Loading...
HomeMy WebLinkAboutPC Resolution 2020-0012RESOLUTION PC 2020-0012 CITY of ATASCADERO PLANNING RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING A CONDITIONAL USE PERMIT (MASTER PLAN OF DEVELOPMENT) AND VESTING TENTATIVE SUBDIVISION MAP (TRACT 3161), FOR THE ANNEX RESIDENTIAL PROJECT ANNEX SUBDIVISION WHELEN / MP ANNEX, LLC (RECON20-0078) WHEREAS, an application has been received from Whelen Consulting (PO Box 5021, San Luis Obispo, CA 93401) applicant, and owner, Annex MP, LLC (284 Higuera Street, San Luis Obispo, CA 93401), to consider a reconsideration of a project consisting of a Master Plan of Development, and Vesting Tentative Subdivision Map on a portion of two existing lots with the subdivision area comprising 1.67 acres located at 1827 & 1843 El Camino Real, Atascadero, CA 93422 (APN 049-102-032, and 020); and WHEREAS, the site's current General Plan Land Use Designation is Single Family Residential (SFR -X); and WHEREAS, the site's current Zoning District is Residential single Family (RSF-X) with a Specific Plan Overlay Zone (SP -2); and WHEREAS, The adopted Del Rio Road Commercial Area Specific Plan requires approval of a Master Plan of Development in the form of a Conditional Use Permit (CUP) to promote orderly and harmonious development and to enhance the opportunity to best utilize special site characteristics; and WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and NOW, THEREFORE BE IT RESOLVED by the Planning Commission of the City of Atascadero: SECTION 1. Recitals: The above recitals are true and correct. SECTION 2. Public Hearin-. The City Council of the City of Atascadero, at a Public Hearing held on November 12, 2019 resolved to approve the proposed zoning text amendments. SECTION 3. Facts and Findings. The City Council makes the following findings, determinations and approvals with respect to the Municipal Code Text Amendments: A. Findings for Approval of a Conditional Use Permit FINDING: The proposed project or use is consistent with the General Plan. FACT: The proposed project is consistent with the intention of Residential Single -Family Development, as envisioned by the Del Rio Road Commercial Area Specific Plan. The proposed project meets the underlying zoning ordinance's prescribed minimum density requirements for 4 units per acre. FINDING: The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including provisions of the Del Rio Road Commercial Area Specific Plan FACT: The proposed project meets all the development standards outlined in the Del Rio Road Commercial Area Specific Plan and all applicable provisions of the Atascadero Municipal Code. FINDING: The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use. FACT: The proposed project will not be detrimental to the health, safety or welfare of the general public or persons residing or working in the vicinity as the proposed project includes residential uses that are consistent with the City's underlying zoning (RSF-X), as well as consistent with the goals and policies of the City's General Plan and Housing Element. Residential uses will not involve hazardous waste handling. FINDING: The proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development. FACT: The proposed project is consistent with the immediate neighborhood as it shares similar roadway geometrics, and additionally is proposed with similar PD -17 overly zone standards applied to the adjacent residential development. FINDING: The proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. FACT: The proposed project will generate 60 average new daily trips consistent with the certified Del Rio Road Commercial Area Specific Plan FEIR and subsequent 2017 and 2020 addendums and will continue to operate at an acceptable level of service with the proposed project, as well as what is considered build -out for the General Plan. The proposed project will be required to pay its fair share of intersection improvements to the Del Rio Road / El Camino Real intersection and the Del Rio Road / US Highway 101 interchange, consistent with the Del Rio Road Commercial Area Specific Plan and adopted improvement projects, subject to the satisfaction of the City Engineer. FINDING: The proposed project is in compliance with any pertinent City policy or criteria adopted by ordinance or resolution of the City Council, including the City's Appearance Review Manual and the Inclusionary Housing Policy. FACT: The proposed project is conditioned to meet the