HomeMy WebLinkAboutPC Resolution 21-0005f S9 MAY 4 2021
PC RESOLUTION 2021-0005 CITY OF ATASCADERO
PLANNING
RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ATASCADERO APPROVING A CONDITIONAL USE PERMIT
TO ESTABLISH A MINI -STORAGE FACILITY, AND ASSOCIATED LOT
MERGER, LOCATED AT 11450 VIEJO CAMINO AND
11505 EL CAMINO REAL AND CERTIFING THE PROPOSED
MITIGATED NEGATIVE DECLARATION PREPAREED FOR THE
PROJECT
DOVE CREEK MINI -STORAGE
NEWTON
(DEV20-0076)
WHEREAS, an application has been received from Scott Newton (215 Santa Fe, Pismo
Beach, CA 93449), Owner and Applicant, to consider Planning Application DEV20-0076, for a
Conditional Use Permit for a mini -storage use and associated lot merger on a 2.4 -acre site
located at 11405 Viejo Camino and 11505 El Camino Real, Atascadero, CA 93422 (APNs 045-
342-009 and 045-342-010); and
WHEREAS, the site's current General Plan Land Use Designation is Public Facilities
(PUB); and
WHEREAS, the site's current Zoning District is Public (P); and
WHEREAS, mini -storage is a conditionally allowed use in the Public (P) zoning district;
and
WHEREAS, the project was reviewed by the Design Review Committee at their regularly
scheduled meetings on June 24, 2020 and November 18, 2020; and
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and
WHEREAS, a timely and properly noticed Public Hearing upon the subject conditional
use permit application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said use permit; and
NOW, THEREFORE BE IT RESOLVED by the Planning Commission of the City of
Atascadero:
SECTION 1. Recitals: The above recitals are true and correct.
SECTION 2. Public Hearings.
1. The Planning Commission held a duly noticed public hearing to consider the project on
April 20, 2021 and considered testimony and reports from staff, the applicants, and the
public and the project was continued to the May 4, 2021 meeting.
2. The Planning Commission held a duly noticed public hearing to consider the project on
May 4, 2021 and considered testimony and reports from staff, the applicants, and the
public.
SECTION 3. Findings. The Planning Commission makes the following findings,
determinations and approvals
1. Findings for Approval of a Conditional Use Permit
FINDING: The proposed project or use is consistent with the General Plan
FACT: The project is consistent with the Land Use, Open Space and Circulation (LOC)
Policies and Programs 1. 1.7 for infill development; 1.4.1 for screening exterior lights; 2.1.3
and 7.2.3 for providing street trees; and, 8.5.3 for providing on-site stormwater
management. In addition, the project is consistent with Circulation Element (CIR) Policies
and Programs 1.4 for requiring a tree lined street; 1.5.1 for requiring adequate off-street
parking; and 2.3.1 for providing adequate sidewalks as required for all new commercial
development in the City.
The General Plan also includes policies and programs aimed at enhancing the City's visual
character and promoting economic viability. LOC3 promotes the transformation of El
Camino Real into a distinctive and attractive commercial, office, and industrial park area
which can provide for the long term economic viability of the community. In addition,
LOCI provides policies and programs aimed at establishing a range of employment and
business opportunities to provide a sound economic base and ensure that new development
generates sufficient revenue to support public service needs and quality environmental,
social, and educational opportunities. LOC 14 also encourages land uses that provide jobs
and services for residents that fit within the city's character.
The project, as proposed, will provide additional service to surrounding residents and
provide increased property taxes once the site has been developed.
FINDING: The proposed project or use satisfies all applicable provisions of the Zoning
Ordinance
FACT: The proposed mini -storage facility can be permitted though the Conditional Use
Permit process as identified in the Municipal Code. The proposed structures and site plan
are consistent with the applicable provisions of the Atascadero Municipal Code as
conditioned.
