021
Base 12:00 am 08/03/2006 Baseline Synchro 11 Report
Page 21
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 110 51 42 11 938 70 31 478 14 68 540 128
Future Volume (veh/h) 110 51 42 11 938 70 31 478 14 68 540 128
Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1796 1870 1870 1796 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 121 56 46 12 1031 77 34 525 15 75 593 141
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, % 2 72272222222
Cap, veh/h 77 664 586 25 561 42 31 472 427 40 316 303
Arrive On Green 0.04 0.37 0.37 0.01 0.34 0.34 0.27 0.27 0.27 0.19 0.19 0.19
Sat Flow, veh/h 1781 1796 1585 1781 1651 123 113 1751 1585 209 1651 1585
Grp Volume(v), veh/h 121 56 46 12 0 1108 559 0 15 668 0 141
Grp Sat Flow(s),veh/h/ln1781 1796 1585 1781 0 1774 1865 0 1585 1860 0 1585
Q Serve(g_s), s 5.0 2.3 2.2 0.8 0.0 39.1 31.0 0.0 0.8 22.0 0.0 9.1
Cycle Q Clear(g_c), s 5.0 2.3 2.2 0.8 0.0 39.1 31.0 0.0 0.8 22.0 0.0 9.1
Prop In Lane 1.00 1.00 1.00 0.07 0.06 1.00 0.11 1.00
Lane Grp Cap(c), veh/h 77 664 586 25 0 603 503 0 427 356 0 303
V/C Ratio(X) 1.56 0.08 0.08 0.49 0.00 1.84 1.11 0.00 0.04 1.88 0.00 0.46
Avail Cap(c_a), veh/h 77 664 586 77 0 603 503 0 427 356 0 303
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh55.0 23.6 23.5 56.3 0.0 38.0 42.0 0.0 31.0 46.5 0.0 41.3
Incr Delay (d2), s/veh 306.4 0.0 0.0 5.4 0.0 383.1 74.5 0.0 0.0 405.4 0.0 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln8.8 1.0 0.8 0.4 0.0 80.6 24.3 0.0 0.3 50.3 0.0 3.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 361.4 23.6 23.6 61.7 0.0 421.0 116.5 0.0 31.0 451.9 0.0 41.7
LnGrp LOS F C C E A F F A C F A D
Approach Vol, veh/h 223 1120 574 809
Approach Delay, s/veh 206.9 417.2 114.3 380.4
Approach LOS FFFF
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s5.6 47.8 26.0 9.0 44.4 35.6
Change Period (Y+Rc), s 4.0 5.3 4.0 4.0 5.3 4.6
Max Green Setting (Gmax), s5.0 39.1 22.0 5.0 39.1 31.0
Max Q Clear Time (g_c+I1), s2.8 4.3 24.0 7.0 41.1 33.0
Green Ext Time (p_c), s 0.0 0.1 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 325.3
HCM 6th LOS F
ITEM NUMBER: C-2
DATE: 10/26/21
ATTACHMENT: 1A
Page 217 of 217