City Council's adopted Inclusionary Housing Policy and provide affordable housing units for individuals or families with incomes ranging from very -low, low, and moderate income, The proposed project has annexed into the City's Community Facilities District to make the proposed project fiscally neutral. The proposed project meets the requirements of the governing Specific Plan. Therefore, the project, as proposed, is in compliance with pertinent City policies established by the City Council. B. Findings for Approval of Vesting Tentative Tract Map (TR 3161) FINDING: The proposed subdivision, design and improvements as conditioned, is consistent with the General Plan and applicable zoning requirements, including provisions of the Del Rio Road Commercial Area Specific Plan. FACT: The proposed project is consistent with General Plan Land Use Circulation and Housing Element Policies. The adopted governing Specific Plan allows for development of the residential portion of this parcel at a maximum base density of 4du/acre. As proposed, the project is consistent with the Del Ro Road Commercial Area Specific Plan concept and standards. FINDING: The proposed subdivision, as conditioned, is consistent with the proposed Master Plan of Development. FACT: The subdivision is consistent with the currently proposed Master Plan of Development. FINDING: The site is physically suitable for the type of development proposed. FACT: The site is generally flat and improvements have been installed to serve each lot. FINDING: The site is physically suitable for the density of development proposed. FACT: The site is located at the terminus of South Mirasol Way and is adjacent to larger lot single-family to the east and commercial property to the west. The project will extend South Mirasol Way and provide for additional residences that maintain a similar lot development pattern. The project also acts as a buffer between commercial and more rural single-family residential uses. FINDING: The design and improvement of the proposed subdivision will not cause substantial environmental damage or substantially and unavoidably injure fish and wildlife or their habitat. FACT: environmental impacts have been fully addressed in the certified Final EIR and subsequent addendums. No substantial damage will occur to the environment or known habitat areas. FINDING: The design of the subdivision or the type of improvements will not cause serious health problems. FACT: The design of the subdivision or the type of improvements will not cause serious health problems. Road geometries have been reviewed by the City Engineer and comply with current standards. FINDING: The design of the subdivision will not conflict with easements acquired by the public at large for access through, or the use of property within, the proposed subdivision; or substantially equivalent alternative easements are provided. FACT: The site is private property and no easements for public use exist at this time. FINDING: Covenants, Conditions and Restrictions (CC&R's) or equivalent shall be required that incorporate the Master Plan of Development conditions of approval to ensure that the site retains the proposed qualities (architecture, colors, materials, plan amenities, fencing, and landscaping) over time. FACT: A condition of approval has been included in the attached resolution, requiring CC&R's be recorded concurrently with the final map. FINDING: The proposed subdivision design and type of improvements proposed will not be detrimental to the health, safety or welfare of the general public. FACT: The proposed residential use will not be detrimental to the health, safety, or welfare of the general public or persons residing in the neighborhood. A residential use is consistent with the surrounding neighborhood to the east, and acts as a transition from adjacent commercial uses on El Camino Real. The road has been designed to meet all City, State, and Federal standards. SECTION 4. CEQA. The project is consistent with the Final Environmental Impact Report, SCH No. 20100051034, Del Rio Road Commercial Area Specific Plan, which was certified on June 26, 2012 by the City Council of the City of Atascadero, in accordance with the requirements of the California Environmental Quality Act (CEQA) and subsequent 2017 and 2020 addendums. SECTION 5. Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on October 20, 2020 resolved to approve a master plan of development and vesting tentative tract map consistent with the following: 1. EXHIBIT A: Conditions of approval / Mitigation Monitoring Program 2. EXHIBIT B: Tentative Tract Map (TR 3161) 3. EXHIBIT C: Master Plan of Development / Site Plan 4. EXHIBIT C: Landscape Plan 5. EXHIBIT D: Elevations / Floor Plan 6. EXHIBIT E: Colors and Materials Board 7. EXHIBIT F: Grading and Drainage Plan 8. EXHIBIT G: Utility Plan On motion by Commissioner Anderson and seconded by Commissioner Wolff the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: Commissioners Anderson, Wolff, Keen, Shaw, van den Eikhof, Zirk and Dariz (7) NOES: None (0) ABSTAIN: None ABSENT: None ADOPTED: October 20, 2020 CITY OF ATASCADERO, CA ark Dariz Planning Commission Chairperson Attest: Phil Dunsmore Planning Commission Secretary (0) Exhibit A! Conditions of Approval . City of Atascadero RECON20-0078, PLN 2017-1647 ANNEX SUBDIVISION 1827 & 1843 EL CAMINO REAL PARENT APN 049-102-032, 020 (PORTIONS) The following conditions of approval apply to the project referenced above. The conditions of approval are grouped under specific headings that relate to the timing of required compliance. Additional language within a condition may further define the timing of the required compliance. A. The following conditions shall be satisfied PRIOR TO THE RECORDATION OF A FINAL MAP, or at the time specified in the condition. Vesting Tentative Subdivision Map for all lots proposed in Tract 3161 was deemed complete on October 12, 2020, for the purposes of vested development rights and fees consistent with the Subdivision Map Act of the State of California. General Conditions. The project shall be consistent with, and governed by, the Del Rio Road ❑ PLN Commercial Area Specific Plan as amended in 2020 including the following: • Annexation into the City's Community Facilities District prior to recordation of the Final Map; • Payment of Affordable Housing In -Lieu Fee at the time of building permit issuance based on 5% of the valuation of each unit; • Fair Share payment of US Highway 101 / Del Rio Road interchange fees based on the 2020 Traffic analysis update for the Del Rio Rd Specific Plan Amendment; • Fair Share payment of intersection improvements to Del Rio Road / EI Camino Real based on the 2020 Traffic analysis update for the Del Rio Rd Specific Plan Amendment; • All pertinent mitigation measures contained in the Mitigation Monitoring Program for the Del Rio Road Commercial Area Specific Plan. The emergency services and facility maintenance costs listed below shall be ❑ PLN 100% funded by the project in perpetuity. The service and maintenance costs shall be funded through a community facilities district established by the City at the developer's cost. The funding mechanism must be in place prior to or concurrently with acceptance of the final maps. The funding mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above mentioned funds shall be by the City. Developer agrees to participate in the community facilities district and to take all steps reasonably required by the City with regard to the establishment of the district and assessment of the property. • All Atascadero Police Department service costs to the project. • All Atascadero Fire Department service costs to the project. • Off-site common City of Atascadero park facilities maintenance service costs related to the project. 3. Prior to recordation of the Tract Map, the Applicant shall establish a benefit ❑ PLN maintenance assessment district, Property Owners' Association, or similar funding mechanism approved by the City, to provide sufficient funds on an annual basis to pay for the operation, maintenance and future replacement of privately owned -in -common subdivision improvements. The engineer of record shall prepare and submit an estimated operating budget and capital improvement replacement analysis for review and approval by the City Engineer, prior to recordation of the Parcel Map. 4. Prior to recording the Final Map, the Applicant shall have the map reviewed by ❑ PWD the public utility providers for power, telephone, gas, cable TV, and the Atascadero Mutual Water Company. The Applicant shall obtain a letter from each utility company stating that the easements and rights-of-way shown on the map for public utility purposes are acceptable. 