FINDING: The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be detrimental
to the health, safety or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in the
vicinity of the use
FACT: The proposed mini -storage facility will be located on a double frontage lot between
El Camino Real and Viejo Camino adjacent to residential, commercial, and recreational
park uses. The site design has been reviewed by all City departments for consistency with
code requirements. The project is proposed to have one access point off of Viejo Camino
Rd. The project is conditioned to construct frontage improvements along Viejo Camino Rd
that will ensure safe traffic patterns in and out of the site in additional to existing park and
residential traffic.
FINDING: The proposed project or use will not be inconsistent with the character of the
immediate neighborhood or contrary to its orderly development
FACT: The proposed project is designed the project to include landscaping along the
exterior of the project to provide visual screening of the storage facility. The project
includes realignment and restoration of the existing ephemeral creek.
FINDING: The proposed use or project will not generate a volume of traffic beyond the
safe capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the land use
element
FACT: The proposed mini -storage facility will be accessed off of Viejo Camino. Mini -
storage facilities are very low traffic generating uses and Viejo Camino, with required
improvements, will be able to accommodate any increases in traffic resulting from the
proposed project. The community meeting space is designed to meet all parking on-site.
Frontage improvements are designed to accommodate community traffic.
FINDING: The proposed project is in compliance with any pertinent City policy or criteria
adopted by ordinance or resolution of the City Council.
FACT: The Design Review Committee has reviewed the proposed project and found the
site plan and elevations to be consistent with the criteria in the City's Design Review
Manual.
2. Findings for Exceptions to the Creek Setback
FINDING: On-site creeks, riparian areas, and site improvements will not be negatively
impacted by a reduced creek setback.
FACT: This project includes the realignment and restoration of the existing ephemeral
stream. The project will be required to meet all building code standards including soils
analysis and compaction. New riparian habitat is included as part of the restoration efforts.
Should wetland habitat be determined to exist on-site prior to construction, habitat
restoration will be incorporated into the project as conditioned.
SECTION 4. CEQA. An initial study was prepared for the proposed project at which
time mitigation measures were identified to reduce the impacts to a less than significant level. A
Draft Mitigated Negative Declaration was posted for public review in accordance with CEQA.
SECTION 5. Approval. The Planning Commission of the City of Atascadero, in a regular
session assembled on May 4, 2021, resolved to approve a Conditional Use Permit to allow for a
mini -storage facility (DEV20-0076) subject to the following:
1. EXHIBIT A: Conditions of Approval
2. EXHIBIT B: Mitigation Monitoring Program
3. EXHIBIT C: Project Design Package
On motion by Commissioner Schmidt and seconded by Commissioner McIntyre, the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Commissioners Anderson, Schmidt, McIntyre, and Carranza (4 )
NOES: Commissioners Keen, Hughes, and van den Eikhof (3 )
ABSTAIN: None
ABSENT: None ( )
ADOPTED: May 4, 2021
CITY OF ATASCADERO, CA
Jeffen Eikhof
Planning Commission Chairperson
Attest:
Phil Dunsmore
Planning Commission Secretary
EXHIBIT A: Conditions of Approval
DEV20-0076
Conditions of Approval
Timing
Responsibility
/Monitoring
Conditional Use Permit
BL: Business License
PS: Planning Services
Mini Storage Facility
GP: Grading Permit
BP: Building Permit
BS: Building Senrices
FD: Fire Deparlment
11450 Viejo Camino / 11505 EI Camino Real
FI: Final Inspection
TO: Temporary
PD: Police Department
CE: City Engineer
Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
1. This Conditional Use Permit shall be for a mini -storage facility as described in
Ongoing
PS
attached Exhibits, located at 11505 EI Camino Real and 11450 Viejo Camino
(APN 045-342-009, 045-342-010), regardless of owner.
2. The approval of this use permit shall become final and effective the date of the
Ongoing
PS
hearing. Issuance of building permits may not occur prior to the appeal period of
fourteen (14) days following the Planning Commission approval.
3. The Community Development Department shall have the authority to approve the
Ongoing
PS, CE
following minor changes to the project that (1) modify the site plan project by less
than 10%, (2) result in a superior site design or appearance, and/or (3) address a
construction design issue that is not substantive to the Conditional Use Permit.
4. Approval of this Conditional Use Permit shall be valid for twenty-four (24) months
BP
PS
after its effective date. At the end of this time period, the approval shall expire
and become null and void unless the project has received a building permit or a
time extension.
5. The owner and applicant shall defend, indemnify, and hold harmless the City of
Ongoing
CA
Atascadero or its agents, officers, and employees against any claim or action
brought to challenge an approval by the City, or any of its entities, concerning this
conditional use permit.
Planning Services
6. A public access easement shall be provided over the area of the sewer
BP
PS
easement to allow for a pedestrian path. The easement document shall be
recorded prior to permit issuance. The easement document shall include
provisions of the continued maintenance of the pathway.
7. The pedestrian pathway shall be constructed to the satisfaction of the City
BP
CE
Engineer and shall provide a minimum of 8 -feet of pavement width to
accommodate maintenance/service vehicle access. Landscaping adjacent to
the path shall be designed to enhance safety and visibility. Fencing shall be
included between the path and the creek to limit pedestrian access to the
riparian zone. Fencing shall be low split rail fencing. Fencing adjacent to the
neighboring residential use property shall be privacy fencing unless
transparent fencing is agreed to by the adjacent property owner.
8. The developer shall record the lot merger prior to issuance of any construction
BP
PS
or grading permit.
9. All project signage shall be limited to 40 square -feet per frontage and shall not
BP
PS
be illuminated whether internally or externally.
10. Development perimeter fencing shall be high-quality wrought iron fencing.
BP
PS
Landscaping shall be installed at a density to screen the facility and fencing.
Should the undeveloped portion of the site be fenced, fencing shall be split rail
style wood fencing. All fencing shall be maintained in perpetuity.
11. Landscaping shall be maintained in perpetuity in a manner that provides
BPI
PS
screening of the facility from the adjacent neighborhood. Any dead or deficient
Ongoing
landscaping shall be replaced immediately, to the satisfaction of the City.
12. All retaining walls shall be constructed of the stamped ECO block or similar
BP
PS
naturalized textured block consistent with EXHIB C sheet A101.
13. Street trees shall be provided along the EI Camino Real and Viejo Camino
BP
PS
frontages. EI Camino trees shall be planted at 30 -feet on center and shall be
London Plane Sycamores. Trees along Viejo Camino shall include a variety of
species and may be installed in natural groupings, subject to the approval of
the City Engineer.
14. Screening landscaping shall be installed along all property frontages outside of
the right-of-way. Landscape shall be designed in such a way to adequately
screen any blank walls as viewed from the adjacent roads.
15. All street and on-site trees shall be maintained in perpetuity in a manner that
Ongoing
PS
allows the trees to grow to their natural canopy width and height.
16. All mechanical equipment on site shall be screened, including all ground and
BPI
PS
roof mounted equipment, air conditioners, transformers, etc.
Ongoing
17. All utilities on site shall be installed underground.
BP
PS
18. Any undeveloped portions of the site shall be landscaped with native
BPI
PS
groundcovers and seed mixes and shall be maintained free of weeds or
Ongoing
invasive species.
19. All mitigation measures identified in the Mitigation Monitoring Program
BPI
PS
(EXHIBIT B) are considered conditions of approval for this project and shall
Ongoing
be adhered to and enforced as project conditions.
20. The drivable path over the sewer easement shall include appropriate design
BPI
CE
features to discourage public vehicular access, to the satisfaction of the City
Ongoing
Engineer.
21. Hours of operation for the facility shall be as follows:
Ongoing
PS
■ Office Hours: 8am-5pm
■ Access Hours: 6am-9pm
22. All exterior site lighting shall be placed on motion sensor dimmers and shall
BPI
PS
be maintained at low lighting levels unless the motion sensor is activated.