5. Documents that the City of Atascadero requires to be recorded concurrently with ❑ PWD the Final Map (e.g.: off-site rights-of-way dedications, easements not shown on the map, agreements, etc.) shall be listed on the certificate sheet of the map. 6. The City of Atascadero may require an additional map sheet for information ❑ PWD purposes in accordance with the Subdivision Map Act. 7. Public improvement plans (PIPs) shall be prepared by a licensed civil engineer. ❑ PWD PIPs shall be prepared on 24"x36" plan sheets and in accordance with Section 2 of City Standard Specifications. 8. The Applicant is responsible for all right-of-way acquisitions and associated ❑ PWD costs. 9. Roadway signing and striping shall be in accordance with the California Manual ❑ PWD on Uniform Traffic Control Devices (CA-MUTCD) and shall be located to provide adequate warning of the traffic calming improvements associated with speed reduction. 10. All plans shall contain the City of Atascadero "Standard Notes for Improvement ❑ PWD Plans" on file in the City Engineer's office. A. Off -Site Road Improvements 11. The Subdivider shall overlay or reconstruct that portion of the existing South ❑ PWD Mirasol Way affected by the extension of the sewer main, to the satisfaction of the City Engineer B. On -Site Roadways 12. The horizontal and vertical design of roads shall be in compliance with the City ❑ PWD of Atascadero Engineering Standards and Standard Specifications, to the satisfaction of the City Engineer. The City Engineer reserves the right to make modifications to all submitted road designs, when in the opinion of the City Engineer, the public's health and safety is benefitted. 13. The design of structural pavement sections shall be based on a Traffic Index ❑ PWD (TI) = 5.5 and a 50 -year design life. New roads with pavement placed prior to the construction of buildings will be subjected to additional construction traffic and wear associated with the on-site construction not included in the design life of the pavement section. Therefore to off -set this, the AC thickness shall be increased from that which is derived from Caltrans method by either: • 1" if the pavement is placed prior to building construction (not phased). • 1.5" if the pavement construction is phased (i.e. — a portion of the ultimate pavement thickness is deferred and a final pavement cap placed prior to final inspection). Final pavement cap shall not be less than 1.5". 14. Street centerline monuments shall be provided at intersections and at the ❑ PWD beginning and end of curves along the street centerline. 15. Roadway signing, striping, and traffic signal modifications shall be in ❑ PWD accordance with the California Manual on Uniform Traffic Control Devices (CA- MUTCD) and shall be designed and constructed to the satisfaction of the City Engineer. 16. Prior to recordation of the Final Map, the Applicant shall establish a benefit ❑ PWD maintenance assessment district, or similar funding mechanism approved by the City, to provide sufficient funds on an annual basis to pay for the operation, maintenance and future replacement of the internal road system serving Tract 3104, including but not limited to: • Pavement, pavement seals, aggregate base, road frontage improvements • Striping, signage, street furniture • Drainage facilities, detention basins, retention basins, bio-swales, & storm water treatment/control measures • Maintenance of slopes containing the road prism • Prior to recordation of the Final Map, the Applicant's engineer shall prepare and submit an estimated operating budget and capital replacement analysis for review and approval by the City Engineer. 17. Pavement and base sections shall be designed and constructed in accordance ❑ PWD with the City ofAtascadero Engineering Standards and Standard Specifications. When said standards and specifications are not clear, lack necessary details, or are silent, the minimum standard shall be based upon the current edition of the San Luis Obispo County Public Improvement Standards or Caltrans Standard Drawings and Standard Specifications, as determined by the City Engineer. C. Grading 18. Where cut/fill slopes are visible from a roadway, slopes shall be contour graded ❑ PWD to eliminate angular daylight/catch points and shall blend into the adjacent topography to the extent feasible, to the satisfaction of the City Engineer. 19. All finish graded areas shall be landscaped or revegetated using a native seed ❑ PWD mixture and shall demonstrate at least 70% ground coverage before final inspection. D. Stormwater 20. A Storm Water Pollution Prevention Plan (SWPPP) is required prior to any ❑ PWD ground disturbing activities. The WDID number provided upon acceptance of the SWPPP into the State's SMARTS system registration shall be noted on the Title Sheet of the Public Improvement Plans. 21. Common drainage basins (serving multiple lots) shall be designed to desilt, ❑ PWD detain and meter storm flows in accordance with City regulations. 22. Storm Sewer shall be of either cast -in-place or precast reinforced concrete pipe, ❑ PWD polyvinyl chloride pipe, high density polyethylene pipe or an approved equal. • Minimum pipe diameter allowable on any storm drain within a roadway or road right-of-way shall be 18" diameter. A lesser size may be used for down drains on fill slopes if approved by the City Engineer. • Minimum design velocity in closed conduits shall be 2 f.p.s. when conduit is flowing to capacity and should not exceed 15 f.p.s. • Closed conduits shall be designed to convey the 10 -year storm flow with gravity flow, the 25 -year storm flow with head, and provide a safe overland route for the conveyance for the 100 -year storm overflow. • Storm Sewer Manholes shall be located at junction points, changes in gradient, and changes in conduit size to the satisfaction of the City Engineer. On curved pipes with radii of 200' to 400', manholes shall be placed at the BC or EC of the curve and on 300' maximum intervals along the curve. On curves with radii exceeding 400', manholes shall be placed at the BC or EC of the curve and on 400' maximum intervals along the curve for pipes 24" and less in diameter and 500' maximum intervals along the curve for pipes greater than 24" in diameter. Curves with radii less than 200' will be handled on an individual basis and approved be the City Engineer. • Spacing of manholes or inlets, of such size as to be enterable for maintenance, shall not exceed 500' for drains 24" and smaller diameter and 600' for pipes greater than 24" in diameter, except under special conditions as approved by the City Engineer. The spacing of manholes shall be nearly equal wherever possible. • Manholes or junction boxes, entry to which does not fall in the gutter line, must have standard 24" diameter manhole covers. Those falling in the gutter line may use the standard grated manhole cover and serve also as an inlet manhole. • Storm Drain Inlets shall be spaced so that gutter flow does not exceed a depth of 6" at the face of the curb for a 10 -year storm and so that a 25 -year storm flow will not cause damage and can be contained within the right-of-way. 23. Prior to approval of subdivision improvement plans, the project engineer shall ❑ PWD provide calculations and a report confirming compliance with City regulations and the low -impact development requirements contained in the previously approved EIR and Master Plan of Development for the Walmart/Annex development. 24. When a Storm Water Operation - Maintenance Plan (OMP) is required for an ❑ PWD individual lot or group of lots, the City Engineer can require the OMP to be recorded as an agreement against each property. When recordation of an OMP agreement is required, the agreement shall contain provisions allowing the City to enter the property, following reasonable notice to the property owner or tenant, to conduct an inspection of the storm water system and post - construction storm water management controls. 25. When an OMP is required, the OMP shall include a section addressing annual ❑ PWD inspection and reporting to the City by a third party, to the satisfaction of the City Engineer. 26. Where storm water is concentrated as a result of new improvements, the ❑ PWD drainage shall be conveyed in a non-erosive, controlled condition to an adequate point of discharge, to the satisfaction of the City Engineer. Where concentrated drainage from new improvements cannot be avoided and crosses more than one property, appropriate easements may be required. 