Ongoing
Should this not be feasible in one light, a dual lighting system may be used
with the same effect.
23. Building E shall provide 11 -feet of landscape area on the applicant's property.
Landscaping shall include street trees spaces a maximum of 30 -feet on -
center to be located outside the City Right-of-way. Landscaping shall include
screening materials. Landscaping will still allowing access to the rear of
Building E for maintenance.
24. The community meeting spaces shall be eliminated and replaced with
BP
PS
conditioned storage units
25. An open space easement shall be placed over the unused portion of the
BP
PS
property south of the development pad.
26. Parking shall be reduced to provide the minimum required by code for the
storage use. Additional landscaping shall be included in this area.
Building Services
27. New buildings shall conform to all Building Code requirements including
BP
BS
permitting, room sizes, restrooms, exiting, path of travel, etc. Inclusion of the site
plan with this Conditional Use Permit does not provide relief from standard
Building Codes in place at the time of submittal of building permits.
The owner or applicant shall obtain a building permit prior to beginning any
demolition or construction work on site.
Public Works
28. A FEMA issued CLOMR must be received by the City Engineer prior to
BP
CE
issuance of any Building Permit.
29. The entry driveway shall be designed to align with Bocina Lane to the
greatest extent possible, subject to the satisfaction of the City Engineer.
30. The Developer shall construct new frontage improvements along Viejo
PI
CE
Camino consisting of a 6 -ft wide integral curb -gutter -sidewalk, and shall widen
the road to complete a road section comprised of class 2 bike lanes, one
travel lane in each direction, a center turn lane, and on -street parking
adjacent to the development site, to the satisfaction of the City Engineer. The
new driveway approach shall include an integral 4 -ft wide sidewalk per San
Luis Obispo County Standard Drawing Nos. B-3, B -3a and B -3c.
31. The Developer shall complete road striping and signage on Viejo Camino to
PI
CE
accommodate left -turns into the subject property in coordination with the
southbound left -turn lanes to the apartment complex entrance and La Paloma
Ct., to the satisfaction of the City Engineer.
32. The Developer shall construct new frontage improvements on EI Camino Real
PI
CE
consisting of a 6 -ft wide integral sidewalk -curb -gutter per City Standards and
to the satisfaction of the City Engineer. The alignment of the new frontage
shall accommodate a 5 -ft wide bike lane. The back of sidewalk shall have a
shoulder sufficient to support the new sidewalk. The new frontage
improvement adjacent to the existing culvert may require the construction of a
pedestrian guardrail depending on the grade differential between the back of
sidewalk and the adjacent grade within 5 -ft. All improvements shall be to the
satisfaction of the City Engineer.
33. This project shall connect to the public sewer main at a location approved by
BP
PW
the City Engineer.
34. Any work within the public sewer easement shall not compromise the existing
Ongoing /
PW
sewer main and shall not preclude or restrict access to the sewer main by City
BP
crews or equipment. Any work within the sewer easement shall be approved
by the City Engineer.
35. Other conditions imposed upon this project shall not compromise the public
Ongoing /
PW
sewer main or sewer easement and shall be subject to the approval or
BP
rejection by the City Engineer. This includes, but is not limited to, creek
realignment and reconstruction.
36. Following completion of site grading and prior to a Final Inspection, the
BP
PW
Developer shall obtain a FEMA LOMR (based on fill) for the revised flood
zone.
37. The applicant shall record a mechanism against the property to restrict
vehicular access rights along both road frontages except where the proposed
driveway is to be located. Modifications may be granted in the future by the
City Engineer based on proposed alterations to site use and updated traffic
analysis.
Fire Department
38. New facilities shall conform to all Fire Code and City Fire Department Policy
BP
FD
requirements including, but not limited to, driveway slope and length, fire truck
access, location of fire hydrants, and fire sprinklers.
39. Auto turn software shall be run on the final project design and turning
BP
FD
diagrams shall be included as part of the building permit submittal package.