27. All stormwater management improvements to be owned or managed by the ❑ PWD HOA shall be identified in an Operation and Maintenance Plan/Agreement (OMP) and shall be recorded concurrently with the Final Map. The OMP shall include a financial plan addressing annual and long-term maintenance as well as replacement. Specific requirements for stormwater management may be required to be identified on an additional Final Map information sheet. E. Flood Control Basins 28. Flood control basins are utilized in the City of Atascadero, as determined ❑ PWD appropriate depending upon site conditions: Retention basins, Detention basins, and Subsurface Infiltration Basins. In all cases, the Project Engineer shall provide evidence that the basin will completely drain within seven (7) days to the satisfaction of the City Engineer. Retention Basin. Any drainage basin which is used as a terminal disposal facility shall be classified as a retention basin. a. Basin Capacity. The basin capacity is to be based on the theoretical runoff from a 50 -year storm, 10 -hour intensity for 10 - hour duration. No reduction in required capacity shall be given for soil percolation rates. b. Percolation Test Required. A minimum of 3 percolation tests per basin shall be submitted to the City Engineer for review and approval prior to approval of the plans. The project engineer shall submit calculations and a report demonstrating the basin will drain within seven -days of a single storm event as noted above. Deep soil borings may be required in areas where there is concern of shallow depth to groundwater or bedrock. Percolation tests shall be performed at depths below the basin bottom. Detention Basin. Any drainage basin which has a downstream outlet designed to meter the outflow shall be classified as a detention basin. Basin capacity shall be based on receiving the runoff from a 50 -year storm with the watershed in its fully -developed condition, and releasing the flow equivalent to the runoff from a 2 -year storm with the project site in its pre- development condition. The outlet shall release water in a non-erosive manner. Subsurface Infiltration Basins. Subsurface basins may be used for either retention or detention of site runoff, where their application is suitable for project conditions. Subsurface basins shall be limited to locations where the depth to seasonally high groundwater is greater than 10 -feet below the deepest portion of the basin. Drain Rock. Drain rock shall be clean, crushed granite (or clean, angular rock of similar approved hardness) with rock size ranging from 1 -1/2 -inch to 3/4 - inch. Rock gradation shall conform to the Specification of ASTM C-33 #4. Operational Requirements. i. Water quality of inflow (both sediment and chemical loading) may require pretreatment or separation ii. Maintenance plan, including provisions for vehicular access and confined -space entry safety requirements, where applicable iii. A safe overflow path shall be identified on the plan and may require easements Easement Requirements. All drainage basins accepting runoff from roads, streets or other common ownership areas shall be located in an easement offered for dedication to the public. Reversionary clauses shall not be permitted. If a fence is required it shall be located not more than 4 -inches inside the drainage easement line, except where setbacks are required as part of the land use permit or by the Land Use Ordinance. Overflow Path Required. The design of all drainage basins shall identify the designated route for overflow. The Project Engineer shall design the overflow path so that the flow in a 100- year storm is non-erosive and will not damage downstream improvements, including other basins. Easements may be required for concentrated flows across multiple properties. F. Water Distribution System 29. The Applicant shall extend the water distribution system to the satisfaction of ❑ PWD the Atascadero Mutual Water Company (AMWC) and City Engineer. 30. The water system shall include easements outside of the road rights-of-way for ❑ PWD water system facilities as required by the AMWC and to the satisfaction of the City Engineer 31. Each lot shall be served with a separate water lateral and meter in accordance ❑ PWD with the AMWC requirements. 32. Where the water distribution system requires an above ground reduced ❑ PWD pressure unit, pressure booster station or other significant above ground facility, said facility shall be located in an easement contiguous to the road right-of-way and shall include visual screening, to the satisfaction of the AMWC, Community Development Director, and City Engineer. 33. Fire hydrant locations shall be to the satisfaction of the City Fire Marshall. ❑ PWD 34. Properties and/or areas that are managed or owned by the HOA shall be ❑ PWD metered separately to the satisfaction of the AMWC. G. Wastewater Collection System 35. The gravity sewer system serving Tract 3104 and extending off-site shall be ❑ PWD offered to the public including easements necessary for the operation, maintenance and replacement of the system. The wastewater collection system shall be designed and constructed in accordance with City standards and specifications, to the satisfaction of the City Engineer. 36. Prior to recordation of the Final Map, the Applicant shall establish a benefit ❑ PWD maintenance assessment district, or similar funding mechanism approved by the City, to provide sufficient funds on an annual basis to pay for the operation, maintenance and future replacement of the wastewater collection system serving Tract 3104 (both on-site and the off-site extension). The engineer of record shall prepare and submit an estimated operating budget and capitol replacement analysis for review and approval by the City Engineer, prior to recordation of the Final Map. 37. Gravity sanitary sewer (SS) mains shall terminate in manholes. ❑ PWD 38. Gravity SS mains shall be a minimum of eight (8) inches in diameter. ❑ PWD 39. Each lot served by the wastewater collection system shall pay all sewer fees ❑ PWD prior to the issuance of a building permit. 40. The on-site sewer laterals shall be privately owned and maintained by individual ❑ PWD lot owners. H. Easements 41. A 6 -feet wide Public Utility Easement (PUE) shall be dedicated contiguous to ❑ PWD the road rights-of-way. 42. Road slope easements shall be dedicated where the road prism cut/fill slopes ❑ PWD extend beyond the right-of-way. The easement shall extend not less than five feet (horizontally) beyond any daylight or catch line of the graded slope or other required road facility (such as a brow ditch, retaining wall, drainage swale, etc.), to the satisfaction of the City Engineer. 43. Driveways serving more than one lot may require an easement for ❑ PWD ingress/egress, public & private utilities, and drainage, to the satisfaction of the City Engineer. 44. Drainage easements: ❑ PWD • Easements shall be dedicated over areas containing drainage improvements that benefit or serve more than one property. The determination as to whether the easement is private or offered to the public will be determined by the City Engineer prior to approval of the subdivision improvement plan and Final Map. • Concentrated cross -lot drainage shall be avoided where possible; when required, concentrated drainage shall be conveyed via appropriate easements, to the satisfaction of the City Engineer. • Development on any lot that blocks or changes a natural drainage course may be required to provide an easement for the benefit of upstream tributary properties to an adequate point of discharge, to the satisfaction of the City Engineer. 45. Wherever an easement is created for commonly owned or operated ❑ PWD improvements for the benefit of more than one lot, there shall also be created a maintenance and operations agreement, to the satisfaction of the City Engineer and City Attorney. 46. Easements that are not intended to continue in perpetuity shall not be shown on the Final Map and shall be recorded by separate instrument. Utilities 47. New utility distribution systems and services shall be constructed underground, ❑ PWD to the satisfaction of the City Engineer. 48. Each lot shall be served with separate services for water, sewer, gas, power, ❑ PWD telephone and cable TV. Utility laterals shall be located and constructed to each lot in accordance with City Standards and Standard Specifications B. The following conditions shall be satisfied prior to the issuance of the first of any DEMOLITION PERMIT, BUILDING PERMITS, SUBDIVISION IMPROVEMENTS, or at the time specified in the condition. 1. A landscape and irrigation plan shall be approved prior to the issuance of building ❑ PLN permits and included as part of site improvement plan consistent with EXHIBIT C and must include the following: • All exterior meters, air conditioning units and mechanical equipment shall be screened with landscape material and/or architecturally compatible features. 2. All project fencing shall be installed consistent with EXHIBIT C and details must be ❑ PLN submitted and approved as a part of landscaping plan. 3. Fire hydrant locations shall be located within the development to the satisfaction of the ❑ FD City Fire Marshall, if required. 4. Properties and/or areas that are managed or owned by the HOA shall be metered ❑ PWD separately. C. The following conditions shall IMPLEMENTED DURING THE CONSTRUCTION PHASE OF THE PROJECT. 5. All site work, grading, and site improvements shall be in substantial conformance with ❑ PLN the Master Plan of Development as shown in any of the enclosed exhibits. D. The following conditions shall be met prior to the RELEASE OF UTILITIES, FINAL INSPECTION, OR ISSUANCE OF A CERTIFICATE OF OCCUPANCY, whichever occurs first. 6. All landscaping is to be installed at each individual lot prior to final inspection. ❑ PLN E. The following conditions shall be complied with AT ALL TIMES that the use permitted by this planning application occupies the premise, and shall be applied to the project in perpetuity until such time that the use is extinguished. 7. The entitlement described at the location per this resolution is determined to be vested ❑ PLN with the property upon issuance of a building permit. 8. Approval of this entitlement shall be final and effective consistent with Atascadero ❑ PLN Municipal Code (AMC) section 9-1.111 seq. et. al. 9. Project construction must be in accordance with provided Exhibit(s), adopted with this ❑ PLN Resolution. Changes to architecture, landscaping design, and non -substantive subdivision design may be approved by the Design Review Committee (DRC). 10. In accordance with the Atascadero Municipal Code section 9-8.105, any violation of ❑ PLN any of the conditions of approval is unlawful and may be cause for revocation of this entitlement and subject the applicant and/or future property owners to the penalties set forth in the Atascadero Municipal Code, as well as any other available legal remedies. 11. The applicant shall agree to indemnify and defend at his/her sole expense any action ❑ CM brought against the City, its present or former agents, officers, or employees because of the issuance of this approval, or in any way relating to the implementation thereof, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any court costs and attorney's fees which the City, its agents, officers or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action, but such participation shall not relieve applicant of his/her obligations under this condition. 12. Should the described use be abandoned or extinguished, the property may be used ❑ PLN and / or developed with any use allowed by the underlying zoning district. **END CONDITIONS** EXHIBIT B -VESTING TENTATIVE Subdivision MAP EXHIBIT C: MASTER PLAN OF DEVELOPMENT / SITE PLAN EXHIBIT D: LANDSCAPE PLAN r _ 1 ♦ l- ; 4 _ 1 "sr SEG 20 ; s x � 6 (7 x EXHIBIT D— LANDSCAPE PLAN WALLS ZFENCES i i � \/ . �. �q!|l �|•i� 2�|! \ $#f| , e._ � }�������`� |- } ■,f7|�. _ ! ! ! | ■| i � EXHIBIT E: ELEVATIONS / FLOOR PLAN UPPER FLOOR PLAN zram:•-a-n� HftkFK'11M3 ua. aim. s„y awae xn� ..aw LOWER FLOOR PLAN ®1 mill.add HftkFK'11M3 ua. aim. s„y awae xn� ..aw LOWER FLOOR PLAN UPPER FLOOR PLAN lrjr L- rs In ryl LOWER FLOOR PLAN ELIOPER F --COR PLAN LOWER FLOOR PLAN IL U)I-GIXAS i0l ,fesSil [son In Isms isms Nei Jon" i0l ,fesSil T L11 ON r� Ina i EXHIBIT F: COLOR AND MATERIALS BOARD 11446) color and matmiats -o-, s oY:Serr.3M: r:Aa' "naw F3fet r�r.,�e J^..arrc HmL•enali3m3 #� fiM1ite xwm.ame... Fhsr¢xas •Gym'. YRS 4e '. Rainted Woad Col -x- flim . :mMrY%£raaeecaU RandM'Nood Cdx. b�Corae -- Attltae!b Mire%£:wrvs. •nh¢e x:wzt C-ekxR— a colorand materials aw Cir. Crwr...� F r:Aosnt V Csomakuizattal=3ng CciRr ware C— .fa'-CafPee '. Panted `Nuod Aerwm rmla lentr�gssa3e Y_:+y :'ainisb. Wood r � MSr Rcd L^r ....{6 ctumneq.baavcrs, wtnc x:ensl ___. Ca.W'Rsstic LOT 2 color and materials aRAi :tin Snm�n CU ': VP�R'�.ed:Yaad °sbft ._ r:—cr—: to rcr—:i•:-.,.s*p Cox Hey Genn 5— Fgaa Ift—5— laPtesn F ea Ce- � wao7 .. Vin^wr G 9 PaVaed woad Calrx: CaY. CoH� - 1mrb �rnnez bpeoees., rr•mie nccrn R -w Rxi - Cda: md:un colors' LOT S color and materials aaer =crrQ srym caa:w—� wxd man F EvCo: posgc 1' Groove F•.c�zorrts:yid"m3 Cots Irbsr, Red F .ate Cdu C.%CW. T". MYwd C.�a: r�a7r creY Yert•_ai dd'ry Cdcr vreMtirey AWetffiaR!<tb ctirr� q.bpawrs, whaa ccca[t R va Fx_s �L :ibd ,^.an coloKi LOT 3 color and materials i� CewgAsscM1ifwga Corm: Ch.— man Ca�tY+p;c aae90�/Deers -iDe•giase Cvm xea.krr, ;'i.&d'Nax C a�va. rx aCem19ffiee;'n Jx-.ny. & parrs. ww_ a ocns', -_ Crior �us'2: LOT f color and materials ® reef copnar,sr:n4. Corm: Wm:r—d woad Mftg -------->.cevc�owe�wr�roeal.smy . acswss CIDa'n:i+51Yo.�3 ca«�'rnre-u*et' Arssbt W_(emrylgsfaeeMors; Medco ce Ccior.9 MCAAee _ A..MJA—ia th' ..aeY 6 uaros. eA,exe oca.:Y, C Ro Goa• rW {tan--K.-nsl EXHIBIT G: UTILITY PLAN See Project File for actual plan it L A I EXHIBIT H - GRADING AND DRAINAGE See Project File for actual plan r i e